My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20172826 - Permit
PBA
>
Building
>
Permits
>
G
>
Griset Pl
>
2901 S Griset Pl
>
20172826 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2021 2:55:47 PM
Creation date
10/6/2021 12:00:04 PM
Metadata
Fields
Template:
Permit
Permit Number
20172826
Full Address
2901 S Griset Pl
Permit ID
272671
Master ID Number
2021-164454
Project Name
Miscellaneous Counter1 Permit
Street Number
002901
Street Direction
S
Street Name
Griset
Street Suffix
Pl
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
2/23/2021
Issued Date
2/23/2021
Finalized Date
5/26/2021
Flood Zone
X-0602320259J
Description of Work
Install roof mounted solar panels. Fees paid on 101105946.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PRoCESS FoR SMALL.SCALE PV SYSTEMS <br />STANDARD STRINc SYSTEM <br />The informarion in rhis guideline is intend€d to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an insGllation is more complex. tt is !ikely that 50 %'75 % of all residential <br />systems will comply with rhese simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Required lnfonnation fot Permit: <br />l. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />wirh a f'perimeter space at ridge and sides may not need separate f,re service review. <br />2. Electrical diagram showing PV array confrguration, wiring sysrem. overcurrenr protecrion. rnve(e( disconnects, <br />r€quired signs, and ac connection ro building (s€e supplied srandard electrical diagram). <br />3. Specifrcation sheets and installation manuals (if available) for all manufacturcd components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnecLs. and mounting sysrem. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure? Eyes Eno <br />U No due to non-compliant roo.f or a ground mount. submit completed worksheet.for the structure wKS I . <br />Roof InJonnation: <br />l Is rhe roohng rype lighrweighr (Yes = composirion. lighrweighr masonry, meral, erc.. )composrtron shrngle <br />lf No, submit completed worksheetJor rooJ structure WffSf fNo = heavy masonry, slate, etc...) <br />2. Does rhe roof have a single roof coveringZ Eyes EIr.Io <br />U No , submit completed worhsheet Jor roof stucture WKS L <br />3. Provide method and type of weatherproohng roof penetrations (e.g. flashing. caulk)flashing <br />M ounting Sy st en I nJoftnat ion <br />neered producl designed to mount PV modules with no more than an IS gap <br />beneath the module frames?ves ! I',to <br />If No, provide detqils oJ structurul attachment cetifed by a design prokssionat. <br />2. For manufactured mounting systems. hll out information on the mounring syslem below <br />a Mounting Sysrem Manufacrurer unir2c Produci Name and i\{odel# solar mount <br />b. Total Weigh t of PV lvlodules 3n4 32;15 670 bs <br />c Toral Number of Attachment Point 34 <br />d weighl per Arrachmenr Poinr 1b+c) 19.62 lbs (if grearer rhan 45 lbs, see wKSl) <br />e. Maximum Spacing Berween Attachment Points on a nail 6' inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Total Surface Area of Pv Modules (square feet)288 I ft <br />Distributed Weight of PV Module on Roof (b + f)lbs/ft: <br />U distributed wetght ol the Pv qstem ts grcatet than 5 lbs[f , see wKSl . <br />Step 2, Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system to be considered for an expedited permit process, the following must apply: <br />l. PV modules. utility'inleractive inverters, and combiner boxes are idenrifred for use in Pv systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />5. The total inverter capacity has a continuous ac power ou[put 13.440 Watts or less <br />4. The ac inrerconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One ofrhe srandard electrical diagrams(El.l,El.la,El.lb,orEl.lc)canbeusedtoaccuratelyrepresentthePV <br />sysrem. lnreracrive PDF diagrams are available at www.solarabcs.org/permirting. <br />Fill out the stand.ard. electrical diagram completely. A guide to the electrical diagram is provided to help the applicant <br />undsrstand each blsnk tolll in. U the electical srstem is more complex than the standard electrical diagrdm can elJectively <br />communicate. provide qn alternstive diagram with appropriate detail. <br />2 ExttDrrED PERMTT PRocEss FoR lv sysrEMs <br />L ls lhe mounting structure an en <br />t. <br />g
The URL can be used to link to this page
Your browser does not support the video tag.