Laserfiche WebLink
CITY OF SANTA ANA <br />Planning and Building Agency <br />April 16, 2025 Project Number 25129-25 <br />Page 11 Approved <br />FOR PERMIT ISSUANCE <br />A preconstruction conference should be held between the developer, general contractor, <br />grading contractor, city inspector, architect, and soil engineer to clarify any quBpAipmrnelating to <br />the grading operations and subsequent construction. Our representative A: be present <br />during the grading operations and construction phase to certify that such recommendations are <br />complied with in the field. <br />This geotechnical investigation has been conducted in a manner consistent with the level of <br />care and skill exercised by members of our profession currently practicing under similar <br />conditions in the Southern California area. No other warranty expressed or implied is made. <br />We appreciate this opportunity to be of service to you. If you have any further questions, please <br />do not hesitate to contact the undersigned. <br />Respectfully submitted, <br />NORCAL ENGINEERING <br />l7 No' 841 rT <br />LU <br />Keith D. Tucker Exp.12/3U202.6 <br />Project Engineer I.P 07TECHN��'P�'� <br />R.G.E.841 q\F0 <br />NorCal Engineering <br />Mike Barone <br />Project Manager <br />