Laserfiche WebLink
City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA927O2 Electrical <br />PermitCounter: (714)647-5800 lnspection Requests: (714)667-2738 lnspectorSection: (714)647-5853 <br />Permit #:2O174OOB <br />Pin #: 68 86 <br />Proiect Address: 2021 S Lowell St-a- <br />Assessor's Parcel: 015-149-07 Lot: 9 <br />Unit: <br />Block: NA <br />Bldg. <br />Tract: 1339 <br />Address Range: <br />Historic: No <br />Suite Range: <br />Zoning: Rl <br />Owner: <br />Address: <br />Dawn Mills <br />2021 S Lowell St <br />Santa Ana, CA 927072515 <br />(714I- 4s4-6e38 <br />Fee Type <br />01 116002 5160C General Plan Update <br />01116002 5777C Microfilm Records <br />Amount <br />23.79 <br />4.05 <br />Qty <br />000 <br />000 <br />Fee <br />$0 00 <br />$0 00 <br />Phone: <br />Tenant Name: <br />Contractor: <br />Address: <br />Phone: <br />Momentum Solar <br />539 W Walnut Ave, Suite A <br />Orange, CA 92868 <br />(510) 6s24261 <br />State Lic #: 1026366 <br />Lic Type: C-10, C-39, C46 <br />Bus. Lic #: 368879 <br />Workers' Compensation lnsurance:Carrier: American Zurich <br />Policy #: 441993700 <br />Expires. 0212612022 <br />Building Use: <br />Job Type: <br />Nature of Work: <br />Single Family Dwelling <br />Solar <br />Solar <br />Occupancy: <br />Constr Type: <br />Code: <br />R.3, U <br />VB <br />cEc 2019 Notes: lnstall roof mounted solar panels - fees paid on <br />1 01 1 07580. <br />Planning Conditions: <br />Planning Approval By:Date: <br />Date: <br />Date: <br />Misc. Receipt: <br />Misc. Receipt: <br />Misc. Receipt: <br />Total <br />Plan Checked By: <br />Permit lssued Amsden, Julie 08rl 8t2021 <br />Account#Subject to Field: <br />Building Permit #:101107580 Fee Total <br />Paid to Date: <br />Balance Due: <br />$0.00 <br />$0 00 <br />$0.00 <br />Every permitissued shall become invalid unless the work on the site <br />authorized by such permit is commenced within 360 days after its <br />issuance, or if the work authorized on fhe sife by such permitis suspended <br />or abandoned for a period of 360 days after the time the work is <br />commenced. <br />lnspector MID#: 2021-168242