My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1113 N Wright St - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Wright St
>
1113 N Wright St
>
1113 N Wright St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 5:00:10 AM
Creation date
5/29/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20188593
Full Address
1113 N Wright St
Street Number
1113
Street Direction
N
Street Name
Wright
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTE: For MPU avoidance with Busbar Overload Control and IQ Combiner 6C, the maximum <br />main DER breaker size (backfeed breaker size) is limited to 125 A. <br />For example, as seen in the preceding figures, if the main load panel busbar size is 100 A and the <br />grid-side main service breaker size is also 100 A, the maximum continuous current backfeed allowable <br />from the IQ Combiner to the main panel is limited to 80 A (the minimum of three values: 100 A, 80% of <br />100 A, or 125 A). <br />Therefore, in this scenario, the main DER breaker can be sized up to 80 A. The system ensures that the <br />production and battery current is limited such that the current in the busbar never exceeds 100 A by <br />monitoring the Production CT, Battery CT, and Consumption CTs. <br />5.3.3 MPU Avoidance with Feeder control (using NEC 120% or current limit directly <br />entered) <br />In grid-tied configuration <br />When selecting the option to use MPU avoidance using the NEC 120% rule or current limit directly <br />entered in grid-tied configuration, the feature continuously monitors the current being produced <br />cumulatively by the installed PV array and the IQ Battery using integrated backfeed CTs. It then <br />limits the produced power in real time based on the current limit imposed by the NEC 120% rule. The <br />following figure shows this grid-tied configuration feature. <br />Enphase Power Control features <br />29 © 2025 Enphase Energy Inc. All rights reserved. August 2025 <br />TEB-00269-2.0-EN <br />Main panel <br />(Back-fed panel) <br />IQ Series Microinverters <br />IQ EV Charger <br />Connect to LC <br />CTs/Cons CTs <br />Connector <br />N <br />N13 <br />RS+GNDRS- <br />NO <br />NC <br />C <br />EIP comm. LED <br />USB1 <br />USB2 RSD LED <br />Status LED <br />Reset <br /> button <br />Main DER <br />breaker <br />AP mode LED <br />AP mode button <br />Power production LED <br />Device comm. LED <br />Device scan button <br />Backfeed lugs <br />with DER relay <br />PV bus DER bus <br />DER centre <br />IQ PV2 <br />IQ PV3 <br />IQ PV1 <br />11 <br />_ <br />N <br />3 4 <br />12 <br />A1 <br />5 6 7 8 <br />910 <br />A2 <br />Combiner controller Board <br />Integrated Production CT <br />Ibattery <br />Integrated Battery CTs <br />Gateway <br />1 2 3 4 D 1 2 3 4 D <br />CT8(L2) <br />IQ PV4 <br />IQ B2 <br />IQ B1 <br />IQ EVC <br />PVA <br />PF <br />CT2, CT3 <br />CT1 <br />CT4, CT5 <br />CT(L1)CT(L1)CT(L2)CT (L2) <br />IQ Combiner 6C <br />Home loads <br />Connect to EVSE <br />CT connector on <br />the gateway <br />11 <br />Utility meter Grid <br />IQ Battery IQ Battery <br />Load Controller <br /> <br />B1 <br />LCB <br />CT6, CT7 <br />1 <br />1 2 3 4 D <br />2 <br />1 2 3 4 D <br />CT9, CT10 <br />(L1,L2) <br />Integrated Backfeed CTs <br />Ibackfeed <br />Main Panel Upgrade Avoidance <br />with Feeder Control <br />Additional loads <br />8 <br />Figure 8: MPU avoidance with Feeder Control in grid-tied configuration <br />The battery discharge is controlled first, followed by the PV production current to limit Ibackfeed <br />entering the main DER breaker in the main panel. The main DER breaker must be sized to the PCS limit <br />as per NEC 2020 705.13 (C). <br />System sizing for MPU avoidance with the NEC 120% rule and the current limit directly entered in a <br />grid-tied system <br />For example, as seen in the preceding figure, if the main load panel busbar size is 200 A and the <br />grid-side main service breaker size is also 200 A, the maximum continuous current backfeed allowable <br />from the IQ Combiner to the main panel, Ibackfeed, is limited to: ((120% * busbar rating) – main service <br />breaker size)/125% = total DER current ((120% * 200)-200)/125% = 32 A. <br />In this scenario, the system ensures that no more than 32 A of continuous current is exported back <br />to the main panel. The integrated backfeed CTs inside the IQ Combiner 6C will monitor the current <br />being back-fed into the main panel in real time and feed this information to the IQ Gateway. If the <br />Enphase Power Control features <br />30 © 2025 Enphase Energy Inc. All rights reserved. August 2025 <br />TEB-00269-2.0-EN
The URL can be used to link to this page
Your browser does not support the video tag.