Laserfiche WebLink
79 <br />6 <br /> <br />M <br />e <br />r <br />u <br />s <br /> <br />C <br />o <br />u <br />r <br />t <br />St <br />. <br /> <br />L <br />o <br />u <br />i <br />s <br />, <br /> <br />M <br />O <br /> <br />6 <br />3 <br />0 <br />2 <br />6 <br />T <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />6 <br />0 <br />0 <br />F <br />6 <br />3 <br />6 <br />. <br />3 <br />4 <br />9 <br />. <br />1 <br />7 <br />3 <br />0 <br />16842136571210911141315 <br />84213657 1210911 1413 15 16 <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />a <br />b <br />c <br />d <br />e <br />f <br />g <br />h <br />j <br />k <br />l <br />m <br />n <br />p <br />r <br />s <br />Checked by <br />Drawn by <br />Issue Date <br />Project # <br />Scale <br />Client Approval <br />TI <br /> <br />T <br />E <br />M <br />P <br />L <br />A <br />T <br />E <br /> <br />V <br />1 <br />. <br />0 <br />, <br />10 <br />- <br />1 <br />1 <br />- <br />2 <br />0 <br />1 <br />1 <br />SANTA ANA - SOUTH <br />(#0972) <br />3313 S. BRISTOL ST. <br />SANTA ANA, CA 92704 <br />AS INDICATED <br />07/09/2025 <br />69325-CA03 <br />ISSUED FOR <br />PERMIT <br />#Description Date <br />These drawings/specifications are the property of Oculus Inc. They are <br />furnished as contract documents only. The seal(s) and signature(s) apply <br />only to the document to which they are affixed, and expressly disclaim <br />any responsibility for all other plans, specifications, estimates, reports or <br />other documents or instruments relating to or intended to be used for any <br />part or parts of the architectural or engineering project. Additionally these <br />drawings and seal(s) shall in no way convey or imply any type of warranty <br />or certification relating to the performance of products and materials <br />beyond those provided by their respective manufacturer. <br />© 2025 Oculus Inc. <br />01/05/2026 <br />Dan Conrad, Engineer <br />CA # E 17866 <br />6 <br />5 <br />4 <br />3 <br />2 <br />1 <br />TOTAL <br />KW (W)REMARKS <br />BY <br /> <br />E <br />C <br />BY <br /> <br />E <br />C <br /> <br />O <br />R <br /> <br />M <br />C <br />TO <br />G <br />G <br />L <br />E <br /> <br />S <br />W <br />I <br />T <br />C <br />H <br />SA <br />F <br />E <br />T <br />Y <br /> <br />S <br />W <br />I <br />T <br />C <br />H <br />MECHANICAL & PLUMBING EQUIPMENT ELECTRICAL SCHEDULE <br />TO <br />T <br />A <br />L <br />VO <br />L <br />T <br />S <br />/ <br />P <br />H <br />A <br />S <br />E <br />DESCRIPTION <br />LI <br />N <br />E <br /> <br />I <br />T <br />E <br />M <br /> <br />UN <br />I <br />T <br /> <br />F <br />L <br />A <br /> <br />( <br />M <br />C <br />A <br />) <br />SIZE <br />HO <br />R <br />S <br />P <br />O <br />W <br />E <br />R <br />(A <br />P <br />P <br />R <br />O <br />X <br />I <br />M <br />A <br />T <br />E <br />) <br />UNIT DATA <br />CONDUIT SIZE <br />WIRE AND <br />UNIT DISCONNECT <br />NE <br />M <br />A <br /> <br />S <br />I <br />Z <br />E <br />MO <br />T <br />O <br />R <br /> <br />S <br />T <br />A <br />R <br />T <br />E <br />R <br />UNIT MOCP <br />ABBREVIATIONS: <br />EC = ELECTRICAL CONTRACTOR <br />MC = MECHANICAL CONTRACTOR <br />HS = HOOD SUPPLIER <br />F = FUSED <br />NF = NON FUSED <br />T = TOGGLE <br />CB = CIRCUIT BREAKER IN PANEL <br />---EC120/1 ------X(132W)---20A-1P CBTGWH-1 (TANKLESS GAS WTR HTR)20A-1P NF (2)#12, (1)#12 G., 3/4"C. <br />NOTES: <br />1.NEMA 3R DISCONNECT <br />2.EXHAUST FAN CONTROLLED WITH RESTROOM LIGHTING CONTROL. <br />3.EXHAUST FAN SHALL BE CONTROLLED BY TIME SWITCH. REFER TO 3/E200 - <br />INTERIOR LIGHTING CONTROL DIAGRAM. <br />4.MOTOR STARTER FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY <br />ELECTRICAL CONTRACTOR. <br />5.FAN INTERLOCKED WITH OVEN. REFER TO MECHANICAL DRAWINGS FOR <br />CONTROL REQUIREMENTS. <br />6.WEATHERPROOF/GFCI RECEPTACLE, PROVIDED WITH UNIT, WIRED BY <br />ELECTRICAL CONTRACTOR. 120V SMOKE DETECTOR AND ANNONUCIATOR / <br />TEST SWITCH PROVIDED BY MECHANICAL CONTRACTOR, WIRED BY <br />ELECTRICAL CONTRACTOR. INTERLOCK DUCT DETECTORS SO WHEN EITHER <br />UNIT'S DETECTOR GOES INTO ALARM, BOTH UNITS WILL SHUT-DOWN. <br />COORDINATE LOCATION OF ANNUNCIATOR TEST SWITCHES WITH LOCAL AHJ <br />PRIOR TO ROUGH-IN. <br />GENERAL NOTES: <br />1.COORDINATE ALL LOCATIONS OF THERMOSTAT AND SENSORS WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. <br />7 <br />8 <br />---EC120\//1 ---1/40 X(63W)---20A-1P CBCP-1 (NEW HOT WATER CIRCULATING PUMP)20A-1P NF (2)#12, (1)#12 G., 3/4"C. <br />45 <br />9 <br />10 <br />11 <br />12 <br />13 <br />EF-2 (CEILING EXHAUST FAN - UTILTY/DISHWASH)MC120/1 ---------20A-1P CB NOTE 3 <br />EF-1 (CEILING EXHAUST FAN - RESTROOM)MC120/1 ---------20A-1P CB NOTE 2(2)#12, (1)#12 G., 3/4"C. <br />(2)#12, (1)#12 G., 3/4"C. <br />HP-1 (10-TON ROOF MOUNTED HEAT PUMP)208/3 <br />(3)#8, (1)#10 G., 3/4"C. <br />--- <br />MC(29)--- <br />--- <br />---NOTES 1, 660A-3P NF45A-3P CB <br />MODULAR PLUG <br />MODULAR PLUG(36W) <br />(36W) <br />--- <br />--- <br />HP-2 (5-TON ROOF MOUNTED HEAT PUMP)208/3 <br />(3)#4, (1)#8 G., 1"C. <br />--- <br />MC(62)--- <br />--- <br />---NOTES 1, 6100A-3P NF80A-3P CB <br />EF-3 (ROOF EXHAUST FAN - OVEN)MC120/1 ---------20A-1P CB NOTES 1, 4, 5(2)#12, (1)#12 G., 3/4"C.20A-1P---0.5 <br />DU-1 (DEHUMIDIFICATION UNIT)EC120/1 8.0 X ---20A-1P CB ---(2)#12, (1)#12 G., 3/4"C.20A-1P NF------ <br />DU-2 (DEHUMIDIFICATION UNIT)EC120/1 8.0 X ---20A-1P CB ---(2)#12, (1)#12 G., 3/4"C.20A-1P NF------ <br />15 <br />14 <br />FD <br />SD <br />KEYED NOTES: <br />CONDENSERS FOR WALK-IN COOLER AND FREEZER LOCATED FOR REFERENCE ONLY. <br />FURNISHED AND INSTALLED BY OTHERS, FINAL CONNECTION TO BE MADE BY EC FOR <br />COMPLETE OPERATIONAL SYSTEM. VERIFY EXACT LOCATION PRIOR TO ROUGH-IN. <br />PROVIDE NEMA 3R, 30A-2P DISCONNECT SWITCH WITH (2) 15A FUSES. <br />PROVIDE NEMA 3R, 60A-3P DISCONNECT SWITCH WITH (3) 40A FUSES. <br />1 <br />2 <br />3 <br />GENERAL NOTES: <br />DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. <br />PRIOR TO SUBMITTING BID, VISIT JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE <br />PROJECT. REVIEW GENERAL NOTES, SPECIFICATIONS, AND PLANS FOR ADDITIONAL <br />REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE <br />CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES <br />PRIOR TO SUBMISSION OF BID. <br />INSTALLATION OF EQUIPMENT SHALL COMPLY WITH EQUIPMENT MANUFACTURER'S <br />INSTALLATION AND CLEARANCE REQUIREMENTS TO ALLOW FOR INSPECTION, SERVICE, REPAIR <br />OR REPLACEMENT. <br />CONTRACTOR SHALL COMPLY WITH ALL LANDLORD'S TENANT CRITERIA. COORDINATE AND <br />SCHEDULE ALL WORK WITH LANDLORD'S FIELD REPRESENTATIVE. <br />1. <br />2. <br />3. <br />1/4" = 1'-0"1 ELECTRICAL ROOF EQUIPMENT POWER PLAN <br />HP <br />2 <br />WP <br />A-14/16/18 <br />EF <br />3 <br />J <br />A-36 <br />SM <br />WP <br />FD <br />SD <br />WP/ <br />GFCI <br />B-36 <br />A-13/15/17 <br />HP <br />1 <br />B-38 <br />B-38 <br />B-38 <br />2 1.2.21 <br />A-20/22 <br />WPWP <br />A-19/21/23 <br />WP <br />WP/ <br />GFCI <br />B-36 <br />31.2.1 1 <br />E-210 <br />ELECTRICAL <br />ROOF EQUIPMENT <br />POWER PLAN <br />03/10/2026