TE OLIRFFOAC
<br />LANRP
<br />E 23191
<br />STA
<br />ER
<br />REGIST
<br />ED
<br />INA
<br />N
<br />REENIGE
<br />FO OISSE
<br />E AICLCERTL
<br />Exp. 06/30/26
<br />MIRASOPHOCLISGEORGY
<br />IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
<br />THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAW ING
<br />AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
<br />BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
<br />EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
<br />©2024 IMEG CONSULTANTS CORP.
<br />REF. SCALE IN INCHES
<br />0 1 2 3
<br />222 S. HARBOR BOULEVARD
<br />SUITE 800
<br />ANAHEIM, CA 92805
<br />P: 714.490.5555 F: 714.490.5560
<br />The FUTURE. Built Smarter www.imegcorp.com
<br />PROJECT #24007312.00
<br />0 5'
<br />GRAPHIC SCALES:
<br />Issue Date
<br />1/16" = 1'-0"
<br />50'
<br />1/8" = 1'-0"1/4" = 1'-0"1/2" = 1'-0"3/4" = 1'-0"1" = 1'-0"1-1/2" = 1'-0"3" = 1'-0"
<br />0 5'25' 0 1'12' 0 1'6' 0 4' 0 3'1'0 2' 0 1'
<br />Chckd By
<br />Drwn By
<br />Scale
<br />Building ID:
<br />KP Proj. No.
<br />Permit No.
<br />Sheet
<br />SheetsOf
<br />Sheet Title
<br />Project
<br />Facility
<br />This document is the property of the Owner and is
<br />Project Architect Approval:
<br />Architect/Engineer Of Record:
<br />IF THIS SHEET IS NOT 30"x42" , IT IS
<br />A REDUCED PRINT - SCALE ACCORDINGLY
<br />National Facilities Services
<br />Post Office Box 12916
<br />Oakland California 94604
<br />not to be used without owner's written permission.
<br />Floor Lev: Section:
<br />HGW Proj. No.
<br />©
<br />A
<br />R
<br />C
<br />H
<br />I
<br />T
<br />E
<br />C
<br />T
<br />S
<br />
<br />h
<br />a
<br />n
<br />n
<br />a
<br />
<br />g
<br />a
<br />b
<br />r
<br />i
<br />e
<br />l
<br />
<br />w
<br />e
<br />l
<br />l
<br />s
<br />,
<br />
<br />a
<br />l
<br />l
<br />
<br />r
<br />i
<br />g
<br />h
<br />t
<br />s
<br />
<br />r
<br />e
<br />s
<br />e
<br />r
<br />v
<br />ed
<br />.
<br />
<br />
<br />A
<br />n
<br />y
<br />
<br />u
<br />s
<br />e
<br />
<br />w
<br />i
<br />t
<br />h
<br />o
<br />u
<br />t
<br />
<br />p
<br />e
<br />r
<br />m
<br />i
<br />s
<br />s
<br />i
<br />o
<br />n
<br />
<br />i
<br />s
<br />
<br />e
<br />x
<br />p
<br />r
<br />e
<br />s
<br />s
<br />l
<br />y
<br />
<br />p
<br />r
<br />o
<br />h
<br />i
<br />b
<br />i
<br />t
<br />ed
<br />.
<br />
<br />
<br />P
<br />l
<br />o
<br />t
<br />t
<br />e
<br />d
<br />CAP029271
<br />1955 Bacon Street. San Diego, CA 92107
<br />Office 619 523 8487
<br />www.hgwarchitecture.com
<br />PROJECT #24007312.00
<br />Revisions
<br />By Appr.
<br />11
<br />/
<br />2
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />5
<br />:
<br />5
<br />9
<br />:
<br />5
<br />8
<br />
<br />P
<br />M
<br />08/15/2025
<br />Checker
<br />Author
<br />E005
<br />ELECTRICAL SPECIFICATIONS
<br />3401 South Harbor Boulevard,
<br />Santa Ana, CA 92704
<br />10
<br />0
<br />%
<br />
<br />C
<br />D
<br />
<br />S
<br />E
<br />T
<br />2441
<br />HARBOR-MAC ARTHUR
<br />ELECTRICAL SPECIFICATIONS TABLE OF CONTENT
<br />• SECTION 26 09 33 -LIGHTING CONTROL SYSTEMSSECTION 26 09 33 -LIGHTING CONTROL SYSTEMS
<br />PART 1 -GENERAL
<br />1.1 SECTION INCLUDES
<br />A.LIGHTING CONTROL OVERVIEW
<br />B.ELECTRICAL PLAN SYMBOLS
<br />C.DEVICE COLOR AND COVERPLATES
<br />D.STANDALONE LINE AND LOW VOLTAGE LIGHTING CONTROLS
<br />1.WALL SWITCHES AND WALL DIMMERS
<br />2.SENSORS (OCCUPANCY, VACANCY, DAYLIGHTING, PHOTOCELL, AUXILIARY POWER PACKS,
<br />ETC.)
<br />E.AUTOMATIC LOAD CONTROL RELAYS
<br />1.AUTOMATIC LOAD CONTROL RELAY (ALCR20)
<br />F.BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS)
<br />1.2 RELATED SECTIONS
<br />A.THE LIGHTING SYSTEM DESIGN INCLUDES A COMBINATION OF LUMINAIRE SOURCES, LIGHTING
<br />CONTROL COMPONENTS, PROGRAMMING SEQUENCES, AND SUPPLEMENTARY COMPONENTS FOR
<br />BUILDING AND ENERGY CODE COMPLIANCE. THE DESIGN USES PERFORMANCE-BASED
<br />SPECIFICATIONS FOR PORTIONS OF THE LIGHTING SYSTEM TO ACCOUNT FOR THE LIMITATION OF
<br />DIRECTLY COMPARABLE PRODUCT SOLUTIONS AVAILABLE BY COMPETITIVE MANUFACTURERS.
<br />THE CONTRACTOR SHALL REFERENCE RELATED SPECIFICATION SECTIONS, PLANS, SCHEDULES,
<br />AND DETAILS PRIOR TO SUBMITTING PRICING, SUBMITTALS, AND INSTALLATION. THE
<br />CONTRACTOR SHALL COORDINATE SYSTEM COMPONENT COMPATIBILITY AMONG VARIOUS
<br />MANUFACTURERS AND SUPPLIERS FOR A TURNKEY LIGHTING SYSTEM. REFERENCED SECTIONS
<br />INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
<br />1.SPECIFICATION SECTION 26 51 19 LED LIGHTING
<br />2.ELECTRICAL DRAWINGS: ELECTRICAL COVERSHEET, PLANS, LUMINAIRE SCHEDULES,
<br />LIGHTING CONTROL SEQUENCE OF OPERATIONS, DIAGRAMS, AND DETAILS.
<br />1.3 RELATED WORK
<br />A.SECTION 01 91 00 -COMMISSIONING
<br />1.4 QUALITY ASSURANCE
<br />A.MANUFACTURERS SHALL BE REGULARLY ENGAGED IN THE MANUFACTURE OF LIGHTING
<br />CONTROL EQUIPMENT AND ANCILLARY EQUIPMENT, OF TYPES AND CAPACITIES REQUIRED,
<br />WHOSE PRODUCTS HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR NOT LESS THAN
<br />FIVE (5) YEARS.
<br />B.ALL COMPONENTS AND ASSEMBLIES ARE TO BE FACTORY PRE-TESTED PRIOR TO DELIVERY AND
<br />INSTALLATION.
<br />1.5 REFERENCES
<br />A.FS W S 896 SWITCH, TOGGLE
<br />B.NEMA WD 1 -GENERAL COLOR REQUIREMENTS FOR WIRING DEVICES
<br />C.NEMA WD 7 -OCCUPANCY MOTION SENSORS
<br />D.CEC 2022 –CALIFORNIA ELECTRICAL CODE
<br />E.UL 924 -EMERGENCY LIGHTING AND POWER EQUIPMENT
<br />F.UL 1472 -SOLID-STATE DIMMING CONTROLS
<br />1.6 SUBMITTALS
<br />A.SUBMIT PRODUCT DATA UNDER PROVISIONS OF SECTION 26 05 00.
<br />B.SUBMIT A COMPREHENSIVE PACKAGE INCLUDING DEVICES, HARDWARE, SOFTWARE, PRODUCT
<br />SPECIFICATION, FINISHES, DIMENSIONS, INSTALLATION INSTRUCTIONS, COMPONENT
<br />REPLACEMENT INSTRUCTIONS, WARRANTY, SYSTEM SOFTWARE REQUIREMENTS.
<br />C.PROVIDE FLOOR PLAN SHOWING LOCATION, ORIENTATION, AND COVERAGE AREA OF EACH
<br />CONTROL DEVICE, SENSOR, AND CONTROLLER/INTERFACE. FOR AREAS REQUIRING MULTIPLE
<br />SENSOR DEVICES FOR APPROPRIATE COVERAGE, SUBMIT SPECIFIC MANUFACTURER-APPROVED
<br />SENSOR LAYOUT AS AN OVERLAY DIRECTLY ON THE PROJECT DRAWINGS, EITHER IN PRINT OR
<br />APPROVED ELECTRONIC FORM. SENSOR COVERAGE PATTERNS SHALL HAVE A 20% OVERLAP.
<br />D.SUBMIT A LIST OF DEVICES AND EQUIPMENT THAT WILL BE INSTALLED FOR EACH SEQUENCE OF
<br />OPERATION.
<br />E.SUBMIT PROJECT SPECIFIC CONTROL WIRING DIAGRAMS SHOWING ALL EQUIPMENT, LINE
<br />VOLTAGE, AND CONTROL WIRING REQUIREMENTS FOR ALL COMPONENTS INCLUDING, BUT NOT
<br />LIMITED TO, DIMMERS, RELAYS, LOW VOLTAGE SWITCHES, OCCUPANCY SENSORS, AND
<br />COMMUNICATION INTERFACES AND PROGRAMMING INSTRUCTIONS FOR EACH SEQUENCE OF
<br />OPERATION. INCLUDE NETWORK CABLE SPECIFICATION AND END-OF-LINE TERMINATION DETAILS,
<br />IF REQUIRED.
<br />F.PROGRAMMING SEQUENCES: PROVIDE A COPY OF THE INITIAL LIGHTING CONTROL
<br />PROGRAMMING SEQUENCES IN NARRATIVE AND MANUFACTURER/VENDOR FORMAT.
<br />G.NAMEPLATE LABELS AND CUSTOM ENGRAVING: SUBMIT SAMPLE LABEL/ENGRAVING TEXT FOR
<br />REVIEW FOR EACH APPLICABLE LIGHTING SEQUENCE OF OPERATION SOO. INCLUDE REFERENCE
<br />TO APPLICABLE SOO DESCRIPTION. PROVIDE STENCIL TEMPLATES FOR EACH DEVICE REQUIRING
<br />STENCILING.
<br />1.7 EXTRA STOCK
<br />A.PROVIDE EXTRA STOCK UNDER PROVISIONS OF SECTION 26 05 00.
<br />B.SENSORS, CONTROLS, POWER SUPPLIES, AND RELAYS:FIVE (5) PERCENT OF QUANTITY
<br />INSTALLED. MINIMUM OF TWO (2) OF EACH CONFIGURATION AND TYPE.
<br />C.RELAYS AND DIMMER MODULES: FIVE (5) PERCENT OF QUANTITY INSTALLED. MINIMUM OF TWO (2)
<br />OF EACH SIZE AND TYPE.
<br />D.LIGHTING CONTROL SOFTWARE / WEB APPLICATION SHORTCUT: PROVIDE INSTALLATION OF
<br />SOFTWARE OR SETUP OF WEB APP SHORTCUTS ON TWO (2) OWNER PROVIDED COMPUTERS
<br />WHEN AVAILABLE AND APPLICABLE TO THE SPECIFIC LIGHTING CONTROL SYSTEM.
<br />1.8 PROJECT RECORD DOCUMENTS
<br />A.SUBMIT PROJECT RECORD DOCUMENTS UNDER PROVISIONS OF SECTION 26 05 00.
<br />B.ACCURATELY RECORD LOCATION OF ALL CONTROLS AND DEVICES. INCLUDE DESCRIPTION OF
<br />SWITCHING SEQUENCES AND CIRCUITING ARRANGEMENTS.
<br />1.9 OPERATION AND MAINTENANCE DATA
<br />A.SUBMIT EMERGENCY, OPERATION, AND MAINTENANCE DATA UNDER PROVISIONS OF SECTION 26
<br />05 00. DATA SHALL ALSO INCLUDE THE FOLLOWING:
<br />1.SCHEDULE FOR ROUTINE MAINTENANCE, INSPECTION, AND CALIBRATION OF ALL LIGHTING
<br />CONTROL DEVICES AND SYSTEM COMPONENTS. RECOMMENDED SCHEDULE FOR INSPECTION
<br />AND RECALIBRATION OF SENSORS.
<br />2.COMPLETE NARRATIVE DESCRIBING INTENDED OPERATION AND SEQUENCE FOR EACH
<br />CONTROL SCENARIO AND SYSTEM COMPONENT, UPDATED TO REFLECT ALL CHANGES
<br />RESULTING FROM COMMISSIONING OF SYSTEMS. NARRATIVE SHALL INDICATE
<br />RECOMMENDED SETTINGS FOR DEVICES WHERE APPLICABLE.
<br />3.REPLACEMENT PART NUMBERS FOR ALL SYSTEM COMPONENTS.
<br />B.IDENTIFY INSTALLED LOCATION AND LABELING FOR EACH LUMINAIRE CONTROLLED BY
<br />AUTOMATED LIGHTING CONTROLS.
<br />C.SUBMIT SOFTWARE OPERATING AND MAINTENANCE MANUALS, PROGRAM SOFTWARE BACKUP ON
<br />COMPACT DISC OR COMPATIBLE MEDIA WITH DATA FILES, DEVICE ADDRESS LIST, AND A
<br />PRINTOUT OF SOFTWARE APPLICATION AND GRAPHIC SCREENS, WHERE APPLICABLE.
<br />1.10 SYSTEM DESCRIPTION
<br />A.PERFORMANCE STATEMENT: THE SPECIFICATION SECTION AND LIGHTING DESIGN DOCUMENTS
<br />DESCRIBE THE MINIMUM MATERIAL QUALITY, REQUIRED FEATURES, AND OPERATIONAL
<br />PERFORMANCE REQUIREMENTS OF THE LIGHTING CONTROL SYSTEM. THE DOCUMENTS DO NOT
<br />CONVEY EVERY COMPONENT, RELAY, WIRE, AND EQUIPMENT CONNECTION REQUIRED. THE
<br />CONTRACTOR AND LIGHTING CONTROL MANUFACTURER/VENDOR ARE SOLELY RESPONSIBLE
<br />FOR DETERMINING ALL SYSTEM COMPONENTS, WIRING, AND PROGRAMMING REQUIRED FOR A
<br />COMPLETE AND OPERATIONAL SYSTEM BASED ON THE PERFORMANCE BASED REQUIREMENTS
<br />OF THE DOCUMENTS.
<br />B.LIGHTING SEQUENCE OF OPERATION (SOO): THE SEQUENCE OF OPERATION (SOO) DESCRIBES
<br />THE REQUIRED LIGHTING CONTROL OPERATION AND PERFORMANCE IN EACH SPACE. THE
<br />SEQUENCE OF OPERATION DESCRIPTIONS ARE INCLUDED ON THE DRAWINGS.
<br />C.DRAWINGS: THE DRAWINGS INCLUDE THE SEQUENCE OF OPERATION (SOO), LUMINAIRE
<br />SCHEDULE, LOCATION OF CONTROL DEVICES, SENSORS, AND IDENTIFICATION OF CONTROL
<br />ZONES, AND BRANCH POWER CIRCUITING. CONTROL WIRING AND MANUFACTURER/VENDOR
<br />SPECIFIC COMPONENTS ARE NOT SHOWN, BUT SHALL BE SUBMITTED WITH THE SHOP DRAWING
<br />SUBMITTALS.
<br />1.11 COMMISSIONING
<br />A.COMMISSIONING OF A SYSTEM OR SYSTEMS SPECIFIED IN THIS SECTION IS PART OF THE
<br />CONSTRUCTION PROCESS. DOCUMENTATION AND TESTING OF THESE SYSTEMS, AS WELL AS
<br />TRAINING OF THE OWNER'S OPERATION AND MAINTENANCE PERSONNEL, IS REQUIRED IN
<br />COOPERATION WITH THE OWNER'S REPRESENTATIVE. PROJECT CLOSEOUT IS DEPENDENT ON
<br />SUCCESSFUL COMPLETION OF ALL COMMISSIONING PROCEDURES, DOCUMENTATION, AND ISSUE
<br />CLOSURE. REFER TO DIVISION 1 FOR DETAILED COMMISSIONING REQUIREMENTS.
<br />B.THE CONTRACTOR SHALL NOTIFY THE COMMISSIONING AGENT, ARCHITECT/ENGINEER AND
<br />OWNER'S REPRESENTATIVE TEN (10) WORKING DAYS PRIOR TO SCHEDULED COMMISSIONING
<br />DATE.
<br />C.THE COMMISSIONING PROCESS REQUIRES MEETING ATTENDANCE. REFER TO DIVISION 1 FOR
<br />MEETING REQUIREMENTS.
<br />D.THE SYSTEM SHALL BE FUNCTIONALLY TESTED BY A FACTORY-AUTHORIZED ENGINEER AND
<br />COMPLY WITH THE SEQUENCE OF OPERATION PRIOR TO SYSTEM COMMISSIONING. ALL LOADS
<br />SHALL BE TESTED LIVE FOR CONTINUITY AND FREEDOM FROM DEFECTS, AND ALL CONTROL
<br />WIRING SHALL BE TESTED FOR CONTINUITY AND CONNECTIONS PRIOR TO ENERGIZING THE
<br />SYSTEM.
<br />1.12 WARRANTY
<br />A.MANUFACTURER SHALL WARRANT PRODUCTS UNDER NORMAL USE AND SERVICE TO BE FREE
<br />FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF TWO (2) YEARS FROM DATE
<br />OF COMMISSIONING.
<br />B.OCCUPANCY, VACANCY, DAYLIGHT SENSORS AND CONTROLS SHALL HAVE A FIVE (5) YEAR
<br />WARRANTY FROM DATE OF SUBSTANTIAL COMPLETION.
<br />PART 2 -PRODUCTS
<br />2.1 LIGHTING CONTROL OVERVIEW
<br />A.LIGHTING CONTROL SYSTEM: AS DEFINED IN THE SYSTEM DESCRIPTION, THE DESIGN
<br />DOCUMENTS DESCRIBE THE OPERATIONAL PERFORMANCE REQUIREMENTS OF THE LIGHTING
<br />CONTROL SYSTEM. THE LIGHTING CONTROL SYSTEM HAS BEEN CATEGORIZED INTO THE
<br />FOLLOWING GROUPS. REFER TO THE ELECTRICAL SYMBOL KEY, THIS SPECIFICATION SECTION,
<br />AND THE DRAWINGS TO DETERMINE THE APPROPRIATE LIGHTING CONTROL CATEGORY WHEN
<br />MORE THAN ONE IS APPLICABLE TO THE PROJECT:
<br />1.STANDALONE LIGHTING CONTROL DEVICES: INDEPENDENT (STANDALONE) DEVICES
<br />TRADITIONALLY OPERATING AT LINE OR LOW VOLTAGE, FIELD CONFIGURABLE WITH OTHER
<br />STANDALONE DEVICES TO PROVIDE AN OVERALL LIGHTING CONTROL SYSTEM.
<br />B.ALL SYSTEM COMPONENTS AND MATERIALS OF SIMILAR FUNCTION (E.G., SWITCHES, DIMMERS,
<br />SENSORS, CONTACTORS, RELAYS, ETC.) SHALL BE OF THE SAME MANUFACTURER, UNLESS
<br />SPECIFICALLY STATED OTHERWISE ON DRAWINGS OR ELSEWHERE IN THE SPECIFICATIONS.
<br />LIGHTING CONTROL SWITCHES, SYSTEMS, AND COMPONENTS SHALL BE LISTED.
<br />C.THE FUNCTIONS DESCRIBED IN THE LIGHTING SEQUENCE OF OPERATION SHALL DICTATE THE
<br />ACTUAL LIGHTING CONTROL DEVICE REQUIRED TO ACCOMPLISH THE FUNCTIONS DESCRIBED
<br />FOR THE SPACE, UNLESS OTHERWISE NOTED.
<br />D.EMERGENCY LIGHTING OVERRIDE CONTROL (UL924 AND UL1008): LIGHTING CONTROL EQUIPMENT
<br />COUPLED WITH REMOTE EMERGENCY POWER SOURCES (EXTERNAL TO THE LUMINAIRE)
<br />REQUIRE ALCR (UL924) OR BCELTS (UL1008) DEVICES FOR EMERGENCY (LIFE SAFETY)
<br />COMPLIANCE. AN EMERGENCY LIGHTING CONTROL BYPASS IS REQUIRED FOR EVERY INDIVIDUAL
<br />LIGHTING CONTROL ZONE-CIRCUIT BUT NOT SHOWN ON THE PLANS. REFER TO THIS
<br />SPECIFICATION FOR ALCR AND BCELTS DESCRIPTIONS. REFER TO THE SEQUENCE OF OPERATION
<br />LIGHTING CONTROL DESCRIPTIONS ON THE PLANS FOR ADDITIONAL REQUIREMENTS.
<br />2.2 ELECTRICAL PLAN SYMBOLS
<br />A.REFER TO ELECTRICAL COVERSHEET FOR ELECTRICAL SYMBOLS LIST AND DEVICE
<br />SPECIFICATION TAG.
<br />1.STANDALONE LIGHTING CONTROL DEVICES: CONTROL STATION COMMONLY DEFINED BY AN
<br />ALPHA CHARACTER WITH SUBSCRIPTS.
<br />a.EXAMPLE SYMBOL "S", TAGGED "SW-1P", DESCRIPTION "SWITCH-SINGLE POLE SWITCH".
<br />b.EXAMPLE CONTROL DESIGNATION: A, B, C (WHEN REQUIRED TO CLARIFY DESIGN INTENT).
<br />2.SENSORS, RELAYS, ACCESSORIES: COMMON PLAN SYMBOLS ARE USED FOR OCCUPANCY,
<br />VACANCY, AND DAYLIGHTING SENSORS. THE CONTROL DESIGNATIONS (A, B, C OR Z1, Z2, Z3)
<br />AND IDENTIFICATION OF A STANDALONE OR #B TYPE CONTROL STATION IN THE SPACE
<br />DEFINES THE BASIS-OF-DESIGN INTENT CATEGORY OF THE LIGHTING CONTROL SENSORS AND
<br />ACCESSORIES.
<br />a.EXAMPLE, A STANDALONE OCCUPANCY SENSOR SW-OC-## DEVICE IS THE BASIS OF
<br />DESIGN WHEN SHOWN IN THE SAME ROOM AS A STANDALONE S (SW -1P) SINGLE POLE
<br />LIGHT SWITCH WITH OR WITHOUT A, B, C CONTROL DESIGNATIONS.
<br />2.3 DEVICE COLOR AND COVERPLATES
<br />A.ALL SWITCHES AND LIGHTING CONTROLS SHALL BE COMPLETE WITH COVERPLATES THAT MATCH
<br />MATERIAL AND COLOR OF THE WIRING DEVICE COVERPLATES IN THE SPACE. WHEN THE
<br />COVERPLATE IS PROPRIETARY TO THE DEVICE/MANUFACTURER AND DO NOT MATCH THE WIRING
<br />DEVICE COVERPLATES, THE ARCHITECT SHALL SELECT THE COVERPLATE COLOR AND MATERIALS
<br />FROM THE STANDARD COVERPLATE OPTIONS.
<br />B.WHERE SEVERAL DEVICES ARE GANGED TOGETHER, THE COVERPLATE SHALL BE OF THE
<br />GANGED STYLE FOR THE NUMBER OF DEVICES USED.
<br />C.INSTALL NAMEPLATE IDENTIFICATION AS INDICATED IN SECTION 26 05 53.
<br />D.PLATE-SECURING SCREWS SHALL BE METAL WITH HEAD COLOR MATCHING THE WALL PLATE
<br />FINISH.
<br />2.4 STANDALONE LINE AND LOW VOLTAGE LIGHTING CONTROLS
<br />A.OVERVIEW:
<br />1.WALL SWITCHES AND WALL DIMMERS:
<br />a.UL LISTED WITH INTEGRAL AIR-GAP SWITCH FOR ON/OFF CONTROL, INTEGRAL EMI/RFI
<br />SUPPRESSION, NON-VIEWABLE HEAT SINK, DIMMER TO MATCH DEVICE COLOR.
<br />b.DIMMER COMPATIBILITY AND WIRING WITH THE LOAD BEING CONTROLLED SHALL BE
<br />VERIFIED BY CONTRACTOR PRIOR TO PURCHASE AND INSTALLATION.
<br />D.
<br />SW -D; DIMMER (STANDALONE):
<br />1.ELECTRONIC DRIVER DIMMER, 120 OR 277 VOLT PER APPLICATION, 0-10 V CONTROL, DECORA STYLE
<br />LINEAR SLIDE OPERATOR WITH POSITIVE OFF, IEC 60629 COMPLIANT. MOUNTED IN DEDICATED BACKBOX.
<br />a.MANUFACTURERS: COMPATIBLE WITH LUMINAIRE DRIVER
<br />2.ALTERNATIVE DIMMER, 120 OR 277 VOLT PER APPLICATION, RATING PER APPLICATION, LINEAR SLIDE
<br />OPERATOR WITH POSITIVE OFF. MOUNTED IN DEDICATED BACKBOX.
<br />a.MANUFACTURERS: COMPATIBLE WITH LUMINAIRE DRIVER
<br />E.
<br />F.SW -OC-# AND SW-VC-#; OCCUPANCY / VACANCY SENSORS (STANDALONE):
<br />1.COMBINATION DEVICES: SUBSCRIPTS IDENTIFY COMBINATION TYPE DEVICES WHEN APPLICABLE. THE
<br />CONTRACTOR SHALL PROVIDE THE COMBINATION DEVICE OR PROVIDE MULTIPLE DEVICE(S) TO MEET
<br />THE FUNCTIONALITY WHEN THE MANUFACTURER DOES NOT OFFER THE REQUIRED FUNCTIONALITY WITH
<br />A SINGLE DEVICE. MANUFACTURER VERIFIED LAYOUTS SHALL INCLUDE A 20% OVERLAP OF COVERAGE
<br />PATTERNS.
<br />2.SUBSCRIPTS: SUBSCRIPTS ARE USED TO DEFINE THE DEVICE TYPE.
<br />a.BLANK (OR D) = DUAL TECHNOLOGY
<br />b.A = ULTRASONIC TWO-SIDED CORRIDOR COVERAGE
<br />3.GENERAL DESCRIPTION: WALL-OR CEILING-MOUNTING, SOLID-STATE UNITS WITH A SEPARATE POWER
<br />SUPPLY/RELAY UNIT.
<br />a.OPERATION -OCCUPANCY: OCCUPANCY SENSORS TURN LIGHTS 'ON' WHEN COVERED AREA IS
<br />OCCUPIED AND TURN LIGHTS 'OFF' WITH A TIME DELAY WHEN UNOCCUPIED, UNLESS OTHERWISE
<br />INDICATED.
<br />b.OPERATION -VACANCY: VACANCY SENSORS REQUIRE A MANUAL SWITCH OPERATION TO TURN
<br />LIGHTS 'ON' WITH A TIME DELAY WHEN OCCUPIED TO TURN LIGHTS 'OFF'.
<br />c.TIME DELAY 'OFF': FIELD ADJUSTABLE WITH A MINIMUM RANGE OF 1-20 MINUTES.
<br />d.SENSOR OUTPUT: CONTACTS RATED TO OPERATE THE CONNECTED RELAY, COMPLYING WITH UL
<br />773A. SENSOR SHALL BE POWERED FROM THE RELAY UNIT.
<br />e.RELAY UNIT: DRY CONTACTS RATED FOR 20 A BALLAST LOAD AT 120 AND 277 VAC, FOR 13-AMP
<br />TUNGSTEN AT 120 VAC, AND FOR 1 HP AT 120 VAC. POWER SUPPLY TO SENSOR SHALL BE 24 V DC,
<br />150-MA, CLASS 2 POWER SOURCE AS DEFINED BY ELECTRICAL CODE.
<br />f.MOUNTING:
<br />1)SENSOR: SUITABLE FOR MOUNTING IN ANY POSITION ON A STANDARD OUTLET BOX.
<br />2)RELAY: EXTERNALLY MOUNTED THROUGH A 1/2-INCH KNOCKOUT IN A STANDARD ELECTRICAL
<br />ENCLOSURE. MOUNT RELAY ABOVE ACCESSIBLE CEILING NEAR ENTRY DOOR TO ROOM OR AREA.
<br />3)TIME DELAY AND SENSITIVITY ADJUSTMENTS: RECESSED AND CONCEALED.
<br />4.INDICATOR: LED TO SHOW WHEN MOTION IS BEING DETECTED DURING TESTING AND NORMAL
<br />OPERATION OF THE SENSOR.
<br />5.BYPASS SWITCH: OVERRIDE THE ON FUNCTION IN CASE OF SENSOR FAILURE.
<br />6.POWER SUPPLY AND CHILD PACKS: PROVIDE AS REQUIRED FOR SENSOR QUANTITY AND SWITCHING
<br />SCHEME. MOUNT TO STANDARD 1/2" KNOCKOUT ON ELECTRICAL BOX ABOVE ACCESSIBLE CEILING NEAR
<br />ENTRY DOOR TO ROOM OR AREA. SENSOR POWER SHALL BE FROM EMERGENCY CIRCUIT IF EMERGENCY
<br />LIGHTING IS IN THE AREA.
<br />7.DETECTION COVERAGE (ROOM): DETECT OCCUPANCY ANYWHERE IN AN AREA BASED ON HAND MOTION.
<br />8.DETECTION COVERAGE (CORRIDOR): DETECT OCCUPANCY BASED ON A HALF-STEP MOTION.
<br />a.(A); ULTRASONIC TWO-SIDED CORRIDOR COVERAGE OCCUPANCY/VACANCY SENSOR: FREQUENCY
<br />GREATER THAN 32 KHZ SOLID STATE, ADJUSTABLE SENSITIVITY AND TIME DELAY, TEMPERATURE AND
<br />HUMIDITY RESISTANT RECEIVERS. SENSOR SHALL CONTROL ALL CIRCUITS IN AREA, UNLESS NOTED
<br />OTHERWISE.
<br />1)MANUFACTURERS:
<br />a)WATT STOPPER WT-2250 SERIES
<br />b)HUBBELL OMNI-US OR ATU SERIES
<br />c)GREENGATE ODC-U SERIES
<br />b.BLANK (OR D); DUAL TECHNOLOGY 360 DEGREE COVERAGE OCCUPANCY/VACANCY SENSOR:
<br />COMBINATION OF PIR AND ULTRASONIC OR ACOUSTIC DETECTION METHODS IN AREA OF COVERAGE.
<br />PARTICULAR TECHNOLOGY OR COMBINATION OF TECHNOLOGIES THAT CONTROLS ON AND OFF
<br />FUNCTIONS SHALL BE SELECTABLE IN THE FIELD BY OPERATING CONTROLS ON UNIT. FREQUENCY
<br />GREATER THAN 40 KHZ. DUAL SENSING VERIFICATIONS (REQUIRES BOTH TECHNOLOGIES TO
<br />ACTIVATE), EITHER TECHNOLOGY MAINTAINS ON STATUS. INTEGRATED AMBIENT LIGHT LEVEL
<br />SENSOR (2 TO 200 FC RANGE), ADJUSTABLE SENSITIVITY AND TIME DELAY, SENSOR SHALL CONTROL
<br />ALL CIRCUITS IN AREA, UNLESS NOTED OTHERWISE.
<br />1)MANUFACTURERS:
<br />a)WATT STOPPER DT 300/200 SERIES
<br />b)HUBBELL OMNI-DT2000 / LODTRP / ATD2000C SERIES
<br />c)GREENGATE OAC-DT SERIES
<br />d)LEVITON OSC-MOW / OSM12 SERIES
<br />e)SENSOR SWITCH CM PDT 10 / WVPDT 16 SERIES (ACOUSTIC)
<br />2.5 AUTOMATIC LOAD CONTROL RELAY (ALCR)
<br />A.ALCR20; AUTOMATIC LOAD CONTROL RELAY ALCR, 120/277 VOLT, DRY/DAMP LISTED, 32°F TO 113°F
<br />(0°C TO 45°C) OPERATING TEMPERATURE, PLENUM NEMA 1 RATED, TEST BUTTON WITH VISUAL
<br />INDICATOR, REMOTE TEST AND FIRE ALARM CONTROL, UL924 LISTED LATEST EDITION,
<br />ELECTRICAL CODE ARTICLE 700 COMPLIANT.
<br />1.RATING:
<br />a.20 AMP (16 A PERMITTED) LED DRIVER AND BALLAST.
<br />b.10 A (1,200 WATT) INCANDESCENT.
<br />2.LIGHTING CONTROL COORDINATION: PROVIDE ALCR DEVICE COMPATIBLE WITH DESIGNATED
<br />LIGHTING ZONE CONTROLS. EXAMPLE: SWITCHED, 0-10 VOLT DIMMING, DALI CONTROL, 2 WIRE
<br />DIMMING, OR DMX.
<br />3.OPERATION:
<br />a.ALCR DEVICE SHALL ALLOW THE SAME LOCAL LIGHTING CONTROL DEVICES TO CONTROL
<br />BOTH THE NORMAL LIGHTS AND EMERGENCY DESIGNATED LIGHTING. DEVICES THAT
<br />REQUIRE SEPARATE LOCAL LIGHTING CONTROLS FOR THE NORMAL AND DESIGNATED
<br />EMERGENCY LIGHTING ARE NOT ALLOWED.
<br />b.ALCR DEVICE SHALL MONITOR THE NORMAL POWER CIRCUIT AND SHUNT/BYPASS THE
<br />LOCAL LIGHTING CONTROLS UPON LOSS OF POWER, REMOTE TEST SWITCH, OR FIRE
<br />ALARM OVERRIDE TO PROVIDE FULL LUMEN OUTPUT FOR DESIGNATED EMERGENCY
<br />LIGHTING.
<br />c.ALCR DEVICE SHALL RETURN DESIGNATED EMERGENCY LIGHTING TO LOCAL LIGHTING
<br />CONTROL AFTER A 15-MINUTE DELAY UPON RETURN OF NORMAL POWER OR REMOTE
<br />TEST/FIRE ALARM OVERRIDE RELEASE.
<br />d.EQUIVALENT FACILITATION AND PERFORMANCE: A LIMITATION OF EQUIVALENT
<br />COMPARABLE PRODUCTS MAY REQUIRE SOME OF THE REQUIRED FUNCTIONS OF THE
<br />ALCR DEVICE TO BE PROVIDED BY AN ALTERNATIVE COMPONENT OF THE LIGHTING
<br />CONTROL SYSTEM. THE FOLLOWING FUNCTIONS MAY BE PERFORMED BY ALTERNATIVE
<br />COMPONENTS OF THE LIGHTING CONTROL SYSTEM WHEN THE DEVICE IS LISTED FOR THE
<br />REQUIRED FUNCTION AND COMPATIBLE WITH THE LIGHTING CONTROL SYSTEM:
<br />1)REMOTE TEST SWITCH / FIRE ALARM OVERRIDE INTERFACE.
<br />2)THE 15-MINUTE TIME DELAY UPON RETURN OF NORMAL POWER OR REMOTE
<br />TEST/FIRE ALARM OVERRIDE RELEASE.
<br />3)TEST SWITCH MOUNTING:
<br />a)FINISHED SPACES (CEILING HEIGHT 10 FEET OR LESS): FLUSH MOUNT DEVICE IN
<br />FINISHED CEILING ADJACENT TO ONE OF THE EMERGENCY LIGHTS.
<br />b)FINISHED SPACES (CEILING HEIGHT GREATER THAN 10 FEET): FLUSH MOUNTED IN
<br />WALL. REFER TO ARCHITECT/ENGINEER FOR LOCATION.
<br />c)UNFINISHED SPACES: ADJACENT AND ALIGNED WITH LOCAL WALL-MOUNTED
<br />LIGHTING CONTROLS.
<br />d)OPTION: ALCR DEVICE(S) WITH A TEST BUTTON, VISUAL INDICATOR, AND FLUSH
<br />MOUNTING PLATE MAY BE INSTALLED IN THE LOCATION OF THE REMOTE TEST
<br />SWITCH IN LIEU OF PROVIDING A SEPARATE REMOTE TEST SWITCH.
<br />4.MANUFACTURERS:
<br />a.LVS CONTROLS EPC-2 (SWITCHED)
<br />b.LVS CONTROLS EPC-2-D SERIES (0-10V DIMMING)
<br />c.LVS CONTROLS EPC-DMX (DMX) EPC SERIES (ALTERNATIVE LIGHTING CONTROL)
<br />d.IOTA ETS-20 (SWITCHED)
<br />e.IOTA ETC-20-DR (0-10V DIMMING)
<br />f.IOTA ETC SERIES (ALTERNATIVE LIGHTING CONTROL)
<br />g.MYERS EMERGENCY POWER SYSTEMS RLY-SW-2 (SWITCHED)
<br />h.MYERS EMERGENCY POWER SYSTEMS RLY-DIM-2D (0-10V DIMMING)
<br />i.MYERS EMERGENCY POWER SYSTEMS RLY SERIES (ALTERNATIVE LIGHTING CONTROL)
<br />j.NINE24 INC ELCR-R (SWITCHED)
<br />k.NINE24 ELCR-Z10 (0-10V DIMMING)
<br />l.NINE24 ELCR SERIES (ALTERNATIVE LIGHTING CONTROL)
<br />m.LIGHTING CONTROL MANUFACTURER
<br />2.6 BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS)
<br />A.BCELTS; BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS), 120/277 VOLT,
<br />DRY/DAMP LISTED, 32⁰F TO 113⁰F (0⁰C TO 45⁰C) OPERATING TEMPERATURE, PLENUM NEMA 1
<br />RATED, TEST BUTTON WITH VISUAL INDICATOR, REMOTE TEST AND FIRE ALARM CONTROL, UL1008
<br />LISTED, UL924 LISTED LATEST EDITION, ELECTRICAL CODE ARTICLE 700 COMPLIANT.
<br />1.RATING: 20 AMP (16 A PERMITTED) LED DRIVER, BALLAST, INCANDESCENT.
<br />2.LIGHTING CONTROL COORDINATION: PROVIDE BCELTS DEVICE COMPATIBLE WITH
<br />DESIGNATED LIGHTING ZONE CONTROLS. EXAMPLE: SWITCHED, 0-10 VOLT DIMMING, DALI
<br />CONTROL, 2 WIRE DIMMING, OR DMX.
<br />3.OPERATION:
<br />a.BCELTS DEVICE SHALL ALLOW THE SAME LOCAL LIGHTING CONTROL DEVICES TO
<br />CONTROL BOTH THE NORMAL LIGHTS AND EMERGENCY DESIGNATED LIGHTING. DEVICES
<br />THAT REQUIRE SEPARATE LOCAL LIGHTING CONTROLS FOR THE NORMAL AND
<br />DESIGNATED EMERGENCY LIGHTING ARE NOT ALLOWED.
<br />b.BCELTS DEVICE SHALL MONITOR THE NORMAL POWER CIRCUIT, SHUNT/BYPASS THE
<br />LOCAL LIGHTING CONTROLS, AND TRANSFER THE LOAD FROM THE NORMAL CIRCUIT TO
<br />THE EMERGENCY CIRCUIT UPON LOSS OF POWER, REMOTE TEST SWITCH, OR FIRE ALARM
<br />OVERRIDE TO PROVIDE FULL LUMEN OUTPUT FOR DESIGNATED EMERGENCY LIGHTING.
<br />c.BCELTS DEVICE SHALL RETURN DESIGNATED EMERGENCY LIGHTING TO LOCAL LIGHTING
<br />CONTROL AFTER A 15-MINUTE DELAY UPON RETURN OF NORMAL POWER OR REMOTE
<br />TEST/FIRE ALARM OVERRIDE RELEASE.
<br />d.EQUIVALENT FACILITATION AND PERFORMANCE: A LIMITATION OF EQUIVALENT
<br />COMPARABLE PRODUCTS MAY REQUIRE SOME OF THE REQUIRED FUNCTIONS OF THE
<br />BCELTS DEVICE TO BE PROVIDED BY AN ALTERNATIVE COMPONENT OF THE LIGHTING
<br />CONTROL SYSTEM. THE FOLLOWING FUNCTIONS MAY BE PERFORMED BY ALTERNATIVE
<br />COMPONENTS OF THE LIGHTING CONTROL SYSTEM WHEN THE DEVICE IS LISTED FOR THE
<br />REQUIRED FUNCTION AND COMPATIBLE WITH THE LIGHTING CONTROL SYSTEM.
<br />1)REMOTE TEST SWITCH / FIRE ALARM OVERRIDE INTERFACE.
<br />2)THE 15-MINUTE TIME DELAY UPON RETURN OF NORMAL POWER OR REMOTE
<br />TEST/FIRE ALARM OVERRIDE RELEASE.
<br />e.ACCESSORY -REMOTE TEST SWITCH: PROVIDE A REMOTE BUTTON TEST SW ITCH. THE
<br />TEST SWITCH SHALL BE A SINGLE GANG TYPE SWITCH COMPATIBLE WITH THE BCELTS
<br />DEVICE AND ALLOW THE REMOTE FIRE ALARM OVERRIDE TO FUNCTION.
<br />f.TEST SWITCH MOUNTING:
<br />1)FINISHED SPACES (CEILING HEIGHT 10 FEET OR LESS): FLUSH MOUNT DEVICE IN
<br />FINISHED CEILING ADJACENT TO ONE OF THE EMERGENCY LIGHTS.
<br />2)FINISHED SPACES (CEILING HEIGHT GREATER THAN 10 FEET): FLUSH MOUNTED IN
<br />WALL. REFER TO ARCHITECT/ENGINEER FOR LOCATION.
<br />3)UNFINISHED SPACES: ADJACENT AND ALIGNED WITH TO LOCAL WALL MOUNTED
<br />LIGHTING CONTROLS.
<br />4)OPTION: BCELTS DEVICE(S) WITH A TEST BUTTON, VISUAL INDICATOR, AND FLUSH
<br />MOUNTING PLATE MAY BE INSTALLED IN THE LOCATION OF THE REMOTE TEST SWITCH
<br />IN LIEU OF PROVIDING A SEPARATE REMOTE TEST SWITCH.
<br />4.MANUFACTURERS:
<br />a.LVS CONTROLS EPC-D-F-ATS SERIES
<br />b.BODINE SIGNIFY GTD20A
<br />c.HUBBELL DUAL LITE ATSD/BCCR SERIES
<br />d.LIGHTING CONTROL MANUFACTURER
<br />e.APPROVED EQUAL
<br />PART 3 -EXECUTION
<br />3.1 PRE-CONSTRUCTION MEETING
<br />A.SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE CONTROLS REPRESENTATIVE, INSTALLING
<br />CONTRACTOR, ARCHITECT/ENGINEER, AND OWNER TO EXPLAIN THE PROPOSED LIGHTING
<br />CONTROL SYSTEM AND INTEGRATION WITH OTHER SYSTEMS AS WHEN APPLICABLE PER THE
<br />DESIGN DOCUMENTS.
<br />3.2 EXAMINATION
<br />A.VERIFY THAT SURFACES ARE READY TO RECEIVE WORK.
<br />B.VERIFY FIELD DIMENSIONS AND COORDINATE PHYSICAL SIZE OF ALL EQUIPMENT WITH THE
<br />ARCHITECTURAL REQUIREMENTS OF THE SPACES INTO WHICH THEY ARE TO BE INSTALLED.
<br />ALLOW SPACE FOR ADEQUATE VENTILATION AND CIRCULATION OF AIR.
<br />C.VERIFY THAT REQUIRED UTILITIES ARE AVAILABLE, IN PROPER LOCATION, AND READY FOR USE.
<br />D.BEGINNING OF INSTALLATION MEANS INSTALLER ACCEPTS EXISTING CONDITIONS.
<br />3.3 INSTALLATION
<br />A.INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND APPROVED SHOP
<br />DRAWINGS.
<br />B.ALL WIRING SHALL BE INSTALLED IN CONDUIT.
<br />C.LOW VOLTAGE CABLING (LESS THAN 100 VOLTS): LOW VOLTAGE LIGHTING CONTROL CABLING
<br />SHALL BE PLENUM LISTED. LOW VOLTAGE CABLES IN NON-ACCESSIBLE AREAS SHALL BE
<br />INSTALLED IN CONDUIT. LOW VOLTAGE LIGHTING CONTROL CABLE MAY BE INSTALLED WITHOUT
<br />CONDUIT IN ACCESSIBLE AREAS USING THE FOLLOWING TYPES OF CABLE SUPPORTS. CABLE
<br />SUPPORT TYPES/SYSTEMS SHALL COMPLY WITH THE WARRANTY REQUIREMENTS OF THE LOW
<br />VOLTAGE CABLE MANUFACTURER.
<br />1.J-HOOKS; BATWING TYPE.
<br />2.BRIDLE RINGS WITH SADDLE SUPPORTS.
<br />3.LOW VOLTAGE CABLE BATWINGS SUPPORTED BY INDEPENDENT LUMINAIRE SUPPORT
<br />SYSTEMS (LUMINAIRE SUPPORT CABLING); USE OF BATWINGS ON CEILING SUPPORT SYSTEMS
<br />NOT ALLOWED.
<br />4.LISTED CABLE TIES. LOW VOLTAGE CABLING SECURED TO EXTERIOR OF LUMINAIRE POWER
<br />RACEWAY.
<br />D.ALL BRANCH LOAD CIRCUITS SHALL BE LIVE TESTED BEFORE CONNECTING THE LOADS TO THE
<br />LIGHTING CONTROL PANEL.
<br />3.4 BRANCH CIRCUIT POWER WIRING FOR CONTROLLERS
<br />1.BRANCH CIRCUIT POWER FOR THE FOLLOWING LIGHTING CONTROL SYSTEM COMPONENTS SHALL BE
<br />PROVIDED FROM THE FOLLOWING BRANCHES. LIGHTING CONTROL POWER SHALL ORIGINATE FROM THE
<br />SAME BRANCH CIRCUITS SERVING THE CONTROLLED LUMINAIRES:
<br />a.ROOM CONTROLLERS, LIGHTING CONTROL POWER SUPPLIES, DEVICES, COMPONENTS, AND
<br />ACCESSORIES WHEN AN ASSOCIATED (ALCR) DEVICE IS APPLICABLE TO THE LIGHTING CONTROL
<br />SEQUENCE OF OPERATION:LIFE SAFETY BRANCH (ELECTRICAL CODE ARTICLE 517)
<br />b.ROOM CONTROLLERS, LIGHTING CONTROL POWER SUPPLIES, DEVICES, COMPONENTS, AND
<br />ACCESSORIES WHEN AN ASSOCIATED (BCELTS) DEVICE IS APPLICABLE TO THE LIGHTING CONTROL
<br />SEQUENCE OF OPERATION: THE LOAD SIDE OF THE BCELTS DEVICE NORMAL AND EMERGENCY/LIFE
<br />SAFETY PENDING THE STATUS OF THE BCELTS.
<br />c.THE CONTRACTOR SHALL COORDINATE THE BRANCH CIRCUIT POWER SOURCE REQUIRED WITH THE
<br />ENGINEER WHEN REQUIRED FOR UNIQUE LIGHTING CONTROL SYSTEM DEVICES, COMPONENTS, AND
<br />ACCESSORIES.
<br />3.5 LOW VOLTAGE LIGHTING CONTROL CABLING
<br />A. CONTROL CABLE RACEWAY ROUTING:ALL WIRING SHALL BE INSTALLED IN CONDUIT.
<br />B.CONTROL CABLING INSTALLED WITH LINE VOLTAGE WIRING: WHEN LOW VOLTAGE CONTROL
<br />CABLING IS INSTALLED WITH LINE-VOLTAGE WIRING, THE CONTROL WIRING SHALL BE, COPPER
<br />CONDUCTORS, MINIMUM 16 AWG OR PER MANUFACTURER, WITH CABLE INSULATION EQUAL TO
<br />THE LINE-VOLTAGE RATING (VOLTAGE, TEMP RATING, ETC.) AND COMPLY WITH SPECIFICATION
<br />SECTION 26 05 13 "WIRE AND CABLE."
<br />C.NETWORK CABLING: AS REQUIRED BY MANUFACTURER.
<br />D.SPLICES AND TAPS: TAPPING OR WIRE TRAP CONNECTORS SHALL BE USED TO SPLICE ALL CLASS
<br />1 AND CLASS 2 CONTROL WIRING. TWIST-ON, WIRE-NUT TYPE CONNECTORS ARE NOT ALLOWED.
<br />3.6 AUTOMATIC LOAD CONTROL RELAYS (ALCR20, ALCR3) AND BRANCH CIRCUIT EMERGENCY LIGHTING
<br />TRANSFER SWITCH (BCELTS)
<br />A.FIELD INSTALL PER MANUFACTURER REQUIREMENTS.
<br />B.REMOTE TEST SWITCH: PROVIDE CONNECTION TO REMOTE TEST SWITCH.
<br />C.FIRE ALARM OVERRIDE: PROVIDE CONNECTION TO ADDRESSABLE FIRE ALARM RELAY.
<br />3.7 SUPPORT SERVICES
<br />A.SYSTEM STARTUP:
<br />1.MANUFACTURER SHALL PROVIDE FACTORY AUTHORIZED TECHNICIAN TO CONFIRM PROPER
<br />INSTALLATION AND OPERATION OF ALL SYSTEM COMPONENTS.
<br />B.PRE-PROGRAM, TESTING, TRAINING COORDINATION:
<br />1.THE CONTRACTOR AND MANUFACTURER SHALL PROVIDE ON SITE REPRESENTATIVES TO
<br />PROVIDE FINAL PROGRAMMING INCLUDING PRESET, SCENE, SWITCH LABELING, AND OTHER
<br />PROGRAMMING ADJUSTMENTS BASED ON OWNER AND DESIGN TEAM ONSITE OBSERVATION
<br />AND VERBALLY REQUESTED ADJUSTMENTS AS PART OF THE BASED BID SCOPE OF WORK.
<br />2.THE CONTRACTOR SHALL DOCUMENT ONSITE REQUESTED CHANGES AND UPDATE
<br />OPERATION AND MAINTENANCE MANUALS TO MATCH FINAL PROGRAMMING.
<br />C.TESTING:
<br />1.SYSTEM SHALL BE COMPLETELY FUNCTIONAL TESTED BY A FACTORY-AUTHORIZED
<br />TECHNICIAN. ALL LOADS SHALL BE TESTED LIVE FOR CONTINUITY AND FREEDOM FROM
<br />DEFECTS, AND ALL CONTROL WIRING SHALL BE TESTED FOR CONTINUITY AND CONNECTIONS
<br />PRIOR TO ENERGIZING THE SYSTEM COMPONENTS.
<br />2.PROGRAMMING OF INITIAL ZONES, SCHEDULES, LIGHTING LEVELS, CONTROL STATION
<br />GROUPS, AND SENSOR SETTINGS SHALL BE PERFORMED BY A FACTORY-AUTHORIZED
<br />TECHNICIAN. LIGHTING CONTROL SEQUENCE OF OPERATION SHALL SERVE AS A BASIS FOR
<br />PROGRAMMING, HOWEVER, ALL FINAL DECISIONS REGARDING GROUPS AND SCHEDULES
<br />SHALL BE AT THE DIRECTION OF THE OWNER. THE FOLLOWING PROCEDURES SHALL BE
<br />PERFORMED AT A MINIMUM:
<br />a.CONFIRM OCCUPANCY SENSOR PLACEMENT, SENSITIVITY, AND TIME DELAY SETTINGS TO
<br />MEET SPECIFIED PERFORMANCE CRITERIA.
<br />b.CONFIRM CONTROL STATION LABELING, PRESETS, SWITCH LABELS, AND SCENES.
<br />3.VERIFY OCCUPANCY/VACANCY SENSOR OPERATION IS CORRECT AFTER FURNITURE AND
<br />EQUIPMENT IS INSTALLED IN EACH AREA. MAKE ADJUSTMENTS TO SENSOR SETTINGS AND
<br />TIME DELAYS TO ALLOW PROPER OPERATION.
<br />4.VERIFY OCCUPANCY/VACANCY SENSORS ARE LOCATED TO PROVIDE COMPLETE COVERAGE
<br />FOR THE AREA SERVED WITH NO NUISANCE SWITCHING.
<br />a.RELOCATE SENSORS OR PROVIDE ADDITIONAL SENSORS AS NECESSARY TO PROVIDE
<br />ADEQUATE COVERAGE.
<br />b.MASK OCCUPANCY SENSORS WHERE NECESSARY TO PREVENT NUISANCE SWITCHING
<br />FROM ADJACENT AREAS.
<br />3.8 SYSTEM COMMISSIONING
<br />A.CONTRACTORS' TESTS SHALL BE SCHEDULED AND DOCUMENTED IN ACCORDANCE WITH THE
<br />COMMISSIONING REQUIREMENTS. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR
<br />FURTHER DETAILS.
<br />B.MASK SENSORS WHERE NECESSARY TO PREVENT NUISANCE SW ITCHING FROM ADJACENT AREAS.
<br />C.SYSTEM VERIFICATION TESTING IS PART OF THE COMMISSIONING PROCESS. VERIFICATION TESTING
<br />SHALL BE PERFORMED BY THE CONTRACTOR AND WITNESSED AND DOCUMENTED BY THE
<br />COMMISSIONING AGENT. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR SYSTEM
<br />VERIFICATION TESTS AND COMMISSIONING REQUIREMENTS.
<br />D.TRAINING OF THE OWNER'S OPERATION AND MAINTENANCE PERSONNEL IS REQUIRED IN
<br />COOPERATION WITH THE OWNER'S REPRESENTATIVE. THE INSTRUCTION SHALL BE SCHEDULED IN
<br />COORDINATION WITH THE OWNER'S REPRESENTATIVE AFTER SUBMISSION AND APPROVAL OF
<br />FORMAL TRAINING PLANS. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR
<br />CONTRACTOR TRAINING REQUIREMENTS.
<br />END OF SECTION 26 09 33
<br />SW -O; DUAL TECHNOLOGY AUTOMATIC SENSOR WITH WALL SWITCH (STANDALONE):
<br />1.WALL SWITCH WITH MANUAL ON/AUTO/OFF. 120/277 VAC LOAD LED. 20-MINUTE ADJUSTABLE OFF DELAY.
<br />DUAL TECHNOLOGY ULTRASONIC AND PIR COVERAGE OF MINOR MOTION IN 12' X 15' PATTERN AND VACANCY
<br />DETECTION IN AREA BASED ON HALF-STEP WALKING MOTION. SENSITIVITY ADJUSTMENTS SEPARATE FOR
<br />EACH SENSING TECHNOLOGY.
<br />2.MANUFACTURERS:
<br />a.WATT STOPPER DW -100 SERIES
<br />b.HUBBELL LHMTS
<br />c.LEVITON ODSMT SERIES
<br />d.SENSOR SWITCH WSX-PDT SA SERIES
<br />e.COOPER OWN SERIES
<br />c.HB = HIGH-BAY 360 COVERAGE
<br />B.SW -1P; SINGLE POLE SWITCH:
<br />1.SINGLE THROW, 120/277 VOLT, 20 AMP MAINTAINED CONTACT. TOGGLE HANDLE, SIDE AND BACK WIRED.
<br />2.MANUFACTURERS:
<br />a.HUBBELL HBL1221
<br />b.LEVITON 1221-2
<br />c.PASS & SEYMOUR PS20AC1
<br />d.COOPER AH1221
<br />e.SENSOR SWITCH nPODM
<br />C.SW -3W; THREE-WAY SWITCH:
<br />1.SINGLE THROW, 120/277 VOLT, 20 AMP MAINTAINED CONTACT. TOGGLE HANDLE, SIDE AND BACK WIRED.
<br />2.MANUFACTURERS:
<br />a.HUBBELL HBL1223
<br />b.LEVITON 1223-2
<br />c.PASS & SEYMOUR PS20AC3
<br />d.COOPER AH1223
<br />e.SENSOR SWITCH nPODM
<br />c.(HB): HIGHBAY AUTOMATIC SENSOR: 20' TO 40' MOUNTING HEIGHT. MINIMUM 1.3:1
<br />WALKING MOTION COVERAGE PATTERN TO HEIGHT RATIO. ADJUSTABLE SENSITIVITY AND TIME
<br />DELAY. SENSOR SHALL CONTROL ALL LUMINAIRES IN AREA.
<br />1)MANUFACTURERS:
<br />a)WATT STOPPER HB-300 SERIES
<br />b)HUBBELL FHB 140 OR HMHB SERIES
<br />c)LEVITON OSFHU
<br />d)COOPER OEF-P SERIES
<br />No. Revisions Date
<br />pl
<br />a
<br />n
<br />
<br />c
<br />h
<br />e
<br />c
<br />k
<br />
<br />r
<br />e
<br />s
<br />u
<br />b
<br />m
<br />i
<br />t
<br />t
<br />a
<br />l
<br />Plan Check Resubmittal 02/25/2026
<br />02/25/2026
|