Laserfiche WebLink
TE OLIRFFOAC <br />LANRP <br />E 23191 <br />STA <br />ER <br />REGIST <br />ED <br />INA <br />N <br />REENIGE <br />FO OISSE <br />E AICLCERTL <br />Exp. 06/30/26 <br />MIRASOPHOCLISGEORGY <br />IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO <br />THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAW ING <br />AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT <br />BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE <br />EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG. <br />©2024 IMEG CONSULTANTS CORP. <br />REF. SCALE IN INCHES <br />0 1 2 3 <br />222 S. HARBOR BOULEVARD <br />SUITE 800 <br />ANAHEIM, CA 92805 <br />P: 714.490.5555 F: 714.490.5560 <br />The FUTURE. Built Smarter www.imegcorp.com <br />PROJECT #24007312.00 <br />0 5' <br />GRAPHIC SCALES: <br />Issue Date <br />1/16" = 1'-0" <br />50' <br />1/8" = 1'-0"1/4" = 1'-0"1/2" = 1'-0"3/4" = 1'-0"1" = 1'-0"1-1/2" = 1'-0"3" = 1'-0" <br />0 5'25' 0 1'12' 0 1'6' 0 4' 0 3'1'0 2' 0 1' <br />Chckd By <br />Drwn By <br />Scale <br />Building ID: <br />KP Proj. No. <br />Permit No. <br />Sheet <br />SheetsOf <br />Sheet Title <br />Project <br />Facility <br />This document is the property of the Owner and is <br />Project Architect Approval: <br />Architect/Engineer Of Record: <br />IF THIS SHEET IS NOT 30"x42" , IT IS <br />A REDUCED PRINT - SCALE ACCORDINGLY <br />National Facilities Services <br />Post Office Box 12916 <br />Oakland California 94604 <br />not to be used without owner's written permission. <br />Floor Lev: Section: <br />HGW Proj. No. <br />© <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br /> <br />h <br />a <br />n <br />n <br />a <br /> <br />g <br />a <br />b <br />r <br />i <br />e <br />l <br /> <br />w <br />e <br />l <br />l <br />s <br />, <br /> <br />a <br />l <br />l <br /> <br />r <br />i <br />g <br />h <br />t <br />s <br /> <br />r <br />e <br />s <br />e <br />r <br />v <br />ed <br />. <br /> <br /> <br />A <br />n <br />y <br /> <br />u <br />s <br />e <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />i <br />s <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br />l <br />y <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />ed <br />. <br /> <br /> <br />P <br />l <br />o <br />t <br />t <br />e <br />d <br />CAP029271 <br />1955 Bacon Street. San Diego, CA 92107 <br />Office 619 523 8487 <br />www.hgwarchitecture.com <br />PROJECT #24007312.00 <br />Revisions <br />By Appr. <br />11 <br />/ <br />2 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />5 <br />: <br />5 <br />9 <br />: <br />5 <br />8 <br /> <br />P <br />M <br />08/15/2025 <br />Checker <br />Author <br />E005 <br />ELECTRICAL SPECIFICATIONS <br />3401 South Harbor Boulevard, <br />Santa Ana, CA 92704 <br />10 <br />0 <br />% <br /> <br />C <br />D <br /> <br />S <br />E <br />T <br />2441 <br />HARBOR-MAC ARTHUR <br />ELECTRICAL SPECIFICATIONS TABLE OF CONTENT <br />• SECTION 26 09 33 -LIGHTING CONTROL SYSTEMSSECTION 26 09 33 -LIGHTING CONTROL SYSTEMS <br />PART 1 -GENERAL <br />1.1 SECTION INCLUDES <br />A.LIGHTING CONTROL OVERVIEW <br />B.ELECTRICAL PLAN SYMBOLS <br />C.DEVICE COLOR AND COVERPLATES <br />D.STANDALONE LINE AND LOW VOLTAGE LIGHTING CONTROLS <br />1.WALL SWITCHES AND WALL DIMMERS <br />2.SENSORS (OCCUPANCY, VACANCY, DAYLIGHTING, PHOTOCELL, AUXILIARY POWER PACKS, <br />ETC.) <br />E.AUTOMATIC LOAD CONTROL RELAYS <br />1.AUTOMATIC LOAD CONTROL RELAY (ALCR20) <br />F.BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS) <br />1.2 RELATED SECTIONS <br />A.THE LIGHTING SYSTEM DESIGN INCLUDES A COMBINATION OF LUMINAIRE SOURCES, LIGHTING <br />CONTROL COMPONENTS, PROGRAMMING SEQUENCES, AND SUPPLEMENTARY COMPONENTS FOR <br />BUILDING AND ENERGY CODE COMPLIANCE. THE DESIGN USES PERFORMANCE-BASED <br />SPECIFICATIONS FOR PORTIONS OF THE LIGHTING SYSTEM TO ACCOUNT FOR THE LIMITATION OF <br />DIRECTLY COMPARABLE PRODUCT SOLUTIONS AVAILABLE BY COMPETITIVE MANUFACTURERS. <br />THE CONTRACTOR SHALL REFERENCE RELATED SPECIFICATION SECTIONS, PLANS, SCHEDULES, <br />AND DETAILS PRIOR TO SUBMITTING PRICING, SUBMITTALS, AND INSTALLATION. THE <br />CONTRACTOR SHALL COORDINATE SYSTEM COMPONENT COMPATIBILITY AMONG VARIOUS <br />MANUFACTURERS AND SUPPLIERS FOR A TURNKEY LIGHTING SYSTEM. REFERENCED SECTIONS <br />INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: <br />1.SPECIFICATION SECTION 26 51 19 LED LIGHTING <br />2.ELECTRICAL DRAWINGS: ELECTRICAL COVERSHEET, PLANS, LUMINAIRE SCHEDULES, <br />LIGHTING CONTROL SEQUENCE OF OPERATIONS, DIAGRAMS, AND DETAILS. <br />1.3 RELATED WORK <br />A.SECTION 01 91 00 -COMMISSIONING <br />1.4 QUALITY ASSURANCE <br />A.MANUFACTURERS SHALL BE REGULARLY ENGAGED IN THE MANUFACTURE OF LIGHTING <br />CONTROL EQUIPMENT AND ANCILLARY EQUIPMENT, OF TYPES AND CAPACITIES REQUIRED, <br />WHOSE PRODUCTS HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR NOT LESS THAN <br />FIVE (5) YEARS. <br />B.ALL COMPONENTS AND ASSEMBLIES ARE TO BE FACTORY PRE-TESTED PRIOR TO DELIVERY AND <br />INSTALLATION. <br />1.5 REFERENCES <br />A.FS W S 896 SWITCH, TOGGLE <br />B.NEMA WD 1 -GENERAL COLOR REQUIREMENTS FOR WIRING DEVICES <br />C.NEMA WD 7 -OCCUPANCY MOTION SENSORS <br />D.CEC 2022 –CALIFORNIA ELECTRICAL CODE <br />E.UL 924 -EMERGENCY LIGHTING AND POWER EQUIPMENT <br />F.UL 1472 -SOLID-STATE DIMMING CONTROLS <br />1.6 SUBMITTALS <br />A.SUBMIT PRODUCT DATA UNDER PROVISIONS OF SECTION 26 05 00. <br />B.SUBMIT A COMPREHENSIVE PACKAGE INCLUDING DEVICES, HARDWARE, SOFTWARE, PRODUCT <br />SPECIFICATION, FINISHES, DIMENSIONS, INSTALLATION INSTRUCTIONS, COMPONENT <br />REPLACEMENT INSTRUCTIONS, WARRANTY, SYSTEM SOFTWARE REQUIREMENTS. <br />C.PROVIDE FLOOR PLAN SHOWING LOCATION, ORIENTATION, AND COVERAGE AREA OF EACH <br />CONTROL DEVICE, SENSOR, AND CONTROLLER/INTERFACE. FOR AREAS REQUIRING MULTIPLE <br />SENSOR DEVICES FOR APPROPRIATE COVERAGE, SUBMIT SPECIFIC MANUFACTURER-APPROVED <br />SENSOR LAYOUT AS AN OVERLAY DIRECTLY ON THE PROJECT DRAWINGS, EITHER IN PRINT OR <br />APPROVED ELECTRONIC FORM. SENSOR COVERAGE PATTERNS SHALL HAVE A 20% OVERLAP. <br />D.SUBMIT A LIST OF DEVICES AND EQUIPMENT THAT WILL BE INSTALLED FOR EACH SEQUENCE OF <br />OPERATION. <br />E.SUBMIT PROJECT SPECIFIC CONTROL WIRING DIAGRAMS SHOWING ALL EQUIPMENT, LINE <br />VOLTAGE, AND CONTROL WIRING REQUIREMENTS FOR ALL COMPONENTS INCLUDING, BUT NOT <br />LIMITED TO, DIMMERS, RELAYS, LOW VOLTAGE SWITCHES, OCCUPANCY SENSORS, AND <br />COMMUNICATION INTERFACES AND PROGRAMMING INSTRUCTIONS FOR EACH SEQUENCE OF <br />OPERATION. INCLUDE NETWORK CABLE SPECIFICATION AND END-OF-LINE TERMINATION DETAILS, <br />IF REQUIRED. <br />F.PROGRAMMING SEQUENCES: PROVIDE A COPY OF THE INITIAL LIGHTING CONTROL <br />PROGRAMMING SEQUENCES IN NARRATIVE AND MANUFACTURER/VENDOR FORMAT. <br />G.NAMEPLATE LABELS AND CUSTOM ENGRAVING: SUBMIT SAMPLE LABEL/ENGRAVING TEXT FOR <br />REVIEW FOR EACH APPLICABLE LIGHTING SEQUENCE OF OPERATION SOO. INCLUDE REFERENCE <br />TO APPLICABLE SOO DESCRIPTION. PROVIDE STENCIL TEMPLATES FOR EACH DEVICE REQUIRING <br />STENCILING. <br />1.7 EXTRA STOCK <br />A.PROVIDE EXTRA STOCK UNDER PROVISIONS OF SECTION 26 05 00. <br />B.SENSORS, CONTROLS, POWER SUPPLIES, AND RELAYS:FIVE (5) PERCENT OF QUANTITY <br />INSTALLED. MINIMUM OF TWO (2) OF EACH CONFIGURATION AND TYPE. <br />C.RELAYS AND DIMMER MODULES: FIVE (5) PERCENT OF QUANTITY INSTALLED. MINIMUM OF TWO (2) <br />OF EACH SIZE AND TYPE. <br />D.LIGHTING CONTROL SOFTWARE / WEB APPLICATION SHORTCUT: PROVIDE INSTALLATION OF <br />SOFTWARE OR SETUP OF WEB APP SHORTCUTS ON TWO (2) OWNER PROVIDED COMPUTERS <br />WHEN AVAILABLE AND APPLICABLE TO THE SPECIFIC LIGHTING CONTROL SYSTEM. <br />1.8 PROJECT RECORD DOCUMENTS <br />A.SUBMIT PROJECT RECORD DOCUMENTS UNDER PROVISIONS OF SECTION 26 05 00. <br />B.ACCURATELY RECORD LOCATION OF ALL CONTROLS AND DEVICES. INCLUDE DESCRIPTION OF <br />SWITCHING SEQUENCES AND CIRCUITING ARRANGEMENTS. <br />1.9 OPERATION AND MAINTENANCE DATA <br />A.SUBMIT EMERGENCY, OPERATION, AND MAINTENANCE DATA UNDER PROVISIONS OF SECTION 26 <br />05 00. DATA SHALL ALSO INCLUDE THE FOLLOWING: <br />1.SCHEDULE FOR ROUTINE MAINTENANCE, INSPECTION, AND CALIBRATION OF ALL LIGHTING <br />CONTROL DEVICES AND SYSTEM COMPONENTS. RECOMMENDED SCHEDULE FOR INSPECTION <br />AND RECALIBRATION OF SENSORS. <br />2.COMPLETE NARRATIVE DESCRIBING INTENDED OPERATION AND SEQUENCE FOR EACH <br />CONTROL SCENARIO AND SYSTEM COMPONENT, UPDATED TO REFLECT ALL CHANGES <br />RESULTING FROM COMMISSIONING OF SYSTEMS. NARRATIVE SHALL INDICATE <br />RECOMMENDED SETTINGS FOR DEVICES WHERE APPLICABLE. <br />3.REPLACEMENT PART NUMBERS FOR ALL SYSTEM COMPONENTS. <br />B.IDENTIFY INSTALLED LOCATION AND LABELING FOR EACH LUMINAIRE CONTROLLED BY <br />AUTOMATED LIGHTING CONTROLS. <br />C.SUBMIT SOFTWARE OPERATING AND MAINTENANCE MANUALS, PROGRAM SOFTWARE BACKUP ON <br />COMPACT DISC OR COMPATIBLE MEDIA WITH DATA FILES, DEVICE ADDRESS LIST, AND A <br />PRINTOUT OF SOFTWARE APPLICATION AND GRAPHIC SCREENS, WHERE APPLICABLE. <br />1.10 SYSTEM DESCRIPTION <br />A.PERFORMANCE STATEMENT: THE SPECIFICATION SECTION AND LIGHTING DESIGN DOCUMENTS <br />DESCRIBE THE MINIMUM MATERIAL QUALITY, REQUIRED FEATURES, AND OPERATIONAL <br />PERFORMANCE REQUIREMENTS OF THE LIGHTING CONTROL SYSTEM. THE DOCUMENTS DO NOT <br />CONVEY EVERY COMPONENT, RELAY, WIRE, AND EQUIPMENT CONNECTION REQUIRED. THE <br />CONTRACTOR AND LIGHTING CONTROL MANUFACTURER/VENDOR ARE SOLELY RESPONSIBLE <br />FOR DETERMINING ALL SYSTEM COMPONENTS, WIRING, AND PROGRAMMING REQUIRED FOR A <br />COMPLETE AND OPERATIONAL SYSTEM BASED ON THE PERFORMANCE BASED REQUIREMENTS <br />OF THE DOCUMENTS. <br />B.LIGHTING SEQUENCE OF OPERATION (SOO): THE SEQUENCE OF OPERATION (SOO) DESCRIBES <br />THE REQUIRED LIGHTING CONTROL OPERATION AND PERFORMANCE IN EACH SPACE. THE <br />SEQUENCE OF OPERATION DESCRIPTIONS ARE INCLUDED ON THE DRAWINGS. <br />C.DRAWINGS: THE DRAWINGS INCLUDE THE SEQUENCE OF OPERATION (SOO), LUMINAIRE <br />SCHEDULE, LOCATION OF CONTROL DEVICES, SENSORS, AND IDENTIFICATION OF CONTROL <br />ZONES, AND BRANCH POWER CIRCUITING. CONTROL WIRING AND MANUFACTURER/VENDOR <br />SPECIFIC COMPONENTS ARE NOT SHOWN, BUT SHALL BE SUBMITTED WITH THE SHOP DRAWING <br />SUBMITTALS. <br />1.11 COMMISSIONING <br />A.COMMISSIONING OF A SYSTEM OR SYSTEMS SPECIFIED IN THIS SECTION IS PART OF THE <br />CONSTRUCTION PROCESS. DOCUMENTATION AND TESTING OF THESE SYSTEMS, AS WELL AS <br />TRAINING OF THE OWNER'S OPERATION AND MAINTENANCE PERSONNEL, IS REQUIRED IN <br />COOPERATION WITH THE OWNER'S REPRESENTATIVE. PROJECT CLOSEOUT IS DEPENDENT ON <br />SUCCESSFUL COMPLETION OF ALL COMMISSIONING PROCEDURES, DOCUMENTATION, AND ISSUE <br />CLOSURE. REFER TO DIVISION 1 FOR DETAILED COMMISSIONING REQUIREMENTS. <br />B.THE CONTRACTOR SHALL NOTIFY THE COMMISSIONING AGENT, ARCHITECT/ENGINEER AND <br />OWNER'S REPRESENTATIVE TEN (10) WORKING DAYS PRIOR TO SCHEDULED COMMISSIONING <br />DATE. <br />C.THE COMMISSIONING PROCESS REQUIRES MEETING ATTENDANCE. REFER TO DIVISION 1 FOR <br />MEETING REQUIREMENTS. <br />D.THE SYSTEM SHALL BE FUNCTIONALLY TESTED BY A FACTORY-AUTHORIZED ENGINEER AND <br />COMPLY WITH THE SEQUENCE OF OPERATION PRIOR TO SYSTEM COMMISSIONING. ALL LOADS <br />SHALL BE TESTED LIVE FOR CONTINUITY AND FREEDOM FROM DEFECTS, AND ALL CONTROL <br />WIRING SHALL BE TESTED FOR CONTINUITY AND CONNECTIONS PRIOR TO ENERGIZING THE <br />SYSTEM. <br />1.12 WARRANTY <br />A.MANUFACTURER SHALL WARRANT PRODUCTS UNDER NORMAL USE AND SERVICE TO BE FREE <br />FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF TWO (2) YEARS FROM DATE <br />OF COMMISSIONING. <br />B.OCCUPANCY, VACANCY, DAYLIGHT SENSORS AND CONTROLS SHALL HAVE A FIVE (5) YEAR <br />WARRANTY FROM DATE OF SUBSTANTIAL COMPLETION. <br />PART 2 -PRODUCTS <br />2.1 LIGHTING CONTROL OVERVIEW <br />A.LIGHTING CONTROL SYSTEM: AS DEFINED IN THE SYSTEM DESCRIPTION, THE DESIGN <br />DOCUMENTS DESCRIBE THE OPERATIONAL PERFORMANCE REQUIREMENTS OF THE LIGHTING <br />CONTROL SYSTEM. THE LIGHTING CONTROL SYSTEM HAS BEEN CATEGORIZED INTO THE <br />FOLLOWING GROUPS. REFER TO THE ELECTRICAL SYMBOL KEY, THIS SPECIFICATION SECTION, <br />AND THE DRAWINGS TO DETERMINE THE APPROPRIATE LIGHTING CONTROL CATEGORY WHEN <br />MORE THAN ONE IS APPLICABLE TO THE PROJECT: <br />1.STANDALONE LIGHTING CONTROL DEVICES: INDEPENDENT (STANDALONE) DEVICES <br />TRADITIONALLY OPERATING AT LINE OR LOW VOLTAGE, FIELD CONFIGURABLE WITH OTHER <br />STANDALONE DEVICES TO PROVIDE AN OVERALL LIGHTING CONTROL SYSTEM. <br />B.ALL SYSTEM COMPONENTS AND MATERIALS OF SIMILAR FUNCTION (E.G., SWITCHES, DIMMERS, <br />SENSORS, CONTACTORS, RELAYS, ETC.) SHALL BE OF THE SAME MANUFACTURER, UNLESS <br />SPECIFICALLY STATED OTHERWISE ON DRAWINGS OR ELSEWHERE IN THE SPECIFICATIONS. <br />LIGHTING CONTROL SWITCHES, SYSTEMS, AND COMPONENTS SHALL BE LISTED. <br />C.THE FUNCTIONS DESCRIBED IN THE LIGHTING SEQUENCE OF OPERATION SHALL DICTATE THE <br />ACTUAL LIGHTING CONTROL DEVICE REQUIRED TO ACCOMPLISH THE FUNCTIONS DESCRIBED <br />FOR THE SPACE, UNLESS OTHERWISE NOTED. <br />D.EMERGENCY LIGHTING OVERRIDE CONTROL (UL924 AND UL1008): LIGHTING CONTROL EQUIPMENT <br />COUPLED WITH REMOTE EMERGENCY POWER SOURCES (EXTERNAL TO THE LUMINAIRE) <br />REQUIRE ALCR (UL924) OR BCELTS (UL1008) DEVICES FOR EMERGENCY (LIFE SAFETY) <br />COMPLIANCE. AN EMERGENCY LIGHTING CONTROL BYPASS IS REQUIRED FOR EVERY INDIVIDUAL <br />LIGHTING CONTROL ZONE-CIRCUIT BUT NOT SHOWN ON THE PLANS. REFER TO THIS <br />SPECIFICATION FOR ALCR AND BCELTS DESCRIPTIONS. REFER TO THE SEQUENCE OF OPERATION <br />LIGHTING CONTROL DESCRIPTIONS ON THE PLANS FOR ADDITIONAL REQUIREMENTS. <br />2.2 ELECTRICAL PLAN SYMBOLS <br />A.REFER TO ELECTRICAL COVERSHEET FOR ELECTRICAL SYMBOLS LIST AND DEVICE <br />SPECIFICATION TAG. <br />1.STANDALONE LIGHTING CONTROL DEVICES: CONTROL STATION COMMONLY DEFINED BY AN <br />ALPHA CHARACTER WITH SUBSCRIPTS. <br />a.EXAMPLE SYMBOL "S", TAGGED "SW-1P", DESCRIPTION "SWITCH-SINGLE POLE SWITCH". <br />b.EXAMPLE CONTROL DESIGNATION: A, B, C (WHEN REQUIRED TO CLARIFY DESIGN INTENT). <br />2.SENSORS, RELAYS, ACCESSORIES: COMMON PLAN SYMBOLS ARE USED FOR OCCUPANCY, <br />VACANCY, AND DAYLIGHTING SENSORS. THE CONTROL DESIGNATIONS (A, B, C OR Z1, Z2, Z3) <br />AND IDENTIFICATION OF A STANDALONE OR #B TYPE CONTROL STATION IN THE SPACE <br />DEFINES THE BASIS-OF-DESIGN INTENT CATEGORY OF THE LIGHTING CONTROL SENSORS AND <br />ACCESSORIES. <br />a.EXAMPLE, A STANDALONE OCCUPANCY SENSOR SW-OC-## DEVICE IS THE BASIS OF <br />DESIGN WHEN SHOWN IN THE SAME ROOM AS A STANDALONE S (SW -1P) SINGLE POLE <br />LIGHT SWITCH WITH OR WITHOUT A, B, C CONTROL DESIGNATIONS. <br />2.3 DEVICE COLOR AND COVERPLATES <br />A.ALL SWITCHES AND LIGHTING CONTROLS SHALL BE COMPLETE WITH COVERPLATES THAT MATCH <br />MATERIAL AND COLOR OF THE WIRING DEVICE COVERPLATES IN THE SPACE. WHEN THE <br />COVERPLATE IS PROPRIETARY TO THE DEVICE/MANUFACTURER AND DO NOT MATCH THE WIRING <br />DEVICE COVERPLATES, THE ARCHITECT SHALL SELECT THE COVERPLATE COLOR AND MATERIALS <br />FROM THE STANDARD COVERPLATE OPTIONS. <br />B.WHERE SEVERAL DEVICES ARE GANGED TOGETHER, THE COVERPLATE SHALL BE OF THE <br />GANGED STYLE FOR THE NUMBER OF DEVICES USED. <br />C.INSTALL NAMEPLATE IDENTIFICATION AS INDICATED IN SECTION 26 05 53. <br />D.PLATE-SECURING SCREWS SHALL BE METAL WITH HEAD COLOR MATCHING THE WALL PLATE <br />FINISH. <br />2.4 STANDALONE LINE AND LOW VOLTAGE LIGHTING CONTROLS <br />A.OVERVIEW: <br />1.WALL SWITCHES AND WALL DIMMERS: <br />a.UL LISTED WITH INTEGRAL AIR-GAP SWITCH FOR ON/OFF CONTROL, INTEGRAL EMI/RFI <br />SUPPRESSION, NON-VIEWABLE HEAT SINK, DIMMER TO MATCH DEVICE COLOR. <br />b.DIMMER COMPATIBILITY AND WIRING WITH THE LOAD BEING CONTROLLED SHALL BE <br />VERIFIED BY CONTRACTOR PRIOR TO PURCHASE AND INSTALLATION. <br />D. <br />SW -D; DIMMER (STANDALONE): <br />1.ELECTRONIC DRIVER DIMMER, 120 OR 277 VOLT PER APPLICATION, 0-10 V CONTROL, DECORA STYLE <br />LINEAR SLIDE OPERATOR WITH POSITIVE OFF, IEC 60629 COMPLIANT. MOUNTED IN DEDICATED BACKBOX. <br />a.MANUFACTURERS: COMPATIBLE WITH LUMINAIRE DRIVER <br />2.ALTERNATIVE DIMMER, 120 OR 277 VOLT PER APPLICATION, RATING PER APPLICATION, LINEAR SLIDE <br />OPERATOR WITH POSITIVE OFF. MOUNTED IN DEDICATED BACKBOX. <br />a.MANUFACTURERS: COMPATIBLE WITH LUMINAIRE DRIVER <br />E. <br />F.SW -OC-# AND SW-VC-#; OCCUPANCY / VACANCY SENSORS (STANDALONE): <br />1.COMBINATION DEVICES: SUBSCRIPTS IDENTIFY COMBINATION TYPE DEVICES WHEN APPLICABLE. THE <br />CONTRACTOR SHALL PROVIDE THE COMBINATION DEVICE OR PROVIDE MULTIPLE DEVICE(S) TO MEET <br />THE FUNCTIONALITY WHEN THE MANUFACTURER DOES NOT OFFER THE REQUIRED FUNCTIONALITY WITH <br />A SINGLE DEVICE. MANUFACTURER VERIFIED LAYOUTS SHALL INCLUDE A 20% OVERLAP OF COVERAGE <br />PATTERNS. <br />2.SUBSCRIPTS: SUBSCRIPTS ARE USED TO DEFINE THE DEVICE TYPE. <br />a.BLANK (OR D) = DUAL TECHNOLOGY <br />b.A = ULTRASONIC TWO-SIDED CORRIDOR COVERAGE <br />3.GENERAL DESCRIPTION: WALL-OR CEILING-MOUNTING, SOLID-STATE UNITS WITH A SEPARATE POWER <br />SUPPLY/RELAY UNIT. <br />a.OPERATION -OCCUPANCY: OCCUPANCY SENSORS TURN LIGHTS 'ON' WHEN COVERED AREA IS <br />OCCUPIED AND TURN LIGHTS 'OFF' WITH A TIME DELAY WHEN UNOCCUPIED, UNLESS OTHERWISE <br />INDICATED. <br />b.OPERATION -VACANCY: VACANCY SENSORS REQUIRE A MANUAL SWITCH OPERATION TO TURN <br />LIGHTS 'ON' WITH A TIME DELAY WHEN OCCUPIED TO TURN LIGHTS 'OFF'. <br />c.TIME DELAY 'OFF': FIELD ADJUSTABLE WITH A MINIMUM RANGE OF 1-20 MINUTES. <br />d.SENSOR OUTPUT: CONTACTS RATED TO OPERATE THE CONNECTED RELAY, COMPLYING WITH UL <br />773A. SENSOR SHALL BE POWERED FROM THE RELAY UNIT. <br />e.RELAY UNIT: DRY CONTACTS RATED FOR 20 A BALLAST LOAD AT 120 AND 277 VAC, FOR 13-AMP <br />TUNGSTEN AT 120 VAC, AND FOR 1 HP AT 120 VAC. POWER SUPPLY TO SENSOR SHALL BE 24 V DC, <br />150-MA, CLASS 2 POWER SOURCE AS DEFINED BY ELECTRICAL CODE. <br />f.MOUNTING: <br />1)SENSOR: SUITABLE FOR MOUNTING IN ANY POSITION ON A STANDARD OUTLET BOX. <br />2)RELAY: EXTERNALLY MOUNTED THROUGH A 1/2-INCH KNOCKOUT IN A STANDARD ELECTRICAL <br />ENCLOSURE. MOUNT RELAY ABOVE ACCESSIBLE CEILING NEAR ENTRY DOOR TO ROOM OR AREA. <br />3)TIME DELAY AND SENSITIVITY ADJUSTMENTS: RECESSED AND CONCEALED. <br />4.INDICATOR: LED TO SHOW WHEN MOTION IS BEING DETECTED DURING TESTING AND NORMAL <br />OPERATION OF THE SENSOR. <br />5.BYPASS SWITCH: OVERRIDE THE ON FUNCTION IN CASE OF SENSOR FAILURE. <br />6.POWER SUPPLY AND CHILD PACKS: PROVIDE AS REQUIRED FOR SENSOR QUANTITY AND SWITCHING <br />SCHEME. MOUNT TO STANDARD 1/2" KNOCKOUT ON ELECTRICAL BOX ABOVE ACCESSIBLE CEILING NEAR <br />ENTRY DOOR TO ROOM OR AREA. SENSOR POWER SHALL BE FROM EMERGENCY CIRCUIT IF EMERGENCY <br />LIGHTING IS IN THE AREA. <br />7.DETECTION COVERAGE (ROOM): DETECT OCCUPANCY ANYWHERE IN AN AREA BASED ON HAND MOTION. <br />8.DETECTION COVERAGE (CORRIDOR): DETECT OCCUPANCY BASED ON A HALF-STEP MOTION. <br />a.(A); ULTRASONIC TWO-SIDED CORRIDOR COVERAGE OCCUPANCY/VACANCY SENSOR: FREQUENCY <br />GREATER THAN 32 KHZ SOLID STATE, ADJUSTABLE SENSITIVITY AND TIME DELAY, TEMPERATURE AND <br />HUMIDITY RESISTANT RECEIVERS. SENSOR SHALL CONTROL ALL CIRCUITS IN AREA, UNLESS NOTED <br />OTHERWISE. <br />1)MANUFACTURERS: <br />a)WATT STOPPER WT-2250 SERIES <br />b)HUBBELL OMNI-US OR ATU SERIES <br />c)GREENGATE ODC-U SERIES <br />b.BLANK (OR D); DUAL TECHNOLOGY 360 DEGREE COVERAGE OCCUPANCY/VACANCY SENSOR: <br />COMBINATION OF PIR AND ULTRASONIC OR ACOUSTIC DETECTION METHODS IN AREA OF COVERAGE. <br />PARTICULAR TECHNOLOGY OR COMBINATION OF TECHNOLOGIES THAT CONTROLS ON AND OFF <br />FUNCTIONS SHALL BE SELECTABLE IN THE FIELD BY OPERATING CONTROLS ON UNIT. FREQUENCY <br />GREATER THAN 40 KHZ. DUAL SENSING VERIFICATIONS (REQUIRES BOTH TECHNOLOGIES TO <br />ACTIVATE), EITHER TECHNOLOGY MAINTAINS ON STATUS. INTEGRATED AMBIENT LIGHT LEVEL <br />SENSOR (2 TO 200 FC RANGE), ADJUSTABLE SENSITIVITY AND TIME DELAY, SENSOR SHALL CONTROL <br />ALL CIRCUITS IN AREA, UNLESS NOTED OTHERWISE. <br />1)MANUFACTURERS: <br />a)WATT STOPPER DT 300/200 SERIES <br />b)HUBBELL OMNI-DT2000 / LODTRP / ATD2000C SERIES <br />c)GREENGATE OAC-DT SERIES <br />d)LEVITON OSC-MOW / OSM12 SERIES <br />e)SENSOR SWITCH CM PDT 10 / WVPDT 16 SERIES (ACOUSTIC) <br />2.5 AUTOMATIC LOAD CONTROL RELAY (ALCR) <br />A.ALCR20; AUTOMATIC LOAD CONTROL RELAY ALCR, 120/277 VOLT, DRY/DAMP LISTED, 32°F TO 113°F <br />(0°C TO 45°C) OPERATING TEMPERATURE, PLENUM NEMA 1 RATED, TEST BUTTON WITH VISUAL <br />INDICATOR, REMOTE TEST AND FIRE ALARM CONTROL, UL924 LISTED LATEST EDITION, <br />ELECTRICAL CODE ARTICLE 700 COMPLIANT. <br />1.RATING: <br />a.20 AMP (16 A PERMITTED) LED DRIVER AND BALLAST. <br />b.10 A (1,200 WATT) INCANDESCENT. <br />2.LIGHTING CONTROL COORDINATION: PROVIDE ALCR DEVICE COMPATIBLE WITH DESIGNATED <br />LIGHTING ZONE CONTROLS. EXAMPLE: SWITCHED, 0-10 VOLT DIMMING, DALI CONTROL, 2 WIRE <br />DIMMING, OR DMX. <br />3.OPERATION: <br />a.ALCR DEVICE SHALL ALLOW THE SAME LOCAL LIGHTING CONTROL DEVICES TO CONTROL <br />BOTH THE NORMAL LIGHTS AND EMERGENCY DESIGNATED LIGHTING. DEVICES THAT <br />REQUIRE SEPARATE LOCAL LIGHTING CONTROLS FOR THE NORMAL AND DESIGNATED <br />EMERGENCY LIGHTING ARE NOT ALLOWED. <br />b.ALCR DEVICE SHALL MONITOR THE NORMAL POWER CIRCUIT AND SHUNT/BYPASS THE <br />LOCAL LIGHTING CONTROLS UPON LOSS OF POWER, REMOTE TEST SWITCH, OR FIRE <br />ALARM OVERRIDE TO PROVIDE FULL LUMEN OUTPUT FOR DESIGNATED EMERGENCY <br />LIGHTING. <br />c.ALCR DEVICE SHALL RETURN DESIGNATED EMERGENCY LIGHTING TO LOCAL LIGHTING <br />CONTROL AFTER A 15-MINUTE DELAY UPON RETURN OF NORMAL POWER OR REMOTE <br />TEST/FIRE ALARM OVERRIDE RELEASE. <br />d.EQUIVALENT FACILITATION AND PERFORMANCE: A LIMITATION OF EQUIVALENT <br />COMPARABLE PRODUCTS MAY REQUIRE SOME OF THE REQUIRED FUNCTIONS OF THE <br />ALCR DEVICE TO BE PROVIDED BY AN ALTERNATIVE COMPONENT OF THE LIGHTING <br />CONTROL SYSTEM. THE FOLLOWING FUNCTIONS MAY BE PERFORMED BY ALTERNATIVE <br />COMPONENTS OF THE LIGHTING CONTROL SYSTEM WHEN THE DEVICE IS LISTED FOR THE <br />REQUIRED FUNCTION AND COMPATIBLE WITH THE LIGHTING CONTROL SYSTEM: <br />1)REMOTE TEST SWITCH / FIRE ALARM OVERRIDE INTERFACE. <br />2)THE 15-MINUTE TIME DELAY UPON RETURN OF NORMAL POWER OR REMOTE <br />TEST/FIRE ALARM OVERRIDE RELEASE. <br />3)TEST SWITCH MOUNTING: <br />a)FINISHED SPACES (CEILING HEIGHT 10 FEET OR LESS): FLUSH MOUNT DEVICE IN <br />FINISHED CEILING ADJACENT TO ONE OF THE EMERGENCY LIGHTS. <br />b)FINISHED SPACES (CEILING HEIGHT GREATER THAN 10 FEET): FLUSH MOUNTED IN <br />WALL. REFER TO ARCHITECT/ENGINEER FOR LOCATION. <br />c)UNFINISHED SPACES: ADJACENT AND ALIGNED WITH LOCAL WALL-MOUNTED <br />LIGHTING CONTROLS. <br />d)OPTION: ALCR DEVICE(S) WITH A TEST BUTTON, VISUAL INDICATOR, AND FLUSH <br />MOUNTING PLATE MAY BE INSTALLED IN THE LOCATION OF THE REMOTE TEST <br />SWITCH IN LIEU OF PROVIDING A SEPARATE REMOTE TEST SWITCH. <br />4.MANUFACTURERS: <br />a.LVS CONTROLS EPC-2 (SWITCHED) <br />b.LVS CONTROLS EPC-2-D SERIES (0-10V DIMMING) <br />c.LVS CONTROLS EPC-DMX (DMX) EPC SERIES (ALTERNATIVE LIGHTING CONTROL) <br />d.IOTA ETS-20 (SWITCHED) <br />e.IOTA ETC-20-DR (0-10V DIMMING) <br />f.IOTA ETC SERIES (ALTERNATIVE LIGHTING CONTROL) <br />g.MYERS EMERGENCY POWER SYSTEMS RLY-SW-2 (SWITCHED) <br />h.MYERS EMERGENCY POWER SYSTEMS RLY-DIM-2D (0-10V DIMMING) <br />i.MYERS EMERGENCY POWER SYSTEMS RLY SERIES (ALTERNATIVE LIGHTING CONTROL) <br />j.NINE24 INC ELCR-R (SWITCHED) <br />k.NINE24 ELCR-Z10 (0-10V DIMMING) <br />l.NINE24 ELCR SERIES (ALTERNATIVE LIGHTING CONTROL) <br />m.LIGHTING CONTROL MANUFACTURER <br />2.6 BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS) <br />A.BCELTS; BRANCH CIRCUIT EMERGENCY LIGHTING TRANSFER SWITCH (BCELTS), 120/277 VOLT, <br />DRY/DAMP LISTED, 32⁰F TO 113⁰F (0⁰C TO 45⁰C) OPERATING TEMPERATURE, PLENUM NEMA 1 <br />RATED, TEST BUTTON WITH VISUAL INDICATOR, REMOTE TEST AND FIRE ALARM CONTROL, UL1008 <br />LISTED, UL924 LISTED LATEST EDITION, ELECTRICAL CODE ARTICLE 700 COMPLIANT. <br />1.RATING: 20 AMP (16 A PERMITTED) LED DRIVER, BALLAST, INCANDESCENT. <br />2.LIGHTING CONTROL COORDINATION: PROVIDE BCELTS DEVICE COMPATIBLE WITH <br />DESIGNATED LIGHTING ZONE CONTROLS. EXAMPLE: SWITCHED, 0-10 VOLT DIMMING, DALI <br />CONTROL, 2 WIRE DIMMING, OR DMX. <br />3.OPERATION: <br />a.BCELTS DEVICE SHALL ALLOW THE SAME LOCAL LIGHTING CONTROL DEVICES TO <br />CONTROL BOTH THE NORMAL LIGHTS AND EMERGENCY DESIGNATED LIGHTING. DEVICES <br />THAT REQUIRE SEPARATE LOCAL LIGHTING CONTROLS FOR THE NORMAL AND <br />DESIGNATED EMERGENCY LIGHTING ARE NOT ALLOWED. <br />b.BCELTS DEVICE SHALL MONITOR THE NORMAL POWER CIRCUIT, SHUNT/BYPASS THE <br />LOCAL LIGHTING CONTROLS, AND TRANSFER THE LOAD FROM THE NORMAL CIRCUIT TO <br />THE EMERGENCY CIRCUIT UPON LOSS OF POWER, REMOTE TEST SWITCH, OR FIRE ALARM <br />OVERRIDE TO PROVIDE FULL LUMEN OUTPUT FOR DESIGNATED EMERGENCY LIGHTING. <br />c.BCELTS DEVICE SHALL RETURN DESIGNATED EMERGENCY LIGHTING TO LOCAL LIGHTING <br />CONTROL AFTER A 15-MINUTE DELAY UPON RETURN OF NORMAL POWER OR REMOTE <br />TEST/FIRE ALARM OVERRIDE RELEASE. <br />d.EQUIVALENT FACILITATION AND PERFORMANCE: A LIMITATION OF EQUIVALENT <br />COMPARABLE PRODUCTS MAY REQUIRE SOME OF THE REQUIRED FUNCTIONS OF THE <br />BCELTS DEVICE TO BE PROVIDED BY AN ALTERNATIVE COMPONENT OF THE LIGHTING <br />CONTROL SYSTEM. THE FOLLOWING FUNCTIONS MAY BE PERFORMED BY ALTERNATIVE <br />COMPONENTS OF THE LIGHTING CONTROL SYSTEM WHEN THE DEVICE IS LISTED FOR THE <br />REQUIRED FUNCTION AND COMPATIBLE WITH THE LIGHTING CONTROL SYSTEM. <br />1)REMOTE TEST SWITCH / FIRE ALARM OVERRIDE INTERFACE. <br />2)THE 15-MINUTE TIME DELAY UPON RETURN OF NORMAL POWER OR REMOTE <br />TEST/FIRE ALARM OVERRIDE RELEASE. <br />e.ACCESSORY -REMOTE TEST SWITCH: PROVIDE A REMOTE BUTTON TEST SW ITCH. THE <br />TEST SWITCH SHALL BE A SINGLE GANG TYPE SWITCH COMPATIBLE WITH THE BCELTS <br />DEVICE AND ALLOW THE REMOTE FIRE ALARM OVERRIDE TO FUNCTION. <br />f.TEST SWITCH MOUNTING: <br />1)FINISHED SPACES (CEILING HEIGHT 10 FEET OR LESS): FLUSH MOUNT DEVICE IN <br />FINISHED CEILING ADJACENT TO ONE OF THE EMERGENCY LIGHTS. <br />2)FINISHED SPACES (CEILING HEIGHT GREATER THAN 10 FEET): FLUSH MOUNTED IN <br />WALL. REFER TO ARCHITECT/ENGINEER FOR LOCATION. <br />3)UNFINISHED SPACES: ADJACENT AND ALIGNED WITH TO LOCAL WALL MOUNTED <br />LIGHTING CONTROLS. <br />4)OPTION: BCELTS DEVICE(S) WITH A TEST BUTTON, VISUAL INDICATOR, AND FLUSH <br />MOUNTING PLATE MAY BE INSTALLED IN THE LOCATION OF THE REMOTE TEST SWITCH <br />IN LIEU OF PROVIDING A SEPARATE REMOTE TEST SWITCH. <br />4.MANUFACTURERS: <br />a.LVS CONTROLS EPC-D-F-ATS SERIES <br />b.BODINE SIGNIFY GTD20A <br />c.HUBBELL DUAL LITE ATSD/BCCR SERIES <br />d.LIGHTING CONTROL MANUFACTURER <br />e.APPROVED EQUAL <br />PART 3 -EXECUTION <br />3.1 PRE-CONSTRUCTION MEETING <br />A.SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE CONTROLS REPRESENTATIVE, INSTALLING <br />CONTRACTOR, ARCHITECT/ENGINEER, AND OWNER TO EXPLAIN THE PROPOSED LIGHTING <br />CONTROL SYSTEM AND INTEGRATION WITH OTHER SYSTEMS AS WHEN APPLICABLE PER THE <br />DESIGN DOCUMENTS. <br />3.2 EXAMINATION <br />A.VERIFY THAT SURFACES ARE READY TO RECEIVE WORK. <br />B.VERIFY FIELD DIMENSIONS AND COORDINATE PHYSICAL SIZE OF ALL EQUIPMENT WITH THE <br />ARCHITECTURAL REQUIREMENTS OF THE SPACES INTO WHICH THEY ARE TO BE INSTALLED. <br />ALLOW SPACE FOR ADEQUATE VENTILATION AND CIRCULATION OF AIR. <br />C.VERIFY THAT REQUIRED UTILITIES ARE AVAILABLE, IN PROPER LOCATION, AND READY FOR USE. <br />D.BEGINNING OF INSTALLATION MEANS INSTALLER ACCEPTS EXISTING CONDITIONS. <br />3.3 INSTALLATION <br />A.INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND APPROVED SHOP <br />DRAWINGS. <br />B.ALL WIRING SHALL BE INSTALLED IN CONDUIT. <br />C.LOW VOLTAGE CABLING (LESS THAN 100 VOLTS): LOW VOLTAGE LIGHTING CONTROL CABLING <br />SHALL BE PLENUM LISTED. LOW VOLTAGE CABLES IN NON-ACCESSIBLE AREAS SHALL BE <br />INSTALLED IN CONDUIT. LOW VOLTAGE LIGHTING CONTROL CABLE MAY BE INSTALLED WITHOUT <br />CONDUIT IN ACCESSIBLE AREAS USING THE FOLLOWING TYPES OF CABLE SUPPORTS. CABLE <br />SUPPORT TYPES/SYSTEMS SHALL COMPLY WITH THE WARRANTY REQUIREMENTS OF THE LOW <br />VOLTAGE CABLE MANUFACTURER. <br />1.J-HOOKS; BATWING TYPE. <br />2.BRIDLE RINGS WITH SADDLE SUPPORTS. <br />3.LOW VOLTAGE CABLE BATWINGS SUPPORTED BY INDEPENDENT LUMINAIRE SUPPORT <br />SYSTEMS (LUMINAIRE SUPPORT CABLING); USE OF BATWINGS ON CEILING SUPPORT SYSTEMS <br />NOT ALLOWED. <br />4.LISTED CABLE TIES. LOW VOLTAGE CABLING SECURED TO EXTERIOR OF LUMINAIRE POWER <br />RACEWAY. <br />D.ALL BRANCH LOAD CIRCUITS SHALL BE LIVE TESTED BEFORE CONNECTING THE LOADS TO THE <br />LIGHTING CONTROL PANEL. <br />3.4 BRANCH CIRCUIT POWER WIRING FOR CONTROLLERS <br />1.BRANCH CIRCUIT POWER FOR THE FOLLOWING LIGHTING CONTROL SYSTEM COMPONENTS SHALL BE <br />PROVIDED FROM THE FOLLOWING BRANCHES. LIGHTING CONTROL POWER SHALL ORIGINATE FROM THE <br />SAME BRANCH CIRCUITS SERVING THE CONTROLLED LUMINAIRES: <br />a.ROOM CONTROLLERS, LIGHTING CONTROL POWER SUPPLIES, DEVICES, COMPONENTS, AND <br />ACCESSORIES WHEN AN ASSOCIATED (ALCR) DEVICE IS APPLICABLE TO THE LIGHTING CONTROL <br />SEQUENCE OF OPERATION:LIFE SAFETY BRANCH (ELECTRICAL CODE ARTICLE 517) <br />b.ROOM CONTROLLERS, LIGHTING CONTROL POWER SUPPLIES, DEVICES, COMPONENTS, AND <br />ACCESSORIES WHEN AN ASSOCIATED (BCELTS) DEVICE IS APPLICABLE TO THE LIGHTING CONTROL <br />SEQUENCE OF OPERATION: THE LOAD SIDE OF THE BCELTS DEVICE NORMAL AND EMERGENCY/LIFE <br />SAFETY PENDING THE STATUS OF THE BCELTS. <br />c.THE CONTRACTOR SHALL COORDINATE THE BRANCH CIRCUIT POWER SOURCE REQUIRED WITH THE <br />ENGINEER WHEN REQUIRED FOR UNIQUE LIGHTING CONTROL SYSTEM DEVICES, COMPONENTS, AND <br />ACCESSORIES. <br />3.5 LOW VOLTAGE LIGHTING CONTROL CABLING <br />A. CONTROL CABLE RACEWAY ROUTING:ALL WIRING SHALL BE INSTALLED IN CONDUIT. <br />B.CONTROL CABLING INSTALLED WITH LINE VOLTAGE WIRING: WHEN LOW VOLTAGE CONTROL <br />CABLING IS INSTALLED WITH LINE-VOLTAGE WIRING, THE CONTROL WIRING SHALL BE, COPPER <br />CONDUCTORS, MINIMUM 16 AWG OR PER MANUFACTURER, WITH CABLE INSULATION EQUAL TO <br />THE LINE-VOLTAGE RATING (VOLTAGE, TEMP RATING, ETC.) AND COMPLY WITH SPECIFICATION <br />SECTION 26 05 13 "WIRE AND CABLE." <br />C.NETWORK CABLING: AS REQUIRED BY MANUFACTURER. <br />D.SPLICES AND TAPS: TAPPING OR WIRE TRAP CONNECTORS SHALL BE USED TO SPLICE ALL CLASS <br />1 AND CLASS 2 CONTROL WIRING. TWIST-ON, WIRE-NUT TYPE CONNECTORS ARE NOT ALLOWED. <br />3.6 AUTOMATIC LOAD CONTROL RELAYS (ALCR20, ALCR3) AND BRANCH CIRCUIT EMERGENCY LIGHTING <br />TRANSFER SWITCH (BCELTS) <br />A.FIELD INSTALL PER MANUFACTURER REQUIREMENTS. <br />B.REMOTE TEST SWITCH: PROVIDE CONNECTION TO REMOTE TEST SWITCH. <br />C.FIRE ALARM OVERRIDE: PROVIDE CONNECTION TO ADDRESSABLE FIRE ALARM RELAY. <br />3.7 SUPPORT SERVICES <br />A.SYSTEM STARTUP: <br />1.MANUFACTURER SHALL PROVIDE FACTORY AUTHORIZED TECHNICIAN TO CONFIRM PROPER <br />INSTALLATION AND OPERATION OF ALL SYSTEM COMPONENTS. <br />B.PRE-PROGRAM, TESTING, TRAINING COORDINATION: <br />1.THE CONTRACTOR AND MANUFACTURER SHALL PROVIDE ON SITE REPRESENTATIVES TO <br />PROVIDE FINAL PROGRAMMING INCLUDING PRESET, SCENE, SWITCH LABELING, AND OTHER <br />PROGRAMMING ADJUSTMENTS BASED ON OWNER AND DESIGN TEAM ONSITE OBSERVATION <br />AND VERBALLY REQUESTED ADJUSTMENTS AS PART OF THE BASED BID SCOPE OF WORK. <br />2.THE CONTRACTOR SHALL DOCUMENT ONSITE REQUESTED CHANGES AND UPDATE <br />OPERATION AND MAINTENANCE MANUALS TO MATCH FINAL PROGRAMMING. <br />C.TESTING: <br />1.SYSTEM SHALL BE COMPLETELY FUNCTIONAL TESTED BY A FACTORY-AUTHORIZED <br />TECHNICIAN. ALL LOADS SHALL BE TESTED LIVE FOR CONTINUITY AND FREEDOM FROM <br />DEFECTS, AND ALL CONTROL WIRING SHALL BE TESTED FOR CONTINUITY AND CONNECTIONS <br />PRIOR TO ENERGIZING THE SYSTEM COMPONENTS. <br />2.PROGRAMMING OF INITIAL ZONES, SCHEDULES, LIGHTING LEVELS, CONTROL STATION <br />GROUPS, AND SENSOR SETTINGS SHALL BE PERFORMED BY A FACTORY-AUTHORIZED <br />TECHNICIAN. LIGHTING CONTROL SEQUENCE OF OPERATION SHALL SERVE AS A BASIS FOR <br />PROGRAMMING, HOWEVER, ALL FINAL DECISIONS REGARDING GROUPS AND SCHEDULES <br />SHALL BE AT THE DIRECTION OF THE OWNER. THE FOLLOWING PROCEDURES SHALL BE <br />PERFORMED AT A MINIMUM: <br />a.CONFIRM OCCUPANCY SENSOR PLACEMENT, SENSITIVITY, AND TIME DELAY SETTINGS TO <br />MEET SPECIFIED PERFORMANCE CRITERIA. <br />b.CONFIRM CONTROL STATION LABELING, PRESETS, SWITCH LABELS, AND SCENES. <br />3.VERIFY OCCUPANCY/VACANCY SENSOR OPERATION IS CORRECT AFTER FURNITURE AND <br />EQUIPMENT IS INSTALLED IN EACH AREA. MAKE ADJUSTMENTS TO SENSOR SETTINGS AND <br />TIME DELAYS TO ALLOW PROPER OPERATION. <br />4.VERIFY OCCUPANCY/VACANCY SENSORS ARE LOCATED TO PROVIDE COMPLETE COVERAGE <br />FOR THE AREA SERVED WITH NO NUISANCE SWITCHING. <br />a.RELOCATE SENSORS OR PROVIDE ADDITIONAL SENSORS AS NECESSARY TO PROVIDE <br />ADEQUATE COVERAGE. <br />b.MASK OCCUPANCY SENSORS WHERE NECESSARY TO PREVENT NUISANCE SWITCHING <br />FROM ADJACENT AREAS. <br />3.8 SYSTEM COMMISSIONING <br />A.CONTRACTORS' TESTS SHALL BE SCHEDULED AND DOCUMENTED IN ACCORDANCE WITH THE <br />COMMISSIONING REQUIREMENTS. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR <br />FURTHER DETAILS. <br />B.MASK SENSORS WHERE NECESSARY TO PREVENT NUISANCE SW ITCHING FROM ADJACENT AREAS. <br />C.SYSTEM VERIFICATION TESTING IS PART OF THE COMMISSIONING PROCESS. VERIFICATION TESTING <br />SHALL BE PERFORMED BY THE CONTRACTOR AND WITNESSED AND DOCUMENTED BY THE <br />COMMISSIONING AGENT. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR SYSTEM <br />VERIFICATION TESTS AND COMMISSIONING REQUIREMENTS. <br />D.TRAINING OF THE OWNER'S OPERATION AND MAINTENANCE PERSONNEL IS REQUIRED IN <br />COOPERATION WITH THE OWNER'S REPRESENTATIVE. THE INSTRUCTION SHALL BE SCHEDULED IN <br />COORDINATION WITH THE OWNER'S REPRESENTATIVE AFTER SUBMISSION AND APPROVAL OF <br />FORMAL TRAINING PLANS. REFER TO SECTION 01 09 00, GENERAL COMMISSIONING, FOR <br />CONTRACTOR TRAINING REQUIREMENTS. <br />END OF SECTION 26 09 33 <br />SW -O; DUAL TECHNOLOGY AUTOMATIC SENSOR WITH WALL SWITCH (STANDALONE): <br />1.WALL SWITCH WITH MANUAL ON/AUTO/OFF. 120/277 VAC LOAD LED. 20-MINUTE ADJUSTABLE OFF DELAY. <br />DUAL TECHNOLOGY ULTRASONIC AND PIR COVERAGE OF MINOR MOTION IN 12' X 15' PATTERN AND VACANCY <br />DETECTION IN AREA BASED ON HALF-STEP WALKING MOTION. SENSITIVITY ADJUSTMENTS SEPARATE FOR <br />EACH SENSING TECHNOLOGY. <br />2.MANUFACTURERS: <br />a.WATT STOPPER DW -100 SERIES <br />b.HUBBELL LHMTS <br />c.LEVITON ODSMT SERIES <br />d.SENSOR SWITCH WSX-PDT SA SERIES <br />e.COOPER OWN SERIES <br />c.HB = HIGH-BAY 360 COVERAGE <br />B.SW -1P; SINGLE POLE SWITCH: <br />1.SINGLE THROW, 120/277 VOLT, 20 AMP MAINTAINED CONTACT. TOGGLE HANDLE, SIDE AND BACK WIRED. <br />2.MANUFACTURERS: <br />a.HUBBELL HBL1221 <br />b.LEVITON 1221-2 <br />c.PASS & SEYMOUR PS20AC1 <br />d.COOPER AH1221 <br />e.SENSOR SWITCH nPODM <br />C.SW -3W; THREE-WAY SWITCH: <br />1.SINGLE THROW, 120/277 VOLT, 20 AMP MAINTAINED CONTACT. TOGGLE HANDLE, SIDE AND BACK WIRED. <br />2.MANUFACTURERS: <br />a.HUBBELL HBL1223 <br />b.LEVITON 1223-2 <br />c.PASS & SEYMOUR PS20AC3 <br />d.COOPER AH1223 <br />e.SENSOR SWITCH nPODM <br />c.(HB): HIGHBAY AUTOMATIC SENSOR: 20' TO 40' MOUNTING HEIGHT. MINIMUM 1.3:1 <br />WALKING MOTION COVERAGE PATTERN TO HEIGHT RATIO. ADJUSTABLE SENSITIVITY AND TIME <br />DELAY. SENSOR SHALL CONTROL ALL LUMINAIRES IN AREA. <br />1)MANUFACTURERS: <br />a)WATT STOPPER HB-300 SERIES <br />b)HUBBELL FHB 140 OR HMHB SERIES <br />c)LEVITON OSFHU <br />d)COOPER OEF-P SERIES <br />No. Revisions Date <br />pl <br />a <br />n <br /> <br />c <br />h <br />e <br />c <br />k <br /> <br />r <br />e <br />s <br />u <br />b <br />m <br />i <br />t <br />t <br />a <br />l <br />Plan Check Resubmittal 02/25/2026 <br />02/25/2026