Laserfiche WebLink
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING <br />CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES <br />OR INCONSISTENCIES. <br />2. ALL DRAWINGS, SPECIFICATIONS AND DOCUMENTS ENUMERATED IN THE <br />OWNER/CONTRACTOR AGREEMENT ARE CONSIDERED TO BE PART OF THE <br />CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS <br />PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR <br />SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO START <br />OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK <br />PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE <br />REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN <br />EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT. <br />3. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER <br />GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, <br />CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. WHERE <br />CONFLICTS BETWEEN DRAWINGS AND THE SPECIFICATIONS OCCUR, <br />CONSTRUCTION SHALL FOLLOW THE MORE STRINGENT REQUIREMENT <br />UNLESS OTHERWISE APPROVED BY SEOR. <br />4. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE <br />FOLLOWING CODES: <br />2025 CALIFORNIA BUILDING CODE, CALIFORNIA CODE OF REGULATIONS, TITLE <br />24, PART 2, VOLUME 2 OF 2 AND LATEST REVISIONS ADOPTED PRIOR TO <br />PERMITTING REFERRED TO HERE AS “THE CODE”, AND ANY OTHER <br />REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE <br />WORK, INCLUDING STATE OF CALIFORNIA DIVISION OF OCCUPATIONAL <br />SAFETY AND HEALTH (DOSH), AND THOSE CODES & STANDARDS LISTED IN <br />THESE NOTES AND SPECIFICATIONS. <br />5. ALL REFERENCED STANDARDS SHALL BE THE VERSION INDICATED IN <br />CHAPTER 35 OF THE CODE. <br />6. THE STRUCTURAL CONTRACT DOCUMENTS REPRESENT THE FINISHED <br />STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. <br />CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE <br />STRUCTURE DURING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO <br />BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT ETC. <br />OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER DO NOT <br />INCLUDE REVIEW OF THE ABOVE ITEMS. <br />7. INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR <br />FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS, <br />CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND, <br />NOTIFY THE ARCHITECT IMMEDIATELY. <br />8. OPENINGS, POCKETS, PENETRATIONS, NON-STRUCTURAL EMBEDS, ETC. <br />SHALL NOT BE PLACED IN ANY STRUCTURAL MEMBER EXCEPT AS NOTED OR <br />DETAILED ON THESE DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN <br />DRAWINGS BY OTHERS SHOW SUCH ITEMS PLACED IN A MANNER THAT IS NOT <br />CONSISTENT WITH THE STRUCTURAL DRAWINGS. <br />9. THE CONTRACT STRUCTURAL DRAWINGS SHOW THE BUILDING IN ITS FINAL <br />INTENDED POSITION. MAKE PROVISIONS IN THE CONSTRUCTION <br />SEQUENCING OF THE BUILDING TO TAKE INTO ACCOUNTS SHRINKAGE, <br />CREEP, SHORTENING, THERMAL EXPANSION, ETC. <br />10. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED <br />ROOF OR FLOOR. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER <br />SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE <br />STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. <br />11. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL <br />CRIBBING, SHEATHING AND SHORING REQUIRED AND SHALL BE SOLELY <br />RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING, <br />SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, <br />STREETS AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND <br />LOCAL SAFETY ORDINANCES. <br />12. COORDINATE AND VERIFY EDGE OF SLAB DIMENSIONS PRIOR TO <br />FABRICATION OR PLACEMENT OF FORMWORK. <br />13. OBTAIN AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER <br />AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT. <br />DIAL 811 (OR 1-800-422-4133 FOR SOUTHERN CALIFORNIA PROJECTS) <br />14. THE CONTRACTOR SHALL VERIFY THE EXTENT AND LOCATIONS OF SITE <br />UTILITIES PRIOR TO EXCAVATION OR SHORING , THERE MAY BE <br />DISCREPANCIES BETWEEN THE LOCATION INDICATED ON THE SITE SURVEY <br />AND ACTUAL VERIFIED LOCATIONS. IF THE ACTUAL FIELD VERIFIED LOCATION <br />OF UTILITIES COULD RESULT IN A CONFLICT WITH THE NEW CONSTRUCTION <br />OR SHORING, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY. <br />15. CONTRACTOR SHALL COORDINATE SHORING WITH DRAWINGS OF RECORD TO <br />ENSURE PROVISIONS FOR POCKETS, BLOCKOUTS, OFFSETS, STEPPED <br />FOOTINGS AND ANY OTHER ITEMS AFFECTED BY THE SHORING. <br />16. CONTRACTOR SHALL SUBMIT PLANS SHOWING ALL PROPOSED OPENINGS <br />(SIZE & LOCATIONS) TO AOR & SEOR FOR REVIEW AND APPROVAL BEFORE <br />START OF WORK. <br />GENERALFOUNDATION <br />1. FOUNDATION DESIGN BASED ON CODE MINIMUMS. <br />2. CONVENTIONAL FOUNDATIONS AND SLABS-ON-GRADE SHALL BEAR ON FIRM <br />NATURAL SOIL OR COMPACTED FILL. ALL UNSUITABLE SOILS SHALL BE <br />REMOVED AND RECOMPACTED UNDER THE SUPERVISION OF THE <br />GEOTECHNICAL ENGINEER OR HIS/HER REPRESENTATIVE. REFER TO THE <br />GEOTECHNICAL REPORT AND PROJECT SPECIFICATIONS FOR EXTENT OF <br />REMOVAL AND COMPACTION REQUIREMENTS. <br />3. FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION <br />PAD FOOTINGS <br />ALLOWABLE BEARING PRESSURE = 1.500 PSF <br /> <br />BEARING CAPACITY IS BASED ON 24-INCH MINIMUM FOOTING WIDTH AND 24- <br />INCH MINIMUM FOOTING DEPTH BELOW ADJACENT GRADE. <br />INCREASE FOR SHORT TERM LOADS <br /> <br />ALLOWABLE BEARING PRESSURES MAY BE INCREASED BY 1/3 WHEN APPLIED <br />DEAD AND LIVE LOADS ARE COMBINED WITH WIND AND SEISMIC FORCES. <br />LATERAL RESISTANCE <br />ALLOWABLE PASSIVE EARTH PRESSURE = 150 PCF <br />PASSIVE AND FRICTION RESISTANCE MAY BE COMBINED TO RESIST LATERAL <br />LOADS INCLUDING WIND AND SEISMIC WITHOUT REDUCTION. <br />4. EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR OR <br />THE GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE AND <br />REINFORCING. CONTRACTOR TO NOTIFY THE INSPECTOR OR THE <br />GEOTECHNICAL ENGINEER WHEN INSPECTION OF EXCAVATION IS READY. <br />THE INSPECTOR OR THE GEOTECHNICAL ENGINEER TO SUBMIT LETTER OF <br />COMPLIANCE. <br />5. REMOVE ALL ABANDONED FOOTINGS, UTILITIES, ETC. <br />6. FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS <br />SHOWN ON DRAWINGS. SHOULD SOIL ENCOUNTERED AT THESE DEPTHS NOT <br />BE APPROVED BY THE INSPECTOR OR SOILS ENGINEER, FOUNDATION <br />ELEVATIONS WILL BE ALTERED BY CHANGE ORDER. <br />7. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE <br />BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS <br />ATTAINED FULL DESIGN STRENGTH. BRACE OR PROTECT ALL BUILDING AND <br />PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS <br />ARE IN PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL <br />PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF SUCH BRACING. <br />8. FOOTING BACKFILL AND UTILITY BACKFILL WITHIN BUILDING AREA SHALL BE <br />MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS <br />REPORT AND APPROVED BY THE SOILS ENGINEER. FLOODING WILL NOT BE <br />PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BE <br />INSPECTED BY THE SOILS ENGINEER REPRESENTATIVE PER CODE SECTION <br />1705.6 & TABLE 1705.6. <br />9. PLACE A MOISTURE BARRIER MEMBRANE OVER SAND AND GRAVEL BASE <br />UNDER SLABS-ON-GRADE PER THE GEOTECHNICAL REPORT, OR AS <br />INDICATED ON THE DRAWINGS AND PROJECT SPECIFICATIONS. <br />1. STRUCTURAL OBSERVATION SHALL BE PERFORMED BY THE STRUCTURAL <br />ENGINEER OF RECORD OR DESIGNEE IN ACCORDANCE WITH SECTION <br />1704.6 OF THE CODE. <br />2. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE <br />ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEM AT <br />SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE <br />FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND <br />SPECIFICATION. STRUCTURAL OBSERVATION DOES NOT WAVE THE <br />RESPONSIBILITY FOR THE INSPECTIONS REQUIRED OF THE CITY OR <br />DEPUTY INSPECTORS. <br />3. THE CONTRACTOR SHALL COORDINATE AND CALL FOR A PRE- <br />CONSTRUCTION MEETING BETWEEN THE ENGINEER OR ARCHITECT <br />RESPONSIBLE FOR THE STRUCTURAL DESIGN. STRUCTURAL OBSERVER, <br />CONTRACTOR, AFFECTED SUBCONTRACTORS, PROJECT INSPECTOR. THE <br />PURPOSE OF THE MEETING SHALL BE TO IDENTIFY THE MAJOR <br />STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL <br />AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW <br />SCHEDULING OF THE REQUIRED OBSERVATIONS. <br />4. THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE <br />STEPS IN THE PROGRESS OF THE WORK THAT ALLOW FOR CORRECTION OF <br />DEFICIENCIES WITHOUT SUBSTANTIAL EFFORT OR UNCOVERING OF THE <br />WORK INVOLVED. AT A MINIMUM, THE FOLLOWING SIGNIFICANT <br />CONSTRUCTION STAGES REQUIRE A SITE VISIT AND AN OBSERVATION <br />REPORT FROM THE STRUCTURAL OBSERVER. <br />CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE <br />OBSERVED <br />FOUNDATIONS REINF/CONC/ANCHOR BOLTS <br />5. THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT FOR EACH <br />SIGNIFICANT STATE OF CONSTRUCTION OBSERVED. A COPY OF THE <br />OBSERVATION REPORT SHALL BE SENT TO THE OWNER, CONTRACTOR AND <br />INSPECTOR OF RECORD (IOR). <br />STRUCTURAL OBSERVATIONS <br />1. THE FOLLOWING ELEMENTS OF CONSTRUCTION SHALL HAVE CONTINUOUS <br />INSPECTION BY A PROJECT INSPECTOR APPROVED BY THE JURISDICTION. <br />A. CONCRETE. <br />B. BOLTS INSTALLED IN CONCRETE. <br />C. PLACING OF REINFORCING STEEL. <br />D. EXPANSION ANCHORS. <br />E. EPOXY ANCHORS. <br />F. HIGH STRENGTH BOLTS. <br />2. ALL SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF SECTION 1704 OF THE CODE AND ANY ADDITIONAL <br />REQUIREMENTS STATED IN THESE DRAWINGS AND/OR THE PROJECT <br />SPECIFICATIONS. <br />SPECIAL INSPECTIONS <br />1. TEST AND INSPECTIONS SHALL CONFORM TO THE REQUIREMENTS OF <br />CHAPTER 17, SECTION 1704 OF THE CODE. <br />2. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE <br />MADE BY AN ADDENDA OR CHANGE ORDER APPROVED BY THE CITY. <br />3. A PROJECT INSPECTOR EMPLOYED BY THE OWNER AND APPROVED BY THE <br />CITY SHALL PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES <br />OF THE INSPECTOR ARE DEFINED IN SECTION 4-342, PART 1, TITLE 24 <br />CALIFORNIA CODE OF REGULATIONS. <br />TEST AND INSPECTION REQUIREMENTS <br />CONCRETE <br />1. ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE <br />CODE AND WITH THE PROVISIONS OF ACI 318-19. <br />2. REINFORCED CONCRETE IS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN <br />METHOD". <br />3. CONCRETE MIXTURES SHALL BE DESIGNED BY THE APPROVED TESTING <br />LABORATORY AND REVIEWED BY THE STRUCTURAL ENGINEER. THE <br />COMPRESSIVE STRENGTH OF THE CONCRETE SHALL BE PROPORTIONED <br />BASED AS INDICATED ON ACI 318. <br />4. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES <br />5. PROVIDE CONCRETE MIXTURES THAT MEET THE DURABILITY REQUIREMENTS <br />INDICATED IN THE GEOTECHNICAL REPORT AND PROJECT SPECIFICATIONS. <br />6. CONCRETE SHRINKAGE SHALL BE LIMITED TO 0.05 PERCENT PER ASTM C157. <br />7. CONCRETE SHALL BE MAINTAINED ABOVE 50 DEGREES FAHRENHEIT AND IN <br />MOIST CONDITION FOR A MINIMUM OF 7 DAYS AFTER PLACEMENT. <br />8. CEMENT TYPE PER SCHEDULE ABOVE OR ASTM C-595 FOR TYPE 1L, AS AN <br />ALTERNATIVE. SEE 03 30 00 CAST-IN-PLACE CONCRETE SPEC FOR MORE <br />DETAILS. <br />9. AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL <br />REQUIREMENTS AND TESTS OF ASTM C-33 AND PROJECT SPECIFICATIONS. <br />10. CONCRETE MIXING OPERATIONS, ETC. SHALL CONFORM TO ASTM C-94.. <br />11. PLACEMENT OF CONCRETE SHALL CONFORM TO THE CODE CHAPTER 19 AND <br />PROJECT SPECIFICATIONS. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL <br />CONCRETE SURFACES AGAINST WHICH NEW CONCRETE IS TO BE PLACED <br />UNLESS NOTED OTHERWISE. <br />12. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS, <br />INCLUDING PIPES AND CONDUITS, SHALL BE SECURED IN POSITION PRIOR TO <br />PLACING CONCRETE. <br />13. PROVIDE SLEEVES FOR PIPES AND CONDUITS PASSING THROUGH CONCRETE <br />MEMBERS INCLUDING CONCRETE OVER METAL DECK BEFORE PLACING. DO <br />NOT CUT REINFORCING WHICH MAY CONFLICT. SLEEVES SHALL NOT EXCEED <br />6-INCHES IN DIAMETER AND SHALL BE SPACED A MINIMUM OF 3 DIAMETERS <br />APART FROM OTHER SLEEVES USING THE LARGER SLEEVE DIAMETER, OR AS <br />INDICATED ON THE DRAWINGS. CLUSTERS OF SLEEVES ARE NOT PERMITTED <br />WITHOUT THE PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. <br />14. CORING IN CONCRETE IS NOT PERMITTED WITHOUT ARCHITECT REVIEW AND <br />APPROVAL. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS <br />NOT SHOWN ON THE DRAWINGS. <br />15. CONDUITS LARGER THAN 1-1/2" DIAMETER MAY BE EMBEDDED IN <br />STRUCTURAL CONCRETE WHERE SPECIFICALLY APPROVED BY STRUCTURAL <br />ENGINEER. UNLESS DETAILED OTHERWISE, EMBEDDED CONDUIT SHALL <br />CONFORM TO THE FOLLOWING: <br />A. CONDUITS SHALL NOT DISPLACE OR INTERRUPT REINFORCING <br />BARS. <br />B. DO NOT STACK AND/OR CLUSTER CONDUITS. <br />C. SPACE EMBEDDED CONDUITS A MINIMUM OF 3 DIAMETERS <br />CLEAR FROM OTHER EMBEDDED CONDUITS USING THE LARGER <br />CONDUIT DIAMETER. <br />D. PROVIDE 1-1/2" CLEAR FROM REINFORCING BARS. <br />E. NO HORIZONTAL CONDUITS SHALL BE PLACED IN CONCRETE <br />FILL OVER METAL DECK. <br />F. EMBEDDED CONDUITS SHALL BE PLACE IN THE MIDDLE THIRD <br />OF SLABS, BEAMS, WALLS, FOOTINGS, ETC. <br />16. PIPES ARE NOT PERMITTED TO BE EMBEDDED IN CONCRETE. <br />LOCATION <br />EXPOSURE <br />CLASSES MIN <br />STRENGTH <br />f'c (PSI)F S W C <br />MAX <br />WATER/ <br />CEMENT <br />RATIO <br />CEMENT <br />TYPE <br />(ASTM C150) <br />DENSITY <br />FOOTINGS 4,500 0.45 145II/VC1F0S0W0 <br />WOOD <br />1. COMPLY WITH THE REQUIREMENTS IN CHAPTER 23 OF THE CODE AND AF&PA'S <br />WCD 1, "DETAILS FOR CONVENTIONAL WOOD FRAME CONSTRUCTION," <br />UNLESS OTHERWISE INDICATED. <br />2. DIMENSIONAL LUMBER FRAMING: <br />A. SPECIES, GRADE, AND MOISTURE CONTENT NOTED BELOW: <br />3. FASTENERS: <br />A. WHERE ROUGH CARPENTRY IS EXPOSED TO WEATHER, IN GROUND <br />CONTACT, PRESERVATIVE TREATED, FIRE RETARDANT TREATED, OR IN <br />AREA OF HIGH RELATIVE HUMIDITY, PROVIDE FASTENERS W ITH HOT-DIP <br />ZINC COATING COMPLYING WITH ASTM A 153. <br />B. NAILS: ASTM F1667, COMMON TYPE. <br />4. WOOD CONNECTORS: <br />A. PROVIDED BASIS OF DESIGN HANGERS, STRAPS, TIES, HOLD DOWNS, ETC, <br />AS INDICATED ON THE DRAWINGS. <br />B. WHERE CONNECTORS ARE IN EXPOSED, EXTERIOR APPLICATIONS OR IN <br />CONTACT WITH PRESERVATIVE TREATED LUMBER, PROVIDE HOT-DIP <br />GALVANIZED OR STAINLESS STEEL CONNECTORS. <br />5. WHERE POSTS OR MULTIPLE STUDS UNDER BEAMS OR HEADERS ARE CALLED <br />FOR ON DRAWINGS THOSE POSTS OR MULTIPLE STUDS SHALL BE CARRIED TO <br />THE FOUNDATION/PODIUM LEVEL U.N.O. <br />6. ALL NAILING/SCREWING SHALL CONFORM TO THE APPLICABLE BUILDING CODE <br />AND REGULATIONS. <br />7. ALL BOLT HOLES SHALL BE DRILLED 1/32" TO 1/16" OVERSIZED AND SHALL BE <br />APPROVED BY THE BUILDING INSPECTOR PRIOR TO COVERING. <br />8. ALL BOLT HEADS AND NUTS WHICH BEAR AGAINST THE FACE OF WOOD <br />MEMBERS SHALL BE PROVIDED WITH METAL WASHERS (1/4"x3"x3" MIN). <br />9. ALL 1/2" DIAMETER AND LARGER BOLTS CALLED OUT ON DRAWINGS, <br />INCLUDING ANCHOR BOLTS (A.B.) SHALL HAVE STEEL SQUARE PLATE <br />WASHERS AS LISTED BELOW UNDER THE HEAD AND/OR NUT BEARING ON <br />WOOD. (ALL ANCHOR BOLTS SHALL BE 12" LONG, UNLESS NOTED OTHERWISE. <br />10. FRAMING ACCESSORIES AND STRUCTURAL FASTENERS SHALL BE <br />MANUFACTURED BY SIMPSON STRONG TIE (OR ENGINEER APPROVED EQUAL) <br />AND OF THE SIZE AND TYPE SHOWN ON THE DRAWINGS. HARDWARE SHALL BE <br />FULLY NAILED FOR MAXIMUM CAPACITY, UNLESS NOTED OTHERWISE. <br />11. ALL NAILS CONNECTING WOOD MEMBERS SHALL BE COMMON NAILS. MINIMUM <br />NAILING REQUIREMENTS OUTLINED IN TABLE 2304.10.1 SHALL BE FOLLOWED <br />UNLESS OTHERWISE NOTED. <br />12. RETIGHTEN BOLTS BEFORE CLOSING-IN. <br />13. ALL HOLD DOWN ANCHORS AND ALL OTHER ANCHORS AND MISCELLANEOUS <br />METAL HANGERS ARE BY SIMPSON OR APPROVED EQUAL. <br />DIMENSIONAL LUMBER <br />USE SPECIES GRADE MOISTURE <br />CONTENT <br />LUMBER 2" TO 4" THICK x 5" OR <br />WIDER (JOISTS/RAFTERS) <br />DOUGLAS <br />FIR-LARCH #2 & BETTER KD (15%) <br />LUMBER 5x5 AND <br />GREATER (BEAMS) <br />DOUGLAS <br />FIR-LARCH #1 S-DRY (19%) <br />LUMBER 5x5 AND <br />GREATER (POSTS) <br />DOUGLAS <br />FIR-LARCH #1 S-DRY (19%) <br />WASHER - THICKNESS <br />WASHER - WIDTH <br />BOLT DIAMETER <br />2 3/4" <br />5/16"1/4" <br />2 1/2" <br />1/2" 5/8" <br />7/16"3/8" <br />3" 3 1/2" <br />3/4" 7/8" <br />1/2" <br />4" <br />1" <br />1. ALL EXPANSION TYPE ANCHORS SHALL CONSIST OF HILTI KWIK BOLT TZ2 <br />CONCRETE ANCHORS PER ICC ESR-4266 REPORT. INSTALLATION SHALL BE IN <br />CONFORMANCE WITH THE ICC REPORT. <br />2. ALL EPOXY TYPE ANCHORS SHALL CONSIST OF HILTI HIT HY-200 HYBRID <br />ADHESIVE USED IN CONJUNCTION WITH DEFORMED REINFORCING BARS PER <br />ICC REPORT ESR-3187. INSTALLATION OF ANCHORS SHALL BE IN <br />CONFORMANCE WITH THE ICC REPORT. <br />3. WHEN INSTALLING DRILLED IN ANCHORS IN EXISTING NON-PRESTRESSED <br />REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR <br />DAMAGING THE EXISTING REINFORCING BARS. <br />4. THE SPECIAL INSPECTOR MUST BE ON THE JOBSITE PERIODICALLY DURING <br />ANCHOR INSTALLATION TO VERIFY ANCHOR TYPE, ANCHOR DIMENSIONS, <br />CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, PREDRILLED HOLE <br />DIMENSIONS, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS, <br />ANCHOR EMBEDMENT AND TIGHTENING TORQUE. <br />5. TEST ALL POST-INSTALLED ANCHORS AS REQUIRED PER SECTION 1705 OF <br />THE CODE. <br />6. ALL WEDGE ANCHORS SHALL BE CARBON STEEL, UNO. USE STAINLESS <br />STEEL ANCHORS IN EXTERIOR EXPOSURE AND DAMP ENVIRONMENTS. <br />POST-INSTALLED CONCRETE ANCHORS <br />1. REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER <br />19 OF THE CODE, ASTM 706, GRADE 60 (UNO). DEFORMATIONS SHALL BE IN <br />ACCORDANCE WITH ASTM A-305. <br />2. BARS SHALL BE CLEAN OF RUST GREASE OR OTHER MATERIALS LIKELY TO <br />IMPAIR BOND. ALL REINFORCING BAR BENDS SHALL BE MADE COLD. <br />3. DETAIL, FABRICATE, AND INSTALL REINFORCING IN ACCORDANCE WITH THE <br />REQUIREMENTS OF ACI 301, ACI 117, AND THE "CRSI MANUAL OF STANDARD <br />PRACTICE." <br />4. REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE <br />DRAWINGS. MINIMUM SPLICE LENGTH FOR REINFORCING STEEL BARS IN <br />MASONRY SHALL BE 72 BAR DIAMETERS, 36" MINIMUM. MINIMUM SPLICE <br />LENGTH FOR REINFORCING STEEL BARS IN CONCRETE SHALL BE AS <br />REQUIRED FOR CLASS B SPLICE PER ACI 318 SECTION 25.5.2 UNO. LAP ALL <br />HORIZONTAL BARS AT CORNERS AND INTERSECTIONS. <br />5. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN <br />THE FINAL IN-PLACE INSPECTION IS MADE. <br />6. COMPLETE AND DETAILED REINFORCING PLACEMENT DRAWINGS SHALL BE <br />PREPARED AND SUBMITTED TO THE ARCHITECT FOR REVIEW BY THE <br />STRUCTURAL ENGINEER PRIOR TO FABRICATION IN ACCORDANCE WITH THE <br />SPECIFICATIONS AND APPLICABLE CODES. THESE DRAWINGS SHALL BE <br />AVAILABLE ON THE JOB SITE PRIOR TO PLACING OF CONCRETE. <br />7. MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO <br />PLACEMENT OF CONCRETE. <br />8. CONTINUOUS INSPECTION OF CONCRETE SHALL INCLUDE INSPECTION <br />DURING INSTALLATION OF REINFORCING STEEL. INSPECTION SHALL BE <br />SCHEDULED SO THAT PLACEMENT OF REINFORCING STEEL, CONDUIT <br />SLEEVES AND EMBEDDED ITEMS MAY BE CORRECTED PRIOR TO PLACEMENT <br />OF OVERLYING GRIDS OF REINFORCING STEEL. <br />9. CONCRETE PROTECTION FOR REINFORCEMENT: <br />REINFORCING STEEL <br />CAST-IN-PLACE CONCRETE: THE FOLLOWING MINIMUM CONCRETE COVER <br />SHALL BE PROVIDED FOR REINFORCEMENT: <br />CONCRETE CAST AGAINST AND PERMANENTLY <br />EXPOSED TO EARTH <br />#6 & LARGER <br />CONCRETE EXPOSED TO EARTH OR WEATHER <br />MINIMUM <br />COVER <br />3" <br />2" <br />#5 & SMALLER 1 1/2" <br />#14 & LARGER <br />SLABS, WALLS, OR JOISTS NOT EXPOSED TO <br />WEATHER OR IN CONTACT WITH THE GROUND <br />1 1/2" <br />#11 & SMALLER 3/4" <br />BEAM AND COLUMN TIES & STIRRUPS NOT EXPOSED TO <br />WEATHER OR IN CONTACT WITH GROUND <br />1 1/2" <br />SPECIAL INSPECTION NOTES: <br />1. OWNER WILL RETAIN A QUALIFIED, INDEPENDENT SPECIAL INSPECTION AGENCY TO <br />PERFORM SPECIAL INSPECTIONS AND TESTS PER CHAPTER 17 OF THE CODE. REFER <br />TO THE TABLES 1 AND 2 FOR TESTS AND INSPECTIONS THAT WILL BE PERFORMED. <br />2. THE SPECIAL INSPECTOR WILL OBSERVE THE INDICATED WORK FOR COMPLIANCE <br />WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL NON-CONFORMING WORK <br />WILL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND <br />NOTED IN THE INSPECTION REPORTS. <br />3. TESTING FREQUENCIES IDENTIFIED IN THE STATEMENT OF SPECIAL INSPECTION ARE <br />DEFINED AS FOLLOWS: <br />A. CONTINUOUS: THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL <br />INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE <br />THE WORK IS BEING PERFORMED. <br />B. PERIODIC: THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING <br />SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA <br />WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION <br />OF THE WORK. <br />C. OBSERVE: THE SPECIAL INSPECTOR WILL OBSERVE THESE ITEMS ON A RANDOM <br />BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br />D. PERFORM: THE SPECIAL INSPECTOR WILL PERFORM THESE TASKS FOR EACH <br />ELEMENT. <br />E. DOCUMENT: THE SPECIAL INSPECTOR WILL DOCUMENT IN A REPORT THAT THE <br />WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE CONTRACT <br />DOCUMENTS. <br />CONTRACTOR RESPONSIBILITY: <br />1. THE CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE MAIN <br />WIND/SEISMIC FORCE RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR A <br />WIND/SEISMIC FORCE RESISTING COMPONENT LISTED IN TABLE 1 SHALL SUBMIT A <br />WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE <br />OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. <br />THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN THE <br />FOLLOWING: <br />A. ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS <br />CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. <br />B. ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN <br />CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS APPROVED BY THE <br />BUILDING OFFICIAL. <br />C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S <br />ORGANIZATION INCLUDING THE METHOD AND FREQUENCY OF REPORTING AND <br />DISTRIBUTION OF THE REPORTS. <br />D. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH <br />CONTROL AND THEIR POSITION(S) IN THE ORGANIZATION. <br />SPECIAL INSPECTIONS AND TESTING <br />TABLE 1 - REQUIRED SPECIAL INSPECTIONS <br />INSPECTION <br />SYSTEM OR MATERIAL <br />CODE <br />REFERENCE <br />REMARKS <br />CONCRETE <br />1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT <br />3. INSPECT ANCHORS CAST IN CONCRETE <br />4. INSPECT ANCHORS POST-INSTALLED IN HARDENED <br />CONCRETE MEMBERS. <br />A. ADHESIVE ANCHORS INSTALLED IN <br />HORIZONTALLY OR UPWARDLY INCLINED <br />ORIENTATION TO RESIST SUSTAINED TENSION <br />LOADS. <br />B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS <br />NOT DEFINED IN 4A. <br />5. VERIFY USE OF REQUIRED DESIGN MIX <br />6. PRIOR TO CONCRETE PLACEMENT, FABRICATE <br />SPECIMENS FOR STRENGTH TEST, PERFORM SLUMP <br />AND AIR CONTENT TESTS, AND DETERMINE THE <br />TEMPERATURE OF CONCRETE. <br />7. INSPECT CONCRETE PLACEMENT FOR PROPER <br />APPLICATION TECHNIQUES. <br />8. VERIFY MAINTENANCE OF SPECIFIED CURING <br />TEMPERATURE AND TECHNIQUES. <br />ACI 318 CHAPTER 20, <br />25.2 - 25.3, <br />26.6.1 - 26.6.3 <br />TOLERANCE AND REINFORCING <br />PLACEMENT PER ACI 318, SECTION 26.6.2 <br />1705.3 <br />ACI 318 17.8.2 <br />CONTINUOUS <br />INSPECTION REQUIREMENTS PER ICC <br />EVALUATION REPORT. <br />VERIFY THAT ADHESIVE ANCHORS <br />INSTALLED IN HORIZONTALLY OR <br />UPWARDLY INCLINED ORIENTATION <br />ARE INSTALLED BY CERTIFIED <br />INSTALLERS. <br />ACI 318 17.8.2.4 <br />ACI 318 17.8.2 <br />1904.1, 1904.2, ACI 318 CH 19, <br />26.4.3, 26.4.4 <br />CONTINUOUS <br />CONTINUOUS <br />ASTM C172 <br />ASTM C31 <br />ACI 318 26.5, 26.12 <br />ACI 318 26.5 <br />ACI 318 26.5.3 - 26.5.51908.9 <br />VERIFY THAT ALL MIXES USED <br />COMPLY WITH APPROVED <br />CONSTRUCTION DOCUMENTS AND <br />REFERENCED CODES AND <br />STANDARDS <br />REFERENCED <br />STANDARDS <br />INSPECTION <br />TYPE <br />PERIODIC <br />PERIODIC <br />PERIODIC <br />PERIODIC <br />PERIODIC <br />TABLE 2 - REQUIRED TESTING FOR SPECIAL INSPECTIONS <br />TESTING <br />GEOTECHNICAL <br />SYSTEM OR MATERIAL REMARKS <br />CODE <br />REFERENCE <br />REFERENCED <br />STANDARDS <br />CLASSIFICATION AND <br />TESTING OF <br />CONTROLLED FILL <br />MATERIAL <br />MATERIAL VERIFICATION <br />CONCRETE <br />CONCRETE STRENGTH ASTM C39 <br />CONCRETE SLUMP ASTM C143 <br />CONCRETE AIR CONTENT ASTM C231 <br />CONCRETE TEMPERATURE ASTM C1064 <br />FABRICATE SPECIMENS AT TIME FRESH CONCRETE IS <br />PLACED. TEST EACH 150 CY NOR LESS THAN EACH <br />5000 SF OF SLAB OR WALL PLACED EACH DAY <br />1705.6 <br />1903 <br />1705.3 <br />1. BUILDING DATA: <br />PROJECT ADDRESS: 600 N PARKCENTER DR, SANTA ANA, CA 92705 <br />EXISTING BUILDING: <br />CONSTRUCTION TYPE: V-B <br />SPRINKLERS: N/A <br />OCCUPANCY: B (EXISTING TO REMAIN) <br />DESIGN CRITERIA <br />18400 Von Karman Ave., Suite 600 <br />Irvine, CA 92612 <br />O: 949.252.1022 <br />www.kpff.com <br />Sheet Number <br />Sheet Name <br />Project Status <br />Scale <br />Drawn By: <br />Agency Approval <br />Stamp <br />Consultant <br />Job Number: <br />REVISIONS <br />Project Title: <br />Key Plan <br />Approved By: Checked By: <br />Issue Date: <br />Project Address: <br />12" = 1'-0" <br />4/ <br />3 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />4 <br />: <br />1 <br />3 <br />: <br />0 <br />9 <br /> <br />P <br />M <br /> <br />A <br />u <br />t <br />o <br />d <br />e <br />s <br />k <br /> <br />D <br />o <br />c <br />s <br />: <br />/ <br />/ <br />1 <br />0 <br />2 <br />6 <br />2 <br />5 <br />0 <br />0 <br />2 <br />2 <br />2 <br /> <br />- <br /> <br />A <br />m <br />er <br />i <br />c <br />a <br />n <br /> <br />R <br />e <br />d <br /> <br />C <br />r <br />o <br />s <br />s <br />- <br /> <br />- <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />/ <br />2 <br />5 <br />0 <br />0 <br />2 <br />2 <br />2 <br /> <br />A <br />m <br />e <br />r <br />i <br />c <br />a <br />n <br /> <br />R <br />e <br />d <br /> <br />Cr <br />o <br />s <br />s <br /> <br />S <br />A <br />_ <br />S <br />2 <br />4 <br />. <br />r <br />v <br />t <br />S-0.2 <br />GENERAL STRUCTURAL <br />NOTES, TESTING, <br />INSPECTION, AND <br />OBSERVATION <br />Project Status <br />SA 10262500222 <br />AMERICAN RED <br />CROSS - SANTA ANA <br />600 N Parkcenter Dr., Santa Ana, CA 92705 <br />WT JW <br />11/18/2025 <br />NO DATE DESCRIPTION <br />1 2026.04.06 PLAN CHECK RESPONSE 1 <br />1 <br />1