My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 W. Washington Ave Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Washington Ave
>
1923 W Washington Ave Unit# 2
>
1923 W. Washington Ave Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2026 5:00:14 AM
Creation date
6/10/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20188851
101127730
Full Address
1923 W Washington Ave Unit# 2
Street Number
1923
Street Direction
W
Street Name
Washington
Street Suffix
Ave
Unit Number
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2024 IronRidge, Inc. XR Flush Mount System Certification - 7.22 - Rev B - 3 <br /> <br /> <br />28357 Industrial Blvd. <br />Hayward, CA 94545 <br />1-800-227-9523 <br />IronRidge.com <br /> <br />9. No splices are allowed in the rail cantilever. For each XR splice type install per the following requirements: <br />a) XR Bonded Splice cannot be installed in the center 1/3 of interior spans, or the outer 2/3 of end spans. <br />b) BOSS Splice can be installed at any location within a span. <br /> <br />10. Shaded cells of the span tables indicate conditions in which UFO Mid Clamp connection capacity is exceeded. If <br />such conditions are encountered contact techsupport@ironridge.com. <br /> <br />11. Systems using CAMO module clamps shall be installed with the following guidance: <br />a) For single module installations (orphan modules), CAMO clamps shall not be installed in regions that <br />experience ground snow loads in exceedance of what is listed in the following table. Such scenarios are <br />shown by asterisks in the applicable span tables <br /> <br />b) CAMO will function within a module’s design load ratings. Be sure the specific module being used with <br />CAMO meets the dimensional requirements shown in the figure below and that the module selected is <br />suitable for the environmental conditions of a particular project. <br /> <br /> <br />Figure 1: CAMO Module Frame Dimensional Requirements <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Maximum Ground Snow load for Orphan Modules using CAMO per ASCE 7-22 <br />Module Area 21.7 ft2 23.5 ft2 28.0 ft2 30.5 ft2 <br />Ground Snow 80 psf 75 psf 60 psf 55 psf
The URL can be used to link to this page
Your browser does not support the video tag.