Laserfiche WebLink
SHEET NUMBER <br />PV-1.0 <br />NEW GRID - TIED SYSTEM 103.84 kW <br />DATE: 5/23/2026 <br />DRAWN BY: <br />MCGUFF <br />APN: 415-021-15 <br />Utility: SDGE <br />AHJ: CITY OF SANTA ANA <br />3080 S. HARBOR BLVD. <br />SANTA ANA, CA 92704 <br />CARLSBAD SOLAR CORPORATION <br />3525 HIGHLAND DR. <br />CARLSBAD, CA 92008 <br />PHONE: 760-826-9226 <br />CSLB #1023872 <br />COVER SHEET <br />SHEET INDEX <br />PV-1.0 COVER SHEET <br />PV-2.0 SITE PLAN <br />PV-3.0 ROOF PLAN <br />PV-3.1 CONCRETE PAD DETAILS <br />PV-4.0 STRING PLAN <br />PV-5.0 ATTACHMENT DETAILS <br />PV-6.0 ELECTRICAL LINE DIAGRAM <br />PV-7.0 PLACARDS <br />PV-8+SPECIFICATION SHEET <br /> GOVERNING CODES: <br />ALL MATERIALS, EQUIPMENT, INSTALLATION AND <br />WORK SHALL COMPLY WITH THE FOLLOWING <br />APPLICABLE CODES: <br />2025 CALIFORNIA BUILDING CODE <br />2025 CALIFORNIA FIRE CODE <br />2025 CALIFORNIA ENERGY CODE <br />2025 CALIFORNIA ELECTRICAL CODE <br />2025 CALIFORNIA GREEN BUILDING STANDARD <br />2025 CALIFORNIA MECHANICAL CODE <br />2025 CALIFORNIA PLUMBING CODE <br />ANY OTHER LOCAL AMENDMENTS <br />STANDARD FOR ELECTRICAL SAFETY IN THE <br />WORKFORCE - NFPA 70E 2015 <br />UL 1703 - SOLAR MODULES <br />UL 1741 - INVERTERS, COMBINER BOXES <br />(UL1741SA WHERE APPLICABLE) <br />UL 2703 - RACKING RAILS, MOUNTS <br />AND CLAMPS FOR PV MODULES <br />AERIAL PHOTO: <br />SCALE: NTS1 <br />VICINITY MAP: <br />SCALE: NTS2 <br />GENERAL NOTE: <br />1. UTILITY SHALL BE NOTIFIED BEFORE ACTIVATION OF PHOTOVOLTAIC <br />SYSTEM. <br />2. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, <br />OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY <br />ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH <br />ADMINISTRATION <br />3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO INITIATING <br />CONSTRUCTION. <br />4. CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION <br />DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. <br />5. ALL EQUIPMENT AND ASSOCIATED CONNECTIONS, ETC, AND ALL <br />ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE INSTALLED ONLY <br />BY QUALIFIED PERSONNEL. <br />6. THE CONTRACTOR OR OWNER MUST PROVIDE ROOF ACCESS (LADDER TO <br />roof) <br />FOR ALL THE REQUIRED INSPECTIONS. LADDERS MUST BE OSHA <br />APPROVED, MINIMUM TYPE I WITH A 250LB. RATING, IN GOOD CONDITION <br />AND DESIGNED FOR ITS INTENDED USE. <br />7. CONTRACTOR SHALL VERIFY THAT THE ROOF STRUCTURE WILL WITHSTAND <br />THE ADDITIONAL LOADS. <br />8. LAG SCREWS SHALL PENETRATE A MINIMUM 2" INTO SOLID SAWN <br />STRUCTURAL MEMBERS AND SHALL NOT EXCEED MANUFACTURER <br />RECOMMENDATIONS FOR FASTENERS INTO ENGINEERED STRUCTURAL <br />MEMBERS. <br />9. AN ACCESS POINT SHALL BE PROVIDED THAT DOES NOT PLACE THE <br />GROUND LADDER OVER OPENINGS SUCH AS WINDOWS OR DOORS ARE <br />LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION AND IN <br />LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH <br />OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES, OR SIGNS. <br />10. WHERE DC CONDUCTORS ARE RUN INSIDE BUILDING, THEY SHALL BE <br />CONTAINED IN A METAL RACEWAY; THEY SHALL NOT BE INSTALLED WITHIN <br />10" OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE COVERED BY <br />THE PV MODULES AND EQUIPMENT. <br />11. PLUMBING AND MECHANICAL VENTS THROUGH THE ROOF SHALL NOT BE <br />COVERED BY SOLAR MODULES- - NO BUILDING, PLUMBING OR MECHANICAL <br />VENTS TO BE COVERED, CONSTRUCTED OR ROUTED AROUND SOLAR <br />MODULES. <br />12. ALL FIELD - INSTALLED JUNCTION, PULL AND OUTLET BOXES LOCATED <br />BEHIND MODULES SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT <br />OF A MODULE SECURED BY REMOVABLE FASTENERS. <br />DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: <br />1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS <br />OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE <br />TERMINALS MARKED "LINE SIDE' (TYPICALLY THE UPPER TERMINALS). <br />2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE <br />LOCKABLE, AND BE A VISIBLE-BREAK SWITCH. <br />3. BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED. <br />THEREFORE BOTH MUST OPEN WHERE A DISCONNECT IS REQUIRED, <br />ACCORDING TO NEC 690.13. <br />4. DC DISCONNECT INTEGRATED INTO ROOFTOP DC COMBINER OR INSTALLED <br />WITHIN 6 FT, ACCORDING TO NEC 690.15 (C). <br />5. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY <br />OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS <br />S30V AND S240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ. <br />6. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, <br />AND 240. <br />7. BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED, <br />THEREFORE BOTH REQUIRE OVER-CURRENT PROTECTION, ACCORDING TO <br />NEC 240.21. (SEE EXCEPTION IN NEC 690.9) <br />8. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION <br />ACCORDING TO NEC 690.11 AND UL1699B. <br />WIRING & CONDUIT NOTES: <br />1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. <br />CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE <br />REQUIREMENTS <br />AND ARE NOT MEANT TO LIMIT UP-SIZING. <br />2. ALL CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. <br />3. EXPOSED UNGROUNDED PV SOURCE AND OUTPUT CIRCUITS SHAll USE WIRE <br />4. PV WIRE BLACK WIRE MAY BE FIELD-MARKED WHITE [NEC 200.6 (A)(6)]. <br />5. MODULE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY. <br />6. ACCORDING TO NEC 200.7, UNGROUNDED SYSTEMS DC CONDUCTORS <br />COLORED OR MARKED AS FOLLOWS: <br />·DC POSITIVE - RED, OR OTHER COLOR EXCLUDING WHITE, GREY AND GREEN <br />·DC NEGATIVE - BLACK, OR OTHER COLOR EXCLUDING WHITE, GREY AND GREEN <br />·AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: <br />PHASE A OR L 1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE <br />PHASE <br />PHASE C OR L3. BLUE, YELLOW, ORANGE', OR OTHER CONVENTION NEUTRAL- <br />WHITE OR GREY <br />·IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO <br />BE MARKED ORANGE [NEC 110.15]. <br />GROUNDING NOTES: <br />1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND <br />GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. <br />2. AS IN CONVENTIONAL PV SYSTEMS, UNGROUNDED PV SYSTEMS REQUIRE AN <br />EQUIPMENT GROUNDING CONDUCTOR All METAL ELECTRICAL EQUIPMENT AND <br />STRUCTURAL COMPONENTS BONDED TO GROUND, IN ACCORDANCE WITH 250.134 OR <br />250.136(A). ONLY THE DC CONDUCTORS ARE UNGROUNDED. <br />3. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC <br />TABLE 250.122. <br />4. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURE <br />CONSIDERED <br />GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). <br />5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN <br />MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. <br />6. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE <br />SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION <br />REQUIREMENTS. <br />7. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE <br />REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO <br />ANOTHER MODULE <br />8. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN <br />OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] <br />9. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 <br />THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A <br />GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 <br />AND AHJ. <br />10. ACCORDING TO NEC 690.47 (C}(3), UNGROUNDED SYSTEMS INVERTER MAY SIZE DC <br />GEC <br />ACCORDING TO EGC REQUIREMENTS OF NEC 250.122. HOWEVER, DC GEC TO BE <br />UNSPLICED OR IRREVERSIBLY SPLICED <br />11. IN UNGROUNDED INVERTERS, GROUND FAULT PROTECTION IS PROVIDED BY <br />'ISOLATION MONITOR INTERRUPTOR,' AND GROUND FAULT DETECTION PERFORMED <br />BY 'RESIDUAL-CURRENT DETECTOR.' <br />GROUNDING NOTES: <br />1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] <br />2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT <br />EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)] <br />3. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV <br />DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS <br />FROM THE UTILITY SOURCE OCPD [NEC 705.12(0)(2)(3)]. <br />4. AT MULTIPLE INVERTERS OUTPUT COMBINER PANEL, TOTAL RATING OF ALL <br />OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, <br />THECOMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC <br />705.12 (D)(2)(3)(C). <br />5. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) <br />6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH <br />SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 <br />7. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT <br />FROM ADDITIONAL FASTENING [NEC 705.12 (0)(5)]. <br />NOTE :- CONDUIT WILL BE HIDDEN OR PAINTED TO MATCH BUILDING <br />COMMERCIAL CONSTRUCTION DESIGN PARAMETERS <br />ROOF MATERIAL TPO <br />NUMBER OF LAYERS:01 <br />ROOF FRAME:STEEL STRUCTURE <br />NO. OF STORY 2 <br />RISK CATEGORY II <br />WIND EXPOSURE B <br />GROUND SNOW LOAD 0 PSF <br />WIND SPEED (ASCE 7-16)110 MPH <br />HIGH TEMPERATURE 29° C <br />LOW TEMPERATURE 4° C <br /> SCOPE OF WORK <br />176 MISSION SOLAR MSI10-590HN4G 590W MODULES <br />176 AP Smart RSD-S-PLC <br />2 SOL-ARK 60K-3P-480V INVERTERS <br />2 SOL-ARK L3-HVR-60KWH BATTERIES <br /> NEW SYSTEM NAME PLATE POWER 103.84 KW DC <br /> NEW SYSTEM AC POWER 120.00 KW AC <br /> NEW ENERGY STORAGE SYSTEM 120.00 KWH <br /> BUILDING CLASS C <br /> ZONING:M-1 (Santa Ana – Light Industrial) <br /> LOT SIZE 1.55 ACRES <br /> SPRINKLERED YES <br /> NUMBER OF STORY 2 <br />PHOTOVOLTAIC ROOF MOUNT SYSTEM <br />MCGUFF <br />3080 S. HARBOR BLVD. <br />SANTA ANA, CA 92704