SHEET NUMBER
<br />PV-1.0
<br />NEW GRID - TIED SYSTEM 103.84 kW
<br />DATE: 5/23/2026
<br />DRAWN BY:
<br />MCGUFF
<br />APN: 415-021-15
<br />Utility: SDGE
<br />AHJ: CITY OF SANTA ANA
<br />3080 S. HARBOR BLVD.
<br />SANTA ANA, CA 92704
<br />CARLSBAD SOLAR CORPORATION
<br />3525 HIGHLAND DR.
<br />CARLSBAD, CA 92008
<br />PHONE: 760-826-9226
<br />CSLB #1023872
<br />COVER SHEET
<br />SHEET INDEX
<br />PV-1.0 COVER SHEET
<br />PV-2.0 SITE PLAN
<br />PV-3.0 ROOF PLAN
<br />PV-3.1 CONCRETE PAD DETAILS
<br />PV-4.0 STRING PLAN
<br />PV-5.0 ATTACHMENT DETAILS
<br />PV-6.0 ELECTRICAL LINE DIAGRAM
<br />PV-7.0 PLACARDS
<br />PV-8+SPECIFICATION SHEET
<br /> GOVERNING CODES:
<br />ALL MATERIALS, EQUIPMENT, INSTALLATION AND
<br />WORK SHALL COMPLY WITH THE FOLLOWING
<br />APPLICABLE CODES:
<br />2025 CALIFORNIA BUILDING CODE
<br />2025 CALIFORNIA FIRE CODE
<br />2025 CALIFORNIA ENERGY CODE
<br />2025 CALIFORNIA ELECTRICAL CODE
<br />2025 CALIFORNIA GREEN BUILDING STANDARD
<br />2025 CALIFORNIA MECHANICAL CODE
<br />2025 CALIFORNIA PLUMBING CODE
<br />ANY OTHER LOCAL AMENDMENTS
<br />STANDARD FOR ELECTRICAL SAFETY IN THE
<br />WORKFORCE - NFPA 70E 2015
<br />UL 1703 - SOLAR MODULES
<br />UL 1741 - INVERTERS, COMBINER BOXES
<br />(UL1741SA WHERE APPLICABLE)
<br />UL 2703 - RACKING RAILS, MOUNTS
<br />AND CLAMPS FOR PV MODULES
<br />AERIAL PHOTO:
<br />SCALE: NTS1
<br />VICINITY MAP:
<br />SCALE: NTS2
<br />GENERAL NOTE:
<br />1. UTILITY SHALL BE NOTIFIED BEFORE ACTIVATION OF PHOTOVOLTAIC
<br />SYSTEM.
<br />2. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED,
<br />OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY
<br />ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH
<br />ADMINISTRATION
<br />3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO INITIATING
<br />CONSTRUCTION.
<br />4. CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION
<br />DOCUMENTS PRIOR TO INITIATING CONSTRUCTION.
<br />5. ALL EQUIPMENT AND ASSOCIATED CONNECTIONS, ETC, AND ALL
<br />ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE INSTALLED ONLY
<br />BY QUALIFIED PERSONNEL.
<br />6. THE CONTRACTOR OR OWNER MUST PROVIDE ROOF ACCESS (LADDER TO
<br />roof)
<br />FOR ALL THE REQUIRED INSPECTIONS. LADDERS MUST BE OSHA
<br />APPROVED, MINIMUM TYPE I WITH A 250LB. RATING, IN GOOD CONDITION
<br />AND DESIGNED FOR ITS INTENDED USE.
<br />7. CONTRACTOR SHALL VERIFY THAT THE ROOF STRUCTURE WILL WITHSTAND
<br />THE ADDITIONAL LOADS.
<br />8. LAG SCREWS SHALL PENETRATE A MINIMUM 2" INTO SOLID SAWN
<br />STRUCTURAL MEMBERS AND SHALL NOT EXCEED MANUFACTURER
<br />RECOMMENDATIONS FOR FASTENERS INTO ENGINEERED STRUCTURAL
<br />MEMBERS.
<br />9. AN ACCESS POINT SHALL BE PROVIDED THAT DOES NOT PLACE THE
<br />GROUND LADDER OVER OPENINGS SUCH AS WINDOWS OR DOORS ARE
<br />LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION AND IN
<br />LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH
<br />OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES, OR SIGNS.
<br />10. WHERE DC CONDUCTORS ARE RUN INSIDE BUILDING, THEY SHALL BE
<br />CONTAINED IN A METAL RACEWAY; THEY SHALL NOT BE INSTALLED WITHIN
<br />10" OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE COVERED BY
<br />THE PV MODULES AND EQUIPMENT.
<br />11. PLUMBING AND MECHANICAL VENTS THROUGH THE ROOF SHALL NOT BE
<br />COVERED BY SOLAR MODULES- - NO BUILDING, PLUMBING OR MECHANICAL
<br />VENTS TO BE COVERED, CONSTRUCTED OR ROUTED AROUND SOLAR
<br />MODULES.
<br />12. ALL FIELD - INSTALLED JUNCTION, PULL AND OUTLET BOXES LOCATED
<br />BEHIND MODULES SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT
<br />OF A MODULE SECURED BY REMOVABLE FASTENERS.
<br />DISCONNECTION AND OVER-CURRENT PROTECTION NOTES:
<br />1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS
<br />OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE
<br />TERMINALS MARKED "LINE SIDE' (TYPICALLY THE UPPER TERMINALS).
<br />2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE
<br />LOCKABLE, AND BE A VISIBLE-BREAK SWITCH.
<br />3. BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED.
<br />THEREFORE BOTH MUST OPEN WHERE A DISCONNECT IS REQUIRED,
<br />ACCORDING TO NEC 690.13.
<br />4. DC DISCONNECT INTEGRATED INTO ROOFTOP DC COMBINER OR INSTALLED
<br />WITHIN 6 FT, ACCORDING TO NEC 690.15 (C).
<br />5. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY
<br />OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS
<br />S30V AND S240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ.
<br />6. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9,
<br />AND 240.
<br />7. BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED,
<br />THEREFORE BOTH REQUIRE OVER-CURRENT PROTECTION, ACCORDING TO
<br />NEC 240.21. (SEE EXCEPTION IN NEC 690.9)
<br />8. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION
<br />ACCORDING TO NEC 690.11 AND UL1699B.
<br />WIRING & CONDUIT NOTES:
<br />1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE.
<br />CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE
<br />REQUIREMENTS
<br />AND ARE NOT MEANT TO LIMIT UP-SIZING.
<br />2. ALL CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7.
<br />3. EXPOSED UNGROUNDED PV SOURCE AND OUTPUT CIRCUITS SHAll USE WIRE
<br />4. PV WIRE BLACK WIRE MAY BE FIELD-MARKED WHITE [NEC 200.6 (A)(6)].
<br />5. MODULE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY.
<br />6. ACCORDING TO NEC 200.7, UNGROUNDED SYSTEMS DC CONDUCTORS
<br />COLORED OR MARKED AS FOLLOWS:
<br />·DC POSITIVE - RED, OR OTHER COLOR EXCLUDING WHITE, GREY AND GREEN
<br />·DC NEGATIVE - BLACK, OR OTHER COLOR EXCLUDING WHITE, GREY AND GREEN
<br />·AC CONDUCTORS COLORED OR MARKED AS FOLLOWS:
<br />PHASE A OR L 1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE
<br />PHASE
<br />PHASE C OR L3. BLUE, YELLOW, ORANGE', OR OTHER CONVENTION NEUTRAL-
<br />WHITE OR GREY
<br />·IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO
<br />BE MARKED ORANGE [NEC 110.15].
<br />GROUNDING NOTES:
<br />1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND
<br />GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE.
<br />2. AS IN CONVENTIONAL PV SYSTEMS, UNGROUNDED PV SYSTEMS REQUIRE AN
<br />EQUIPMENT GROUNDING CONDUCTOR All METAL ELECTRICAL EQUIPMENT AND
<br />STRUCTURAL COMPONENTS BONDED TO GROUND, IN ACCORDANCE WITH 250.134 OR
<br />250.136(A). ONLY THE DC CONDUCTORS ARE UNGROUNDED.
<br />3. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC
<br />TABLE 250.122.
<br />4. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURE
<br />CONSIDERED
<br />GROUNDED IN ACCORD WITH 250.134 AND 250.136(A).
<br />5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN
<br />MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ.
<br />6. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE
<br />SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION
<br />REQUIREMENTS.
<br />7. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE
<br />REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO
<br />ANOTHER MODULE
<br />8. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN
<br />OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119]
<br />9. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50
<br />THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A
<br />GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47
<br />AND AHJ.
<br />10. ACCORDING TO NEC 690.47 (C}(3), UNGROUNDED SYSTEMS INVERTER MAY SIZE DC
<br />GEC
<br />ACCORDING TO EGC REQUIREMENTS OF NEC 250.122. HOWEVER, DC GEC TO BE
<br />UNSPLICED OR IRREVERSIBLY SPLICED
<br />11. IN UNGROUNDED INVERTERS, GROUND FAULT PROTECTION IS PROVIDED BY
<br />'ISOLATION MONITOR INTERRUPTOR,' AND GROUND FAULT DETECTION PERFORMED
<br />BY 'RESIDUAL-CURRENT DETECTOR.'
<br />GROUNDING NOTES:
<br />1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)]
<br />2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT
<br />EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]
<br />3. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV
<br />DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS
<br />FROM THE UTILITY SOURCE OCPD [NEC 705.12(0)(2)(3)].
<br />4. AT MULTIPLE INVERTERS OUTPUT COMBINER PANEL, TOTAL RATING OF ALL
<br />OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER,
<br />THECOMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC
<br />705.12 (D)(2)(3)(C).
<br />5. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1)
<br />6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH
<br />SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42
<br />7. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT
<br />FROM ADDITIONAL FASTENING [NEC 705.12 (0)(5)].
<br />NOTE :- CONDUIT WILL BE HIDDEN OR PAINTED TO MATCH BUILDING
<br />COMMERCIAL CONSTRUCTION DESIGN PARAMETERS
<br />ROOF MATERIAL TPO
<br />NUMBER OF LAYERS:01
<br />ROOF FRAME:STEEL STRUCTURE
<br />NO. OF STORY 2
<br />RISK CATEGORY II
<br />WIND EXPOSURE B
<br />GROUND SNOW LOAD 0 PSF
<br />WIND SPEED (ASCE 7-16)110 MPH
<br />HIGH TEMPERATURE 29° C
<br />LOW TEMPERATURE 4° C
<br /> SCOPE OF WORK
<br />176 MISSION SOLAR MSI10-590HN4G 590W MODULES
<br />176 AP Smart RSD-S-PLC
<br />2 SOL-ARK 60K-3P-480V INVERTERS
<br />2 SOL-ARK L3-HVR-60KWH BATTERIES
<br /> NEW SYSTEM NAME PLATE POWER 103.84 KW DC
<br /> NEW SYSTEM AC POWER 120.00 KW AC
<br /> NEW ENERGY STORAGE SYSTEM 120.00 KWH
<br /> BUILDING CLASS C
<br /> ZONING:M-1 (Santa Ana – Light Industrial)
<br /> LOT SIZE 1.55 ACRES
<br /> SPRINKLERED YES
<br /> NUMBER OF STORY 2
<br />PHOTOVOLTAIC ROOF MOUNT SYSTEM
<br />MCGUFF
<br />3080 S. HARBOR BLVD.
<br />SANTA ANA, CA 92704
|