Laserfiche WebLink
McPherson Engineering By: R.S. <br />Date: 4/8/26 <br />Gravity Loads: <br />DEMAND INCREASED BY 12.63%< 5% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY -326.19% < 10% = OK! <br />Anchorage: <br />DEMAND OF 791.5LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 8FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />4/8/2026 12:25 PM <br />8 of 8 <br />©McPherson Engineering