My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2414 N Tustin Ave & 2424 N Tustin Ave Bldg B - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Tustin Ave
>
2414 N Tustin Ave
>
2414 N Tustin Ave & 2424 N Tustin Ave Bldg B - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2026 5:00:15 AM
Creation date
6/13/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20187492
20187686
101125865
Full Address
2414 N Tustin Ave
2424 N Tustin Ave Bldg# B
Street Number
2414
Street Direction
N
Street Name
Tustin
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE FOUR LEVELS OF EV CHARGING ENERGY MANAGEMENT: A GUIDE TO SMARTER EV CHARGING 13 <br />How to Choose the Right Level <br />of Energy Management <br />Selecting your approach depends on several key factors: budget <br />constraints, performance requirements, building characteristics, and long- <br />term operational goals. Here’s a practical decision framework: <br />Choose Level 1 (Circuit <br />Load Sharing) when: <br /> →Budget is the primary constraint. You need the <br />lowest possible upfront investment <br /> →Small-scale deployment. Installing fewer than 15 <br />chargers where usage patterns are predictable <br /> →Long dwell times. Employee parking or residential <br />applications where cars park 8+ hours <br /> →Temporary solution. You need charging capability <br />now but plan major electrical upgrades within 2-3 <br />years <br />Choose Level 2 (Dedicated <br />Circuit with Centralized <br />Management) when: <br /> →Performance matters most. Driver experience <br />and charging reliability are top priorities for tenant <br />satisfaction <br /> →New construction. Installing dedicated circuits is <br />straightforward and cost-effective during initial <br />build-out <br /> →Growth planning. You anticipate expanding your <br />charging network significantly within 5 years <br /> →Premium positioning. Your property markets itself <br />as offering superior amenities <br />Choose Level 3 (Panel- <br />Integrated Dynamic Load <br />Management) when: <br /> →Retrofitting existing buildings. Major electrical <br />upgrades aren’t feasible or would be extremely <br />expensive <br /> →Speed to market. You need operational chargers <br />within 60 days to meet immediate demand <br /> →Infrastructure constraints. Physical limitations <br />prevent new panel installations <br /> →Moderate performance requirements. Acceptable <br />charging times of 1-3 hours for most users <br />Choose Level 4 (Whole- <br />Building Integrated Load <br />Management) when: <br /> →High demand charges. Your utility bills include <br />substantial monthly demand charges (review your <br />bills to determine if this applies) <br /> →Energy cost optimization. Controlling operational <br />expenses is a primary objective <br /> →Comprehensive strategy. EV charging is part <br />of broader building energy management and <br />sustainability initiatives <br /> →Premium commercial properties. You’re <br />implementing best-in-class building systems
The URL can be used to link to this page
Your browser does not support the video tag.