Laserfiche WebLink
EV <br />CHARGING <br />ONLY <br />21 3 5 6156 <br />EV <br />CHARGING <br />ONLYNO <br />PARKING <br />12'-0"6'-0" <br />22'-3" <br />18'-6" <br />9'-0" <br />SCALE: <br />EV LAYOUT BLDG. 24B <br />3/16"=1'-0" <br />EV <br />LAYOUT <br />E-03 <br />KEY NOTES: [#] <br />1.(N) SWTCH ZEROVA AX48, DUAL-PORT CONFIGURATION, <br />PEDESTAL MOUNT, EV CHARGER. <br />2.(N) EV CHARGING ONLY STENCILS. 12" LETTERING. PAINTED <br />WHITE. <br />3.(N) PAINTED PARKING DIVIDER LINES. <br />4.(N) 12'-0" VAN ACCESSIBLE EV CHARGING STALL. (E) MAX. <br />SLOPE OF 2% IN ALL DIRECTIONS. <br />5.(N) 9'-0" STANDARD EV CHARGING STALL. <br />6.(N) ACCESS AISLE. (N) MAX. SLOPE OF 2% IN ALL DIRECTIONS. <br />PAINTED WHITE. <br />7.(N) NO PARKING STENCIL. 12" LETTERING. PAINTED WHITE. <br />8.(N) PATH OF TRAVEL. (E) MAX. RUNNING SLOPE OF 5%. MAX. <br />CROSS SLOPE OF 2%. <br />9.(E) BLDG. 24B UPGRADED HOUSE PANEL. REFER TO SINGLE LINE <br />DIAGRAM (SLD) SHEET [E-04] FOR ADDITIONAL INFORMATION. <br />10.(N) SWTCH CONTROL. REFER TO SINGLE LINE DIAGRAM (SLD) <br />SHEET [E-04] FOR ADDITIONAL INFORMATION. <br />11.(N) SWTCH ECHO. REFER TO SINGLE LINE DIAGRAM (SLD) <br />SHEET [E-04] FOR ADDITIONAL INFORMATION. <br />12.(N) CELLULAR GATEWAY. REFER TO SINGLE LINE DIAGRAM <br />(SLD) SHEET [E-04] FOR ADDITIONAL INFORMATION. <br />13.(N) APPROXIMATE CONDUIT ROUTE. <br />14.(E) SIDEWALK. <br />15.(E) LANDSCAPE. <br />16.(E) BUILDING. <br />17.(E) WHEEL STOPS. <br />PE <br />R <br />M <br />I <br />T <br /> <br />A <br />P <br />P <br />L <br />I <br />C <br />A <br />T <br />I <br />O <br />N <br />THE DRAWING AND THE <br />DESIGN SHOWN IS <br />PROPERTY OF <br />SITELOGIQ, INC. THE <br />REPRODUCTION, <br />COPYING, OR USE OF <br />THIS DRAWING <br />WITHOUT WRITTEN <br />CONSENT OF SITELOGIQ <br />IS PROHIBITED. ANY <br />INFRINGEMENT WILL BE <br />SUBJECT TO LEGAL <br />ACTION. <br />EVCS DESIGN <br />DOCUMENTS <br />DRAWN BY: <br />CHECKED BY: <br />DATE: <br />REVISION: <br />SHEET: <br />TEMPLATE:3V - 6.10.25 <br />3V <br /> <br />I <br />N <br />F <br />R <br />A <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />E <br />24 <br />1 <br />4 <br /> <br />N <br />. <br /> <br />T <br />U <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />VP <br />JE <br />10.9.2025 <br />A <br />COMIND008854_42053_3V INFRUSTRUCTURE_BRIDGE HORIZON_EV PERMIT_REV A.DWG <br />HO <br />R <br />I <br />Z <br />O <br />N <br />1 <br />2 2 <br />3 3 33 <br />4 56 <br />7 <br />8 <br />12 <br />10 <br />11 <br />9 <br />13 <br />13 <br />14 <br />15 <br />14 <br />14 <br />14 <br />16 <br />16 <br />15 <br />15 15 <br />15 <br />15 <br />15 <br />15 <br />15 SCALE: <br />KEYPLAN <br />NTS <br />BLDG. 24A <br />BLDG. 24B <br />17 17 17 17 17 17 <br />CLARK LONGHURST, PRESIDENT, C&I DIV. <br />SITELOGIQ, INC. LICENSE NO. 1054171 <br />C-10 ELECTRICAL