Laserfiche WebLink
-,-SANTA <br />NA <br />Ptt\lt\c <br />&nttDIIc <br />$t1{cr <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />DISABLED ACCESS COMPLIANCE <br />DOCUMENTATION FORM <br />ACC-01 CBC 2019 <br />A. PURPOSE OF THIS DOCUMENTATION: (check one) <br />E Finding of unreasonable hardship for prqects UNDER the valuation threshold- <br />! finoing of unreasonable hardship for proJects OVER the valuation threshold' <br />X Certification of Full Compliance with the 2019 California Building Code <br />t Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and <br />Section 202 is $172.4'18.00 (as of January 2021) <br />B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: <br />Project Address: <br />511S. Grand Ave., Santa Ana, CA 92705 <br />Permit Number <br />101 106525 <br />Projeci Description: <br />Structural Repairs <br />Floor Number: <br />1 <br />Business Name / Owner: <br />Extra Space Storage <br />Business Phone Number: <br />(951) 337-3644 <br />Legal Property Owner: <br />ESS Prisa, LLC, Josh Ludington, Owner's Represenlative <br />Phone Number: <br />(9sl ) 337-3644 <br />Total Construction Cost or Project Valuation <br />$ 25.000 <br />Cosl of Provading Complete Disabled Access <br />$ 5,000 <br />1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold <br />based on the valuation of site and building improvements for the last three-year period. <br />Permit No lssuance Date Valuation of lmprovements <br />Total <br />2. 20o/o ot Tolal Construction Cost or Project Valuation: <br />3. The actual amount to be spent to provide disabled access <br />$5.000 <br />$5,000 <br />4. Describe the impact of the proposed improvements on financial feasibility of the project. <br />Required accessibilitv improvements can be constructed within the 20% required allocation <br />5. Describe the proposed improvements related to accessibility upgrades on this project <br />Reslroom: Relocate water closet, sink & toilet accessories <br />Signage: Replace access signs, remove & replace striping <br />Replace entry qate, Modifv apron to restroom <br />Rev: 05t2012021 Page 1 of 2