Laserfiche WebLink
t <br />E <br />l==t-n <br />slomer Name and Address <br />Chns Jones 2119 Freeman Street <br />Santa Ana, CA 92706 <br />Tesla Encrgy Ope.atrorF <br />CA CSLB 888'104 <br />90'l Page Avenue, Fremont, <br />cA 94538 <br />Localro, <br />Andy Hoang <br />2119 Freeman Street <br />Santa Ana. CA 92706 Regrslr <br />2102 Alton Pkwy #Suite B <br />lrvine, CA 92606 <br />This Home lmprovement Agreement (this "Agreement") is between Tesla, lnc ("Tesla", "we" or "Contractor") and you <br />("Customer") for the work described below (the "Work") at your home (the "Property" or your "Home"). The parties <br />agree as follows: <br />KEY TERMS AND CONOITIONS <br />1. OESCRIPTION OF THE WORK ANO DESCRIPTION OF THE SIGNIFICANT MATERIALS TO BE USED. <br />Tesla will temporarily remove the Tesla-installed solar panel system (the "System") and reinstall the System after <br />completion of the Customer-initiated roof work.(i) Tesla to remove the System from rooftop.(ii) Tesla may choose not to remove the pucks installed into the roof if their removal would cause <br />damage to the roof. Cuslomer's roofer will then be responsible for removing the pucks.(iii) Customer to provide on-site storage for removed System for duration of time needed for roofer <br />coordination.(iv) Non-Tesla roofer to repair/replace existing roof under location of System (not part of Tesla Work).(v) Non-Tesla roofer must re-install the same roofing material and coordinate the flashing process <br />with Tesla. The roof warranty is held by the roofing company. lf a different roofing material is to <br />be used under location of the System, the non-Tesla roofer must have prior written approval from <br />Tesla.(vi) Non-Tesla roofer to prepare roof for re-installation of System (not part of Tesla Work).(vii) Tesla to reinstall the full System on rooftop and re-commission System to working order. <br />2. CONTRACT PRICE. The Contract Price for the Work is 51499.001. The Contract Price is sublect to any change <br />orders agreed to in writing by both parties. <br />3. WORK TIMELINE. Tesla will perform the Work within a reasonable amount of time after we sign this Agreement <br />but no later than six (6) months from the date of this Agreement, which shall be of the essence. Vvhen Tesla <br />completes the Work described above, then substantial completion of the Work to be performed under this <br />Agreement shall have occurred: <br />Approximate Start Oate: 3 months from the date of this Agreement <br />Approximate Completion Date: 6 months from the date of this Agreement, contingent on roofer's <br />timeline <br />This performance timeline is an estimate and may be adjusted as provided in this Agreement, including delayg <br />due to late payments or unfores€en conditions. <br />4. SCHEOULE OF PAYMENTS. <br />6611 Las Vegas Blvd. S., Las Vegas, NV 891191 888.765.2489 | <br />Horne llnprovement Agreernenl version 5 0 Seplemb€r 25 2020 <br />Tesla lnc <br />3947404 <br />I <br />tesla.com <br />'1P ROVEIVlENT AGREEIIIENT - RES I DEN TIAL