Laserfiche WebLink
Richard Hallowell <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Attachments: <br />Concrete Falcone GEI <br />Tuesday, February 25, 2019 9:53 AM <br />Richard Hallowell <br />Joe Daniels; Blake Garcia; Jim Cullinane <br />concrete Pour Schedule (2222 Metro East) <br />53900 for foundations, slabs, walls, columns, elevated slab & beams.pdf <br />Hello Richard, <br />Please see below the details for the 2 days this week I have concrete scheduled: <br />CONCRETE R DETAIIS: <br />Date : Thurday, 2-2a-2O19 <br />Time of DeliYery: 7:00am <br />Pouring: footings for elevators <br />Mix DesiSn: f639d) (see attached approved mix design) <br />Total Yards Ordered = 20 yards <br />SpacinS: 15 minutes <br />COTTCRETE POUB DETAITS: <br />Date: Friday, 3-1-2019 <br />fime of Dellvery: 12:0opm (trying to tet earlier time) <br />Pourint: slurry into footing & Pads <br />Mlx Deslgn: 3-sack slurry <br />Total Yards Ordered = 90 yards <br />Spacint: 20 minutes <br />Thank You, <br />Michael Falcone <br />Project Manager <br />Falcone General Engineerin& lnc. <br />1560 Newbury Road, Suite 1-288 <br />Newbury Park, CA 91320 <br />Phone: (805) 499{880 <br />Mobile: (805) 479-6175 <br />Fax: (805)499-2390 <br />concrete@falconegei.com <br />1