Laserfiche WebLink
()SINANIAN <br />REQUEST FOR INFORMATION <br />AMG & Associates, LLP. RFI f <br />Construction. Development. Management <br />033TO: <br />FROM: <br />PROJECT: <br />SUBJECT: <br />Sinanian Development, lnc.DATE: O3/28/t9 <br />Metro East Apartments <br />Column Pad Rebar Tie Off Clarification <br />Drawing lndex Reference #: <br />Specification Reference: N/A Subcontractor: <br />work lmpact: E lmpeded /!Stopped /trTBD <br />Schedule lmpact: EYes /trNo /!TBD <br />Priority: EHigh /DMedium /!Low <br />cost lmpact: EYes /!No /ITBD <br />Response Required Date: <br />Critical: EYes /D No <br />REQUEST: <br />City inspector needs confirmation from structural engineer that it is acceptable that the vertical <br />bend at the end ofthe column pads bottom bars does not tie ofTto the bottom grid rebar. <br />See anached photo for additional clarillcation. <br />RECOMMENDATION: <br />t fu.td.CONTRACTOR'5 AUTHORIZED SIGNATURE: <br />DATE:04l02lt9 <br />RESPONSE: <br />Confirmed, not tying them is acceptable <br />ARCHITECT / CONSTRUCTION MANAGER: Anton Angelov, Reiss Brown Ekmekii <br />oArE 41212019 <br />18980 VENTURA BOULEVARO. STE.2oO, TARZANA. CA 91356 | TEL 81&9969666 | Fr"\ 418.7O57914 I CSLB No. 455273