My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20173312 - Permit (2)
PBA
>
Building
>
Permits
>
J
>
Jody Ave
>
2136 N Jody Ave
>
20173312 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 2:06:19 PM
Creation date
11/5/2021 2:06:18 PM
Metadata
Fields
Template:
Permit
Permit Number
20173312
Full Address
2136 N Jody Ave
Permit ID
275023
Master ID Number
2020-160938
Project Name
Miscellaneous Counter1 Permit
Street Number
002136
Street Direction
N
Street Name
Jody
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
5/12/2021
Issued Date
5/12/2021
Finalized Date
6/4/2021
Flood Zone
X-0602320144J
Description of Work
Electrical for solar. All fees paid on # 101104365
Nature of Work
Solar Panels
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPED1TED PERMIT PROCESS FOR SMALL.SCALE PV SYSTEMS, STANDARD STRINC SYSTEM <br />The information in this guideline is intended to help local jurisdictions and conractors identiry when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. lt is likely that 50 % -75 % of all residential <br />systems will comply with these simple criteria. For projects rhar fail to meet the simple criteria, resolution steps have been <br />suggested ro provide as a path to permit approval. <br />Requbed hforrnation for Permit: <br />l. Site plan showing location of major components on the property. This drawing need not be exactly to scale. but it <br />should represent relative location of components at site (see supplied example site plan). Pv arrays on dwellings <br />with a 3'perimerer space at ridge and sides may not need separate hre service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverte( disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />5. Specifrcarion sheets and insEllation manuals (if available) for all manufactured components including, but nor <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure?ves E r,lo <br />U No due to non-compltant roof or a ground mount, submit completed worksheet lor the structure WKS I <br />Rooj lr{onnation: <br />l. Is the roofing type lighrweight (Yes = composition, lightweight masonry, metal, etc...)YES <br />If No, submit completed worksheet lor rooj structure WKSI (No = heavy masonry, sbte, etc. . .) <br />2. Does rhe roof have a single roof coveringu Eves !no <br />If No, submit completed. worksheet for rcof structure WKSI . <br />3. Provide method and rype of weatherproofing roof penerrations (e.g. flashing, caulk)UNIRAC FLASHKIT. CAULK <br />M offiting Sy s t em Informat ion : <br />L ls the mounting structure an <br />beneath the module frames? <br />Mounting Sysrem Manufacturer UNIRAC Producr Name and Model # u rR^c su LTGHIR^L SOI-AR MOUNTRACKTNG SYSTEM <br />Total Weig ht of PV Modules 2n6 n2115 630 Ibs <br />Total Number of Attachmenr Points 20 <br />weight per Artachment Point (b - c) 31 5 lbs (if greater than 45 lbs, see wKS I ) <br />Maximum Spacing Between Attachment Points on a Rail 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Total Surtace Area of PV Modules (square feet)251.58 fr, <br />Distributed weight of PV Module on Roof (b + 0 <br />U distributed weight ol the PV systefi is greatet than 5 lbstf , see WKSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />1. Pv modules, utility-interactive inverrers, and combiner boxes are idenrihed for use in Pv sysrems. <br />2. The PV array is composed ol4 series strings or less per inverter. <br />3. The toral inverrer capacity has a continuous ac power output 15,440 Watts or less <br />4. The ac inlerconnection point is on the load side of service disconnecting means (690.64(8)). <br />5. One of rhe standard electrical diagrams (El.1, El.l a, El .l b, or El.lc) can be used to accurarely represenr rhe PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standdrd electical diagram completely. A guide to the electrical diagram is provided to help the applicant <br />understand each blank tofU in. U the electTical system is more complex than the standard electrical diagram can effectively <br />communtcate, provide an alternative diagram with appropriate detdil. <br />2 EXPEDITED PERMIT I'}ROCESS FOR PV SYSTEMS <br />a <br />b <br />c <br />d <br />e <br />f. <br />A No, provide detaib of siuctural attachment certified by a design professional. <br />2. For manufactured mounring sysrems, fill out information on the mounting system below: <br />2.50 lbs/fC <br />engrneered product designed to mount PV modules with no more than an 18" gap <br />Eves !no
The URL can be used to link to this page
Your browser does not support the video tag.