My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 S Daisy Ave & Unit MET01 - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Daisy Ave
>
220 S Daisy Ave
>
220 S Daisy Ave & Unit MET01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 5:00:11 AM
Creation date
6/17/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20188356
20188758
101127088
Full Address
220 S Daisy Ave
220 S Daisy Ave Unit# MET01
Street Number
220
Street Direction
S
Street Name
Daisy
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />X X X <br />X <br />W <br />WW <br />W W W <br />W <br />W <br />W <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />EE <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E E <br />E E E <br />E <br />E <br />E <br />E E E E <br />E <br />3 <br />SS <br />ECGR <br />E <br />E <br />E <br />E <br />SS <br />SS <br />PI <br />RD <br />IR <br />IR <br />E <br />E <br />E <br />EE <br />E <br />IR <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />E <br />30'-3" (TYP) <br />8' <br /> <br />( <br />T <br />Y <br />P <br />) <br />9' <br /> <br />( <br />T <br />Y <br />P <br />) <br />30' <br />30' <br />30' <br />E1 <br />ELECTRICAL SITE LAYOUT <br />SCE ID:00002141204 <br />CITY OF SANTA ANA <br />CORPORATE YARD <br />220 S DAISY AVE <br />SANTA ANA, CA 92703 <br />SOUTHERN CALIFORNIA EDISON CO. <br />CHARGE READY PROGRAM <br />2244 WALNUT GROVE AVENUE <br />ROSEMEAD, CA 91770 <br />TEL: (800) 665-4555 <br />S8 <br />GG <br />MW <br />02/17/26 <br />07/08/25HLSP/SLD <br />877.706.6858 www.NV5.com <br />12/04/2550% CONSTRUCTION DOCUMENTS <br />02/17/26100% CONSTRUCTION DOCUMENTS <br />GENERAL NOTES <br />LEGEND <br />EXISTING EDGE OF PAVEMENT LINE <br />EXISTING NATURAL GAS GEOPHYSICAL LINE <br />EXISTING WATER LINE <br />LIMITS OF WORK <br />W W <br />G G <br />CONSTRUCTION NOTES <br />EXISTING SANITARY LINE SS SS <br />BL <br />DD <br />E <br />E <br />E <br />E <br />G <br />GT <br />D C <br />D <br />S C <br />S <br />W <br />W <br />W <br />EXISTING BOLLARD <br />EXISTING DOWN DRAIN <br />EXISTING DROP INLET <br />EXISTING ELECTRICAL BOX <br />EXISTING ELECTRICAL PARKING STATION <br />EXISTING ELECTRICAL RISER <br />EXISTING ELECTRICAL TRANSFORMER <br />EXISTING ELECTRICAL VAULT <br />EXISTING ELECTRICAL LIGHT <br />EXISTING NATURAL GAS METER <br />EXISTING GATE <br />EXISTING STORM DRAIN CLEANOUT <br />EXISTING STORM DRAIN MANHOLE <br />EXISTING SEWER CLEANOUT <br />EXISTING SEWER MANHOLE <br />EXISTING HANDICAP PARKING <br />EXISTING SIGN <br />EXISTING WATER MARKING POST <br />EXISTING WATER RISER <br />EXISTING WATER VALVE <br />EXISTING WHEEL STOP <br />EXISTING ELECTRICAL LINE E E <br />EXISTING FENCE LINE <br />PROPOSED TERMINAL BLOCK FOR LEVEL 2 CHARGER, PER DETAIL 1, SHEET E51 <br />PROPOSED 400A 480V METERED SWITCHBOARD, PER DETAIL 2, SHEET E52 <br />3 PROPOSED STEP DOWN TRANSFORMER, PER DETAIL 3, SHEET E5 <br />4 <br />INDICATE EVSE CHARGEPORT STALL <br />PROPOSED DISTRIBUTION BOARD, PER DETAIL 4, SHEET E5 <br />1. REFER TO CONDUIT AND WIRE SCHEDULE ON SHEET E2.0, E2.1, E2.2 FOR <br />REQUIREMENTS. <br />2.CONDUIT ROUTING IS DIAGRAMMATICALLY SHOWN ON PLANS AND ARE ONLY <br />APPROXIMATIONS. THE EXACT LOCATION AND ROUTING PATHS SHALL BE FIELD VERIFIED <br />AND INSTALLED PER JURISDICTIONAL REQUIREMENTS. <br />3.UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE <br />APPROPRIATE UTILITY ENGINEER TO ENSURE ACCURACY OF INSTALLATIONS. <br />4.BOLLARD PROTECTION TO BE INSTALLED PER UTILITY SPECIFICATION. ADDITIONAL <br />BOLLARD PROTECTION MAY BE REQUIRED AT THE DISCRETION OF THE UTILITY FILED <br />INSPECTION PERSONNEL. <br />5.CONTRACTOR TO INSTALL TERMINAL BLOCK PRIOR TO CUSTOMER EVSE CHARGING <br />DISPENSER BEING INSTALLED IN PHASE II <br />6.THE METHODS CONTAINED IN CEC/NEC ARTICLE 250 SHALL BE FOLLOWED TO COMPLY WITH <br />GROUNDING AND BONDING OF ELECTRICAL SYSTEMS AND NON-CURRENT CARRYING <br />CONDUCTIVE MATERIALS, ENCLOSURES, OR ITEMS FORMING PART OF ANY SUCH <br />EQUIPMENT THAT ENCLOSES OR CARRIES ELECTRICAL CONDUCTOR OR EQUIPMENT THAT <br />IS LIKELY TO BECOME ENERGIZED. SEE CEC/NEC 250.4(A)(1) THROUGH (5) FOR FURTHER <br />DESCRIPTION, <br />7.WHERE TWO OR MORE GROUND RODS ARE TO BE INSTALLED, THE MINIMUM SEPARATION <br />SHALL BE 6' PER CEC/NEC 250.53 (A)(2), AND (3) RESISTANCE OF ELECTRODES. <br />8.ALL CONDUITS SHALL COMPLY WITH CEC/NEC TABLE 300.5 MINIMUM BURIAL DEPTH, AND BE <br />INSTALLED A MINIMUM OF 30" BELOW GRADE. <br />9.PER CEC/NEC 110.26 ”ACCESS AND WORKING SPACE SHALL BE PROVIDED AND MAINTAINED <br />ABOUT ALL ELECTRICAL EQUIPMENT TO PERMIT READY AND SAFE OPERATION AND <br />MAINTENANCE OF SUCH EQUIPMENT.” <br />10.ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2025 LOS ANGELES COUNTY ELECTRICAL <br />CODE, 2025 CALIFORNIA ELECTRICAL CODE, 2023 NATIONAL ELECTRICAL CODE. <br />11.ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY <br />RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL <br />SAFETY HEALTH ADMINISTRATION. <br />12.PER CEC/ NEC 210.19 (A) INFORMATIONAL NOTE #4, "CONDUCTORS FOR BRANCH CIRCUITS <br />AS DEFINED IN ARTICLE 100, SIZED TO PREVENT A VOLTAGE DROP EXCEEDING 3 PERCENT <br />AT THE FARTHEST OUTLET OF POWER, HEATING, AND LIGHTING LOADS, OR COMBINATION <br />OF SUCH LOADS, AND WHERE THE MAXIMUM TOTAL VOLTAGE DROP ON BOTH FEEDERS <br />AND BRANCH CIRCUITS TO THE FARTHEST OUTLET DOES NOT EXCEED 5%". <br />**AC CONDUCTOR: 16FEET IS ADDED TO HORIZONTAL RUN LENGTH TO ACCOUNT FOR BURIED <br />DEPTH <br />- <br />EXISTING 500KVA 480/277V 3Ø TRANSFORMER <br />SCALE: <br />CONDUIT SCHEDULE1 <br />E1 NONE <br />1 <br />4 <br />PROPOSED UTILITY TRANSFORMER <br />EXISTING BUILDING <br />EXISTING PARCEL LINE <br />EXISTING WALL <br />(TYP) <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PROPOSED CONDUIT TO BE <br />INSTALLED ON WALL <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />3 <br />4 <br />2 <br />3 <br />0 2010105 <br />SCALE: 1" = 10' <br />PROPOSED SERVICE 600A 480/277V METERED SWITCHBOARD <br />PROPOSED 300KVA STEP DOWN XFMR <br />PROPOSED 1000A 208V SERVICE DISTRIBUTION <br />E <br />PROPOSED WHEELSTOP <br />PROPOSED BOLLARD <br />PROPOSED ELECTRICAL LINE <br />PROPOSED L2 DUAL PORT WALL MOUNTED EV CHARGER
The URL can be used to link to this page
Your browser does not support the video tag.