Laserfiche WebLink
ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL CODES AND ANY OTHER <br />REGULATING AUTHORITIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE <br />WORK. <br />PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL VERIFY <br />EXISTING CONDITIONS AND NOTIFY THE DESIGN PROFESSIONAL IN RESPONSIBLE <br />CHARGE FROM TESLA OF ANY DISCREPANCIES. ANY WORK PERFORMED IN <br />CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT THE <br />SUBCONTRACTORS SOLE EXPENSE. <br />SUBCONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO TESLA <br />FOR APPROVAL BEFORE MAKING ANY CHANGES. DEVIATION FROM PLANS BEFORE <br />WRITTEN APPROVAL FROM TESLA PLACES LIABILITY ON THE SUBCONTRACTOR. <br />ALL EQUIPMENT SHALL BE MOUNTED AS SHOWN. WHERE DETAILS ARE NOT <br />PROVIDED, CONTRACTOR SHALL USE STANDARD CONSTRUCTION PRACTICES. <br />ALL SURFACES SHALL BE PATCHED AND PAINTED AROUND NEW DEVICES AND <br />EQUIPMENT TO MATCH EXISTING FINISHES. <br />ANY METAL SHAVINGS FROM SITE WORK SHALL BE CLEANED FROM ALL SURFACES <br />WHERE OXIDIZED OR CONDUCTIVE METAL SHAVINGS MAY CAUSE RUST, <br />ELECTRICAL SHORT CIRCUITS, OR OTHER DAMAGE. <br />APPROVALS FROM BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO <br />DEVIATE FROM THE DRAWINGS. <br />NEW PAVEMENT INSTALLED AS PART OF THIS PROJECT SHALL MATCH EXISTING <br />PAVEMENT SECTION. ASPHALT AND GAB DEPTHS SHALL BE MAINTAINED. <br />GENERAL NOTES <br />SUPERCHARGER NOTES <br />1.ALL CONDUIT FURNISHED AND INSTALLED BY CONTRACTOR. ALL <br />WIRING FURNISHED BY TESLA AND INSTALLED BY CONTRACTOR. <br />2.ALL BUSHINGS AND WIRING INTERNAL OF PROPOSED SERVICE <br />EQUIPMENT PROVIDED BY MANUFACTURER. ANY MODIFICATIONS <br />SHALL REQUIRE ENGINEERING APPROVAL PRIOR TO ANY CHANGES <br />BEING MADE. <br />3.ALL ALUMINUM(AI) CONDUCTORS TO RECEIVE ANTI-OXIDATION <br />COATING DURING INSTALLATION. ALL OTHER CONDUCTORS ARE <br />COPPER UNLESS OTHERWISE NOTED. <br />4.THE FOLLOWING CHARGING CABINETS AND THE CHARGING POSTS <br />USED ON THIS PROJECT COMPLY WITH THE FOLLOWING STANDARDS: <br />·IEC 61851-23: 2014 / EN 61851-23: 2014 <br />·UL 2202: 2009(R2012) <br />·CAN CSA C22.2 NO. 107.1-01(R2011) <br />5.THE AFOREMENTIONED STANDARDS IDENTIFY THE REQUIREMENTS <br />MET BY THE EQUIPMENT, INCLUDING BUT NOT LIMITED TO: <br />·PROTECTION AGAINST ELECTRIC SHOCK <br />·OVERLOAD AND SHORT CIRCUIT PROTECTION <br />·FAULT PROTECTION <br />·DEGREES OF PROTECTION AGAINST ACCESS TO HAZARDOUS <br />LIVE PARTS <br />·THE INTERNAL COMPONENTS OF THE SYSTEM ARE <br />PROPRIETARY. ANY QUESTIONS CONCERNING ACTUAL <br />INTERNAL PROTECTIVE DEVICES MUST BE COORDINATED <br />DIRECTLY WITH TESLA. <br />6.TESLA SUPERCHARGER SIGNAL WIRING RATED 1000V AND USED FOR <br />POWER LIMITED CLASS 1 CIRCUITS SHALL BE PERMITTED TO RUN IN <br />CONDUITS, CABLE TRAYS, WIRE WAYS, OR RACEWAYS ALONG WITH <br />ASSOCIATED DC CONDUCTORS AS ALLOWED PER NEC 725.48(B)(1) <br />AND 620.36. <br />7.SUPERCHARGER CABINET AC CONDUCTORS SIZED UNDER <br />ENGINEERING SUPERVISION USING THERMAL MODELING SOFTWARE. <br />SPECIFICATIONS ABOUT THE TRENCHING REQUIREMENTS ARE SHOWN <br />IN E-501 <br />8.FOR DC RUNS IN EXCESS OF 330 FEET, CONTACT TESLA. <br />9.UNDERGROUND CONDUITS SHALL BE SCHEDULE 40 PVC OR UL LISTED <br />HDPE. THE ABOVEGROUND PORTION OF AN <br />UNDERGROUND/ABOVEGROUND TRANSITION SHALL BE SCHEDULE 80 <br />PVC OR UL LISTED HDPE. <br />10.ABOVEGROUND CONDUITS EXPOSED TO VEHICULAR OR EQUIVALENT <br />PHYSICAL DAMAGE SHALL BE RMC. ABOVEGROUND CONDUITS NOT <br />EXPOSED TO VEHICULAR OR EQUIVALENT DAMAGE SHALL BE <br />PERMITTED TO BE EMT. <br />11.WIRE SPLICES ARE NOT PERMITTED TO EXTEND WIRE RUN LENGTH. <br />CONTRACTOR IS RESPONSIBLE FOR RERUNNING FULL LENGTH OF <br />WIRE IF RUN LENGTH IS MISCALCULATED. <br />12.SPECIAL INSPECTION IS REQUIRED FOR ALL POST-INSTALLED <br />CONCRETE ANCHORS. <br />13.PLANT GUARANTEE: CONTRACTOR SHALL GUARANTEE ALL PLANTS <br />FOR A PERIOD OF ONE (1) YEAR FROM DATE OF PROJECT <br />ACCEPTANCE BY THE OWNER. CONTRACTOR IS RESPONSIBLE FOR <br />PLANT MAINTENANCE FOR THE FIRST GROWING SEASON. <br />14.IF EXISTING GRASS IS DAMAGED/REMOVED DURING CONSTRUCTION, <br />CONTRACTOR SHALL APPLY SEED PER HYDROSEED METHOD. RATING <br />OF SEED SHALL BE PER DISTRIBUTOR BASED ON SPECIES TYPE. <br />15.CONTRACTOR SHALL MATCH EXISTING LANDSCAPE; USE GRASS, <br />RIVER ROCK, MULCH ETC. TO MATCH EXISTING LANDSCAPE AROUND <br />EQUIPMENT, UNLESS OTHERWISE NOTED. <br />16.CONTRACTOR TO INSTALL WEED BARRIER IN FRONT OF <br />SUPERCHARGER CABINETS AND SWITCHBOARD. BARRIER TO EXTEND <br />FULL WIDTH AND DEPTH OF NEC REQUIRED WORKING CLEARANCES. <br />GENERAL NOTES <br />1.ALL ELECTRICAL WORK SHALL COMPLY WITH THE NATIONAL ELECTRIC <br />CODE AS AMENDED BY APPLICABLE STATE AND LOCAL CODES. <br />2.ALL WIRING SHALL BE MANAGED IN A PROFESSIONAL, WORKMAN-LIKE <br />MANNER AND MUST BE SUPPORTED, SECURED, AND PROTECTED TO <br />PREVENT DAMAGE. <br />3.AC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER <br />ART 210.5 OR 215.12. UNLESS OTHERWISE REQUIRED BY ART 210.5(1) OR AHJ, <br />COLOR-CODING OF POWER CONDUCTORS SHALL BE AS FOLLOWS: <br />CONDUCTOR 277/480V 120/208V <br />PHASE A BROWN BLACK <br />PHASE B ORANGE RED <br />PHASE C YELLOW BLUE <br />NEUTRAL GRAY WHITE <br />4.DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED PER ART 210.5 OR 215.12: <br />CONDUCTOR STD COLOR ALT COLOR <br />DC+RED RED-STRIPED <br />DC-BLACK BLACK-STRIPED <br />5.TERMINATIONS OF AC, DC, AND COMMUNICATIONS CONDUCTORS SHALL <br />BE PROFESSIONALLY AND LEGIBLY LABELED WITH CIRCUIT SCHEDULE <br />IDENTIFIER, CONDUCTOR SIZE (AS APPLICABLE) AND TERMINATION TORQUE. <br />6.ALL EQUIPMENT SHALL BE LISTED BY A NRTL IN COMPLIANCE WITH ART <br />110.3. WHERE EXISTING NRTL LISTING CANNOT BE MAINTAINED, <br />ENGINEERING APPROVAL SHALL BE OBTAINED PRIOR TO EQUIPMENT <br />MODIFICATION, AND THE EQUIPMENT SHALL BE RELISTED BY A SUITABLE <br />NRTL. <br />7.UNDERGROUND CONDUCTORS & CABLES TO BE INSTALLED IN CONDUIT <br />UON. <br />8.ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO <br />BOXES AS REQUIRED BY NRTL LISTING. <br />9.REFER TO MANUFACTURER'S CURRENT PLANNING AND INSTALLATION <br />MANUAL FOR TORQUE SPECS FOR ALL BOLTS AND TERMINAL <br />CONNECTIONS. <br />10.ALL CONDUCTOR TERMINATIONS ON BUSSING OR TRANSFORMER SPADES <br />SHALL BE MADE WITH HIGH-PRESS CRIMP LUGS UON. <br />11.ALL TERMINATIONS OF ALUMINUM CONDUCTORS SHALL BE PROPERLY <br />INSTALLED WITH BEST PRACTICES INCLUDING BUT NOT LIMITED TO: <br />·USE OF TERMINATION EQUIPMENT RATED FOR ALUMINUM AT THE <br />CONDUCTOR TEMPERATURE, CURRENT, AND VOLTAGE <br />·ALLOWANCE FOR MOVEMENT DUE TO THERMAL <br />EXPANSION/CONTRACTION <br />·PROPER COATING OF EXPOSED ALUMINUM WITH ANTI-OXIDIZATION <br />COMPOUND <br />·USE OF CALIBRATED DEVICES TO TORQUE AND MARK TERMINALS TO <br />REQUIRED SETTINGS <br />12.DUCT SEAL COMPOUND SHALL BE APPLIED WHEREVER CONDUITS <br />TRANSITION INDOOR/OUTDOOR OR UNDERGROUND/ABOVEGROUND. REFER <br />TO EQUIPMENT NOTES FOR ADDITIONAL DUCT SEAL REQUIREMENTS. <br />13.BELL ENDS SHALL BE INSTALLED WHEREVER CONDUIT ENTERS EQUIPMENT <br />FROM UNDERGROUND AND WHEREVER POTENTIAL FOR DAMAGE TO <br />CONDUCTORS IS PRESENT AT ANY POINT. BELL ENDS SHALL NOT PREVENT <br />THE USE OF GROUNDING FITTINGS OR COUPLERS WHEN REQUIRED. <br />14.ALL STUB-UPS WITHIN FLOOR-MOUNTED EQUIPMENT SHALL BE 3-5" ABOVE <br />FINISHED GRADE. <br />15.ALL CONDUITS EXPOSED TO VEHICULAR OR EQUIVALENT PHYSICAL <br />DAMAGE SHALL BE RIGID GALVANIZED STEEL. <br />16.GROUND LUGS SHALL BE RATED FOR THEIR ENVIRONMENT AND CONDITION <br />OF USE. <br />ELECTRICAL NOTES <br />SITE LEGEND <br />(EXISTING OBJECTS)UTILITY SOUTHERN CALIFORNIA EDISON <br />CATEGORY ITEMS TESLA UTILITY <br />PRIMARY <br />PRIMARY TRENCHING X <br />INSTALL PRIMARY CONDUIT X <br />INSTALL PULL ROPE X <br />INSTALL PRIMARY FEEDERS X <br />PROVIDE PRIMARY FEEDERS X <br />PROVIDE ROAD CUTS / ROAD <br />BORES X <br />PAVEMENT REPLACEMENT X <br />TRANSFORMER <br />INSTALL TRANSFORMER PAD X <br />PROVIDE TRANSFORMER X <br />INSTALL TRANSFORMER X <br />INSTALL CONNECTIONS - PRIMARY X <br />INSTALL CONNECTIONS - SECD X <br />SWITCHBOARD <br />PROVIDE METER X <br />INSTALL METER X <br />LAND SECONDARY FEEDERS X <br />SECONDARY <br />SECONDARY TRENCHING X <br />INSTALL SECONDARY CONDUIT X <br />INSTALL PULL ROPE X <br />INSTALL SECONDARY FEEDERS X <br />PROVIDE SECONDARY FEEDERS X <br />PROVIDE ROAD CUTS / ROAD <br />BORES X <br />PAVEMENT REPLACEMENT X <br />SCOPE OF WORK <br />UNDERGROUND <br />SANITARY LINE <br />CLEANOUT <br />GREASE TRAP <br />FIRE HYDRANT <br />IRRIGATION CONTROL <br />VALVE <br />LIGHT POLE <br />UTILITY POLE <br />HANDICAP PARKING <br />SIGN <br />DECIDUOUS TREE <br />PALM TREE <br />SS <br />UNDERGROUND <br />ELECTRIC LINEUE <br />OVERHEAD ELECTRIC <br />LINEOE <br />17. THE GROUND-FAULT PROTECTION SYSTEM SHALL BE PERFORMANCE <br />TESTED WHEN FIRST INSTALLED ON SITE. THIS TESTING SHALL BE <br />CONDUCTED BY A QUALIFIED PERSON(S) USING A TEST PROCESS OF <br />PRIMARY CURRENT INJECTION, IN ACCORDANCE WITH INSTRUCTIONS THAT <br />SHALL BE PROVIDED WITH THE EQUIPMENT, A WRITTEN RECORD OF THIS <br />TESTING SHALL BE MADE BE AVAILABLE TO THE AUTHORITY HAVING <br />JURISDICTION. <br />1"12"0 <br />PROPRIETARY AND CONFIDENTIAL <br />ABCDEFGH <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />DA <br />T <br />E <br />NO <br />. <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />ORIGINAL SIZE 24"X36" <br />SHEET SIZE ARCH "D" <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-5000 <br />02 <br />. <br />1 <br />0 <br />. <br />2 <br />6 <br />A <br />20 <br />2 <br />5 <br /> <br />C <br />O <br />D <br />E <br /> <br />& <br /> <br />O <br />V <br />E <br />R <br />A <br />L <br />L <br /> <br />P <br />L <br />A <br />N <br />03 <br />. <br />2 <br />3 <br />. <br />2 <br />6 <br />B <br />BU <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />D <br />E <br />P <br />A <br />R <br />T <br />M <br />E <br />N <br />T <br /> <br />C <br />O <br />M <br />M <br />E <br />N <br />T <br />25 <br />2 <br />5 <br /> <br />N <br />O <br />R <br />T <br />H <br /> <br />G <br />R <br />A <br />N <br />D <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> 92 <br />7 <br />0 <br />5 <br />, <br /> <br />U <br />S <br />NOTES <br />G-002 <br />REV: B IFP <br />MCARMONADIAZPLOT DATE: 4/21/2026 2:55 PM <br />JB-9275533-00 <br />  <br />TE <br />S <br />L <br />A <br /> <br />S <br />U <br />P <br />E <br />R <br />C <br />H <br />A <br />R <br />G <br />E <br />R <br />_ <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />16 <br /> <br />S <br />U <br />P <br />E <br />R <br />C <br />H <br />A <br />R <br />G <br />E <br />R <br />S