HomeMy WebLinkAbout101105526 - PlanPlannlng & Bulldlng Agency
Bulldlng Safaty Dlvlslon
20 Clvlc Center Plaza
P.O. Box 1988 (t-19)
Santa Ana, CA 92702
0r4) 647{800
wwwsanta-ana.ol!
DISABLED ACCESS COMPLIANCE
DOCUMENTATION FORM
ACC-01 CBC 2019A. PURPOSE OF THIS DOCUilIENTATION: (check one)
E Finding of unreasonable hardship for projects UNDER the valuation threshold*
! Finding of unreasonable hardship for projects OVER the valuation threshold"
I Certification of Full Compliance with the 2019 California Building Code
" Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is llzqllogoQ (as of January 20201
B. PROJECT INFORMATION TO BE COi'PLETED BY PETITIONER:
Project Addressi
90] W Civic Center Dr ve Su te 180SantaAnaCa92703
Permit Number:
101 105526-901
Project Description:
lnterior tenant improvemenl at suite 180
Floor Number:
sulte ls on first floor this four story building
Business Name / Owner:
Johnson/ <Orino / De Anda DBA Novadent Manager Carlos Morino
Business Phone Number:
714 863 0588
Legal Property Owner:
Santa Ana Corporate Office Center LLC l\,4anager Tony Bolbolian
Phone Number:
718 755 4968
Total Construction Cost or Project Valuation
$ 20 000 00
Cost of Providing Complete Disabled Access:
$ 5,000.00 at this Suite
1 The cost of all construction contemplated in the determination of the valuation of improvement threshold
based on the valuation of site and building lmprovements for the last three-year period.
Permit No lssuance Date Valuation of lmprovements
Total
2. 20o/o of f ol€l Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access:
$
$
4. Describe the impact of the proposed improvements on financial feasibility of the project.
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
This entire facility complies with disability accessibility.
N o additional improvement needed for compliancE
Rev: 0210412020 Page 1 ol 2
-,-SANTA
ANA,',li[ffi
6. ldentify the accessibility features and equivalent facilities that WLL be brought into compliance with the
latest edition of Title 24 as a part of this project and an estimate of the cost of each ilem: (Documenlallon
may be required)
Accesslble Features to be Hade Acceaslble Cost of lmprcvomont
a. Entrance NA
E Door E Landing E Stairway/Steps E Ramp $
n Path of travel from accessible parking to the building entrance
and area of remodel $
E Path of travel to sanitary facilities / public phone / drinking
fountain $
E Path of travel from the public way to the building entrance $
c Sanitary facilities ( Floor no )$
d. Public phone(s)$
Drinking fountain(s)
f. Parking $
g. Signage & Alarms $
i. Other $
$Total:
7. ldentify the accessibility features that wlLL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each ilem: (Documenlalion may be required)
Cost of lmprovement
a Not applicable $
b $
C $
$Total:
8, Petltloner must be the legal prcperty own6r or hlsrher logal represontatlye:
I certify that the above noted information is true and correct.
E Legal Property Owner E ArchitecUEngineer E Contractor ! Other
print Name: Sean Nourani Architect Phone No. 424 365 2070
Address: 21 15 W Crescent Ave Suite 261 Anaheim Ca 92801
Signature:Sozz-,1/rrro.-Date: 01 20 21
Rev 0210412020
FOR AGEN USE ONLY
Page 2 ol 2
b. Path of Travel:
$
Accesslble Features Not to be lmproyod
Date:Approved by:
f-
/J
I
A
pddflr4M1.ofu6B
tuunoN ueeqcallqSJV
)
EUZ6 VINAO!11VO VNV VTNV9
3AN0 A NlC StAtC lgJM t06
tN: tBAOAdW UVNSL 08L ttnS
€
O
e<
]t""
Ij
ll
997-\I
iilftii lii'iii*i!arr arr aa & r
l: I
iE lr
EE Ii
-;a r llE*F ro
3,
3
I
'rfSt*-orr
fa-TErdt
i!
1s-rnlo
\
I
l.
!E
<:;!
Exe
;:,iii!
B
!
I
5q-l-
I
3
@
,i
te
ri
ii
Eq
:[
Elq
!
ia
EE
rl\
I
i
6
5
;".
63
rl
i
E
n
1
I
-i r--
tl'
!s
a!
lu
E',ll
v{
tt
l
i
Ez;;
!
E
:
t-
I
xI
5
;I
-:
!
tq
i
@
t.
II
!I
)
T
IEfrI
I
t
I
I
I
I.Efl
\lv Z
I
JI
t.i
a
rL
,lt
tl
tl
ll
tl
lL
rlEDTvt$o ll:Hl iG-r-;llo za I
,=JJ
fl't}
L
,j'2l'\\.
,raac .t,1. l
qI
I
F
#F:
T
--il
I
I
I
ll
,l
-tlti
rl
.@
i
E
t)
E