HomeMy WebLinkAbout10197804 - Permit (2)E
Project Address: 4509 W Sunsweot Ave Bldg: Address Range Suite Range:
Zoning: R'lAssessor's Parcel:100421-02 Lot: 54 Blockr NA Tract: 2463 Historic: No
city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permat Counter: (714) 647-5800 lnspection Requests: (714\ 667-?738 Inspector Section: (714) 647-5853
Permit #: {O{97804
Pin #: 72745
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
Sfd w/att garage
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
R.3, U
VB
cBc 2016
A-0602320143J
,|
Description of Work: lnstallation of roof mounted PV system. Worksheet attached to plans.
Planning Conditions:
Satch+:46097 'ilzAlz0l$ ID: NGAtIt IA
ttff ice: CTYH lpsns;: {0 1 o{' L
kct+: Ref+: 10197Sn1
D-laln?aolO77 - g/?S/?fil* t:59 Ffl
Owner:
Address
Phone:
Tenant:
Ken Truong
4509 Sunswept Ave.
Santa Ana, CA 92703'1231
17141487-749',1
Contractor: South West Sun Solar, lnc
Address: 13752 Harbor Blvd
Garden Grove, CA 92843
Phone: (714) 582-3909
State Lic #: 1004557
Lic Type: B, C-10, C-38, C-39
Bus. Lic #: 350754
Workers' Compensation lnsurance:
Carrier: State Fund
Policy #: 9232358
Expires: 06/01/2019
Dass srr Gn lEFEtli|llfuJgtc t t451 ' r:rr:l
Praveen Dass
ress sr,"*flbt"lhi!"3y2-z&to"' rn..
Newport AilLIt# 92663 g q',,r.r. it
(sae) 2s Sff|gl6r62- sr601000-
742OO Bldg Stde R€volvinr {1.tx.r
0lll6fr2- 5r612m0-
South WGtCtUn Solar, lnc. $411 , r.n.r
Ct+:rrrlrrrrrrrrET24 Auth+:(r7?9:ri;
13752 Harbor Blvd
Garden Grove, CA 92843
(714) 582-3909
Address.
Architect /
Desiqner:
Address.
Phone:
License #:
Phone:
License #
Planning Approval By:
Plan Checked By;
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd;
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Date: Misc. Receipt
Date: Misc. Receipt
C,nauez, Dave4 0 / Date: ogl25l2o1a Misc. Receipt
- Subject to Field:
07776002 5t60I Permit Fee
07716002 57612 Bld}. Stds. Revolving
07776002 57500 General Plan Update
$450.00
$1.00
$0.00
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'dr No 011 i6002 5i60j
01 1 16002 51612
$450 00
$1 00
Every permil issuad sha becorne invalid unless the wotu on lhe sile authoized by
such permit is commenced within 180 days aftet its issuance,ot if the wo* aulhorized
on the site by such pemil is suspended or abandoned for a period of 180 days after
the time the wo* is commenced
lnspector MID#. 2018-146372
Fee Total:
Paid to Datel
Balance Due:
$451.00
$0.00
$451 .00
Unit:
1st FL Area:
2nd FL Area:
Other Areas:
Garage Area:
Total:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $9,000.00
Engineer:
SITE-WORK DATE ID/SIG.COMMENTS
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Roof Shealhinq
Shear Wall
Framinq
lnsulationi Energy
Drywall
Ext./lnt. Lath
Brown Coat
lr/asonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Enqineer Final Report
Flood Zone Certif
FINAL loh1/lfr,.,D-?//.)
Certificate ol Occu nc
Notes, Remarks, Etc
BUILDING. INSPECTOR RECORD
OWNER Ot]II,DTJR DEI,CARATION
I hdr.hy ll,lmr uftlcr p.nalry of pcrury rh.r I rm cxc.rnr ton rhc CoNrocknl l.t.tr* l-aw l;r rhc folloui'r8 rcrtoD lscc.7oll 5
Iru\incss ind Proltsio! Co<lc): Aoy Ciry o! Counrt shich rcqlncs r lirmir r) ..tr(rucr, rller. imnnvc. cmoli\l' "r (trn rr,y
dflcrtrrc. prior h ir\ isurncc. d$ rcqu k( rl.ij ,tDhant hr \u.h p.nnil tu li h ! si!rcrl nllcmni ih! h. or shc is li.cnscd |uNrrnr
ro rfu pmli\nns ol rl[ Cotrlrrckr\ Liccnsd Lnw (Chrplcr 9. C.nnrdnc'n! wnh sc.ri.n 7ur) oI Divnion.l ofihc Bu\inrs\ nd
E.r.ssnNCodc)orrhrthc.r\hchcic'npllhcrofronridlhcba\i\lorrhcrlLs.dcxcnrlion.Atryvi.llrionolSccri,nT0ll5hyrny
nmliu furnnnir\ubj..hrhcrfpli.rntx'.civilpc.altyofnormorcrhlnfivchunmddollarslS5(D)
-1.
r\ o*ncr ol rhc rnFny. o, nry emlloyc.s *irh srac{ r\ rhcn k,h ..trFnsaliol s itl do lhc $ort aod rh. {n.'m s nor
inrcndcd or oircr.d atr {lc (SLi 7Lr,l4, au$r.$ dPi(nt$n,nsColc:lhcContricktr\l-[cnscI:w.l..snorarf]yro0no*ncr.l
rhc |nop.ny wth btri]ds or im|ni,vcs rh..Ntr. ud who dcs surh work hi'n\cll o' h.*clfor rhn,ugh his or hc! owrcmnbrces.
lhlidcd rhrr iu.h i'npn*rmtrh urr rbr nlcnd.d d otldsl nr sok ll lr*.rr. rh. $oildi',! or impnrcnr i\ $ld wirhir or. )car
of $ {brion- thc O*rcr BuiLir w,ll hak rtr burdin or ptuvir! rhd hr or {r dil En tlili or in{mw rh. pnlP.n, nr rhe Pu4${ ol
I.nsownciorrhcpn,pcdy.,'ncxclusivcly.onlr.clirswilhliccnrd.onlra.t,Fk,coo{dcrrlEfrojc.l(S.t 7o14.liu trcs
ufrl lhrfL\sirn Codc:'fhc Conrrsdoar Li.cnrc t-rw do.s nor lpply ro trn oencr.lnropcny who builds or ihprots rhcrcon.
r.d who c.ddcctu such rrr.jNls wnh a 6.rBcro(, licctr*d pururnr b rh. conkdoas Lic.ns ljsl
I rm cxcnrll undcr Scclio'L _. a & PC ttrrhis r&$i
]rcf,KTBS:gDTlINSAIqN
IIECI.ASAIPN
I hcr.h, dmnnundcr lcmllyofFrjuryonc ol'thc lnlbwins dcclaruln,r:
-lhrvcond
willnuinraina C.nillcrr.olCon*trrro sctf ln\urc fir wor kcrf .. nD.nsnr ion. rs pmlidcd ror hl sccri{,n 1700 ofrhc
Lahrc(dc, r{tr rhc trfonuNc olthcvork tuwhich rhc Fnnil ir issucd
l0l hrL. i0d qill trhir ri| $ork.r\ .rtrr|[n.rri,D i'rurn.o. r. 'aqri'ltl by Sc.lion 3?mof rhc tibor Code. for rhc p.rroiluncc of
ne cmicr at policy numbcr N:rl'. r.rl f.r *h'cr rhr ncnn jri$Lcl M) q^'rc'' J,{nFn.ri. n i' \d'J
,"",", d).J"-/*.r',
r 4?fis?Lrpir!\6-t4,
-l
ccdifyrhrrrn rhc !.rl'orDnccolrhc *ork In shichrhi\ pcrnn is i\nkd.I sl[ll n.r cn+kry rry ,{notr in rtry rnK_r
$ a\ b h.coft srhJc.r r. rh. sorkc( conpcNmnr ldwr ol C.lifoi i!. rtri !Er.c rhrr if , sh.uld tE.onr subi.ct ro rh.
workci\' rohltrnsrrii)n ptuvisio s ol sccl ior .17(D ol thc hhrr ( odc- I sMll. r,xrhsirh .o llny with rhosc P.ovniotrs.
WAINING I'rilur. lo s.urc $orkcri conr|{nslli,'n cov.n'gc i\ utrlawrnl, d shrll nrhJccr M ctrDlorr h crinnrlFndri\ ntrd
.ivil ircsupt,on [utrdrcn lhouslnd dolla^ ($100,(XX)r. in addirnnr n) rhc co( .i conlrnsarion. drnugc\ ]\ Pn,vid.d lnr rh.
,,,", 1-ZC-rY "----2-
IJIj;NU'DTOIIIBA(IIS
J]I'(L,I8AII!.rI
I hcrchy rffinnundcr Fn.ltyofFrjurylhil I ! liena!udcrpmlisionorCh,rrd9Grnnrrcin8sirhScclion7({r))orDivi\n:r
oi rhc Blsincs rnd Profesn,n{4d.. md nry li(cnsc is in irllturc! cflirt
L-( <.'
14:,\-
(o av s67
th4L
IANUB!,]SUqXTE!IUNIj.AIiEN!}
I hcchy lifinn undcr pcnrhyot p.rjory rhdr rhcrc is a..n{fl.rn,n [ndir8 r3ctrcy for rh. Flrfonun.c orrhc sotk lar whEh rhh Ntrnil h
issued(sa l(r97- civ. c.).
hndcr'sNamc:-
A.IILICANLDEEIAIIU,I2Ii
I lE lhy dlinnundcr pcnrlry utt)rrjury onc ofrhd nnt,wirE ilc.hnrn rs:
Ocnnnin,n Pcnlils A\t8s'o\ Norificrn,n F.dcrnlRcgulnbon\ (Tirlc J0.I' n1l)
rd\lL, rnr I .rr ,)1 Nof nrlitn,
I..nrfyrhxrrlr fcdcml rcSuLlions rcBelinE asl'ci.s rc ov!larc norrpplicrblcu rhi(Pr..)ccr
xh^.'rn,'.n.,1 r ndv i,tr i'r,nLrri.,n.unk,*\'....-,--....',
\pprnont or asrnr \iamrum "fZ'l
P.rni,.rrunriDrin,,: Ld-e LE'
q/rdtt
Set Backs
Subf loor/VenVlnsulation
--------r------
,-,,SANTA
NA,',rffi[t
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa{na-org
RES!DENTIAL
PHOTOVOLTAIC
CHECKLIST
soL"01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESTOENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer lhe ten questions and
sign the certification seclion below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x 17" size. ll ^n swerina! N Otoan of the uestion s itlan cha ck shall be reo uired
Project Address 4509 SUNSWEPT AVE, SANTA ANA, CA 92703
SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO Aie the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Seclion 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment inlo roof rafters (wilh pre-drilled holes) and is this minimum embedment
shown on lhe plans?
Are ALL lhe structural pages of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)
tr tr
?Etr
Eltr
Ettr
Etr
Etr
Etr
4
5
6
7
I Etr
9. Etr
10 Etr
I cerlify under penalty of perjury under the laws of the State of California th
Print Name. TRANG CONG PHAIVI
phone Number: 714 582 3909
Signature:
Date:
Email Addres
Rev: 8/1712015
S: PERI\4IT@SOUTHWESTSUNSOLAR.COT\'4
tg
Contraclor Company Name:
is true:
,--SANTA
NA,'ffiH
Planning & Building Agency
Bullding Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647.5800
www.santa.ana.org
soL-01 cBc 2013
Project Address:4509 SUNSWEPT AVE, SANTA ANA, CA 92703
Contractor Company Name:SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layerwith no
overlays?
Will the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of lhe plans WET stamped and signed by a Caliiornia
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spaclng, anchorage delails and manufacturefs PV support information.)
1 tr tr
2 8tr
Eltr
tstr
Ettr
trtr
atr
4
5
6
7
I tstr
I Etr
10 Etr
I certify under penalty of pefury under the laws of the Slate of California is true:
prinr Name. TRANG CONG PHAM signature
phone Number: 714 582 3909 Date:
Emait Address: PERIM lT
Rev: 8/1 7/201 5
SOUTHWESTSUNSOLAR.COM
thpra6ove
l<
RESIDENTIAL
PHOTOVOLTAIG
CHECKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten queslions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. ]f answerinq NOto anv of the questions. plan check shall be reouired.