HomeMy WebLinkAbout10192841 - Permit (2)city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA 92702 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714\ 667-2738 lnspector Section; (714) 647-5853
Project Address: 2238 S Park Dr
Assessor's Parcel 015-203-21 Lot: 41
BIdg: Address Range:Suite Range:
Zoning: R1Block. NA Tract: 1'192 Hisloric No
Patio:
T.l.Area:
Yards Req'd:
Valuation: $13,000.00
Planning Conditions:
Owner:
Address
Phone:
Tenanl:
Allison Haubrick
2238 S Park Dr
Santa Ana, CA 92707312'l
(714) 402-s818
Contraclor: SunrunSolar
Address: 20512 Crescent Bay, #108
Lake Forest, CA 92630
Phone: (818) 5634529
State Lic #: 750184
Lic Type: A, C-'10, C-46
Bus. Lic #: 3/0287
Workers' Compensalion lnsurance:
Carier: Zurich American lns
Policy #: WC01369600
Expires: 1010112017
Engineer
Address
Sotr0ff
A,:':r
kr p1
Architect /
Desiqner:
Address:
Phone:
License #
Phone:
License #
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping Insp. Req'd
Zuniga, Allissa
Oate:
Date:
Date: 05/01/2017
Subject to Field:
Misc. Receipl
Misc. Receipt
Misc. Receipt
$500.00
$1.00
$0.00
07776002 51601 Permit Fee
07776002 57672 Bldg. Stds. Revolving
07776002 57600 Gene.al Plan Update
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 01116002 S1601
Every pomit issued shall become invalid unlessthe wo* on lhe site authorized by
such pefinit is commencod within 180 days 6fter its issuance,or if the work authonzed
on lho stte by such pemil is suspended or abandoned fot a peiod ot 1 80 days alter
the time the wod< is commenced .
$501.00
$0 00
s501 .00
lnspector MID#: 2017-135885
$500.00
$1.00
Fee Total:
Paid to Date:
Balance Due:
Permit #: {O192841
Pin #: {3994
Unit:\q-
Building Use: Single Family Dwelling Occupancy: R-3, U 1st FL Area:
Job Type: Solar Constr Type: V B 2nd FL Area:
Nature of Work: Solar Code: CBC 2016 other Areas:
Existing Bldg. & Use: SFO w/att garage Flood Zone: X{602320259J Garage Area
Proposed Use: # of Stories:
Total:
Ooscription of Work: lnstall new 4.1 kw roof mounted aolar PV system (15 panels) Per PV checklists.
I
01 1 16002 51612
BUILDING. INSPECTOR HECORD
SITE-WORK ID/SIG.COMMENTS onNIR Bull,l)l:i Dt:r.( AnA1roN
I h.rh) lmnn udid Fiihj ol lErury rhd I m.r.r{r rn)m rh. ('trflrkio^' Litic ljr f'tr rlr (nhrmr ,.r"tr' iS( n,ll 5
BurN( rrl Pnrf.r.ir Oi.! Ary Ciy o, (i dy *hih Equn.( r Fni nI dr{M. ild. rn{ln\.. &D'lhh ( '.F,i y
r{.m. alk (qomr rr rrrlrrd ritr (rhFrdn, fik. {Ed {r.m rllr t:or \h. h l..iql |!rsd
ft,rltFnnir. f rh(t d{r'r Lk.N.d li$ (()Ed 9. (i,nnmxri! r h Srrhn Trrr ,i l)'r$.. I !r rlx An{ft$ lid
Pmf.(r,.r(1 .).rrhnrlEorrn n.rcnv rh.rlnlndn ih. ho\a ntr rh..lLgal.r.nlriln ,\n)rN,L !n rSttrrnrrl rbrnv
{p,rlir f,n r Fmi tuhj.dl rh. .rDlr. (,! rln iity ln{ nnrrMnfir. h!ftlr.J rll \ri5rr{l
l. fi o*Er.lrh. FnFny. or my.mnlDi\ rih triB.\ rlFn v)k o,mr.n\rrnn, ll & rli {,xl r
' dkd r!fi.r.d (, qkls(.7rls. Btr(r\ snJ lrr r.nnn\(( . th.(nnrdoi.l.acn{Ixtrd.rn({rppl}hr'!,qdIol
rrrtnFny wlr' hiH\ 'tr iq'rirr rlEGr,.tol eh, !8qh*!tth,n.lr rh.kllorihrorghh*',lHnrn.n'nr')..l,
pn,vrl.{ rtur $ch iqmw \ ar. rn inrrtki { ')fi.61 i(, qk ll. h'{\rr. rll h'ildinE or irnttwrnr I {ttl I r h'n ! 'tr FiI
ol$q,!.kD (h. ()ri.r Buitld silllME rh. l{(Gi.fInivr8 rhr h. { \lt did nn tuikl r imnntr? lh. nnlFny I'tr rlt Brrlr\.nf
-1.r(
*r,.lrh.prI.ny,rm.r.h\n?ly.nd.rd'nt$rhl'..nqtlnitkl ^!,onnn(rl*|I!s(trsd ]r]11.11'xix$
ullh,h\ir(inl.Th.ConrmttrrLt.ni?l.ird({tnirtlvi!,r(otrn.r.lrn,ni}uhth(rld\!{i'nfr'r.\r,'.,.otr.
,nd r&, d)dmktutehrnrj.ilrrrrh'(i'dRr (,ri.nqln{run hrhtC!'nt nr'\tf,.n*lr\,
I m.!.nll, uhh, Sdi'r-, B Rf ( trrhhrcin'n
1r... Oxe.nlrlf}*ijq llisAra!
IILO,AAAIIQIi
I h.r.h) aftum un&, Fmh) nf Flllrt oEol(h n'rh*'.t daLi,,r)n\
-l
hn\r Erl w,ll roinran r C.nifrn. o, CD.(nr h S.ll l.{t. [{ rorr(r omFnsrr)n. r\ rh* ki.d r(tr hy s..i x,n !7ix, oI tlr
Lrr, (ixk. I', rh. Ffirmr. .f r *orl (tr*ti(hrh. Fnni i r!u.d
Itiv.rndwrllB'rnhrnr.'!rtrmnn\arnnihu'rfr..r\r.q(t.dhts..ri,n.1?rlrnlrhcLrhort,xl..r{rlrrll'itr'r'f,rol
rlE wort f,n *hihthn n rm[ n rss.! Myworl.^ .o'np.nwtntr in\lrrrt'.(mn i lF'lf,y nun f,r rr
c,,,,", ' ')\^JU i\
"r,.rn*r" 5!!! \,\[r
-l..nrfyrhlr
{ rll F.rIorEm.olrL $o nn sh(hrtFFrmn n kruar I \h3llrtn.nfl,t dnvnivn 'n ii\ trhnn.r
r, rib lEi!tu.ohFn n, rlE *lt.c !r,mn ndi'i &u\ of('ilinno rnd iiE rtd rr Ish)uU h. m{hB1n,rlI
* dr n'qEnsrioi Frovnirr ot SRi i :r'7llrnfrrr lrhn(iJ..l{sll. (!nh,ihomoi} trtrhrh'{ nnnntr'nr
WAllNlN(; flihrk h auE rr*LF ('mFndir t .hx. r u.Urtul. rnd \hall {hrd atr .illfll\fl i!' drnnnl FL,lr..d
.N f'R! un r.t rh ,.d ih{{id L!, l,Krtlrrrorlm*xrr'nr,rlt(Ntrfruqk.r{hi.drm!!.ri!trrilRl I!, rh.
sd4 rr7lor rrr I.h{ c,r,.. d*{ ".d dh"!t ./6. I<-\. \\-\ tr ||ftL--.----
lht, j.\.v\\ I
^p?llqllt:lJl;la.tlJ1-lllauall0aI}.lLxar(rx
Ilrrny.rrnmnnkrFnakynrIEr|!r)rhtLmlt!trqiunl.rt'"vnnnofqu.re(dlmm 'iP $trhs.!rnn7rrr,,olIr$nn !
of rh. ntr{mlrrnd Fn,f.ln)ffCudr. rnlrnl lf,.n\. tr m folrn,..)nr.fLcr
L- r^'
4
t \t\\..L -\6,^[-.-_]
glxsrxlcul!.[NlrlriJlirNgr
I lrEhy rllinn uid.r Fnrlry or Ftue rhd rlE. ir ! o,n{rucri,n k l'n3 oF.Ry ntr rlE IFrr.nM(. .l ih. * t (tr whrh lhtr Fnit 6
n{ rS( lin?,(iv C r
daul:Alr"l,lllABlr!.ll
I ldd,, rtrrm unkr Fndhy ol rEriry .E frlr f!nt,*'nrrt rh,di$\
lln'lri'n f ,nnn ArtE(o\ N, ifi.di,i lnkrrlR.Buldx'i\{fnk.l0. t'i 6r
Rat"tr.,l I dr.r,)f N!{'lr: rr'
lc.n,rirh:i rn f.d.rilr.Eul.r$n\ r.3i nFr\h.d.\r.nx)rrlrr.'rnrnnlrihl.irrhNnn,r!1
I t.,r!rh.( I hr\.r.r rh^rpflicnirnrn,l {.rh rh.ali)F irf!rn!i3,n tr.,n.rr lrcran,
rurli('n nnl h.r.hyirihrrcr.nts.miriv.\of I
fir!. nrnrn)ial nn{xny i,, i
^mlkrnr
or,r[.nr sknrrur.{L (rS\.*)
ertr!ily !irl'il ( ir) xtr,l(ir'trry
h^( i) r' rl nr,r\r.rtrrsrrE
'|)''|' -'\t\t-t
Set Backs
Forms/Steel/Holdowns
Erection Pads
SLAB Floor
Subf loor/Vent/l nsulation
Roof Sheathino
Shear Wall
Framinq
lns u lation/ Enerqy
Drywall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Enoineer Final Report
Flood Zone Certif
FINAL 7/n A\Le'fi1 Yq
Cerliticate ol Occupancy '
Notes, Remarks, Etc
rll,
I DATE
UFER Ground
l/11 .- Di
*-SANTA
NAJhffi
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(7r4) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11 x 17" size. lf answerinq NO to anv of the oues tions, plan check shall be reouired.
Project Address:u3{ ?,,a2
Contractor Company Name:
Contractor License Number:
2
3
15c .a\
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.'l l of the California Fire Code, and is this shown on the roof plan?
Wll the PV system be installed on a roof having only one roofing layer with no
overlays?
Wll the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Wll the PV system weigh maximum 4 pounds per square feet or less?
\Mll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
\Mll the PV system be installed with a space of 2" minimum to 10'maximum between
the underside of modules and the surface of the roof?
Wll the PV system be installed without using any ballast system or counter-weight
system?
\Mll the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16" lag screws be installed with a minimum ol2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans VVET stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
er penalty of
K.;r,lu..;Signature
under the laws of the State of California that the above is true:
Phone Number: "\\\. 3t )
Email Address
YES NOEn
Etr
tr
tr
tr
tr
\l
4
u bo
,Eu
'tso,.\u
ro -El E
I certify und
Print Name:
\' 13qt Date: t-{
Rev: 8/1712015
1
*-SNTA
NA
II,I\lIlllC
lrlll.Nc
rfit0
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached STNGLE FAM|Ly RESTDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO s ets of plans, of
minimum '1 1 " x 17" size. lf answerinq NO to an v of the questions. olan check shall be required
Project Address:
Contractor Comp
u34 ?,.
any Name:
Contractor License Number:5c
Are the following applicable to the proposed project?
\Mll the PV system layout provide the required threejoot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
\Mll the PV system be installed on a roof having only one roofing layer with no
ovedays?
Wll the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Wll the PV system weigh maximum 4 pounds per square feet or less?
Wll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Wll the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
VMll the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans VIET stamped and signed by a California
licensed professional engineer? (including project specific site plan, pV layout,
anchorage spacing, anchorage details and manufacturer's pV support information.)
YES NO
2
3
6
7
4
tro
trtr
trs
Eu
tsn
\s
ro 'El El
tr
tr
tr
tg
E
9
I certify unde
Print Name:Signature
Phone Number: "\\\.
Email Address
e State of California that the above is true:r pelalty of(."tr pgrjury under the laws of th
\5<o )i-;
Rev 8/1712015
35\.1jcl Date: q )e
' 'a:,.:,,g ,"- bui:di .!g .qge,,:v
20 Clvrc C.nia. p|.:a Ros3 qn6.t
P.O.8o.: 1988 (rt-t9)
Srnh 4n.. Ca 92702
(7te) 6..7.5800
rB*.tantr-ana,oro
imoke & CO
l'.la:m Affidavii
f sese :,-;a ? -lack :,.:h:e.i.ri bc l|-poir, pe..)
I hereby certify that I am ihe contractor or the property owner of the above projert. I further certifylhat smoke alarms and ca e alarms have been installed in compliance with th€ goveming
5tate of california requires thar smoke and carbon monoxide (col alarms are installed in residcntialbuildings.
caliiornia Reridentiar code (cRc) seciion R314.1and R315.2 states in part that existing dweflings be"retroFirted with smoke ararms and carbon monoxide ararms. cRc section R314.3 and R315.3 d€fine
ahe required locations.
'to.ir bo::es :elow mt:s; ba :l.r:ke:i:
::':rl' i o" f,xi' e ala,;rs: Are instaled outside of each sreeping area in the immediete vicinity otbedrooms and also on each rever of the dweling. Ararms are recom-mended in bedrooms wth trs-firedappliances (i.e. hot water heater, cooktop, fumace) or a fireplace.
':r": re : r r;, !: Are instaled in each room used for sreepin& in each halrway outside of a sreepingroom, and on each levelof the dwelling.
Retrofitted detectors may be batteryoperated for buildings where no interior alterations ercperformecl combination smoke/co ararms must compry wi*r att appticabre standards and be approvedby the State Fire Marshall (StM). Battery life must be 10 years.
n
Codes and have te
:,'2a: --'nei
functional
Lic nsed Contractor tr Property Owner
r' : . f.: }is r..r'-cer:$ccii.n is onty rsed fot prciects thot clfect the EfiERtr,R ol thc sttucturc, this-'. 1ce:-' 's '-ooricoble 2Nr-y tc otolects wher. 'rccess ta rhe rnaefior ol rhe dwcuing by o i,,nto Ano.1sce: t i: no. -?qulrc,!,
'?.€ .lr's :--,mpleted fo:,r anC the job-carC readlty avallable on final inspection!
qt r -r.e!_.:?)3b PnAv (.. 5pNTl1 At]A L
'tD 14 29.{
1.,,9,:Alu\s U rrAU
ututu LT L;:e,.se #:19Otgt-(
{Dcte 1 /!/a
ffi
'its 'c,.t!n,cr. r,oy ic 1ounC o..., httD:/. vw.santa-ana.orcy'oba,/
I 0t