HomeMy WebLinkAbout10193029 - Permit (2)n-
t
Permit #: 1O193029
Pin #: 79027
city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA 92702 Building
Permit Counter: (714) 647-5800 lnspection Requests: (7'14\ 667-2738 lnspector Section: (714) 647-5853
Project Address: 1346 S Rita Way
Assessor's Parcel 109-315-10 Lot: 43
Unit Bldg: Address Range:Suile Range:
Zoning: RlBlockr NA Tract 2069 Hisloric No
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Drvelling
Solar
Solar
SFD w/att garage
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
R-3, U
VB
cBc 2016
x-0602320257J
1st FL Area:
2nd FL Area:
Other Areas:
Garage Area
Total:
Patio:
T l.Area;
Yards Req'd:
Valuation: $22,000.00
Description of Work: lnstall solar panels
Planning Conditions:
Owner:
Address
Phone:
Tenant:
Aurora Dionicio
1346 S Rita Way
Santa Ana, CA 927043726
1714t235-6743
Contractor. Effect Energy lnc
Address: 29442 Via Napoli
Laguna Niguel, CA 92677
Phone: 13101972-8277
State Lic #: 1O1427O
Lic Type: C-'10
Bus. Lic #: 365751
Workers' Compensation lnsurance:
Carrier: Exempt
Policy #:
Expires:
Engineer
Address
Architect /
Desiqnerl
Address:
Phone:
License #
Phone:
License #
ernandez, Kathy
Date:
Date;
Date: 05/18/2017
Subject to Field:
Misc. Receipt
Misc. Receipt
Misc. Receipt
$500.00
$1.00
$0.00
07775002 51501 Permlt Fee
07776002 51672 Bldl. Stds. Revolving
07116002 57600 General Plan Update,il
\,/H
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd U Account#Total
Flood Zone Cert. Req'd: No 0i11600251601
01 1 16002 51612
$500.00
$1.00Every pemit issued sha becomo invalid unless the work ot the s,tg authotized by
such pofinit is comnenced within 180 days aftet its issuance,ot if the wo* aulhotizod
on the sile by such pefinit is suspended or abandoned for a penod o1180 days aftet
the lime the wo* ts commencecl .
lnspector MID#: 2017-136263
Fee Total
Paid to Date:
Balance Due:
$501 00
$0.00
$501.00
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
BUILDING- INSPECTOR RECORD
SITE-WORK DATE ID/SIG.COMMENTS OWNEII B!ILDf, R DF'I,(' RA f ION
I ha.lD lrrm u cr pc.ah, olFju^ rh{ I m crmpi frcn rh< (idr.d.6' Lrdr. L.s itr 'lr tullo\rms r.r$n lS€70115
Iluri.6s ,na.l ProLsion Cod.): ,(n) ((l or (oud! rhi.h r.quir6 ! p.rni tr c.drud, ih6. mFo\q &tulih.r r.1rr tnr
{tudsq Fm kJ ns isudn .. aLr. r.qut6 lh. sprlaut for s.h rErm lo fik a 3'sncd {dtul lh,d lE or ih. . lid..J pn'tu.ni
h thc Forisiom of lh. (irnkrdoi3 l-i..nsd litr ((naFd 9. Comm.nrint lrirh s(lnrn 7ux) of Division r of
'hc
ltonn* .nd
Prcfsir.s CorL)or lh.l lE or slr R.rmpt th6.ltom Md rh. h.sa lo. rh. ,ll.8.d .rmt, ion Any ! k,hlnrn ol Sdrioo 70!l t,f- any
orplicad ntr E Fnil rubjclilhl q,phc! ro.cnrlp.Eh! ofmt mr. rhe fi\ c hnn&.d dollsr ( tt(xl)
I.Gorn(oflhcprorEny..rn).nplo\6rirhtru6ds!h.r$l...mrEMnn,$ill&,ltEqo*a!lrE(urE.,
idnldlorolT6.nnnd.lsr7(}rl.Bc'6rmdPr.IdFc(od.Th.cl)dr.i.r.Lrft.liwd)6,.rflyroano\rsol
rh.pnl'rnv r',F hil& or inpov6lhaon. sd shr &E sh trld irN.lr or fi*lr or rhmuSh h'r or hd o\n mtLr €,
l,or idrt rhdr 3trch imr'ovsrEds d ( iddddi or rfrEld lo, sL la- hNod. rlE hldr{ or nlF ml ir 3rr.j $ nhin .or !6
oa corrkirtr
'E
(,*ffi Bu[& ( ill lEr. ilE h,ddr .f F\tB rhd h. M sh. dn d h]rld d imFo\. d. ,i.tdy lor lh. purFE ol
L o\ F n ll hc Fipdr- dn.rdur^.\ mnrrd,n8 snh li.d.d conkcloR lo .otrn rrcl Ih. p.r61 ls( 7(!14. Bniins
0 hrtsbn (td. Ii.(ontrttr'sl.ic6*l,r d6 kn lr,flr lom.$knrrnoFr) trn hnrld. or inrpn 6 rhd Nn.
and rvho conlmds nr such Forcls snh a Co.ltrrotls) lir.G€d r{l:sl kr rh. (n r&1c 3 l](d I jtr ,
I m.\dsfl un&r sdrK,n
D.r. ()nn.r
\r oRxEist( onr PFNsA r (,n
Dli(tJaArttt
I h(crla aflim unds p.nalrr oIpsjuD.n. otrh. folk'sins d(lddioB
t h{yedd*ill mrinr.h. ('cnif{trr. of(tMr to S.lllBur. a {.116 $mr€rB.dion.6 Eord.rj for tr s.crhn u(xrofrh.
L.br ('od.. forrh.Ffome.olrh.$. nn$hichrn.pmn B nru.d
I ha\ c ..d sill m.rnlain r 0116 conr.rqlio! iNu.rn.c, 6 raturcd h! S<1hn li(n of thc lrrr{ ( i.dc. tu rh. Ff(\mG. o f
rh. \orl finsh'chlhisrm rs su.d Mysork6 co,rndalion iNura(.cmis axl Inncl. numh6 rc:
Policr NlmtE tsrpnG
\,1
^
I c.diforha!
'tr
rhcrdfomafr'corrll.urrt t r trhththin rmir is isu.d.l +.llml6r'h, &
h a b nd.G .ut <r ro rhc u1',t6 qrnFtsdmn l|tr! of ( llifomia. ud !s6 rhd if I should b<om. 3ut d r. rh.
s..I6.onFsrirnF.\ii{6.fs<rh.1700olrh.Lrtncod.,Irh6ll,hdhunh.omp,y$irhihoslm\rioN
$ARNnC rnlur. ro suc q,od6' comrENni.n ordrn. i! unLtrful a lnill 3ubd { 6phrs
'o
ciniut rEerB rnd
trrl fin6 up (' oE hund.d lltrsnd dolld (tr100,0m). in addilio. ro lhc cosl of comFulion. d&M*6 B rolid.d tu lta
Sdi,. 1076 of rh.l,tnr Cod. mrdd rddrl)lrs'! td
o,.,6< lrt, lz or-z n*r-*, k'wrf fu*o. t.-
Ll(tnlsEp ( orfR^( roR /DESIAAIIIJ!
I h6.$, rmnr rndd pd.h! d ardlrD, thal I m licmr.n lndd Frrirn'n oi( h6prc al.omnrdinB $nn sdhn rulol oIl)nn'on r
ol !h. BB'B od Pnn*tr'trs cort.. d iy lictuc B in lull torc. ed cfr6r
1rctu.(1&s L tU
*" os Lr,t Lr-o rz
l,ic.N. NumtE
"^,*".y'ts"-*
\h\q-1-?ow
(adjlrau(JllMENlruc-&cEtcr
I h6.b rrm undd Fn!h) ofrEJuD lhn lhsc is r corEltudhn kndins asdcy for th€ r,dfomMcc otth. sort r shthrhistsnir (
is.J (Sd 109?.Civ ( )
AITLISANLDE4J.dAAI]A!
I rry*!trm und6 paally oa pslury on ot lhc followine d..lslltB
D.n lnhn P6mn!-&bcros Norifi.dF.I.dnrl R.sulaliois (titrc40. Pan6)
R.q!ftn Iard olMrifE lion
{ , "-,ry ,* 'o r*r ..*uhrFB Es'dins stE$os ,mo1 u. nor .Frlic.bL ro rh! proJd
l.dift rh,l I hv. rdd rhi! appli.rtion.ndstltcrhr rh. lh)E intomrion ii cord l.nrElocomplr. *nhrll(\r}r.d(tnd\
odinrc rd Srd. h*! Eh!€ r. hrldinE (orliruciioa ad hdctrlq .urbrn. rcFd.rldivB oflhu (\ry dd (irunr, k' 6r. uion lh.
tln\. Darircl mdv lor inN n'ffi
^**,*n.-,,*,."- V-S** ffi*vu-e- -,"o16\zo r7
,*,,* "...rrn*,, S+cA 5\ -4 a urrrn /
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenUl nsulation
Roof Sheathing
Shear Wall
Framing
lns u lation/Energ y
Drywall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
En gineer Final Report
Flood Zone Certif
tl
FINAL Gtt5|+flvi n3+
Certificate of Occu pancy
Notes, Remarks, Etc
I
I I
I
I
I
*,,sililA
NA,ffi
I Planning & Building Agency
Building Safety Divis ion
20 Civic Center Plaza
P.O. Box'1988 (M-19)
Santa Ana, CA 92702
(714) 647 -5800
www.sanla-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-o1 cBc 2013
Qz7o,'\c,.AProject Address:
Contractor Comp
a
any Name
Contractor License Number: C \r.,+ \C \t-] Lra.,T
YES NO Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-1t2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
gtr
Ettr
E+\
4
5
2
3
6
7
8
gtr
@tr
gtr
Mtr
gtr
utr
I gtr
10 EID
I cerlify under penalty of perjury under the laws of the State of California that lhe above is true:
Print Name: SrJ r 4 signature:'-,, uvlL **'fu, o+e.,'.'.--S*-clct,.-...,
Phone Number
Email Address:
Clrq\ z oz, - .sqz2- Date v
Rev I 1/19/2015
{
Solar Photovollaic (PV) Checklist for Detached STNGLE FAMILY RESTDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x 17" size. lf answerinq NO to anv of the ouestions, olan check shall be required.
1.
r';S/ral-znt-r
;,SNIA
NA.ffi
Planning & Building Agency
Building Safety Diyision
20 Civic Center Plaza
P.O. Box 1988 (M.19)
Santa Ana, CA 92702
(714) 647.5800
www. sa nta.a n a.o rg
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-o1 cBc 2013
Solar Photovoltaic (PV) Checktist for Detached STNGLE FAM|Ly RESTDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of rwo s ets of plans, of
minimum 11" x 17'size. lf answerinq NO to anv of the o uestions. plan check shall be req uired
QLTo+lx-\a (\\.1Project Address:
Contractor Company Name:L
Contractor License Number: C \f.,ttr \
d
\t{L7f)
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 '1 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Wlll the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roofedges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, pV layout,
anchorage spacing, anchorage details and manufacturer's pV support information.)
I certify under penalty of perjury under the laws of the state of california that lhe above is true:
Print Name: 3\i ,. +SignatureS\<lcr^^
PhoneNumber: Cf f q\ ? oz- -.$qz2-
Rev 11/19/2015
)l
oate, (rs/rc\-zo\-'l
4
Email Address
YES NO1 gtr
2 go
3 ultr
4 gE
5 gtr
6 gtr
? vlE
s Eltr
e vltr
10 ultr