HomeMy WebLinkAbout20163223 - Permit (2)City of Santa Ana
Permit Counter: (714) 647-5800
20 Civic Center Plaza (M-19), Santa Ana, CA 92702 Electrical Permit #: 20163223
Pin #: 3O5E9lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853
Project Address:1218 W San ta Clara Ave Unit
Block: NA
Bldg:
Tract: 1502
Address Range:
Historic: No
Suile Range:
Zoning: Rl
{h
Assessor'sParcel: 001-122-05 Lot: 2
Owner:
Address
lris Gierrero
1218 W Santa Clara Avenue
Santa Ana, CA 92706
17141421-37'.t1
F€o Type
01116002 51603 Serv Meter
01 116002 5'1600 General Plan Update
01 'l'16002 51603 lssuance
Amount
49.63
20.56
51.26
Qty
1.00
1 .00
1.00
Fee
$49.63
$20.56
$51.26Phone
Tenant Name:
Contraclor
Address:
Semper Solaris
1637 Tierra Montanosa
ALPINE, CA 9,I901
(323) 359-0424
Botchi:38758 - 'r/23/2tJL7 I0: ororoleslS
Phone
0ff ice: CTYH Trons+! 142Acctg: Ref+: 2
Rcpti:01856509 ' 5/23/2017 2
Tronroct ion Totol tg
016
353
34.
2 ol 3
32?l
Pll
15
State Lic #: 974152
Lic Type: B, C-10, C-39, C46
Bus. Lic #: 365759
Workers' Compensalion lnsurance:
Carrier: State Fund
Policy #: 9029275
Expires: 1011012017
Serper Solsr i5
6enirll Plon Updste Fee
0ru6m2- 51600000-
Ele€tr icol
01116002- 51603000-
lloster Cord
CCi: rrrlrrrrlrrrTS23
_ |20.56
_ t1t10.99
!st4.45
&rth? 3 026190
Building Use:
Job Type:
Nature of Work
Single Family Dwelling
Miscellaneous
Service meter
Occupancy:
Constr Type
Code:
R.3, U
VB
cEc 2016
Notes: Handout given.
Planning Conditions:
Planning Approval By:
Plan Checked Byl
Permit lssued By:
,
Subject to Field:
Building Permit #:
Amsden, Julie
Date
Date
Date 05118t2017
Account#
Misc. Receipt:
Misc. Receipt:
Misc. Receipt:
Total
Every pormit issued shall become invalid uhless the wo* on lhe site
authoized by such petmit is cofifienced within 180 days after its
issuanco, ot il the wod< authonzod on tho site by such pemit is suspended
ot abandoned lot a penod of 1 80 days aftet lhe tims the work is
cofimenced
$121.45
$0.00
$'t21.45
lnspector MID#: 2017-136272
01 1 16002 51600
01116002 51603
$20.56
$100.89
Fee Total:
Paid to Date:
Balance Oue:
ELECTRICAL-INSPECTOB RECORD
APPROVALS DATE ID/SIG.COMMENTS trllNl.iL lllrll.lrlil{ Dt:l-( AR,\'l l(rN
I h.$! nlln r !rl{ Il(orlr!,'a |f,U rl rlli I n N.nrr t',tnrlr(, {rnd,a, t.ir { trt ntrtk.n)tL,rrN (,'"{' rS.r.?0i t
llu{,$r lrl l\nrrs*n, (ixk, Atrt (iry d (iu{r shxl' 'lltrn.\ x frn'i trntr,'r. rltrr'rh rtr tf,i. my
n' rlr FUrFinn or ili (imr.rl{ \ l.i..ny\l lr'tr r( lud.r q, (innnf,,f,nr,! rn[ srlri 7 [ or t)'1irr r r, nf, BunEs .ri
unplkrnrkrrIi,tr,irirhi\r!rh..rnln!dn,!nr'lNDlrrrt'r nr{( rlhr rnr hrItr.(tr['tt,,\ r11rD
Lr\ o{'s,'lrlrIrnfrnr.n' rtrntrt's{\f,irhrrt.!r\n!trv'l(ontrnrir{'tr'll,l,dr.{,,l,trrlr[!r'rrr.(r
tltlfiI*nt *h,lli !,{ itrtr!*!\ rl$trnr ldl $h),tk\ {rh trrit hN\.tld tr'dr!( rhnirttr I'i\ o' tr1!Ntr.n't,i(r.\
tlnnrknrMr{(hnrfro\$r.rnmnirGrkrrdrrkNrLr!'5 l. hi$.\rr. rllrinrnl't:r i,trokrrnr ^q,U
(it' !!x}tr
l. i\o$kr rrlIFqHr\.!n,rt(hni\.t\.o lr(rtr'r {irt' tiotrart$ r rrtr\r,(o n'Nrrtr.rr.'F1rrS(\ nlrl
l'r,(\r.(irk Ilr(ini',nnn'\1.i.tr!.1xtrtr,f,\'r ntlt)r\r,,ntr,,{'f,',,rI,'r,tu[trti,l[rr(ti rtrtr!!r!.
wlN dtr[tr.r\1,tr$'.h|noi.r\sdhr(i( rhrtri\)lk.tr{\lN'{'rnrn,rtr(iI11,r'\Iirtr!tn\I
-l
n!\rn|n tro,tr S*futri
lril.
tt( tt{K t,-lts, CUt I I'ttNs,\t lt t:\
uilJ.tf,at!,!
I lEr$y irrnnrrnrl.. |xrrlr) I'ltUIryotrc 0trlk tutto$ l'llj,t.rlxr, ir{r
-lhrv.drltrrll
ui'[nn,tr(Lniftnr..l(,rrrnr!,Srll ltr\urn,{rlnr.urt{t\b{.t\tiarrLnrtt'\S.\rri'rTrx)ofg.
Lfi tr (irlu. nr rlf, trcrlt'nutrxu f llE rdI ld slrih rlr tunri n i\utl
rlr rorknntrhrl'rhi!lr1 rir,\ tr{krl ilrxn.ld\ (! r{r1'!irr i'rn!,(i..r'i' rnrl|t'li.\ ruo'h1 ..
-l..dirynrr
r rlr ttrtrtrnrnxculrhr s(trt trtr rl!f,hihtr trr rr h N{'rtl. I rlrrll rtsi f rrlyr r\r'trro r {'hi{lr' rtrDortni.o rtulii ritr\r,tr'xtil(nh . n'rl 4n1. rhi n t \lrn'Ill tr1, 'r,{n}rrr, r
unll(\'otr{xtr*i{rt,r,vi\iri\otsL\linrr7r,0nrrh.t.,ti(iik,t\tL,Iknrt,\t,(onI!s,rhrti,t,ll,rtrFri\
rir 11r76 0lrlf lihtr (iiL. i.n.'rn n'rl xria r\\ r$
l).1.: /lpr{ot:
Lt(:s stIc(NfR (jlltR
laglxAJu!
I h.Ety!lln'nuflls lEulrvol rHtrry rh{ I tr lrtnalu'rtr Ft'r,ri ,n(lL1dd9ir{nnNr[Fr lSNirrTrrrr,nl),ri.iD]
ol rh. Brri'Es 0.J hnt$i(,N(i d.u'rl nry li(u\r ir i[ Iillti,rn xl.trl..r
ll.|lsutrllt)tLltillliiLrirlrl
/t|lt,t t(.aNl. Dt..(.t i|.rl.t(!N
I t!('y illir n o'rkr ff,nnhtoftf,rrrtryom,n rh n)tt,* r!(ti{t,trxrk h
llnr'lirlr,Iu ( \Nn,^ N,{ilur-n rartrrl RrrtrLri ^ I I L 11r. l,rinr
_R.q trr,l lln(' nlN,'lili(L'hrr
lror,ryrh rr'.1(al(1'lr.(,'l{r'n\ nlnrl,'[ r\ri\r[ 'nrD\,,] n.rn,|)l,tk.Lr,t.iirh\tr!,rtI
$itrc nrntini F,'tt,r) n, n,!r\ri tu|r,{\
,{ppli(.d or.t|l.nr SIluruF
Site-Work
Underground
Pole Bases
Li ght Standards
Pool, Fountains
Life Safety /Low Voltage
Fire Alarm i Dam pers
Communications Cable
Buildin g
Under Slab / Floor
Bondin / Groundin / UFER
Transformers
To uer
Sub-Panels
Roof To E ul ment
,f qctory Wired Unit
Walls Conduit
Walls Ro h
Hard & Soffit Rou h
Meter Release
Rough
Service Meter
FINAL bEZm 5. D6rL€fu tK
Notes, Bemarks
Spas,
Siqns (monument)
Air Conditioners
Ceilinos
Ceilinos (T-Bar Rouoh)
Etci
*,JA}I'TA
AIIIA.ffi
PIan ning & B uilding Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M.19)
Santa Ana, CA 92702
(714) 647.s800
www.sa n ta-ana.o rg
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-o1 cBc 2013
Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILy RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certrfication section below. A copy of this form shall be attached to each of rwo s ets of plans, of
mrnimum 1 '1" x 17' size. lf answerin NO to anv of the ouesti ons, olan check sha ll be required.
Proj ect Address: lLlb k/.S-^L (^y' ar. r^.,,.---4_
Contractor Company Name:
Contractor License Number:/ {2-
YES NO Are the following applicable to the proposed project?
Will the PV system layout provide the requjred threejoot wide clear access pathways
per Section 605.'1 1 of the California Flre Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10,, maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minlmum 5/16" Iag screws be installed with a minimum ol2-1/2inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project speciflc site plan, pV layout,
anchorage spacing, anchorage details and manufacturer's pV support information.)
-g tr
2 atr
3--EI tr
4 €trs-otr
6 -Dtr
tr
8 Eltr
I -E1.,tr
'10 E}D
I certify under penalty of perjury under the laws of the State of Califo a that the above is true:
Print Name:
Phone Num
S rgnatu re
ber
Emarl Address
Rev 11/19/2015
'.9hqa.ln V eJu-@ Eewgorso lar'r S. Co
Date