HomeMy WebLinkAbout10193197 - Permit (2)City of Santa Ana 20 civic center Plaza (M-19), santa Ana, cA 92702 Building
Permit Counter: (714) 647-5800 lnspection Requests: (7'l4l667-2738 lnspector Sectionr (714) 647-5853
I
Permit #: {O{93{97
Pin #: 14443
Project Address: 2028 E Wellington Ave
Assessor's Parcel 400-153-15 Lot: 51
U nrt Bldg: Address Range Suite Range:
Zoning: R4Block NA Tract 8954 Historac: No
Patio:
T.l.Area:
Yards Req'd:
Valuation:s15,000.00
Planning Conditions:
Owner:
Address
Phone:
Tenant
Aline Mccoy
2028 E WELLINGTON AVE
Santa Ana, CA 927013182
(714) 88't {990
Conlractor: Advancedlnprovemenlslnc
Address: 1352 Valencia Drive
Fullerton, CA 92831
Phone; (714) 630-6611
State Lic #: 947761
Lic Type: C-36, C-10, C-20
Bus. Lic #: 350773
Workers' Compensation lnsurance:
Carrier State Fund
Policy #: 9137594
Expires: 0312612018
Engineer
Addressl
Pool Engineering lnc
Christopher J, Biedenbach
1201 N Tustin Avenue
Anaheim, CA 92807
(714) 630.6100
74003
Phone:
License #:
Architect /
Desiqner:
Address:
Phone:
License #l
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Oalel
Date:
Date: 06/08/2017
Subject to Field:
Misc. Receipt
Misc. Receipt
Misc. Receipt
$500.00
$1.00
$0.00
07176002 515OI Permit Fee
07776002 s1672 Bldg. Stds. Revolving
07176002 57600 Gene/al Plan Update
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 01 116002 51601
Evory permil issued shall bocome nvalid unless lhe wo* on lho sita authorized by
such pemtt is confienced wilhin 180 days aftat its issuance,or il the v'/otk outhonzed
on lhe s e by such pormit is suspended or abandoned fot a peiod of 180 days after
lhe tifie lhe $,/ork is cofihenced .
lnspector MID#: 2017-136659
0'1116002 51612
$500.00
$1.00
Fee Total:
Paid to Date.
Balance Due
$501 .00
$0.00
$501.00
Building Use: Single Family Owelling Occupancy: R-3, U 1st FL Area:
Job Type: Solar Constr Type: V A 2nd FL Area:
Nature of Work: Solar Code: CBC 2016 Other Areas:
Existing Bldg. &Use: SFDWattgarago Flood Zone: x-0602320164J carage Area
Proposed Use: # of Stories:
Total.
Description of Work: lnstall new 3.36 kw roof mounted solar PV system. (14 panels) Per PV checklist.
Zuniga, af f issaN
BUILDING- INSPECTOR RECORD
SITE.WORK COMMENTS oltNEn tulIDEe D[t.( AR,\rl()N
I hd.bt amm u.dd padhy o l pc.Jury thll I m .tdPl lmm rh. Contados l -Eqsc l,{ (or th. folhsif,r r.Mn (S€ 7(rl l 5 '
B6in6r ,,r, Pr.fBio. (-odc) A.l Cil) or ( ou'n) uh{h r.qui6. Fni lo Ntrrrud, rhs- i"l'ro\c dmlith ot rcId d\
etodu., Firr ro n! isM.G. rls rcrllltE lh. lptlicel for rch Fmit h fi|. . sisncd sldoMr lhd lt ot 3h. n lictu.d pu&ai
lo lh. Irlviri.B of$. Conlra.roa! t-ic63.d t-tw ((ntFd s, Commtrin! sirh sftri.. 7000 olDivisnn I 6tlh. Burmd lnd
Pror*nns ( od.l dr lhd lE or nE is.rml'l lt-.too ud llE 66n for lhc dls.n.lmplirn An! rirllr(noasdion 70115 t1 tn)
spnlico'l lor s psmil subjdr lh. atpli. tloaLivilP.ntlryof.ot orclhtr livt hundr.d dolld I t5m)
L ar o*@ of rh. FiFny. or mt ophr6 n(h uaad s rh.ir FL tumFrs:Iirn. u'll rh rlE rnrt,ld dE slnrlrc i
inr6d.d or ofi6.d fo. sE {sc 7o.l,l, Bu!.d .nd Pr.fdriod cod. Tfi. Co,n.lclois l-(dk t * do6 nor l9plr ro .n 6$ 6 or
th. tfrFry tribl l(ldin{m\6rlEEr!d$ho&E*htr { hidslr.r lEklf oi rlmusn hu or hE.sn mplolc,
pr.vid.d lhil ru.h iht'ovffih E not iddd.d 6r ortudi ror sL ll hoqos, ltF l{ildinr or iElnNdld i! knd wilhin onc )@
of(oi{'kD( ir ()sE BriBq rill hi\. rlt ltuild orFn\ ing rhd ,r or lrE drl d Lild tr inqD\t lh. FtrF] nn !h. tr.FE of
l. 6 osc of rh. IB.pdty, md.lusnrlvco r*lins $nh licdE dcoliBlotsro tltr!rud llE Foj.tl (S( 7014. &!tr6
dv.i Ar(si)n Cod. -I h. Conlft.lor ! l-i(63. I -!tr do6 nol tmly lo M o*nn ol prcpdy tr ho build! or inPrord lh6@n.
ud uho onrr! to $ch lrjEts $nh r Coflno(i) lkdE d FlGu,n lorh.('.drdoir Lt.M ltu)
I m.(drpt und6 S<lxrr
uaBf,$lEraulE$anq!
OESAAAIIA!
I hddr rmrm u .. rEuh) of n6tuo oE orrh. folhtr i.l &rlmri)c
Ih,r.inf,illmDt.in.Cqlifrarcor(oe{loS.lll6ucfor|o 6NfrIEEdnn.8Fn\.dfo.h)Sdio.r7(x)orrh.
Lrh,r ( od.. lor rh. p6lollMc. oalfi. "!rl lor trl'ih lhc Fqni b i$u.rt
if rra' r ana " rr r mamtm "
qrc cnmrtrM tr,n rBu[n..- s ,.qun.d t,J. Sdion !?m or lh. l.hor ( {x1.. for I hc pqf.mrc. or
rh. $orl f.r $hkh rhir D.mi n isd My world omp.aaron EurM.. (8id dd Flicy numbq ,.:I,'",r. 'FFpL;eD 6 kNdrnu,alctt -
t"txrrr, t-, .fiNloa7A { t"r"{ ,-?1^ tt
I cnt,&lhd inrh.FfortffiGof th.trorl forrhatlh6tEmir i iro.n.l ri.ll mr mth! lny nsen in tnl me6
$ 6 b hdom. ruqer lo lh. {olt6' comFs, b. las! of Crltfomo. rd aSrE lnd rl I sholld b..ofl. 3ut!.d kr rh.
so*6 mmFMh. IrsvithB ots.dirn ll Td) or llE lr.r CGL. I dEll. fMhl nt mnplr. tr nh rlh* Forilioc
WARNINC ldlur€ ro *-s. $0r[6' .omp.f,erion cot@s. is unLsnrl ud rh.ll sdbjd e mphlq t' simintl Fhti6 tnd
c^'l lir6 up lo orc huod.n rk'@.d
Sdioi 1076 of rhc tri{, ( o{te inrdd
ot .of,FNtoc d.msB &r pr.r i.rl aor rh.
-?-t
I hc.N ilfi
'
m u dd rdatv of p6j!'y lhal I an licos.d und6 FNn n f( hinrs ')tconrmdc'n! $irh S.dtr)n 70001df!rrsion I
or llE BBrsud Pr.a6'.6 co&, eldm) lktr n n tullaore&ri.f[cr
,,..,.r.,,"* {- l9
oa, 7i- Y-/ /
?q.>>z t=zz
I @, .frrm uBLr lduly ot Fju'y lhn lho. u . s6^rdDi tadi,B .{d} for llE pdfon@G of rlE *!rt tu qti.h lhi! ptmi !
i$u.d (sd 1097, cn c)
l,n&r't N!m:
AXtLlgrLDEgdxaIlo!
I h!6ylrun uodr parhy olr-jtrry on .f lh. lollo*in8 delrations
D.oonrion Pmirr-Albcro! Notnc m. raldil R.snld bN (hlc .10. Prl6l
R.qunal tdls olNdrncdnn
I cdily rhlr rh. f.dmlr.suhtioB r.ssdinB Gtxslor mu.l r. nol smhcabr. ro rhs p,r!d
Ic61ilyrhdIh.\rr.!drhBqplkdrrn&islit.rhdfi.rbor.inlorrdhnircordItsrcrodomlyqilhall(ny!d('ounr'
ord'mnc6 dslar. l-atr3ELn'nEn'r.F.srdrv6.f thr Cny Md ( out) r. drd upon rlr
.trrc Mrion d pmr<r! tu
.tpt ti..nl or.\Eal Shn.lu o^, 6 -t -t?
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Roof Sheathing
Shear Wall
Framing
lns u la tion/Energ y
Drywall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req.
Deputy Final Report
Engineer Final Report
FINAL
Certificate of Occu anc
Notes, Remarks, Etc
DATE I tD/Src. i
I
I
II
ISubfloor/VenUlnsulation I
I
II
b()
Flood Zone Certif.
Z//a
SA}iTA
I\A
lqginc-er,,,ft&,6 1,. I \,Bullding S.fdy alltion
20 Clvlc Ccnbr Plrzr
P.o. Bor ltoE (r-19) JU,AJ (J R . nttSrnts Ans, CA giu02 " t.tt i I
(71'l) 647-5t00
w*wteda{na-org t-ltV of 5^,111,, _r.,,
E IhYl ESIDENTIAL
OTOVOLTAIC
CHECKLIST
sol-01 csc 2013
Solar Photovoltalc (PV) Checklist for Dotachod SINGLE FAUILY RESIDENCES Only
lnStructbr6: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of thas form shall be attached to each of TWO sets of plans, of
minimum I l' x 17' size. I answerlno NO to any of tho qusltions. olan check .h.ll bo rooulrod,
P rorect Addre33: 2028 E WELLINGTON
Contractor Company tr166. ADVANCED TMPROVEN'rrENTS tNC
contractor Licenee Number: 947761
1
YES ilotrtr
Etr
tr
tr
otr
Ar€ the following applic.blo to the propo!.d projecl?
Vltrll the PV system layout provide the required three-foot wide clear access pathways
per Section 605 11 of the Calibmia Fire Code, and is this sho\.m on fre roof plan?
Wll fie PV system be installed on a roof having only one roofing layer with no
ovedays?
Wll the PV anay be ffush mounted to the existing roo, so that the plane of the
modules (panels) are parallel to the plane of the roof?
Wll the PV systsm weigh maximum 4 pounds per square fs€t or less?
Wll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2' minimum to 10' maximum b€tw€€n
the underside of modules and the surface of the rmf?
\Mll the PV system be installed without using any ballast system or counter-weight
System?
\MIlthe anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16'lag screws be installed with a minimum of 2-1l2 inch
embedrnent into ropf rafters (with pre<rilled holes) and is this minimum emHment
sho rn on the plans?
Are ALL the structural pages of the plans stamped and signed by a Califomia
licensed probssional engineer? (including proiect specific site plan, PV layout,
anchorage spacing, anchorage details and manuf,acture/s PV support information. )
2
3
4
6. aE
7 atr
8 Elo
9 EID
10 EIE
I certify under penahy of perjury under the laws of the Stat6 of Califomia that the abovo is true:
pnnt Narne: JASON HAYES Signature: _
phone Number: 714-630-661 1
Emait Address: JASON@ADVANCEDIMP.COM
Rev: 11/19/2015
pslg 5/8/'17
-,,,SANTA
NAJI[if
Ef*ffSB,JR$;"qErr,.r,
20 Civlc Centar Phzt IF
PH
ESIDENTIAL
OTOVOLTAICP.O. Box 1988 (M-19)
Santa Ana, CA 92702
JUN 08 i0r/
(714) 6/t7-5800
rvww.sa nta -a n a. o rg City of s"r,,
^n
CHECKLIST
sol-01 cBc 2013
Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILY RESIDENCES Only
lnsfuctions: The licensed contractor of record shall complete all sections, answer the ten questrons and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x, 17" size. lf answerlnq NO to anv of the quegtiong. plan check shall b€ required.
P roj ect Address: 2028 E WELLINGTON
Contractor Company Name. ADVANCED IMPROVEi.4ENTS INC
contractor Licenae Number' 947761
YES NO Are the following applicablo to tha proposed proiect?
Wll the PV system layout provide the required three-foot wide clear access pathways
per Section 605 11 of the Califomia Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one rooflng layer with no
overlays?
Will the PV anay be ffush mounted to the exisling rool so that the plane of the
modules (panels) are parallel to the plane of the roof?
Wll the PV system weigh maximum 4 pounds Per square feet or less?
Wll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Wll the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roon
Wll he PV system be installed without using any ballast system or counter-weight
system?
Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
VMll the minimum 5/16'lag screws be installed with a minimum of 2-112 inch
embedment into ropf rafiers (with PIenrilled holes) and is this minimum embedment
shofln on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specif,c site plan, PV layout,
anchorage spacing, anchorage details and manuhctureds PV support information.)
Eltr
2 tr
tr
tr
tr
tr
3
4
5 E
6
7 atr
8 u
I Eltr
10 E)tr
I certify under penalty of perjury under the laws of the State of California that the above is true:
pnnt Name: JASON HAYES Signature: _
Phone Numbe. 714-630-661 1
Emait Address: JASON@ADVANCED \,4p.COM
Rv 11i 192015
Qslg 518117 ,/L
----l