HomeMy WebLinkAbout10193629 - Permit (2)City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, cA 92702 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714\ 667-2738 lnspector Section: (714) 647-5853
Permit #: 1O193629
Pin #: 56077
Proiect Address: 604 N Raitt St
Assessor's Parcel 007-05t-10 Lot: 48, POR 49 Block NA
Unit
Hrstoric: No
Suite Range:
Zoning: R2
Building Use: Single Family Dwelling Occupancy: R-3, U 1st FL Area:
Job Type: Solar Constr Type: V B 2nd FL Area:
Nature of Work: Solar Code: CBC 20'16 Other Areas:
Existing Bldg. & use: sFo WDET GARAGE Flood zone: X-0602320257J carage Area:
Proposed Use: # of Stories: , ao,",,
Description of Work: Add {12) new roof mounted panels to existing (20) fora total of (32). Porchecklist.
Patio:
T.l.Area:
Yards Req'd
Valuation:
0@0
s10,000.00
0
Planning conditions:
Owner:
Address:
Phone:
Tenant
GIANG VU
604 N RAITT ST
Santa Ana, CA 927032926
(714) 928-9990
Contractor: South West Sun Solar, Inc.
Address: 13752 Harbor Blvd
Garden Grove, CA 92843
Phone: (714) 582-3909
State Lic #: '1004667
Lic Typer C-'10
Bus. Lic #; 350754
Workers' Compensalion lnsurance:
Carrier: COMMERCE & INDUSTRY INSURA
Policy #: 033571266
Expires: 0610112018
Thuan T. Nguyen
Thuan Nguyen
16025 Hyacinth Ave.
Fountain Valley, CA 92708
6756s
Address
Architect /
Desiqner:
Address:
Phone:
License #
Phone:
License #
Planning Approval By:
Plan Checked By
Permit lssued By:
NPDES lnsp. Req'd
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping insp. Req'd
Amsden, Julie
Date:
Dale:
Oale: OBl17l2O17
Subject to Field:
Ir,lisc. Receipt
NIisc. Receipt
t\risc. Receipt
$500.00
$1.00
$0.00
07776002 5160I Permil Fee
07716002 s7672 Bldg. Slds. Revolving
07776002 51600 Genetal Plan update
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No Ot.l16002 51601
Every pemit issued shall become invahd unless lhe wo* on tho site authoized by
such pomit is commenced within 180 days aftet its issuance,ot if the wotk aulhotizod
on the site by such pemit is susponded ot abandoned for a period of180 days aftet
lhe tlme lhe wo* ts commenced
$501.00
$0 00
$501 .00
lnspector MID#: 2017-137625
01 1 16002 51612
$500.00
$1.00
Fee Total:
Paid to Date.
Balance Due:
Bldg: Address Range
Tracl: FAIRLAWN PARK
Engineer
BUILDING- INSPECTOR BECORO
SITE.WORK DATE ID/SIG.COMMENTS
Forms/Steel/Holdowns
Erection Pads
UFER Ground
Subf loor/VenVlnsulation
Roof Sheathino
Shear Wall
Framing
Insulation/Energy
Drywall
Ext./lnt. Lath
Brown Coat
[,4asonry
Pool Fence
T-Bar
Handicap Re o
Depuly Final Report
Enoineer Final Report
Flood Zone Certif
FrNA(fir r )J/z+lr-7 /LUqf n,/
Certif ic;16 ot Occu pancy
Notes Remarks Etc
z
t
( rwNl.R 8t rt t_Dtta Dltt_( aRAIt( \
I rErchr nfiim utolfl rtnrhf or F!ur! ilt lM,.r.'q{ rrnn rh. Ci'drtunn. lunel]r nr rh. r,,l[{mr '.,tLri r\.( ro]15
Buws !'n t1nl$i!'n (,x1.,: A,y ( irt .' (i{dt trh(h ..q!n.i r Frou n, (,ninkr, nhd, rnpnr.. (kMnNh o. Btr iny
{ duE. nr !'{\ n{ritu?. rlv, r.qun?! rh. rndf,r r,r such Franr h liLr ri3Blixr.'E rh,lrrr1lr N l(. {d |[r{an
h rh. If,Dvti'n\ tr1rh. (-oirncroil l.i(n\ l.i{ (('hifl., 9, ComnrniiE }{h S..ri('n Trrxr !,f I)!^Dn I nfrh. lltr\ln.\\ ind
Pn)f.si,'n\(itr|.) 'rh lr.r\h. i\.\.nrn! (h...ifnind rlrhi\n f,trrh. ill.t.tl .t.nnri'n Ant1i,ldiin,,lS.(rirnTorl5hyany
.ptlaMr i,!n rfrn su$,.{( rlF qrtlio ntr.n,lp.ehvolnorDtr.irunr.nu r. ollmi$ir,r
-l.
rs o*Er nrrlr Flrny. ( my.nl|ll'rftt *rh $nr.r !{ ih.ir srl rtnlin{n.. r'llil, rlr s,d rn rll {f,rnn n n{
id.nLd nlY.r.tl ,.n {t rsc 7lpr. Aunr( rd Pilrf.$iN C,ik I |l (ndr(na r l-i:tr< Llr tlxlr { !opl} rt in nx F of
trEFtdv sh, tutt]! r nrF)Fs rlFrmn.,il rh' dlE rr+ krt hiNrl d h.rrlr,{ rll fhhi.,rhdoxr.i! ,rrr
Frivil.d rhn uh qmrrldr e r, n.rlnl ,'fi.r! r, sb I[ h$$r rh. h|lnry ,, fFtr.md F t'll $rhr rR tr,
.rornbrr6. ilr(rftr auitLr *1ll IEF rtr tu&rolF,uI8 d|l l)Idn rr hnll,, inF*! & F,Ft r,,rrrFrF{rl
*l.i(o$n.r!'frh.Irl,Fny,am.rclhiv.]y.r rrunx \nh hertr{ .!nn,trn,\r,ron{n'.irh.nhi..ls..7(}rr.B'rrk1!
aRl P! i$ni(\nl. Ih.(i)ntrmxn\l'c.n\.1.r*d,E.nrrfflyr,rn,Ni.r lt'otrirrlri huild\d trtrt"or.\rh.r.ri.
nn'l rln, r'nrtuGfrtr \uchIn)i(i\snho(nnrN,rr,ra.nkl pu^rnr L,rh.(i ',(r.a\ LFctre lx\l
-l
n.r.nfl unl.r sdk,
Drt. (,im
wonxr*s: rruielrsr rurn
III(IIBAIIIIB
I lEr.hy rltum trftL, n .iI, nI lErj!ry n* ot(h. nni,s'nr d.chrdirn\:
-l
hr!. dlwillntrinrflno(.nilrir..f(. EN r, s.lr li{tr. ntr tro,k.n (( |xnliriDn,i\ fr)vrl.d litr h) S.(ri'{r rnnorilr
l,rhnC dd, l'{ rlx l.rfixMnG ,,r rh. $dt li, $hi(hrh. |rrmir i\ i\n'.d
L,
ff#ll
"*' *-*'^ on''n!i)n inlurlnrar'' orrF' (r Du'nh" "
*",*, n",*, WJ l?'bL -. ,.*r^ (*l-l( '
Iknifyrhd inrkF.rnnm ..frh.$o n"trh(hrhkFrmnrlr\ud.Irhlliar.nfl,,aift,!,r rnj in'rr
$ !\n' tEc m \uhi.cr (' Ih. wD*.i\' (,ml'.n\rri,
'n
h*\ or(-{lif,mir, rnl rFrd rhd 'l I \h,ulJ h..or {'hi.( i' ilr
*o*.ii onnt nr itrn I'n,!i!i,rii of sdi,'n lTrx) of rh. I ihtr oxl.. I \llrll. iihrih.!,mnly sirh rnn*ndtrr,n\
WAINING FrituE nt EcuE \$rl. !rur!..srt'n $irr3. ir unllstul in(t \tntt uhral .npt,,!.r n) d0Nn l tytrrti.r.iul fmr ut !, r h idrd rh{snd d.lh( Itl(x,.rrrr,. i( llini r, r|I rr{ or .unl|rn\ir xr. ,lan!|3.r i\ n|^rlnl n,
snrrin l0rh l rh. t-rh, ( trr. i
,,.,.: s{nlrl {pp,krn,:
I h.Ehy iffirm trnl.r Fmky orF.riury thr I nlkrnclonr.rfn,yrnnoi(hrn..s{NnnEtuinsqnhS..iiinrrrrrrorl)'r^rn:r
ol ln. tsr\in.* md lir L(i,nr(i)d..u my lr.n{ n in fu 11 f!(. ml .If.er
L-1 \)#vezKI
colsla!!:rurN.lJllllsuJil!.(I
I l:khy rfr,m !d.r F..ty ol Jr4{ry rhd rt-. n r c.nitu!1ion L li.ir!.r! rttrrll Fntrmm. nrrrr *rk nn rhf,hrhn Fmr n
$iurd (Sa- 1Ir7. ( ir (- r
AU:UTA}Ur!:SJAAIO!
I hdtny ifrm ulla Fnllrt nl FrjoD oE ofrll n'llr..S d<Lrrbn!
tuBrlarr P.rmrt \lr<or NdifKdi,n F.iknl R.3ur'r i,r r Tirk ,ro. PM6r
R.quu.!lldr.r lMrf.ri'.
l..n'fyrktr rrr fak6l E3ul hrc rEint'it n\h.{r\ '.ni,u!rr. n![ rplrlf,ftl. n, rhr pn'|di
lcdnilyrhn I h'!.
'o,(Ldn\
ift)l,.dit tlnrrr(1,tr rl'.rh r.inr!tr inn a.!tr'.!r lrl,er,rrt,lr\ihrll( i\.,r1( !{tr \
r*r.h) iurhtr,. nl)'.\.trrxrr.( !f rhn (,\ Jtr'1 ( ", \ r, fli., trF'i rrr! (r'nxN.\ xitr sr . Lr{\,.r irr !i htr'l! u,r t r\ro(
(.-\!h)E tunrion.l n'o|tnyntr in\
Apprk.nr f la6t sl.nn
P.mna En rprl.l,:/€-dty'rt
Ilev 08-07-2015
Set Backs
SLAB Floor
I
I
I
I
1
*,,SANTA
NA,'Iffi
Plannlng & Bullding Agency
BuildinE Srtoly Division
20 Clvlc Center Plaza
P.O. Box 1988 (M.19)
Sant Ana, CA 92702
(7r4) 647-5800
www.santa€na.olg
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
-
sol-01 csc 2013
Solar Photovoltalc (PV) Checklist for Oetached StNcLE FAMTLY RESTDENCES Onty
lnstruclions: Thg licensed contractor of record shall complete all seclions, answer the len questions and
sign the certification section below. A copy of this form shall be attach€d to each
anv of the ouestions. Dlan check
of TWO sets of plans, of
shall be requlred.minimum 1 'l'' x 17" size. lf answerino NO
Project Address:604 RAITT ST, SANTA ANA, CA 92706
Contractor Company Name:SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO
1. 8tr
2. Etr
3. Eltr
Aro lhe followlng applicable to tho proposed project?
Will the PV system layout provide the required three-foot wide clear accsss pathways
per Seclion 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan?
Will ths PV systsm be installod on a roof having only one roollng layer with no
ovedays?
Will the PV anay be flush mounted to the existing roof so that the plane of the
modulas (panels) are parall6l to the plane of th8 roof?
Will the PV system weigh maximum 4 pounds per square feel or less?
Will the PV system be installed where tha modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be inslallod with a space of 2" minimum lo 10" maximum between
the underside oI modules and the surfacs of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inc,l,,
embedm€nt into roof rafters (with pre-drilled holes) and is this minimum emb€dment
shown on the plans?
Are ALL the structural pages of the plans WET stampod and signed by a California
licensed professional engineer? (including project sp€cific site plan, PV layout,
4
5
tsD
Etr
atr
Etr
Eltr
Ettr
't0 Etr
anchorage spacing, anchorag e details and manufaclure/s PV su pport information.)
I certify under penalty of periury under thc laws ot the State of California
Print Name. TRANG CONG PHAM
Phone Number: 714 582 3909
Signature
Date:
Email Address:
Rev:8/1712015
PERMIT@SOUTHWESTSUNSOLAR.COM
ovo is true:
6.
7.
8.
9.