Loading...
HomeMy WebLinkAbout10196307 - Permit (2)City of Santa Ana 20 Civic Center Plaza (l/-19), Santa Ana, cAg27o2 Building Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853 Permit #: {O{96302 Pin #: 72599 q Assessor's Parcel 140-131-14 Lot: 83 U nit Bldg: Address Range Suite Range: Zoning: RlBlock NA Tract 2461 Hrslonc No Building Use: Job Type: Nature of Work. Existing Bldg. & Use Proposed Usel Single Family Dwelling Solar Solar Sfd watt garage Occupancyl Constr Type Code: Flood Zone # of Stoflesl R.3, U VB cBc 2016 x-0602320259J Patro: T I Area Yards Req'd Valuation:$12,000.00 Description of Work: lnstallation of rool mounted PVsystem. 10 panels, 2.328kw system Plan ning Conditions (Contraclor. Paragonsun dba P G S Sola Address: 126 Newall lrvine, CA 92618 Phone: (858) 386-0463 State Lic #: 1025115 Lic Type C46 Bus. Lic #: 366438 Workers' Compensation lnsurance: Carrier: Exempt Policy #: Expires: Engineer Address Owner: Address Phone. Tenant: Rene & Ana Canas 2621 S Towner Street Santa Ana, CA 92707 (714) 476-0573 Phone License # Architect / Desiqner: Address: Phone License # 126 Newall lrvine, CA 92618 (858) 386-0463 Planning Approval By: Plan Checked By: Permit lssued By: Chavez, Dave _ ,- NPDES lnsp. Req'd: No Date: Misc. Receipt Date: Misc. Receipt Date: 04130/2018 Misc. Receipt Subject to Field: No No Account# 07776002 5f5O1 Permit Fee 07776002 57612 Bldg. Stds. Revolving 07776002 57600 Genetal Plan Update $500.00 $1 00 $0.00 PWA lnsp. Req'd: No Planning lnsp. Req'd: No Fire lnsp. Req'd. Police lnsp. Req'd Total Landscaping lnsp. Req'd: No Flood Zone Cert. Req'd: No Every pemit issued shall become nvahd unless lho work on lhe sile aulhoflzed by such pemil ts commenced wthn 180 deys after tts tssuance orifthe wo* authonzed on the site by such pemit ts suspendocl ot abancloned for a penod of 180 daysafter the tifie the wotk lscomfienced $501 00 $0 00 E501.00 lnspector MrD# 2018-143068 0'1 1 '1 6002 5'1 60 1 01 1'16002 5'1612 $500.00 $1 00 Fee Total: Pard to Date: Balance Due Project Address: 2621 S Towner St 1st FL Area: 2nd FL Area Other Areas: Garage Area Total Paraqonsun dba P G S Solar DATE COMMENTSSITE.WORK Set Backs Forms/Steel/Holdowns Ereclion Pads UFER Ground SLAB Floor Subf loor/VenVlnsulation Roof Sheathinq Shear Wall Framino lnsulation/Enerqy Drywall Ext./lnt. Lath Brown Coat Masonry Pool Fence T-Bar Handicap Req Deputy Final Report Enoineer Final Report Flood Zone Certif 0"r{"ldfuv5rr let t"4 U \-^6-il-ii \,YhdFINAL Certif icate ol Occupancy Notes, fiemarks, Elc I uu)I I I I hclchy ,firm untl.r Fnrlly in Frjury lh( I 'm crcn0r ftuD ik ('(nnh(lrtrr l.kcn! liw frtr rhc n'hwi'rs Eaq'n (s" 70'11 5 Buiin.{l anl ProLrsi'r C(xLl Any Cny or ((rnry wii.h rlqutr.1 ! FIni k'.'nllrurr. nli'r' rml'tr' &'mlnh or EPair dy (nEture. Iritrro it nrurnc.. !l\n rcqxiEq rlE |Flltrnr l su(hFnnirkr llk u 1istrd irir'nr rh ncor sh' i liccn\'d Ncuant ro rtu ld,rnFns ol ltr Conkicror. Liccned lr* lchtrnrcr 9. ( 'rmmBin8 wih S.di('n 7(tn of Divti(' 'l of rh' Btrsinc\r n'd Pftnc$ionrG'dc)ollh'llrn'\h.il.r.mfllh.l.lt.mmJllthon(ll!ihcrllc8.(l.i..nplil,.A.yvioh'i'nnfseli[7()']l5by'.y lppliclnlr,nrtx.miriuhjarrrh..Ifli.lnrlord!ilr.nrxyotr 'trtr.lhrn rirc huidr'd 'lolltri l$5u' -1.n(u*wolrhclrtrFdy.r,.rycrlpby&.$(h*0!.\arrlEtrq,k.on{rnqtk'n.uldorh'BtkBlrlr{Muitn;did or nlt.r.i roi {k ISc?(}u. au\iksl.trtl hrr.\\rlnr(trl. I1E (idtr rt l l.i(..s li* dx( to q'nlvl.lnoskror rh. pnFny wh) tlill3or iqr*6lhcrnnl r i $h! ds (u-h ki( hms( lf.r lrrtll o. th]ugh ht or h'' ostr 'riPlote\'g,ria.a rr'a .,.r, 'nlnrTnrnc rc ftn d.ni..l n olY.rrl n, sb ll. h$.ts. rrx ho'llnl8 d nilioKm n*!*ihinom,ad ;r(ulr'Lrnn. rll osftt Buitlc. eill hnlt lhc io.d.n orr( n3 rM lE or {t dil n{ hri! or oinn! thc InFnv f rlIPn4rE'r -1. ds or ft. of rlr F.If,d y, .m.r.luiiv.l) .onrrd ml rlrh l{.nql &.r n^h t\In{rud rli FrFi lSr 7(Il-l' Itunms *r ft"s.i. C,,a. rh.C"n"ein r l.r.nt Ii$d{{. rn.f'nlYt' mo$mr.rnnFdt f,h' htrild(nr mrP(n$rh'rd'n' lnn rlrl (ontNn t(r \kh FoF.l{ uirh i G!'ratun (,l"'5'rl l[Fud n' rlf crl rsilri I-rtnc IiBI r,\\ \l k Ir r,r rr Dl I ( \lr \ rx r:! D.r. !.ll8fEll5:glll8f.lisArM!lrli0.a8alrs.! I h.r.ht !ffiflnunds Fntrh\ ol In|InY o'r ol rh nn[,str,3 d(lurri'n\ I rm.r.nrfl unlcr sr.rrtrr N{cirs( .l(l)7. ('iv ( l L.tr(ln'\ Nrn'r Rr(ttrtr.,1 l.rrrrr ol Ntr'li.trrrtr, tl+o) r€,,,-*-,>-.zilL -l hl!. ,n * ill mur.in r ( .nrr.l. o, Conrnr h s.lf l n$r rd f,ort6 !r'qF.srir. .' Fotrk{ (n hv sft' n' t?m or rtt hlv Col.. r{r rtr FrrnnuN ofurF $r,r tu \hih rh Fmr il n ud -l h.\T md *itl minr.in f,o di .on{xnqi nn rau..t.. t\ r.qotrdl ht sLr i'n uq) ol rlE tilr' (iiJc, nn rlr Frfi,l m dl rl* rorl fr vhah lhi! F hir r nqd My srrd! dnFreri.,i inur.Br {trir trl F)liy non*r' e,*",' ElGmPr t -t ccnilJ- ih'r r rh. rcilotro'rc. ofrh. *nrl fn $hrh thF pcrnii n nskl. I \hall nor 'i{'['v t Fron r lnynEnN *. r' ton* -t'r..i t rrt" *'lt6{ lanrqinqlif ll$(.r Cnlift)mi.. ! {ad rh{ rf I \h'nll tEirm $trFr tIttE wua6 mnlEnsri'n lln)virFm of sdir r7{xr ol llE lrlttr (id.. t $dll. kflh*irh omlly *nhIh'e I'(ri\inr WARNINC F.'luft hi q-uir *ofl.r mqEnsrx,n G*th3. !\ utru*tu|. ! lhnll 5uhF1 !. mlllbt" lo rimimr Fnhia !d civrl ,in.\ up ro oft huBircd rhru{d dolh^ r3l(rl(rr), r u[hird k, rh..o( nl 'onlJEn{rnn' drm3cs rr l*olilcd I{n rh' s&l ion :1076 nf rti khn (ixlc. inrcE{ lhi lrirrY \ fd\ /ullNlr]LrlrNrS/r(ralllElBStruax ol rh. tluiitrcs rn'l I'r utc\irrr\ ( itln. nrlnry lr.tr{ n i(lln ..r'rl.rl..r c.4 6 I o2-5lts coNs'l'llt ( TloN I llNltlN(: ,{(:lN( l AIILI!;AN!I2}:(!AEAIO! I [nty]nnni ufrld,{trrlry rat{rru.y.B olrlt l')ll,)tr[F 'l'Ylr ur\ Ilnrnli,)n t'crnn\ A(hno\ Nd'fi[rx l'c(l.dl R+trlir!NIl[1.4) l'ndrt) l*n'f\ rll th.r.JtrilRIUl. i F r3r'l'nt !\ 7-,''*',n***''r.urrrkr,r .,rr{. ., .'rJ'tuNc(Jrn Sl c I Jr.rL inxt,h{'Il'nEL',nrrru. rh{c mnrx,m'l nn,rtn\ n{ 'n.Fr,m I'u,Flf,./ ^pprr(rn,or,rFn,lirlr,u* * ////,1 p.m,,dmm,pd..: K Vi" lE(or rcnr,lrrc Nr rnr'l h:r rtr.h*r 'traimdi{r 6 xr'( lrl hcr$r rhtrr. r fu> .ornr l a8k! k'.onPrt * hrllC !nftl(-"uni)_ .rr.enrartr.1 .f rhi{ Cir v ,,rl ( ounrJ_ (, .nrd uF)n rlr D'r'' 1/e"y't BUILDING. INSPECTOH RECORD 'n/1 t|@ *-SANTA NA ILi\$C {riltDrrc lCIIfl Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-s800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol{1 cBc 2013 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only lnstructions: The licensed contractor of record shall fill in the address ofthe project, contracto/s licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the guestions, plan check shall be required.'" Proi ect Address: 2621 SOUTH TOWNER STREET SANTA ANA, CA 92707 Contractor Company Name: PGSSOI.AR Contractor License Number:#10251l5 (c-46) 2 3 YES NOtrtr Etrtrtr Btr trtr Are the following applicable to the proposed project? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 3 pounds per square feet or less? Will the PV system be installed where the modules do not ovedlang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed wthout using any ballast system or counter-weight system? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV syslem layout provide a three.foot wide clear access pathway per the latest edition ol "Guideline for Fte Safety Elements of Solar Photovoltaic Systems" by OCFA? (Guideline available on the OCFA website: htlp://www ocfa oro) Do the plans show a maximum horizontal anchor spacing of 6 feet? Do the plans show a minimum of 2-112 inch lag screw embedment into roof raflers? Are ALL the structural pages of the plans WET stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturels PV support information.) 4 5 b 7 trtr Etr 8 trtr 9 Etr 10 EIE I certify under penalty ol periury under the laws of the State of Ca ia that the above is true: Printname: ltc UuN/+Signature phone Number; f5/ 2S? €656 Date 30 Reu 2t17t2115 Emait Address: /,/Lu il4a g (o /Jo7r/7,4/. ' oo //4 ,-,'SANTA NA,',il'i,il$ Planning & Building Agsflcy Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-s800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol,01 cBc 2013 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only lnstructions: The licensed contractor of record shall flll in the address of the project, contractois licensing information and answer questions 1 -10 below. Complete and sign the certafication section*lf answering NO to any of the questions, plan check shall be required." Projec tAddress: 2621 SOUTH TOWNER STREET SANTA ANA, CA92707 Contractor Company Name: Contractor License Numbea: trtr Etr I certify under Print name: 2 3 P G S SOI-AR #r025r ls (c-46) Are the following applicable to the proposed project? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 3 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Wll the PV system be installed without using any ballast system or counter-weight system? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV system layout provide a thresfoot wide clear access pathway per the latest edition ol "Guideline for Fke Safety Elements of Solar Photovoltaic Systems" by OCFA? (Guideline available on the OCFA website: htlo://www.ocfa.orq) Do the plans show a maximum horizontal anchor spacing of 6 feet? Do the plans show a minimum ol2-112inch lag screw embedment into roof rafters? Are ALL the structural pages of the plans WET stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support information.) Ity of perjury under the laws of the State of Califo that th above is true: Phone Number q€/ zs? s654 Signature: Date: Email Address YES NOtrtr Eltrtrtr trtr trtr 4 5 6 7 8 Eltre Eltr 10 EIE Re\r:211712015 /L/4 ;*$Al'lTA.AI{Ajffi Planning & Building Agency 20 Civic Ceoter Plaza Ross Annex P.O. Box 1ga8 (M-19) Santa Ana. CA 92702 (714) 647.5800 Smoke & CO Alarm Affidavit t3 -a i a. cr:t This document moy be lound dt h ii::/,",,r',,,",v. sa n ta -a na.o rc.'cb a,, /.L rNSP-02 2a1l CRC (Please use a black or blue ink ball-point pen) Project Address (o,,4 Permit N umber:,n /1[ ]o Prope rty Owner:tn1, .-1 rn 5 ana{ License #:(A /- ,k'c2:: State of California requires that smoke and carbon monoxide (CO) alarms are installed in residential buildings. California Residential Code (CRC) Section R314.1and R315.2 states in part that existing dwellings be "retrofitted with smoke alarms and carbon monoxide alarms. CRC Section R314.3 and R314.3.3 define the requ ired locations. f\ eo,rl boxes betow must be checked: arbon monoxide alarms: Are installed outside of each sleeping area in the immediate vicinity of oorns anC also on each level of the C,welling. Alarmi are required in bedroor-;rs with gas-f rec pliances ii. e. hot water heater, cooktop, furnace)or a fireplace Smoke alarms: Are installed in each room used for sleeping, in each hallway outside of a sleeping room, and on each level of the dwelling. Retrofitted detectors may be battery-operated for buildings where no interior altera ons are performed. Combination Smoke/CO alarms must comply with all applicable standards and be approved by the State Fire Marshall (SFM). Battery life must be 10 years. I hereby certify that I am the contractor or the property owner of the above project. I further certify that smoke alarms and carbon monoxide alarms ha're been installed in compliance with the governing Codes and have been tested to be functional. l, also, hereby certify that lwill retest the alarms per the ma n ufacturer's instructions. 5ig noture:Dote e-t7-l( (check onel tr Property Owner NOTE: fhrs sef-c ertifi cotion is only used lor projects thdt oflect the EXTERTOR of the structure, This process is applicable ONLY to projects where occess to the interiot of the dwelling by a Sontd Ana lnspector is not required. Have this completed form and the job-card readily available on final inspectionl Contractor:/1 Licensed Contractor