HomeMy WebLinkAbout10197109 - Permit (2)city of santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permit Counter: (714) 647-5800 lnspection Requestsr (714\ 667-2738 lnspector Section: (714) 647-5853
Permit #: lOt97'l09
Pin #: 33727
q
Proiect Address: 1322 N Olive St
Assessor's Parcel:405-303-17 Lot: 32
U nit Bldg: Address Range:Suite Range:
Zoning: RlBlock: NA Tract: 1012 Historic: No
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
SFD w/att garage
Occupancy:
Constr Type:
Code:
Flood Zone:
# of Stories:
R.3, U
VB
cBc 2016
x-0602320163J
1 st FL Area
2nd FL Area
Other Areas
Garage Area:
Totat
Patio:
T.l.Area:
Yards Req'd
Valuation: $4,500.00
Description of Work: Add additional solar panels to (e) system
Planning Conditions:
Bqt- ch *
fiff i{e
t /i:--;56.j - g/11/2t1l9; (TYH Tronsi: 71
Rel+ r
ID3 N6AT{(
1 oi
l rl1971r:r,
r_rltqllaa - g/t,. /'lnlO 'l.r'o f,,l'i
Owner:
Address:
Phone:
Tenant
Jose Chico
1322 N Olive St
Santa Ana, CA 92706
(7',t41 7834442
Contractor: South West Sun Solar, lnc.
Address: 13752 Harbor Blvd
Garden Grove, CA 92843
Phone: (714) 582-3909
State Lic #: 1004657
Lic Type: B, C-10, C-38, C-39
Bus. Lic #r 350754
Workers' Compensation lnsurance:
Carrier: State Fund
Policy #: 9232358
Expiresr 06/01/20'19
Thuan T.hlg0f6ft islr Totql $451 ,r.rrl
Thuan Nguyen
16026 Hyl8lltlh Avlt -r'n sulqr' lnc.
FountaihYrgll?U,0ceA 92708 ,
(t1 1 loitit:i- -.lnLrlLtUtt-
67565 g16e std-q Fcvolv ine
tll116r.rir.1 11.5 J 2ir(0-Vi;t, 'f
{C+:}-},}r'."*+}rirg724 AUi_hi:Lt.r:l:,
Engineer:
Address
l- lll
Architect /
Desiqner:
Address:
Phone:
License #
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Date:
Date: 08/13/2018
Date: 08/14/2018
Subject to Field:
I/isc. Receipt
Misc. Receipt
Misc. Receipt
07776002 51501 Permit Fee
07776002 57672 gldq. Stds. Revolving
07776002 57600 cenelal Plan Update
$450.00
$1.00
$0.00
\N(
No
No
No
No
hangian, Kathy
ernandez, Kathy
Fire lnsp. Req'd:
Police lnsp. Req'd ffi Account#
Flood Zone Cert. Req'd: No 01116002 5i601 $450.00
$1.00
$451 00
$0.00
$451.00
lnspector MtD#. 2018-144846
o1116002 51612
Fee Total
Paid to Date:
Balance Due:
Phone:
License #:
Every pemil issued shall become invalid unless lhe wor.k on the sile authotized by
such perfil is commenced wilhin 180 days after its issuanco,ot il the wo* authorized
on the site by such pemit is suspended ot abandoned for a period of180 days after
the tifie the wo* is commenced.
Total
BUILDING- INSPECTOR BECORD
SITE-WORK DATE ID/SIG.COMMENTS OWNER BUII,DER DET,CARATrcN
I hcrchy trffinn ulldq Fnnxy or Frjury rhd I dh cx.hpr ftnn rh. Co.rdois Liccnsc ljr lor lhc lolhwins rerw,n (sc.7o:ll5
au\ir.ls ,ki Piofcsio. Codc): Any Cily or Counly shi.h mqut$ r Frmil ro con(rucl- ,lrq, inprv.. dc $lnh ot rcptr My
nrucrure. priorro irs issuo"e- aho rcquncs rhc aopltlrr l'or su.i p.mur ro filca sisrcd {arcmnr rhtrt hcor shc n li.ensd punulnl
lo nr tlovnions ol lhc Conlractols Liccnscd tiw (Cllll cr 9. Connne.cin[ *irh Sccrion 7fix) or Division ] oflh. Busincs rnd
Pnnasions Crxlc)or lhlt llcorshc iseicmpl lhcrciromlnd lhchs\i\ lor rhcrlLgcdcxc,ryrn Anyvn'lationofSalhnT0:ll.5hrlny
lppliunl fq a Il.rmir slbjccrs rh. upnli.an o ucivilp..,lryofn.r nx,c th.n fivc hundrcd dol1a6 1S500).
l. $ owtrcr ofthc lioJ)tny. or m, cnrtloyecs wirh *:lsc( rs rh.n sb.nmprn\!rn,n. sill do rhc *ork dd rhc atu]m tr 'rninrcdcd or oficrcd lor {h (Ss 7l}{]. arsirc\s and Prcfc$iiin\ C.xlc: Thc c(nta.ktr s Ltcnsc kw &cs nol amlt n' an .wncr ol
thc pn)p.dy wh) buikls.r i'npmrcs lhc8nr. nnd sho dm\ \u.h *(l* hnnrcllor hc^cllor rhDlAh hh r lki owncnrhyNs.
I' oli cd rhar {'ch i'npmvcm s m ior i c.dcd or oali:rcd li)r sslc ll h.w$rr. rlr huildirs or impmvcmn, i sold sirhin onc )tar
ol conulctior. lhc Osrcr lruikcr wiu hN ltE hurdcn olpDvins rhJr hc or \hc dil frn hnilil or ir9tue rh. pmpsly lir lhc purlr{ ol
-l.
usowncrolrhcprorcny. imcxclusilclyconrrodirs wirI liccnsd coorEck,n n, .onqtud rhcpdccl(Scc 7014. Bu\inc\\
snd &.ftssiDGd.: ThcConkdcro. rLi.cnsc Lrwdodr R npplyb rnowncr oltn'p.aywho huild\ or impn,vc\ rltcrcon.
, d who .onhcB tu such rojccr\ *ith r O, mckn(r liccnsd puruad n' rhc Conka.ttr\ Li.cn* tjw).
-lrDcx.nrt
urdcrSali0
lll)&Ni8[t:auu,Nlarl()NDI.]II,AR 'I'I0N
I tercby.ffinn utrdcr peMlly of pcrju,y oft ofrhc followins d..lsarions:
bhrE J q' ll mmhn o Ccnrrralc ol Cnnsnt to Scll- lnsurc for workcu conrcnsarion.N,ovidcdlorbySslion3?00oflhc
lIJ[o, .,d., Ior rhc p.rlomkc.rrhc wo \ rry *hrhrhcr{irn is h\ucd
r-, haw and will nuinl.in porkcr' .otr{Easario inslmmc, as rcqotcd by sc.rhn 1700 of lh. L.bor Codc. for lhc rrfotue oa
rlt tro.k lor uhi.h rhn pcflnir t Mylukc^ .on,J,cn\rri.n i'rurrmc .nris xtrd F,li(y dtrD 'cr c
1 d44
l..nify rhar in rhc p.rronMncc olrhc wolk lir. *hi.h rhn Firnir is n\ucd. I \hrll nor empk,r,ny p.r*,n in 0ny n'onncr
$ N lo bccom subj.cl lo lhc workcn' .omran\d ion laws ofcolifolnir. und astr rhm irI sk,ulil hcco'm suhicr k, rlE
sorkos collr|*trstriion pnvnions ofScction 3?(x) of thc litxtr Corlc.l shrll, ronhsirh conrdy srih lhosc Povhions
WARNING: FlnilnE ro sw sorkcn conDctrsorio. covcrrSc is unhwlirl. and \hrll srbjccr an.nrplo,tr to ciminal Pcuhis 3nd
civil uncs up l. one hufrncd rhousand dollm (SlOO.ux)). in lddirion ro rhc .o{ or.. lPcnsntion. donuacs a\ Polid.d r{tr rh.
Sccriotr 3076 olthc Lltnr Codc. inrercsr !.d
DArc: 4 nltr A -,'*,,K h/1- I
t.t(EiNtl, (or t&\( toR
DtrCI.AIAUAN
I hcrcby o,lim under Fc,alry ot pcrjury ihd I ''n lie.e{ tndcr pn,visim .i Chaplcr 9 (connrf,ncina wili SNrion ?(xxr) orDrision l
oi rhc susinc$ d P$fcssions Codc. atrd nylicctrsc i\ h tull lore a8l cffc.r
(av la;9tt t
ti/{
CAISIaI](;IIANIENDINC.A{iEN(:T
Incrcbyatfimuderpcnalryortriuryrhdrrh.rcisa.unerudionlcndinsaScmylorlhcpcoflrBmcolrhcworkr whichrhis,Ernrit is
issucd rscc 109?. Civ C.).
tttucaNfDlirl./t&l.llo!
I Ltrby afinnr undcr pcnrtry oiFrjury orc ol rhr rbrk,*in8 d(lnarion\
Dc x,liri.n Pcnnih-Ashcios Notincltion rcdcr.l Rcsuhrion\(lnt{). P!n6l
Rcqutcd Ir cr of Norifi carion
_lccnifyrhi( rhc lcturalrcsrhri, s rcgrdtr,gr\h(no\ rcnn,vrLxr. or xt),rh.rhlc r, rhi\ nr(]lc.r
_l.enifyrh{ I hnv. r.rd rhhapplkdnJ.rrdsr{rcrha[h.rt v. rnlonMrion hcorcr.I a8lsr.coqrywnbrUcnya.d(-ounry
ordinlnccs and Srarc lj*r rchring l. buildinS connru.rk)n.,rxl h.Bby {ulhornc rc[csntalivcsoflhn Cirylod Counryro.nl$ uB)n rtr
$ovc nrnriotrcd |n),Erly lirr insDcclnnr ,,iW
Dplicanl or A8cnl Si*nalu "AWL {/ulL
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/Vent/lnsu lation
Roof Sheathinq
Shear Wall
Framing
lnsu lation/Energy
Drywall
Brown Coat
Itrlasonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Engineer Final Report
Flood Zone Certil.
Ir
FINAL tL tg /JtL6/h
I vCertif icate of Occupancy
Notes, Remarks, Etc.
l rl ".A'lJ'.$
Ext./lnt. Lath
,*,,SANTA
ANA-'ffi
Planning & Building Agency
Building Safety Division
20 Civic Cenler Plaza
P.O. Box '1988 (M-i9)
Santa Ana, CA 92702
(714) 647.5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer lhe ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answerinq NOto an v of the questions. D lan check shall be required.
Project Address:1322 N. OLIVE ST, SANTA ANA, CA S2706
SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO Are the following applicable to the proposed project?
Will the PV system layoul provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and lhe surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (wilh pre-drilled holes) and is this minimum embedment
shown on lhe plans?
Are ALL the structural pages of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including project specific site plan, PV layout,
tr tr
8tr
Etr
AD
Etr
Etr
Etr
4
5
6
7
8 ED
o trD
anchorage spacing, anchorage details and manufacture/s PV suppo information.)
I certify under penalty of perjury under the laws of the State of California
pr;n1 x3mg. TRANG CONG PHAIVI
phone Number: 714 582 3909
Signature
Date:
EmailAddress
Rev:8/1712015
PERIU IT@SOUTHWESTSUNSOLAR,COM
al the bove is true:
Contractor Company Name:
10. El E
,*-SNTA
NAJ}ffiffi
Planning & Building Agencj
Building Safety Division
20 Civic Cenler Plaza
P.O. Bor 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-01 c8c 2013
Solai Photovoltaic (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answerinq NO to anv of the Ouestions. D lan check shall be reouired.
Project Address:1322 N. OLIVE ST, SANTA ANA, CA 92706
Contraclor Company Name:SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO
B tr
Eltr
9. Etr
10.EE
4
5
2
3
6
7
Eltr
Ettr
Ettr
Etr
Etr
&tr
ayo
tion.)
I certify under penalty of periury under the laws of the State of California t
licensed professional engineer? (including project specifrc site plan, PV I
anchorage spacing, anchorage details and manufacture/s PV support in
p1;n1 1i13mg. TRANG CONG PHAIi'l
phone Number: 7'14 582 3909
Signature
Date:
Emait Address: PERM lT@SOUTHWESTSUNSOLAR.COM
Revi 8/1712015
the is true:
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV anay be flush mounted to the exisling roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV syslem be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum o12-112inch
embedmenl into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the strucfural pages of the plans WET stamped and signed by a Califomia