HomeMy WebLinkAbout10197226 - Permit (2)@ City of Santa Ana
Peimit Counter: (714\ 647-5800
20 Civic Center Plaza (M-'19), Santa Ana, cAg27o2 Building
lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853
Permit #: 1(J197226
Pin #: 7723l)
E
Assessor's Parcel 396-082-18
Unit Bldg: Address Range Suite Range:
Zoning: RlBlock: NA T.acl 5282 Historicr No
Building User Single Family Dwelling Occupancy: R-3, U 1st FL Area:
Job Type: Solar Constr Type: V B 2nd FL Area:
Nature of Work: Solar Code: CBC 201 6 Other Areas:
Existing Bldg. & Use: SFo Watt Garage Flood Zone: X-0602320163J Garage Area:
Proposed User # of Stories:
Totat:
Description of Work: lnstallation of roof mounted PV system. Worksheet attached to plans. 20 panels. 5.70 kw.
Patio:
T.l.Area:
Yards Req'd:
Valuation: $18,500-00
$ii;x:;'iill.l i'i:13l1*,,0',foli,fEngineer: James A AdCEts, Engineer Rel+: 1r;r197??!rOwner: Miguel Gomez Contractor: Sunrun Solar James A f6$3s tr234;r11i11 , g/3/2t7ll. 931.r Afl
Address: IO1OE2lSTST Address: 20512 Crescent Bay, #1OB Address: 146 San.bgd|Goolo o,1 fotol t451,tn:l
Santa Ana, CA 927063027 Lake Forest, CA92630 San Luis.Obispo, 9A 93405
Phone: (714) 603-83i2 Phone: (818) 563-0529 Phone. (805) 21sSdUBrr rolor'
Tenant: State Lic#: 7s0184 License #: 51672 Building $4ir.r,r.ll
Lic Type: A, c-10, c-46 Arch ect / srn.rn ddlJJ6ll,? I1t,5u1uu[-
Bus. Lic#: 340287 o""ion"i, --"'-"Tll:'.:lls F(evolvine ,l.1rr.ll
workers' compensarion rnsurance: oooi""", ?ogr 1"r$g!l{tU{t,jtdbt:r":"- $+:., } - . ,,carrier: zurich American rns L.-a19 19f11-{A 9?$3gr xxrxxlzgg Auth+:ur:ri47:
Policy #: WCO13696OO3 Phone: (818) 553'0529
Expires: 10/01/2018 License #;
Chavez, Da (.,
Date:
Date:
Date: 08/03/2018
Subject to Field:
lvlisc. Receipt
[Iisc. Receipt
lvlisc. Receipt
$450.00
$'1.00
$0.00
07776002 51601 Permit Fee
07176002 57672 Bldg. Stds. Revolving
07776002 57600 Genetal Plan Update
<7'
Fire lnsp. Req'd:
Police lnsp. Req'd ffi Account#Total
Flood Zone Cert. Req'd: No 011160025160i
Every permit issued shallbecome invalid unlessthe work on the site authorized by
such permlt is commenced wilhin 1A0 days aftet its issuanco.or if tho wo* authorized
on the site by such permit is suspended or abandoned fot a period of 180 days aftet
the time the wo* is commenced.
$451.00
$0.00
$451 .00
lnspector MID#: 2018-145118
011 16002 516'12
$450.00
$1 .00
Fee Total:
Paid to Date:
Balance Due:
Project Address: 1010 E Twentv-First St
Lot 23
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd: No
PWA lnsp. Req'd: No
Planning lnsp. Req'd: No
Landscaping lnsp. Req'd: No
BUILDING- INSPECTOR RECORD
SITE.WOBK DATE IDiSIG.COMMENTS OWNER BUILDI}R DEI-CARA ION
I hcrchy rffirm undcr pcnrlty ol pcrjury rhal I m€xcmtl rnrn rhc Co rudr. ticnc L,s hrIh( li,lln*inc rcrsotr (Scc7l,:ll5
Br*iic$ snd Profc*ion Cdrc): An, Ciry o! Counry whi(h rc'tutrc\ J rrnnlr . .-",..f,,;. trnfnrc. Jc rlrh or rpni ,ny
nru.iurc. t,i.rro irs h.u,n... rko rcquircs rh.,rrdkM! lir \u.h frrrni' h ft.a si8trcd {lrcmnr rh0l h.or shc h liccnsn lurslnt
io rhc ,mltions or lh. CDnrtuctd \ Li.cr*d tiw (Chaprcr 9. Conmcrin! sirh S..rn,n l0OO of Divhion I of lhc Br$nrcsr dnd
ttoicssnns Codc) or rhrt hc or shc is cxcmpr rh.Eiron a*l rhc bari lor rhc lllc3cd cxcnuri{r. Any viohtionolSr.^r6n70.115 hyxny
rppliuir lnfu Frntir \ubF.B rh. aptli.inr b a ciril I,c.slr, of nor frrc rhrn ,lh hu ndrcd dolla^ I S5fi,
-r.
rs owncr ol rhc ,orny. or my cnll)lorccs with $.gca rs rhcn $t ouF.salion. will do rlE {o* ond rtE (rrr is el
inrcndcn or ofTcrcd aor stc (Sa 7ol,r- Busincss and h)Iclsions Codc: -l}c C'o.rrrr, r Ltcnsc tjs docs mr ,r/y ro M osmt ol
rhc F{f,dy 8h) builds or iDpmv6 0rNn- and sh. dcs su.h so* hinN.llor h.Gclfor thouBh hh or hcr o*ncmployccs.
,bvidcd rhrr iu.h impmcc rna m mr i cfthd or or.ftd tu \rk Il lh*cvcr, rh. buillirS or inl,mw.Etrl h sld wirtm om )rs
of.onubrion. rhc Oqrcr BuiHe will harc the burdcn ol frcving rh.r tE or stc di1 nn ioild or i,r{'ot rhc tn,p.ny f.r th. ,,urFls ol
-1.
!\o$ncroirnc nmpcny. !flcxclusilclyconhcrins sirh licc0scd(otrtr&i)Froc.n{'xcrrhc Iln,fcr(sft 7(}1-{, Busncs\
id Pi'fs\intCodc: Thc ContKttr \ Li.cisc Lr*doc\ nor rpplyk) r own$olftupinyElr,huildsoii provcsrhcrcon,
rn(l s1n).onrndsntrsurhlo]c.h$irh!C.nrrcr{fls)licctrscrlNnur r, ihc Cotrkr.(tr s l-icci* ks )
-l
r crrn,nr trn,fur Sc.rio tl & l'( li,r r[n rr !nr.
Dale Owner:
woRxFRs, couPttNs,ii!oN
DIICIABAIIA!
I hcrcl,y.linnundcr pcmlryolncrjryoncolrhclollo*irBdc.lnraridr\l
-l
h{v. i,nt will nDinl0h a Ccnificot of Consc.t h Sclal.surc lor sortsr snnpetr\arnnr. xs ptuvidcd tur by sNr ion r7lx) or rrt
Lrixtr Codc. ntr rhc t r.rornDncc of fic wo.k lbr which thc pcmir is rs$cd
l.cnifr rhr in rh. lxrfonMrc. ol rhc sork for whch rht p. nir is i$u.d.l sh0llnol cnlPloy in, p.ron inanymmncr
so !sh hccom ruhjccr ro rh. wo cn compctrslrinn hws olColilhiri0. and n8N rhar itl slmuld hcconr \rbjkr brhc
worker co.pcnsation [ovnions otSeclion ]1700 oflnc Lrtry Codc.l\h!ll. fonhwilh comrly qilhrho* lioviriuns
WARNINC: Failurd b kun w.rkc* .ofrpcn\dnrn c.lrrgd i\ rnlawlul. rnd sh.ll iuhl..r of, cn{,loFr to rin nal Ianaltts lnd
ro onc hui nd rltr'u\rtul dollar\ 1$|(x).(XX)). in diri,)n r, ihc ro{ ofro rl.nsrn r. dnEScs as providcd tur lhc
sc.ri{'n.1076 or rhc Lhtrcctc. inirrd{ and arbmcy s rcc!4A^-.t-3-(t 7,
I hcabr rllirm undfi pcndryolpcrjur! rhal I rn lrcnscd undfi pn)visnr ol Chr s 9(omnrtrcins wilh Scclior T(r0O) olf)
ol rh.llu\i'i.$ nrllt,'lc*ntrn Ci r. M ry li(rnso s i'r ltrlllnrr. rlcll(r
c(o -75bt8 q
u*"'?'3-1?"",,*'-E 9"rn Rr^,
coNualcutlNrENollti-atiENrl
I hceby uf,irn und$ ,cndly ol pcrlury rhal thcrc is ! connrucrbn hndin8 qcncy fn rhc FrfonMncc of lhc aorl f.r *hkh thn Fmrir ir
issucd lS.. .1097.Civ. C ).
AIILICANLDECITIAAII}N
I lrdry dmmr und.r pc.dhy of pcrtury om ofrhc follo*ing dcclirrtnrs
Dc'mlirion Pclnits Asbcsrns Norificalion Fedcral RcB!hrt,ns ('l irlc.l). Prn6)
-Rcquted
Lcllcr of Norifi cdion
I.cniryrhd r h. rcdcr0l rcgul,r io.s rcB&di.8Nb.{.src x'vdlric..r.|Dlicnblck,rhislrjNl
I rcnil rh ( I hrk rcrdrhi\ afplicnnnrrid (dc rh]r rhcrtx,vc inf(ntrdior n.odc.r I rlrcct).onrnlywiihrllCily d()unry
riv. nrcrri,nrcd ,ropcny lor impcclion 7,4AApDlicanl or Aa€nt sianrlrre
Pcn rc. nnn'€(prnrr): }(.eSSie r Ho..h-1
t-, -(9
Set Backs
Erection Pads
UFER Ground
SLAB Floor
Sublloor/Vent/l nsulation
Roof Sheathing
Shear Wall
Framing
lnsulation/Eneroy
Drywall
Ext./lnt, Lath
Brown Coat
[,4asonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Enqineer Final Report
Flood Zone Certif .
FINAL ltlulc 't\4{t
Certilicate of Occupancy
Notes, Remarks, Etc.
J
-l
h{vcind will Drirlain wor[crr c.mpcnsalion ]nsumncc. as rcquircnbySrcrtnr:l7lnoiihclf,horG .. ror Ihc pcrlbirMkc of
,hctrorlr.rtrhic\r\nnc n['\s.dcdVytrndcq'smlcn{rh,nrn.u,,'ftc.]ni.'inrlF,lr.)numh'rr
,",,", . Z....cic[ .t*t.l.erl'ct.-:.
,.r-
Landcir Ad&cs
Forms/Steel/Holdowns
-,-SANIA
NA
Itr\w
TB[IDIIC
tfiICI
Planning & Building Agency
Building Safety Oivision
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL 01 CBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certiflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answerinq NO to anv of the questions, plan check shall be required.
Project Address:lolo t ,+tr ,\,*t-
Contractor Company Name:
Contractor License Number
Sunr
1
2
YES NOEtr
trtr
trtr
Etrtrtr
6a
Etr
Eltr
trtr
trtr
,7f,o
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
Wll the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Wll the PV system be installed with a space of 2" minimum to '10" maximum between
the underside of modules and the surface of the roof?
Wll the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch
embedment into roof rafters (with pre-drllled holes) and is this minimum embedment
shown on the plans?
Are ALL the slructural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
3
4
5
6
7
8
I
10
I certify u nderJEnalty
Lz-
Print Name: )' C
Phone Number: 1W. L{b0'31 <3
of perjury under the laws of the State of Califo
MA t+^rro,Signature
Date:
Re.r': 8h712015
o{1<?t Q*9Onr,t
B,( .r(
above is true:
Email Address
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
sol 01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answeranq NO to anv of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO1 EID
2 EItr
3 Eitr
6 Etr
7 Eltr
8 Etr
9 Etr
10 EIE
lolo lr,+y( z rlf,SI
S...r
4 Eltrtrtr
7
Are the following applicable to the proposed project?
Wll the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Wll the PV system weigh maximum 4 pounds per square feet or less?
Wll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch
embedment into roof raflers (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
I certify und
Print Name:
Phone Number: 1W. qb0.3'/
of perjury under the laws of the State of Califo
A4itA A$roD
er,penetyta Signature
Date:
L.
Rev:8/1712015
ol
93
Q-9On
t,( .r(
above is true:
Email Address
*-SANTA
ANA-'ffi
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
aau