HomeMy WebLinkAbout10197546 - Permit (2)ciw of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permit Counter: (714\ 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714)-647-5853
Permit #: {O{97546
Pin #: 54241
q
Project Address: 126 S Gunther St
Assessor's Parcel 144-322-05 Lot: 41
Unit Bldg: Address Range Suite Range:
Zoning: R2Block: NA Tract: '1491 Historicr No
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Owelling
Solar
Solar
Sfd WAttached Garage
Residential
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
R-3, U
VB
cBc 2016
x-06023202s6J
I
1st FL Area:
2nd FL Area:
Other Areas:
Garage Area
Total:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $16,000.00
Description of Work: lnstallation of roof mounted PV system. SFDhas(e) solar pv system. Worksheet
Planning conditions:
attached to plans.
Owner:
Address
P hone:
Tenant:
Hiep Van Nguyen
126 S Gunther St
Santa Ana, cA 927041310
(714) 987-8399
Dass Structural Engineers
Praveen Dass
1655 Shertington Place, Z-202
Newporq Beach, CA 92663
(949) 29517943
74200
Engineer.
Address
Architect /
Desiqner:
Address:
Phone:
License #
Phone:
License #
Planning Approval By:
Plan Checked By:
Permit lssued By: Chavez, Dave
NPDTS lnsp. Req',d: No n!/
Date: Misc. Receipt
Oate: Misc. Receipt
Date: 08/29/2018 Misc. Receipt
Subject to Field:
No
No Account#
01 1 16002 51601
01 1 16002 51612
07776002 51501 Permit Fee
07776002 57672 Bldg. Stds. Revolving
07776002 57500 Genetal Plan Update
$450.00
$1.00
$0.00
PWA lnsp. Req'd: No
Planning lnsp. Req'dr No
Fire lnsp. Req'd:
Police lnsp. Req'd Total
Landscaping lnsp. Req'd: No Flood Zone Cert. Req'd: No
Every peftnit issued shall become invalid unless the wo* on the site authotized by
such pefinl is cornmenced wilhin 180 days after its issuahce,ol if the wo* authoized
on the site by such permit is suspended ot abandoned fot a period of 180 days after
the time the work iscommenced
lnspector MID#: 2018-145761
Fee Total:
Paid to Date:
Balance Due:
$451.00
$0.00
$451 .00
Contractor: Star Sun Solar LLC
Address: 12966 Euclid Street, #550
Garden Grove, CA 92840
Phone: (7141530-8777
State Lic #: 1008302
Lic Type: C-10
Bus. Lic #: 363540
Workers' Compensation lnsurance:
Carrier: State Compensation lnsurance Fur
Policy #: 9159581
Expires: 1112112018
$450.00
$1.00
BUILDING- INSPECTOR RECORD
SITE-WORK DATE ID/SIG COMMENTS {JWNF]R BUI!,DER DEI-CARAlION
I hcr.hy ilfirnr hdcr ,.Nlry 0i pcrjury rrnr I u cr.nrrr nor rhc Conractm Li..n{ La* lhr rhc n)lrrsirr! r.r$D lscc 70.11 5
Bu\i'rsr r d l'r.lc\siotr G)dc), AtryC yur Cuudy which rcquir.s r n n ir b coNru.l. nllcr. iilPnJvc. dcNni\h or ruNn &y
* rror. pri(trt, ir\ is$rncc. rl\. rcqunc( rhcintlic nt irtr such!.mirt) hlcJ \tnc{l n$.Rnr rhrrhcor +c i\ licttr\cd flrsutrnr
rii rhc flovi\itnr\ uf rhL Contridois l,icciscd l-as (Chrflcr 9. Connncn.i'rg sirh Sc.riotr TUxr oi l)ivi\i{'n I ol rh. ln'\i'lcs rnd
Pn'lt\non\ Codc) or lhal h: or \h. n crcn{r rhcrclionrind rhu hr\i\ turrhc allcScd crcnllli,r Any !tulnriotr ofSc.ii{nr 70:] l 5 hf itrv
r!plicrnl lorrlrcflnir suhjecr\ rhc nff i.anlr. rcivilt.nrlryol or rorcrhin fivc hundr. dollnrs ($5(x))
Ln\oqicr.lrhcronrny.ornry.d.yccsqilhwiscs(\rhcirvnc(nnFn\dri,rr.silldor1[w.rkntrdrhc{Mrurcisior
fictrd(l orolltrcd lr \rlc {S( 70!. tsuircs ind Pnncs\i,n,' cl)dc: rhc Codri.nn \ t-Nisc l-rr iocs norIlPply tu an '*n( ol'
ihc|rlnc v sh, lrrilds or iDprorcs rhcnnr dd who d€s {.h sor k hi'n\clr ot h.mc ll or ihfl'ugh hi or hci orn cntl(,y.c\.
trovid.d rhar \uch i'npnivci
^
urc Bn inrrndel d oficmd ltr !'k ll ho*c\ cr. rlf, i iUinF .r i' nrtr cNN is $lil ( irh]n ' ( 1\ r
-l.rsosncrorrh.proFny.0Dcx.lulively.ontacrn,swrhli.cnnd.onrrrcnrh.otr{nr.lltrPn+cr(stc701'1.Buir,c\\rn,l lh,la$im Cl.dc Ih.(onlrlcloist.iccn\cl-s.krc\nolrDnlyh!nowrcroi|nolcrry*hohildsorirnDro{slhcrcon.
,nd trho c.nrr{cls f.r \trch pn)j..rt wirhr Cotrfilcr)n\r liccnscJ PUrsun hlh.(in rrttr s l-rcnsc li* )
I rmcrcn,tr un,lcr s.crnnr B & r'C larrhr!r.rn)n
l)0tc: OrNr:
lvoIll(FRs (l( )nI t'l lNsl'l l( )N
Dr!t^&l]roN
I h.rchy illnn, tr nl.r p.nulry.l lu]ltryofc.frhc knb*i',3 dc.h'rri,nr!
Ih{!clMl*illn lnrin cc ii.rrcoiCotr\crrbstllltr\urer'irtrokc'\'..nrrn\nti(n s F,ridcJfrnbys..ri$17(I)ofrhc
Lntitr Cdlc- ior rhc prfoxmn c ofrhc sork ktr Nhi.h rh. Frmir n nsucd
fl hN drl s rll nhinGin $orkc^ .on|trsdid inntrrnc.. ns ruqrncd hy s.cr ior .l?(x I or I hc lrh.r ( odc. for rht rrr.rrnrrcc or
rh. work tur shichthis pc.nrir is issucd My f,orkcri .onrNN,ltr i'sufuD.c crric! ,trd lx,licy nun$q re
.,,,,,", -(tor,fund 0 cn'otn lOlr'on
L*-rl .,nrg,,,,'.r",,,,,n.,,. ! 95 rarrr.s: . [[
I ccnlly ll in rtu p.rru nrNcollhcwork lar shi.h rhs tc nir u \suc(|. lshrlltrorcnrfl.v rnvPcrn,r in anv nranrur
$ r!b hccom \uhjc.r rothc $orkc6 co'nrtrDsrri{in lrssor(rlihnrir a ag,QrhrrilIshould }rdrt {h}d rollt
sorkc,s.ompld\dnnrfrovisionsoiSccrid.lTU)olrhcLalrrCodc.l\h!ll.n'nhwirhconrPlywirhrho{ftuv^ion\
IIARNIN(; I i lLn. ro {.urc *orl'cs .o ltn\rtr r .!rc'r8c i\ unltr{Itr]. rnll \hxll {'hi!cl xn k))_.r n,.ri'ni'nl lf,r'lri.s rtul
drnrg.\ r\ Dr.li(lfll ktr rhc.ivil iNs up ro onc hrndr.d rhonsrnd dolhn (Slm.oOO), irr dd iliotr nr rlt con of.o
Sc.rnr 1076ollhc l2txtr Codc. inrcrc(and lrlorNy s rcc\
0t \u: I co [t ^,,,.,,, x
LICENSIiD-CANIIACIOB
DllcLa&tll()li
IhcrctrydttnrD dcr p. rtryol pcrjury rhrr I m li.cn{d Dncr provisim .i Chrprd 9 lconnrEn. ing NirhSc.rion TlXx)rolr)ivrhn 1
of rhc Busircs and PdrsiuNCodc. rRlDry li.ctrs is i'r tull r(,rc rt cllcct
coNsTttUc.l_t()N I t_NDtNc aeFN(y
istr.d (Scc 1109r. Civ ( )k Jcr's Ni r
-
APPLI( ]AN'I' T)F(:I,ARATION
I lr($y rllinn u ndcr p.nalry of Frlury onc ol'thc tulk,sn,g Jccla ri,)ns
Dci6hlior Pcnnik Asbcsio\ N.tificrriotr I'cdcrrl Rcguhrt,ns (Tirl.40. PM6)
_R.!!ncd Lcnd oi Nori,i.nlion
l.dliJy llrr rhc tncr lrcluhri,,n\ rtgrnlln! x\hc{os,ctr(rrlnrc trfl .'l,nli.xhl. L, rhr\ prqc.l
\/ l..jrrr'u' I h.r" r..il rl'F,a rrtr "11 tu l.r. rl.i rlr'hrc r.L
, i'.htr. Jrt \'n( 1,,\.'clJ'.s r, h'.i'ttr r !'{rrL.rtr,,Et h rhJ
i\(onc.r lrgr$k).onll'ly Birh !llCir!nh Cortrry
izc r.rc\.nrrri\.\ ofihx (-rryarrd cortrry ro cnrd uFrn lhc
)Ix^r ff, urJ t,nrlrriy li, i'r\J'..ri(n, t0'lr.s.!
,\pllicrnr or '\!rn! Sixtr l,'rt
I'rr il.r mt rDritrlrr x {.h tL
,,,,". ot (ur luo rl
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Roof Sheathinq
Shear Wall
Framinq
lnsulation/Energy
D rywall
Ext./lnt. Lath
Brown Coat
[,4asonry
Pool Fence
Handicap Req
Deputy Final Report
Engineer Final Report
,i^zt/u/lf ,l.W1 7rl
Certilicate ot Occu nc
Notes, Remarks, Etc
-t
Subf loor/Vent/lnsulation
T-Bar
Flood Zone Certif.
FINAL
,,"...,,. . c!0 _ -c. Nu.,{, - l00R3na
n,. . 0l l,.,tJl"rnrt,,,",,"",,,, x------?-
-
=
f-
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-01 cBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Onty
lnstruclions: The licensed contractor of record shall fill in the address of the project, contractor's
licensing information and answer questions 1 -10 below. Complete and sign the certification section.
"*lf answering NO to any of the questions, plan check shall be required.**
P roj ect Address: 126 SOUTH GUNTHER STREE1' SANTA ANA, CA92704
Contractor Company Name:STAR SUN SOLAR
Contractor License Number:$ 1008302
6 tru
Are the following applicable to the proposed project?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 3 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV system layout provide a three-foot wide clear access pathway per the
latest edition oI "Guideline for Fire Safety Elements of Solar Photovoltaic Systems"
by OCFA? (Guideline available on the OCFA website: htto://uryvw.ocfa.orq)
Do the plans show a maximum horizontal anchor spacing of 6 feet?
Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
Eltr
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print name: Shane Cunningham Signature
Phone Number:
Email Address
2
3
4
5
8 trtr
9. Etr
10 EE
YES NO
Ertr
Etr
Etr
Etr
atr
7
Rev:2h7/2015
7t4 370.8877 Date: 81312018
*,SNIA
NA,ffi
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, C492702
(714) 647-s800
www.santa.ana,org
1
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-'19)
Santa Ana, CA92702
(714) 647-s800
www.santa.ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-01 cBC 2013
,--SANTA
NA
PL,I\]NC
&B[T"0tiG
tG[tcY
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall fill in the address of the project, contractor's
licensing information and answer questions 1 -10 below. Complete and sign the certification section**lf answering NO to any of the questions, plan check shall be required.**
Proj ect Address: 126 SOUTH GUNTHER STREET SANTA ANA, CA 92704
1
YES NO
Eltr
trtr
Etr
trtr
atr
Are the following applicable to the proposed project?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 3 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV system layout provide a three-foot wide clear access pathway per the
latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Systems"
by OCFA? (Guideline available on the OCFA website: httoJ/www.ocfa.orq)
Do the plans show a maximum horizontal anchor spacing of 6 feet?
Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including prolect speciflc site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
2
3
4
5
s. trtr
9. Etr
10.EE
6 Etr
trtr7
I certify under penalty of perjury under the laws of the State of California that the above is true:
Signature
Phone Number: (714) 370 8877
Email Address:
Rev: 2117 l2O1 5
Date: 81312018
Contractor Company Name: STAR SUN SOLAR
Contractor License Number: #1008302
Print name: Shane Cunningham