Loading...
HomeMy WebLinkAbout10195988 - Permit (2)EProject Address: 2111 1/2 S Maple St Assessor's Parcel: 403-154-04 Lot: POR 2 Bldg: Address Range Suite Range; Zoning: RlBlock: L l racl 284 City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CAT27O2 Building Permit Counter: (71q A47-5800 lnspection Requests (714) 667-2738 lnspector Section: (714) 647-5853 Permit #: 1O195988 Pin #: 93456 Building Use: Job Typel Nature of Workl Existing Bldg. & Use Proposed Use: Single Family Dwelling New ADU SFD Watt garage Description of Work: ADU attached to detatched 2-car garage Planning Conditions: 1 st FL Area 2nd FL Area Other Areas: Garage Area Total lncludes (1) bedroom, (1 ) bathroom & kitchen. Auth on file. Occupancy: Constr Type: Code: Flood Zone: # of Stories: R-3, U VB cBc 2016 x-0602320276J 1 390 390 Patio: T.l.Area: Yards Req'd Valuation: $42,510.00 Owner: Address Phone: Tenant Tuan Doan 2111 S Maple Street Santa Ana, CA 92707 (7141837-2251 Archilect i Desiqner: Address: Midway Arcs Architectural Toby Nguyen 14832 Monroe Street Midway City, CA 92655 Contractor Address. Owner-Builder Engineer Address: TMC Engi Tien Chu, neers P. E. Phone: State Lic #: Lic Type: Bus. Lic #: Workers' Compensation lnsurance Carrier: Policy #: Expires: Phone: License #: Phone: License #: Services 17 1 4) 251 -2490 Planning Approval By: Plan Checked By: Permit lssued By: NPDES lnsp. Req'd: PWA lnsp Req'd: Planning lnsp. Req'd: Landscaping lnsp. Req'd Fire lnsp. Req'd: No Police lnsp. Req'd: Yes Flood Zone Cert. Req'd: No No No No No Orozco, lvan Chehade, Nabil Zuniga, Allissa Dale: 0412712018 Dale. 0412612018 Date: 05/11/2018 Subject to Field: Misc. Receipt Misc. Receipt Misc. Receipt 0 7116002 0 71160 0 2 o 717600 2 i 73 7300 2 a 890100 7 47776002 07776002 07776002 Account# 70768 Total 5160-1 Permit Fee 53600 Plan Check Fee 5 7770 l.4icrofilm Records 5799i Res. Dev. Fee - S/E 24o00 SMIP , Category 1 51672 Bld}. Stds. Revolving 57600 Genetal Plan Update 5150I lssuance/New Structu $450 00 $550.00 $21.72 $3,206.86 $5.53 $2.00 $21.25 $141 32 $4,398.68 $550.00 $3,848.68 Evary petnit issued shall become invalid unless the work o, lhe slte authorized by such pemil is commenced within 180 days afler ils issuance ot if the wo* au:hoized on the site by such pefinit is suspended or abandoned fgt a peiod of180 days after the tine the wotu is commenced lnspector MID#: 20'18-142058 $21 .25 $591.32 $2.00 $21.72 $5.53 $3,206.86 Fee Totat Paid to Date Balance Due: 0'1 1 16002 01 1 '16002 0'1 1 '16002 01 1 16002 ofi901001 31313002 51600 5 160'1 51612 57770 24000 57991 Unit: Historic: No lnc ion i 9542 Pacific Ave Anaheim, CA 92804 (714) 829-s053 72324 BUILDING- INSPECTOR BECORD SITE-WORK DATE ID/SIG.OWNFJR !IU!I,DI:R DD!,(]ARA IoN I hcrcby rfllnn u d( r.niky i,r p.rjury rhd I am cxc rr liom (hc Cotrt..ktrs t,ic.n\c Llr lor lh. n,lhwi',c rcru isc.70ll I \ Snsincs strd Prine\sin Cdcr Any Cily or Cou y $hich r.quirc\ r ncDir k, mn{fld. rlrs. nl\p(,r.. dcmrrh or rcr{t my (r!.rurc. prnrti ns h\u.i.., ln' rcquncsrhc itplicMr rd \u.h F-^n irtr nbr \iB cd n .nrnr lh.rhcorshc t liccnsc rr^umr n, rhc puhnnr ol rhc Conrrnclr r l,iccn\cd Ir,* {Chrflcr 9. (_.m,ncnci',9 \rirh Sccri,)n 70ln of Divition I .f th. Bu\i'rcss itrd Pn,fssnnr\Codc)orrhri hcorrhc l.x.ntrr rhcrctnnnrtul rhc hr\is nrrlt. iLlcg.d.rcnlf'ridr A,ryvn rlionolSNlionT0.ll5hyrny t rptli.r nn rFrnrir \ubjcccrh. imli.rnr h a.rv,!pcMkr"oi nor ndcrhnn,nc hundr.d doll.r l$5({) -1. tr\ ow.crolthc DruItny.(n mtcnrpl.yes wirh sr8csrsrhct Nnc.onrNnsolion. $illdo rhc trork tralrhc {ndur n Nr ificMd or.ltt6d ror slc (Sd 70,1.1. Bxsi.Ns rnd Pnfd$bn\ Co{lc 'l h. C hckr'sLiccn{t-.qdocstrotrptlyroMowncr.l ric pmJxny who huilds or iryrmrcs lhcren. d *ho des \uch sl)* hitrscllor hcr{lIorrhroueh hi\ or hcr own .'npbyccs. providcd ihar uh imnmEEnls ,r mr inrcNlcd or of.rcd lor srL. ll hostvcr. Ihc huillins or impflnrnr.r i\ v,U { irhir . c }t.tr ot.orlnLrior. rlr Ow cr &rikcr sillhr\! rlE bodcn orftulin! rhtrr hc or drc did n.r trild or infmec tlr pn,lEty for lhc lult yoi l.n\oqncrolrl[nnincn)i,r'ncr.lu\ivcly.otrrrrri'rg$ h licri\cd.onrn.ky(h..tr{nr.r rhc lr.lc.l lScc 7O.{r. Buri,'r\\ d lttrli\si,n Codc:1hc Cotrrr&rr'r l-iccns.l-.s rloc{ n.rr! yn, rnorvtr.r.lporcnysho huil{l{or in,p(k{rh.r.otr. nM *h. conkrck for \u.[ rolccr\wiihi G,nhcnn(sr lkcnscd lU^urd nrrtuc(,nrrnctn'\ l-iccn:c l-Jtr) rln .rrmn uL!,ic, \r.r' n J B &p. n ,br:!:{r!, , - / ""," og/tr /Zux ,/S-.. 776.(".4--- }IIItrIBfII]II&:ISAIION DICLASII]OX Ihcrchyrlhl utrd.r I[rdllv ol rc' Drv otrc olrh.lnlk,s i'u tl.rltrrrri, \: lhrlcrrrlwill.untrnirC.nilr.ofcotr\cnrbsclrliso'ri,tr*.*c(.onrFnqriotr.rsrrovidcdlor$ySccron.lTlr)olrhc t jhrr C.dc. rrtr lhc pcrlorn!ft c of rh. work nn shich rhc pcnnil n issucd rhc uo'k f(* sh,ch rhi\ |nrnririr n\u.{ l{y trorkr^'.,n r^--n\rrn,n i,trr'rf...m$ |r)liyrtrnvuc Elpir.s l.cnilirhrriIrhcpcrtunmNcolrhc$orktu\hi.h(hnNflnnin\ucd.I\lullnorctrrtl,'yin,l.r\oninany,rimr snslotcconE{$iccrrorhcworkcr'corpcnsuIionhwsol'Crlirornir.rndrsrccrharirlshrdldh.conrc\ubj..rI'irf, sor[c conlPcnurion pmvkn,n\ oISNiion ]7(x) ofrh.lltytr Codc., lhali.l(lnh*irh cnnply *irh rh)t Pn,rhnnr IVARNINGT Fdurc to {.urc work$J.onr,trfsnii(in (rchlc i\ utrh{lirl. d \hrll \ubt.r ur cnDlorr ro crinimlp.mlric\ xn,l ) n, or lLrfdrc(l rln,u\trxl Llo l \ r\l(X ,r. m r,lJ r{ ro rl'r .^r/,f u,trr.n(ri, r. dlntrscr as nr ."-"-':, / . I&4'L{,u-,2-,^.6sJ tt/)-ot;t^*,, I hcnbt rrft und.r!.Mhyofl,.rluryrhdI0'nlietrk{utr.rnn,vni(,noiChrl'lcr9(connrEncingwirhScdion701,ofDivi(i,,n:l ol rhc Businc$and PmlcsionsCodc. &l nrylircnsc h in tullnrcc ant cftcrr toNflalcua.t{tE$rlN!-auEN(r I hcehy rfirn uM.r Fnrlrrolp.rury tlu rhuc is r.otr{ru.ri.n lcndinS i8cmy li,r lhc pcnornEncc olrlt sori ntr *hich rhil p.nnir i\ i\su.,i lscc .!(Ir7. Civ C ) A.TTU!]ANLII}:CIj.BAIIQN llri-h!rnn ru dcr|ttrrhyol tcrjLryomof rhcnil[^ri']Idc.lrnri(fi\ t).fnnirion Pcnnir\ A\bcnos N.rificrrioi lrcdcrrl RcEuhti,nr\ 11irlc 40. t' d6) RequtcJ I crrcrotNorificrri,n, I..difyrh.r rhc fcdcdl rcgulrlbN ogrnlrn! asbr{orrc k^darc mr (nflicrhk ro lhn pm}cct -l ccnift lh.r I hnvc rcnd r[is omlicriion ind { c rh$ thc rnoic i.r'omition h corc.r. I aEE ro co'qny wnh illCityand conily oRlinonccs 0nd Sr.rc Lws rclnlitrB lo buildiry c.nsrrudbn. on tsrchy aurhnrizc rcnrcrnBrnc\ olrhn Ciry rn'l cndtrr, t. crrcr u,!.n Ih. ir$r.,mirn.rJ r,,,nrny,n- n.tt'trr. T*-\ / _ /, t I .,,ppn",nro,axnrsv*M-::: 1W(-z2Lb4tL-,"'"' O{/!L/2z'E ""^u** ",r.,g/ 'akzr, DVu,n- Set Backs 7/ult*AAAA Forms/Steel/Holdowns lhetix ailYb) Erection Pads ll UFER Ground SLAB Floor ilz-ltag,flfr: Sublloor/Vent/l nsulation Roof Sheathing 71plr9 1t0-*9 Shear Wall J6-t t.---'d a <'t-\ Framinq qqlt6 tYt"/ lnsulation/Energy aq/tl tK f"*22 D all 4INLry Ti@ Ext./)nt. Lath 7ltll6 (t W&<*i >r) ts;r6wn Coat tblt'l I'X v4il14' It/asonry I t Pool Fence T-Bar Handicap Req Deputy Final Report En gineer Final Report Flood Zone Certil Ylnk/W raarP ,tluilt9n,vr/'r 'l UJ FINAL t0l tb I t, 7,Dln^qP '?2) Certif icate of Occupancy I I a ['v Notes, Remarks , Etc ,A e uhl 1-70-19 . ?tr, (- e.L T4'b I '7N.*1i)our-. l'l ,u COMMENTS lxnde' \ Addrcs z. P.t?-r, MAYOR MiguelA. Pulido I,4AYOR PRO TEIV1 Michele Martinez COUNCIL[/E[/BERS P. David Benavides Mcente Sarmiento Jose Solorio SalTinajero Juan Villegas CITY OF SANTA ANA PLANNING & BUILDING ACENCY 20 Civic Center Plaza P.O. Box I988 . Santa Ana, California 92702 www.santa-ana.orgl pba NOTICE TO PROPERTY OWNER Dear Property Owner: An application for a building permit has been submitted in your name listing yourself as the builder of the property improvements specified at 2ilt ("A-r,a-c+ q/ 70 We are providing you with an Owner-Builder Acknowledoment and lnformation Verification Form to make you aware of your responsibilities and possible risk you may incur by having this permit issued in your names as the Owner-Builder. We will not issue a building permit until you have read, initialed your understanding of each provision, signed, and returned this form to us at our official address indicated. An agent of the owner cannot execute this notice unless you, the property owner, obtain the prior approval of the permitting authority. OWNER'S ACKNOWLEDGMENT AND VERIFICATION OF INFORMATON DIRECTIONS: Read and initial each statement below to signify you understand or verify this information. q-/ 1 . I understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner-Builder" building permit that erroneously implies that the property owner is providing his or her own labor and material personally. l, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner-Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. -J--+'U- 2. I understand building permits are not required to be signed by property owners unless they are responsible for the construction and are not hiring a licensed Contractor to assume this responsibility. -W-3. I understand as an "Owner-Builder' lam the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed Contractor and having the permit filed in his or her name instead of my own. -ffi O I understand Contractors are required by law to be licensed and bonded in California and to list their license nurnbers on permits and contracts. ,,1 ff-S I understand if I employ or otherwise engage any persons, other than California licensed Contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer" under state and federal law. LU ,understand if I am considered an "employer" under state and Federal law, I must register with the state and federal government, withhold payroll taxes, provide workers' compensation disability insurance] and contribute to unemployment compensation of each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. -r+W 7. I understand under California Contractors' State License Law, an Owner-Builder who builds single-family residential structures cannot legally build them with the intent to offer them for sale, unless a// work is performed by SANTA ANA CITY COUNCIL mou doaosanIa-ana oro Mayor P.o Tem Ward 2 mimartrnezrasanta ana oro Vicente Salrn enlo samEnbaAsanla-an6 oro i!9lqio@$da:a!4q9 P. David Benavides dbenEv des@santa ana.o.o ivilleoas@sanla-ana oro stinaie.o@santa ana.o.o ACTING CITY MANAGER Gerardo Mouet CITY ATTORNEY Sonia R. Carvalho CLERK OF THE COUNCIL Maria D. Huizar licensed subcontractors and the number of structures does not exceed four within any calendar years, or all of the work is perf/ormed under contract with a licensed general building Contractor. ,l--' U:8. I understand as an Owner-Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owne(s) that result from any latent construction defects in the workmanship or materials. f,--S I understand I may obtain more information regarding my obligations as an "employer" from the lnternal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of lndustrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) at 1-800-321-CSLB (2752) or www.cslb.ca.qov for more information about licensed contractors. 10. I am aware of and consent to an Owner-Builder building permit applied for in my name, and understand that I am the party legally and financially responsible for proposed construction activity at the following address: 11. I agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern Owner-Builders as well as employers. fulZ.I agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. lf you contract with someone who does not have a license, the Contractors' State License Board may be unable to assist you with any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. lt is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. lf you obtain a permit as Owner-Builder and wish to hire Contactors, you will be responsible for verifying whether or not those Contractors are properly licensed and the status of their workers' compensation insurance coverage. Before a building permit can be issued, this form must be completed and signed by the property o\rvner and returned to the agency responsible for issuing the p ermit. Note.' A copy of the propertv owner's driver's license, form notarization, or other verification acceptable to aaencv is reouired to be oresented when the Dermit is Signature of Property Owner Date: O<.10 Print name of Owner AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Notice to Property Owner, the execution of which I understand is my personal responsibility, I hereby authorize the following person(s)to act as my agent(s)to apply for, sign, and Ille the documents necessary to obtain an Owner-Builder Permit for my Scope of Construction Project (or Description of Work) Project Location or Address Name of Authorized Agent: Address of Authorized Agent:_ Phone Number of Authorized Agent I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled out the above information and certify its accuracy. Property Owner's Signature Date Print Name of Owner: Note: A, copy of the owner's driver's license, form notarization, or other verification acceptable to the agency is required to be presented when the permit is issued to verify the propedy owner's signature. SANTA ANA C{TY COUNCIL mou do@sa.ra-a.a o.o Mayor Pro Tem, Ward 2 minarilnez@sanla-ana orq V,cente Sarmienro vsarme.ro@sa.la-a.a orq isolorio@sanla-ana.oro P Oav'd Benavdes dbenavdes@santa 6...orq iv eoarAsa016-ana.orc stinaiera@sa.ta'ana.ora issued to verifv the propertv owner's sidnature.