HomeMy WebLinkAbout10193264 - PermitCity of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA\TTOZ Building
Permit Counter: (714) 647-5800 lnspection Requestsr (714) 667-2738 lnspector Section: (714) 647-5853
Project Address: 1033 N Custer St
Lot l0
Unit Bldg: Address Range:
Tracl: HAWKIN'S ADO
*-
Block B Hrstoric Yes
Building Use: Single Family Dwelling Occupancy: R-3, U 1st FL Area:
Job Type: Solar Constr Type: V B 2nd FL Area:
Nature of Work: Solar Code: CBC 2016 Other Areas:
Existing Bldg. & Use: SFD w/att Garage Flood Zone: X-0602320163J
Garage Area
Proposed Use: # of Stories:
Totat:
Description of Work: lnstallation of roof mounted PV system. 14 panels, 4.060 kw. Worksheet attached to plans.
Planning Conditions:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $12,000.00
Contractor: SunLuxEnergy
Address. 800 S. Rochesler Street
Ontario, CA 9'1761
Phone: (909) 390-1786
State Lic #r 1008374
Lic Type: C-10
Bus. Lic #: 366119
Workers' Compensalion lnsurance:
Carrier; State Compensation lnsurance Fur
Policy #: 9159437
Expires: 0512112018
Engrneer las M Morales, Engineer
las M Morales
Address
Doug
DougOwner.
Address
Phone
Tenant:
James Hill
1033 N. Custe. Street
Santa Ana, CA 92701
(714) 904-1870
Architect /
Desiqner:
Addressl
Phone:
License #
Phone.
License #:
69'163
SunLux Enerqy
800 S. Rochester Street
Ontario, CA 91761
(909) 390-1785
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd: No
PWA lnsp. Req'd: No
Planning lnsp. Req'd: No
Landscaping lnsp Req'd: No
Chavez. Dave
Date:
Date:
Date: 06/15/2017
Subject lo Fieldl
Misc. Receipt
Misc. Receipl
Misc. Receipt
$s00.00
$1.00
$0 00
07776002 5f601 Permil Fee
07776002 57672 Bldg. Stds. Revolving
01776002 57600 Gene.al Plan Update
-.r'
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert Req'd: No 01116002b1601
Evary perfiit issued shallbecome invalid unlessthe wolk on the stte euthonzed by
such pemit is comfienced within 180 days after its issuance,or if lhe wo* authonzod
on the stte by such permit is suspended ot abandoned tor a penod of 180 daysatler
the time lhe wo* is cornfienced .
$s01 00
$0 00
s501.00
lnspector MID#: 20'17-136818
01 1 16002 51612
$500 00
$1.00
Fee Total
Paid to Date:
Balance Due:
Permit #: lO{93264
Pin #: 2603{
Assessofs Parcel 398-193-05
Suite Rangel
Zoning: SO84
BUILDING- INSPECTOR RECORD
SITE.WORK DATE ID/SIG.COMMENTS OWNIiR BU I LDER DELCA R,{TION
I h6ctl} !fiim und.r Fn!h, ol tcjury lhol I m .rmF from lhc Conraclos l-ids lr* tu rh. rolh*ins rd$n (sft Tlrll 5
Burindr ! PrufRrnn (\{.) An} ( nr .r ( oud} {hih rcqun6 r pdnir r. odrud. ah6. iml'o\4 &nolirh or rqrn d}
strudoE. Fior h ns is Mc, lkl rq!n6 th. q)plkM! f.r su.h Fmn lo fik ! si[Ed ndffil lhd h.or ]h. t lico*n puM r
ro rh. F.\ni olrrE (o.rr[.loir l.i.6rri lr* (ftarrc 9- Co@mins sirh Sdhn 7(x)0 ot Divtion I of lh( BN'D6 ud
PmfaioN (..d.) or th lEor.h. ndmF rh..fiom od rh. h6n ao. rh. ilkB.d.(aFiri Any rirLlxu ot S..lrr 7r)r l !b rn)
rp0ltr f.r.Fm tulGBrh..prl'cerrororrlp@nrofm!mrcrh,,fir.hun<lr.d&llJt(lJ(xrl
l, a o*c oarh. rnFr). c i! ongloyG $nh urs6 d rh.n $h o.iFsio( triI.h th s t rn rlE rirlR 6 n{
ddlLd off6.d fo. nL{sE 7ol4. BBind od ProftsioB Cod. nECo rrld ! Lt* L.s &6ml {"tyror.uEolth.FnFry u ln hl'ld, n inF.\6llEstr .n * b &6 qrt \oli hilrlt or hdell or rlr.ugh har d ts o*n 6r{'h!G.
Folid.d thd Mn imp..\d c d noi.i orolH an rL lf. h*6!, tlE tlildna q hss!6i 6 hB *ihn oft 6
of @l4'ldm th. Osc Boiltd tr llrE tE hrdr otForiie rhi lE o dE dn d brild or !r+.!1. fi. FoFiy tn llE Frrrtof
L a o*G ohh. l'qE
',
m.r.llBn.lt ..drkinE * nh ltn&d ..ddm to mBtud rlE Fwd tse 7O,r, &!!6
lrl Etrk in Co& I h. ( . rrroir l-ico* t,s d<,6 ml rr?lr ro e on r otFoFry $ho bu,ld! or inpnrr6 'h66n.ed $ho 6 rdr for r(h Iroj.(s $nh ! Gddo(3, lk.E d Fr6o,rl 'o
rh. Coir&1oiJ l.tc trtr )
I n.rc prunJrSc-jnn
ltaa[Eei-(a]lrElsallaxDli(l!$AIraI
I hschy alltr trnd6 tH,allt oltFJrtryon.orrh. nnLrrina d(lralFB
lh.\cond*illm.inr!'n.(-.nificar.ol(onsorros.ll-lnsurcfor$0!16$rpqridi,,n.Br(rv'd.!rnhys{ri,'n:17(x)ofrh.
lxbor ( olc aorrh.Fdnnrmnc.ofrh.$o* for wh ich rh. Idmil i3 isrd.
.zy'r r,-",".r*,rr*.,.. *,rrr!'( rnn tr$li,n ,Ntr/,hc s.rr lf{h(h,!ruM)', ",r.,.'i My'l,r.";,,,,>h/ l^J
pohc,Nu,rrs ! ?ts?ttV7
!nc..6 r.quiEd h.rSarion.1700 olrh.litrr(-o&.Ior Ih. nqfomerc. of
mn<t lion iNue. ceid dd poli., n,mh.r a.:
{/r,l/S
I cdia, $d o
'h. Fft'lflm. of rh. r.rl for trhih rhir Fnn is ir$.d" I sh.l! .or mph) u) Fen in lnv mDnd
3, 8 ro lE$nc $bar ro rh. trsd6 c.dFqFn hus otcsliaomia and.sG rhd if I
*.6 comFlslFnForiladnls.dni lTm.rllE l.bor Codc I JEll. fdh$ni
u dphla ro turnd FsI.r ind
h on. hun&.d ih.6ntl ilolld ll100-(l(l0). in .dli'hn ro rh.
'on,
.LBr6 B rnorri.n iY lh.
s<lion 1076 of llE I itrr (il}, i,nn.{ ,.d dronEr'3 f6
-,,, '/zr/t7
Lr!t_!Eula]
I h6.t't .rrm o.dd F.lty ol Fjury td I m li€!.d undcr F.l tion of clrytE 9 Gomnffiins *ilh sG1nn 7uU .r l)n iion r
of rh. BBild ilrd PDf<ioc Co<t , .rd oy licte !, tull ror.. dld.lId
t,."nr"<t,* 7 ('/D
-" ' a/t r/r7
D
I hd.b! amirn undd ltnah, of IEjury rh, rh.. ie r .o^ctuc1ion Lnding .8acy for rhc tqfollME ol rhc $rI lor s hi$ rhi. lEhir ir
t.u.J (s- 11097, C,v ( )
AITLICANLDECTJAAIIA!
I h.6.llm u.rL, F.h! ol Fjlrr om ollh. folhtr in8 .krld ioE:
Damliion P.m 3 Art6n r Notlicd.n F.dd.l R+uhrir6 (Tnb40, Pd6)
R.qur.rl l.drd oaNd'Rd.n
I cdrtl rhd rh. fqLtrl rcBuldnN rct-d'ry alEslos mr 4,tlrrbk n' rhitr ptuFl
l4airr rrd r rnc ra rrrs +pli.dioi ad nd. r a.mplt s hrll( \rn.l(i{nt
ordmn.6 rnd nd. |.tr! Bldms h tu dr6oarhirCnr d ( ilun\ lo oto 'q$n llE
*,, o/zry'z3En. mrtun.d Fo0<rr tu EIKrp
lpplic. o.,ltol siS.rr,,.. X
P.mrR nrmc , prin,,, Yr6" ),//.-.-,a-'16^ntz*w-O
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenUl nsulation
Roof Sheathinq
Shear Wall
Framing
lns u lation/Energ y
Drywall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Engineer Final Report
Flood Zone Certif .
FINAL 1/_7/J,l D -afr4 O^^ b)
Certificate of Occu anc
Notes Remarks, Etc
--i
...,..,...,.x.-
I
Plannlng & Building Agency
Buildlng Safety Oivision
20 Clvlc Center Plaza
P.O. Box 1988 (M-r9)
Santa Ana, CA 92702
(71lt) 6/17-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol{1 cBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall flll in the address of the proiect, contractois
licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the questions, plan check shall be required.*
Proj ect Address: 1033 NORTH CUSTER STREET SANTA ANA, CA 92701
Contractor Company Name:
Contractor License Number:
SUNLUX ENERGY, INC
1 trtr
trtruu
otr
trtr
YES NO
x
# I 00tt37.1 (C- I 0)
Are the following applicable to the proposed project?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 3 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10' maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV system layout provide a three-foot wide clear access pathway per the
latest edition of "Guideline for Firc Safety Elements of Solar Photovoltaic Syslems"
by OCFA? (Guideline available on the OCFA website: http://www.ocfa.oro)
Do the plans show a maximum horizontal anchor spacing of 6 feet?
Do the plans show a minimum ol2-112 inch lag screw embedment into roof rafters?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including prqect specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)
2
3
4
5
6
7
tr
trtr
I trtre trtr
10. EE
I certify under p_qnalty of perjury under the laws of th,/./
Print name: (a?';", e-';'z , t '-/-D/a4-aZ<,
PhoneNumber: t7"Y )7a 1 Zj?
e State of California that the above is true:
Srgnature
Date
Email Address .olr -C ^J Q 5,n /t,
,,-SANTA
NA
llt\]l\G
&B[tDt\c
lctvt
Rev:211712015
- 24e,.
*-SNTA
NA,Tffi
Planning & Building Agency
Building Safety Divis ion
20 Civic Center Plaza
P.O. Box 1988 (M-'19)
Sanla Ana, CA 92702
(714) 647-s800
www,santa.ana.org
Solar Photovoltaic (PV) Checktist for Detached SINGLE FAMILy RESIDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certjfication section below. A copy of this form shall be attached to each of TWO sets of plans, of
mrnimum11"x17'size. lf answerinq NO to anv ofth e o uestions. D lan check shall be required
Proj ect Address: lna?..L\0Y{f\ fir(tI,(
"Q)fContractor Company Name:
Contractor License Number \00841 q
2
YES NO
Ftr
Etr
trtr
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, pV layout,
anchorage spacing, anchorage details and manufacturer's pV support information.)
3
4 trtrpa
Ftr
Ftr
6
7
8 tstr
9 Ftr
10 Eltr
I certify und et 9eqalry o
0-t 'zk
the State of California
Print Name Signature
Phone Number: 4M31afibt Date
Email Address: 'ia(Af\ . f ',f\aYlLtna
Rev 11r19/2015
@Sun[uv 'e-wNw corn
ve is true
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-o1 cBc 2013