HomeMy WebLinkAbout10192989 - Permitcity of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA 92702 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853
Permit #: 1O192989
Pin #: 13472
Project Address: 820 S Dennis St
Assessor's Parcel:108-253-30 Lot 10
Bldg: Address Range Suite Range:
Zoning: Rl
k
Block NA Tract: 4258 Historic No
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use;
Single Family Dwelling
Solar
Solar
SFD Watt garage
R-3, U
VB
cBc 2016
x-0602320256J
'1 st FL Area:
2nd FL Area:
Other Areas:
Garage Area:
Total:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $28,800.00
Occupancy:
Consk Type
Code:
Flood Zone:
# of Stories:
Description of Work: lnstall solar panels
Planning Conditions:
Owner.
Address
Phone:
Tenant:
Bruce & Darlene Smith
820 S Dennis St
Santa Ana, CA 927042211
(714) 839-5999
Contractor: PeteBen & Dean lnc dba Pe
Address: 39300 Civic Center Dr
Fremont, CA 94538
Phone; (657) 236-5061
State Lic #: 4681 17
Lic Type: C-35, B, C-10, C-20, C-39, C43, CJ
Bus. Lic #: 318074
Workers' Compensation lnsurance:
Carrier XL lnsurance America
Policy #: CWC7409480
Expires: 0413012017
Engineer
Address
Phone:
License #.
Architect /
Desiqner;
Address.
Phone:
License #:
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Hernandez, Kathy
Date:
Date:
Date: 05/16/2017
Subject lo Fieldr
Misc. Receipt
Misc. Receipt
Misc. Receipl
$500.00
$2.00
$0.00
07776002 57607 Petmil Fee
07776002 57672 Bldg. Stds. Revolving
01775002 57600 Genercl Plan Update
0i
l,'ro
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 011 16002 5160,1 $500.00
$2.0001 1 16002 51612
Every pemit issued shall become invalid unless the wolk on the sile authorized by
such pemit is commenced within 180 days aftet its issuance,or I the wofu authonzad
on the sile by such peinil is suspended ot abandoned lot a penod of180 days after
the time the wo* is commenced
lnspector
Fee Total.
Paid to Date:
Balance Due:
$502 00
$0.00
$502.00
Unit
MID#: 2017-136184
BUILDING. INSPECTOR RECORD
SITE-WORK DATE ID/SIG.COMMENTS O\T NEX AUILDl:R DEI,('AFATION
I hfttry rllm unda !F..h) of FjrD th, I m dmpr lmm !h. Conl'ac1oR' L ctu. l,* tu rh. folk'ullls @$n (s< 1)rl 5
Bush63 d,rl Pro,*irn ( qj.) Anr. ( il] dr (iunrr s h'(h rdlun6 d tdnir h .onnnr.1, ahs, imEor c, ddmlLh or kFn Mr
3rrudr.. rnr lo iti 6umc, .&. Equn6 rlE q'dkd tor $.h Fmit lo lil. ! sisncd s'li.fur rhd l€ ot sh. 6 heBd I'{eE,
h rh. Fo\isioB of ltr Co.r,rro.r I ic..si ll* (Chqnr 9, ('omm..ci.r {nh sdion 700(r or Di\nnn r ol rh. Busin* lnd
Pmfsion3 ( od.)or rhal rE or slE B.rmrt rh€.6.m sd lh. bdlis for rhc.ll.scd ddfltrr An) r'6ldhi olsdirtr 7ol l 5 h! 'n)l,l)li.rd lor r Fn( lubldtr rlE rFpli.anl k) . cn il pmhy o t nol no,c lhd n\. hun(hdi {hlltrs i t500,.
l. .! otrE ofrh. rmFnv. nr mr.mdorc sirh $ra6 ar rhtr in. mnp.nsnn. s l & rlE rut xd rh ruls. k dr
ddrldl or ord.d aor sk(s{ 7olr.l,urm*dd erofgsioN ( od. h. ( onrnrd s l t@ t,\ &}6.d 4pl} lo mo\@ oa
rk FDEIy *ho tlikl or mlrov6 rhe'n. sd sh. dE nkh {o himklf o. harlf or rhmu[h his or hd 6r. anrn]v6.
prov .d rlur .urh m[nrrddrr ft ftn hEr:ldl m.fi6al am sL lf. btr6d. rrE tliui,E.r ir{ror!tu I $ld *irhr.n. yw
of conpldrn, rhc Orna lllikb * ill h'\. rh. hrd6 of Fo\ qr rhi lE or 3lr dil n{ lnild or inqr.r. th. ImIEiv tu llE tlrIrE ol
l. s.{n6olrh.ln)d}. m.r.l$trcb co'n,aclins niih lKmrd co.lEd.nro onind rh. tr).d isa 7(N'1,lt[in<
and t\nkn ( odc: , h. Contrd.r. Licdlr l.r* do6 nor rt plv rD in o*nd .ftrop.n ! tr h. huildr o drr.\ 6 rh(mi.
and \ho onuds fo, such r,or.ds *nh o tuntmdo(t) licds.d pu^@In ro rh. ( odEdoir li.c l,r )
, d.r.'ntllndr s$rifn
D.re (ti.d
tttlRJ(f lLs' ( ()tlPf \sa t tol\oroiSrlla!
I n6.h) annr und6 rdrlr) oirEjur! on.rirh. nn[\(nt dNlird'ons:
\)9is.. ",,a " 'tt
*'n'n'n u t'.n'fi(r,c rr(iin<r !, s.lt ltr5urc tur qurk6' c.mFMx,n. s F ii.drorbs6!io.r7(xrorrhc
I rhtr ( Gle aor lhl Frfolruc. o f lh. \ o* for fiich rh. Fnn s si!c!
I hlvc aM *ill narnllin tr orkdr' conFE.h{n 'd!dnc., r.qxr.J bt sd ion !70o ol rh. blror C.d., for rh. !€fom.nc. ol
rh. tr'o,l r,r trh(l. rhs Fnd B e.d \l) \.,16 cohFM.n 'B mG !rn6 odr.l'("numh. n.
, -,.};=.r1,'-, cn* -€ z>/-s Ar.'^ / r,e /-h ,-s
,uu.,,,.'., + z/o5<77g ,,r.,- //="/zg:
l.qlifr. rhlt 'nrh.FnrM..ofrh.r'ork n! *hichrhBrEmir 6 !$u.d- I shrllftr mpL).n! Fen in 0nt muF
$ Btobc.omc hie' ro rh. u'o.ld Nmpoition l$1.r( nlin,ma.nd tEterhd ifI sh,uld b<o'E sut <r i. 'h.$1116 (onD.Mrion pnvis'oc o r S.cl i6n l70o 6f lh. t$or ( tti., I sh.ll, fodhn ilh oq,l! u ilh lh,e pN iri.m
WARNINC ljarlutc r(' ku. No n .omFMbn o\d*. is unl.trful. 0.d dull subjd d oFlo!6 nr aininil rd4hi6 dd
t. thr con olcomp.(erion. dm.B6 as prold.n nr rh.civil find un ro on. hundc! rh.lend &ll.u (ll00,lx )- in
s(rrn 1076 orrhc l-ilrlr(o&. irl6d,nld
5
I hdb! .mnn trnd6 tsrlryotnsrufr lhar I lirss.l und< Fo\isn,h
.r rh.lluins and ltmrBrN( od., dd hy hrmk s m ftrll lorc..,rd
of(]ufl( e (.offiirs rnh Sarhn 7000)olDtrhnn:l
z'z/r
r,.oscctas L 1(a
,,,"s/v/t z
z//*t z
cQnflalLcullltl.ExDlNc.AcElQIhodJyrfttrmundoFn.htof,.rjurrthntha.ir.coteMh.lddinsrs,aorlh.Ffolruc.otlh.*.rtlorshrhrhitFni!i
$uc! (56 1(})7,Civ ( )
AIIUCAAI.DICI,AEAIIA!
I hdlb iftm und6 rEn.lty of ndjury oN or rh. aolld inr dd!r{ i{n.:
l).moh$n P6mns-Asb<ros Nor'6c.rion I.dqal R.auLrions (Tirl. 10, Pd6)
R.qur6j tdrs ot Nd'6crin
l.6rili rhlt rh. f.ddil r.suldn\6 E!.rdin8 aiBrs rmfml arc n.r snpl'cabl. t' rh6 tnoFd
Icdibrh,Ih,\.radrhi!rrrlicalhneditar.ihlirhchhl.'nnrmdri6.oftall4ranl
oirliMi.6 Md srar.Inss.cldrnr ro hnld'nr rlnl$rE r.p(6dd^6 oll
ah\r mdr(,n d [I'olhv f(Y mspRlNn
a-/on
cdmplt \ hall(,r) ind(i{nr\
his( 'r! ifrlCounrrroon6 ut\ rlr//
,',', o/2, 7
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenUl nsulalion
Roof Sheathing
Shear Wall
Framinq
lnsulation/Energy
Drywall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Engineer Final Report
Flood Zone Certif . /;\
tztttb* JoLhIL [.,-19-17 y.v(1[)
V\
FINAL c-t947 k.t14)t
Certificate of Occupancy
Notes, Remarks, Etc
I
I
I
I
I
i
,^-SANTA
ANA
ILIINC
IBiltDt\[
icil0
Planning E Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. aox 1988 (M-19)
Santa Ana, CI.92702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-01 cBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size lf answerinq NO to anv of the q uestions. Dlan check shall be required.
Proj ectAddtess: flO {o^*t - ))e rrn is <}c..*\J)e q.+
1
Contractor Company Name:
Contractor License Number:
YES NO
Etr
Fo
Eo
4( t ttl
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV affay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
I certify under penalty of periury under the laws of the State of Cal at is true:
Print Name: 0. 6t oA 0'NE Signature:
Date: J
2
3
4
5
6sEo
M
o Eltr
, Etr
s. Eltr
g Altr
10 tr
o
PhoneNumber: 0G( qlq ?OL{t
Email Address O NlJ L/O
Rev 811712015
Oo r.t
,,,SANTA
NA,',i:r,ffi
Plannlng & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Sanla Ana, CAS2702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKL!ST
soL-01 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x 1 7" size. lf answerinE NO to any of the ques tions. Dlan check shall be reouired.
Project Addtess:flO 5r, fu. ))errnis <*r"el
,...\l'\Ye--fctae n' J)€ q. nContractor Company Name:
Contractor License Numbor:
YES NO
4( r tt-t
Are the following applicable to tho proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on lhe roof plan?
Will the PV system be installed on a roof having only one roofing layer wilh no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counler-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project speciflc site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
I certify under penalty of perjury under the laws of the State of Cal at
D.oA a
1 Ftr
Fn
Fo
2
3
4
(
(u
Ftr
F10
U Ftr
, Efl
a Etr
s,Eltr
tr
Print Name:
Phone Num oe,, bGt qlL{ ?oq t
Signature:
Datei r
Email Address
Revr 8/1712015
o N /'J
N
0a r.t
ve is truo: