HomeMy WebLinkAbout10198496 - Permitq
Proiect Address: 1429 W Tolliver St
Assessor's Parcel 109-342-02 Lot: 90
Unit Bldg: Address Range
Block: NA T.acl 2325 Historic: No
city of Santa Ana 20 civic center Plaza (l\4-19), santa Ana, cAg27o2 Building
Permit Counter: (714],647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714],647-5853
Permit #: {O{98496
Pin #: 14893
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
SFD Watt garage
R-3, U
VB
cBc 2016
x-0602320257 J
1 st FL Area
2nd FL Area
Other Areas
Garage Area
Total
Patio:
T.l.Area:
Yards Req'd
Valuation: $11,088.00
Description of Work: lnstall solar panels
Planning Conditions:
i(lr!
Owner:
Address
Phone:
Tenant
Jose Gutierrez
'1429 W Tolliver St
Santa Ana, CA 92703
(909) 815-1626
Engineer
Address:
Phone:
License #:
Architect /
Desiqner:
Address.
Phone:
License #:
Rel+:
I l7'/ / 2i.l
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Date:
Date:
Dale:1112712018
Subject to Field:
lvlisc. Receipt
l\,lisc. Receipt
Misc. Receipt
$450.00
$1 .00
$0.00
07776002 5150] Permit Fee
07776002 s7672 Bldg. Stds. Revolving
07776002 51600 ceneral Plan Update
$ Hernanoez, Kathy
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Every permit issuod shall become invalid unless the work o, the site authorized by
such permit is conmenced within 180 days after its issuance,ot if the wo* authoized
on the site by such permit is suspended ot abandoned for a period of180 days after
the time the wotu is commenced.
lnspector MtD#. 2018-147957
01 1 '16002 51612
$450.00
$1.00
Fee Tolat
Paid to Date:
Balance Due
$451.00
$0.00
$451 .00
Suite Range:
Zoning: Rl
Occupancy:
Constr Type:
Code:
Flood Zone:
# of Storaes:
Contractor: VivintSolarDeveloper
Address: 9847 Pioneer Blvd.
Santa Fe Springs, CA 90670
Phone: 1562) 942-1270
State Lic #; 973755
Lic Type: C-10, C46
Bus. Lic #: 345470
Workers' Compensation lnsurance:
Carrier: American Zurich lns Co
Policy #: WC5096013
Expires: 11101120'19
1lll
Flood Zone Cert. Req'd: No O1i 16002 51601
BUILDING- INSPECTOR RECORD
SITE-WORK DATE ID/SIG.COMMENTS OWNAR BI]ILDIiR DEI-CARA ION
I her.by afm uodd p.nahy oi pdiury rhrl I dn €xdDpl 6on1 rhe C'onlnclo6 License lrw for rh€ follolviis t.@n (t( 7011 5
BNin6s a l Profeion Codc) Any ( il, or Counly which requit$ . lsmit lo coNrtucr, ahd. nnprova donolish or i'!€t dv
srrucluc prbr ro tu isue... also r.qoit6 thc @pli.d lor suoh p.mit lo filc a sirn.d slttsd lhal h. or sn b lictred pusrd
ro rhc prorisions olrhc Conrracloas Lic€nsed Lrw (clDpld 9. CoDn@cin8 with Sdion 7000 ol Division I ofth' Businas d
Pror€si.ns codc) or lhal he or thl is er.,npl rh6.arom and ln. h€lis aor th. allcr.d cxqnFion Atrvriolarionofserion?0lll t bl f,
applic.nl for a r6iil subjdbrhe applica ro acivilpcn.hyotnor mo.erhe fi\.nundr.ddolld3($500)
-1,
6 osoq o I the snpory, or mt enploy6 virh Nas6 o rh.[ $le comp.nerion will do lhc $o& ed rh€ stelue t nor
inlsd<l or olttr€d lor elc 15(.?0.14. Busind dd Prcf6io6 Code The aontraclor's l,ics. ti{ do6 nol arplv ro an 'Mr or
rh€ pmlEiy who hilds or imprc!6 $aotr dd tr ho do6 such \roi( hims.ll or h*lf or thror8h hG or ho oM cmplovc6.
provii.n rn r such n Fdvmts sc mr inlodql or onatd tu ele lf. how6a. the huildins or iflp.or.rhl i! eld $ nhin on. }!d
of complelnnl Ih€ Ownr Buil,:Li will navc ft budd ofPotins rhd hc ot shc did nor build or impro\ c lnc litrFrv for rhc pur1DF of
l. 6 om6 ol th. pr.peny. m qcluiv.ly .ontactins wnh licded coobaclon lo codrl4c( lh. pojel {Scc. ?044. &trinRr
md Aolission Codc: 'r,. cott.clols Lic6c t-6w do6 nol apPly ro doMd ofproP€nv who buildsor Lnprov6 ths'on.
and *ho .onh.ls for such rroj{G sith . Contrrto(!) licqs.d pu6uot lo lhe Conlradoas Lkos llw)
-l
an ercmpt under Sdio.-. B & P C aorlhB r.en.
Drte: - Own€r.
IVOR(ORS' COMPENSATION
a[9484!:la!
I hseby amfln undB poalry oit6jury one oathc follo$ins d(ld.l ions:
-l
hN. ed will nainlain a Ccnifictt. of Co6ol lo Selt'lN@ lor rwkdt enPens0lion, 6 prcvid.d lot bv Sstion 1700 o f thc
Labor C.d.. fo. fi. pEfonn c€ olrhc *ott for s'hich lh. pqnl $ isucd.
-lh.v.andsillmainrai.qorkeGcomFNalioni6!ra6.e.sr.lunedbySNriotrl?0Oollh.LlborCod..lorlh'pdr'nn'nc'orrh. worl for which rhis pnil is isluct My workeu co'tpcGation insutucc cdnd d policv nu'nbo e€l
Policy Numb.r
-Iirptres:
lceniryrhat inrh.pdlonnanccorlhcsorl for which rhis pcrni h lstr.d.l shallnor dnplot.n, pcrson i'an, mmncr
e 6 lo b6ome subj$l !o lh. sork6 co,npqsar dn l6ss of Califomi.. sd asm thal if I should b..omc subjd ro rh.
sol*ds' composalioo prcvirioN ol S.dion l70O oarh. tibor aodc. I thau. aonhwiih comPlv *irn rhos ProvGio6
WARNING, idilurc ro su. workcu .omp6$rioo covqast G unl.sful. ud shall subjel an oq,lovd ro dimirrl FElti6 dd
civil li.6 up ro on hundrc{t rhoMd dollm ($100,000), in .ddil co'nrcn$r(,n, da rres 6 prtnidLn ilt lh€
s&rion 1076 ofrhc Labo, Cdd., inl.rd dandtncv'3 as
L7 (8
DECIAAAIIA!
I hd.ny .mn. undd pentlly ol pdjury lhal Ln licds.d uodq Ftvnion of Chapts 9 (ctfurcnci.8 with Sccliod 7000) or Division ll
or lh. Busin6 od Proleios Cod., dd my lic.M is in lull force md Er(l
un Qz-r74<
't+rO
CONSTRT]C'NOIt LENDINC AGFNCY
I hcrchy amrn u q pc.ahy ol pdjury rtal rhse is a coistuclbn k dins agdcy lor Ihe psfoiJmc. oflh€ rvo.k lor *hich this p6'nil is
$su.d(s<. 1097, Civ. C.)
L.nd.r s:,J.m.
-
AIIIICANLDEII.A8AIII}T
I bolbyr]ln onddpoally ofpdjlty on.ollhc fouo{ing delmlions
Dnolirioo Pdnils-Asb6tos Norincarion r'€dsal R€gularion! (I nlc 40, Ian6)
-Rcquiral
rnlB olNolifi clrion
-l
cdiryrhat lhc fdloal t.EutarioB Esedints AlEtos roordl d. nor applicablek\ rhis projer.
rhar I h,vc r{d rhis.pplicalio, a,! srate lhal IheatFvcinaomation is coftd I aBrelocomplv*irhallCnvand Counlr-
odinancd &d Sral. kws rcbtiru lo
ab.v. mtrlio.cd prcp.ny aor insp€ci
.uthorn! rqrGmrarn 6 orlnis Cny
,1pplicrnt or Cetrl SiAn!1trr.
4l \)
\\/2"/D
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenVlnsulation
Roof Sheathing
Shear Wall
Framinq
lnsulation/Energy
Drwvall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req.
Deputy Final Report
Enqineer Final Report
Flood Zone Certif
FINAL t\to\ rfl I'llltt fiot)
Certificate of Occupancy
Notes, Remarks, Etc
S
--sN[A
NAffi
flIY
Planning & Building Agency
Building Safety Oivision
20 Civic Center Plaza
P.O. Box 1988 (Nl-19)
Santa Ana, CA.92702
(714) 647.s800
www,santa-ana.or9
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11' x 17' size. lf answerinq NO to any of the q uestions. olan check shall be required
Contractor Company Name:
Contractor License Number
NO
tr
rtr
4Za \v{*
' V^ Y\-\ \D \-o* r
'11=-,a-:3e
2
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having oniy one roofing layer with no
overlays?
Will the PV array be flush mounted to the exisling roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
U/ill the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
\ /ill the PV system be installed with a space of 2" minimum to 10" maximum bei/veen
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
\ /ill the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 iach
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (inciuding project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
I certify under penalty of per.iury under the laws of the State of California hat the ove is true
3 tr
tr
tr
tr
,fra
, rtr
n FEI
roptr
4
5
6
Print Name \--E-.r-u-., G.-* wa't siJ2- qA
gnature
DatePhone Number
Email Address:LJ
za
.,^ vrvrslo \a-,' - (6 /-'\w\JcL
Rev 1 l /19i 2015
sol-01 cBc 2013
Project Address:(_\
1
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647.5800
www.santa-ana.org
scL,0'CBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Project Add ress:47a \ v'Q-,/r-
\//. r/^ \r\_\ \O \_O- r
2
3
6
7
4
5
Contractor Company Name:
Contractor Licens e Number:
YE NO
tr
tr
tr
tr
tr
tr
tr
tr
tr
7
76
E
P
fr
r
7
F
11-ra-<te
Are the following applicable to the proposed project?
u/ill the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
\ /ill the PV system be installed on a roof having only one roofing layer with no
overlays?
\ /lll the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
VYill the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
\ /ill the PV system be installed with a space of 2" minimum to l0" maximum betiveen
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
hat the ve is true
8
9
10
I certify under penalty of perjury under the laws of the State of California
Print Nane:
Phone Num
Signature
Date:
Email Address
het qa 2. qA L1-D ; r.^vrjt!'o \a,' - (6 /-'\
Rev 1 1/19/2015
\-,!
m$c
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
lnstructions: The licensed contractor of record shall complete all sectjons, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimurn 11'x 17' size. lf answerinq NO to anv of the ouestions, olan check shall be required.
1
\,