Loading...
HomeMy WebLinkAbout101117116CITY"SANM NA/,'ilffi t h,Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (7141 647-5800 Yl/\ /w.santa-ana.org R tr 0 s: / flffiffi i #sfffi jf r5k',.f N c E f'tfufr o a .;,,,^ driil"u Ana ACC-01 CBC 2022 A. PURPOSE OF THIS DOCUMENTATION: (check one) E finOing of unreasonable hardship for projects UNDER the valuation threshold* ! finOing of unreasonable hardship for projects OVER the valuation threshold* E Certification of Full Compliance with the2022 California Building Code * Valuation threshold as defined in the 2022 California Building Code, Section 118-202.4 (Exception #8) and Section 202is $L95S8.00 (as of January2023) B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: Project Address: 3345 S Bristol St. Santa Ana, CA 92704 Permit Number: 101 1171 16 Project Description: Interior remodel of an Existing Starbucks Coffee Shop FIoor Number: 1 Business Name / Owner: Starbucks Business Phone Number: (714) 55e-5108 Legal Property Owner: Cheryl Inaba - Brixmor Property Group Phone Number: (858) 202-1 138 Total Construction Cost or Project Valuation: $ 125,000 Cost of Providing Complete Disabled Access: $0 1. The cost of all construction contemplated in the determination of the valuation of improvement threshold based on the valuation of site and building improvements for the last three-year period. Permit No lssuance Date Valuation of Imorovements 101118815 Currently under review Total: 20o/o of Total Construction Cost or Project Valuation: The actual amount to be spent to provide disabled access: $ N/A $ N/A Describe the impact of the proposed improvements on financial feasibility of the project. No lmpact, property owner is delivering a fully compliant site under permit # 101 1 18815 5. Describe the proposed improvements related to accessibility upgrades on this project. No lmpact, property owner is delivering a fully compliant site under permit # 1011 18815 2. 3. 4. Rev: 4210112023 Page 1 of 2 ?! 6. ldentify the accessibility features and equivalent facilities that !!!! be brought into compliance with the latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documentation may be required) Accessible Features to be Made Accessible Cost of lmprovement a. Entrance: X Door X Landing tr Stairway/Steps tr Ramp $0 b. Path of Travel: K path of travel from accessible parking to the building entrance and area of remodel $0 X Path of travel to sanitary facilities / public pho ne I drinking fountain $0 X path of travel from the public way to the building entrance $0 c. Sanitary facilities ( Floor no. 1 )$0 d. Public phone(s)$ N/A e. Drinking fountain(s)$ N/A f. Parking $0 g. Signage & AIarms $0 i. Other:$0 $0Total: 7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is granted. Provide an estimated cost of compliance for each item: (Documentation may be required) Accessible Features Not to be Improved Cost of lmprovement A. N/A $ b.$ c $ $Total: 8. Petitioner must be the legal property owner or his/her legal representative: I certify that the above noted information is true and correct. E Legal Property Owner f] ArchitecUEngineer E Contractor X] Other:Proiect Manager Print Name: Maggd Gelges Phone No. (949) 292-4457 Address Signature:Date: 05101 12024 Rev: 0210112023 Date:17-Lq Page 2 of 2 Approved by: FOR AGENCY USE ONLY