HomeMy WebLinkAbout1035 W Walnut St - PlanRev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
1035 W Walnut Street, Santa Ana, CA 92703
Magic Sun Power Inc
999485
Jennifer Kemme
909-748-1300 10/4/22
permits@visionce.com
1035 W Walnut St
10/24/22
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1035 W Walnut St
10/24/22
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
1035 W Walnut St
10/24/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
MAGIC SUN POWER
GUERRA3857 FOOTHILL BLVD
GLENDALE, CA 1035 W Walnut St, Santa Ana, CA 92703
909-748-1300 9.730
1035 W Walnut St
10/24/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MAGIC SUN POWER
3857 FOOTHILL BLVD
GLENDALE, CA
GUERRA
9.730
1035 W Walnut St, Santa Ana, CA 92703
909-748-1300
1035 W Walnut St
10/24/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
MAGIC SUN POWER
3857 FOOTHILL BLVD
GLENDALE, CA
909-748-1300
GUERRA
1035 W Walnut St, Santa Ana, CA 92703
9.730
1035 W Walnut St
10/24/22
Hi my name is Oswaldo Guerra, my property is located at 1035 W Walnut St, Santa Ana 92703.
The company that will be installing my solar system is Magic Solar Electric License #999485.
Thank you,
Oswaldo Guerra
Signature________________________________________ Date: _____________________
DocuSign Envelope ID: 9D3FCE17-8389-4B4B-A70F-07A71E738F2E
9/23/2022
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
A0
PROJECT INFO
VICINITY MAP
PV NOTES
VICINITY MAP
PROJECT SITE
ARRAY AREA: 20.41 SQFT x 27 = 551.15 SQFT
PROJECT SCOPE
INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM
NEW
EQUIPMENT:27 Q.PEAK DUO BLK ML-G10+400
HANWHA Q.CELL MODULES
27 IQ8PLUS-72-2-US (240V) [SI1]
ENPHASE MICRO INVERTERS
1 X-IQ-AM1-240-4
ENPHASE IQ COMBINER BOX
SYSTEM SIZE: 10.800 DC kW RATING
12.531 CEC AC RATING
AERIAL VIEW
SHEET INDEX
A0 PROJECT INFO, VICINITY MAP, NOTES
A1 SITE PLAN
A2 MOUNTING ROOF PLAN
E1 SINGLE LINE DIAGRAM
E2 ELECTRICAL CALCULATIONS
E3 REQUIRED SIGNAGE
E4 - E4.1 MODULE DATA SHEET & CERTIFICATION
E5 INVERTER DATA SHEET
S1-S1.1 STANCHION DATA SHEET & ENGINEERING
S2 -S2.1 RACKING DATA SHEET & ENGINEERING
S3 RACKING GROUNDING
S4 - S4.1 RACKING CERTIFICATION
1 0.800 DC KW SOLAR PV MICROINVERTER SYSTEM - ROOF MOUNT SYSTEM
GUERRA RESIDENCE
1035 W WALNUT ST SANTA ANA, CA 92703
SOLAR PHOTOVOLTAIC SYSTEM NOTES
1. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER THE
LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS, CEC 110.2, 110.3, 690.4(B) AND 690.12(D).
2. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND
SWITCHES.
3. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250.
4. ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT PER CEC
690.9.
5. DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN READILY
ACCESSIBLE LOCATION NEAR THE EQUIPMENT, CEC 690.13, 690.15.
6. ENERGY STORAGE SYSTEMS TERMINALS LOCATED MORE THAN 5 FEET AWAY OR ON OPPOSITE SIDE OF WALL FROM
CONNECTED EQUIPMENT MUST HAVE DISCONNECTING MEANS IN ACCORDANCE WITH CEC 706.7(E) AND LABELED PER
706.7(D). A SECOND DISCONNECTING MEANS LOCATED AT THE CONNECTED EQUIPMENT SHALL BE INSTALLED WHERE
THE DISCONNECTING MEANS AT THE ESS END OF THE CIRCUIT IS NOT WITHIN SIGHT.
7. RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12.
8. THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL
PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN IN THAT STATE
UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED, CEC 705.40.
9. ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT
AND FOR THE APPLICATION. CEC310.10(D) AND 690.31(C) THROUGH (F).
10. INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV SYSTEMS, CEC
690.31(C).
11. FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE USE, CEC
110.14.
12. ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION, CEC
690.31(B).
13. ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE STRIPES, CEC
200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT COVERING, OR WITH
INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE COLOR OF UNGROUNDED
CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND GROUNDING CONDUCTORS, CEC 310.110(C).
14. MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10 FEET, CEC
705.31.
15. CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY
DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING, CEC 705.12(B).
16. DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE SHEATHINGS,
CEC 690.31(G).
17. METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER 250-VOLTS TO
GROUND MUST BE BONDED IN ACCORDANCE WITH CEC 250.97.
18. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS, CEC
314.15
19. FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR CONNECTOR
THAT ARE IDENTIFIED AND LISTED FOR SUCH USE, CEC 690.31(H) & 110.14.
20. CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND
OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED “DO NOT DISCONNECT UNDER
LOAD” OR “NOT FOR CURRENT INTERRUPTING”, CEC 690.33(C) & (E)(2).
21. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM PHYSICAL
DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C).
22. THE INTERCONNECTION POINT SHALL BE ON THE SUPPLY SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT, CEC
705.32.
23. CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES, MUST
BE PROTECTED, CEC 300.4.
24. PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL UTILITY
COMPANY.
25. FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND COLD
WATER MUST BE PROVIDE, CEC 250.104.
26. GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8’’ IN DIAMETER AND INSTALLED 8’ MINIMUM IN CONTACT WITH
SOIL, CEC 250.52(A)(5), 250.53(G).
27. MINIMUM 7/8’’ CLEARANCE FROM ROOF TO BOTTOM OF CONDUIT OR USE A TEMPERATURE ADDER OF 33 DEGREES
C. CEC 310.15(B)(3)(C)
28. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE
COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM.
29. EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE
PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF THE
MODULES, CPC 906.1.
30. EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED MODULES,
MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1).
31. THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES MUST BE AT
10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS, CEC 690.31(G)(4).
32. PV COMBINER PANELBOARDS MUST HAVE PERMANENT MARKINGS INDICATING THAT THEY ARE DEDICATED FOR PV
CIRCUITS ONLY NO LOADS ARE TO BE CONNECTED.
33. WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT, CEC 110.26.
34. A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED AND
EXTENDING 3' ABOVE THE ROOF.
35. ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY
INSPECTIONS.
36. LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8'' IN
WHITE ON A RED BACKGROUND. CEC 690.31(G)(4)
37. IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC 690.56(C).
38. WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE PANELBOARD TO
INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT UPSIZE IT.
39. PANELS AND MODULES NOT TO BE INSTALLED ON ROOF BELOW AN EMERGENCY ESCAPE AND RESCUE OPENING. CRC
R324.6.2.2
40. GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION DISTANCE
OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES, CRC R324.7 & R302.1.
41. PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY.
42. ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE.
43. APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL BE
FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE INSTALLED
IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE. CARBON
MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR OF THE
HOUSE. R314.1, R315.1
44. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM.
APPLICABLE CODES
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK
SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES
2019 CA BUILDING CODES (CBC)
2019 CA RESIDENTIAL CODES (CRC)
2019 CA MECHANICAL CODES (CMC)
2019 CA PLUMBING CODES (CPC)
2019 CA FIRE CODES (CFC)
2019 CA ELECTRICAL CODES (CEC)
2019 CA ENERGY CODES (CEnC)
2019 CALIFORNIA GREEN BUILDING STANDARDS CODE
(CALGreen)
PROJECT SITE
OWNER: OSWALDO GUERRA
ADDRESS:1035 W WALNUT ST
SANTA ANA, CA 92703
PHONE: 714-606-7796
EMAIL: OWGUERRA.6906@GMAIL.COM
APN: 00814220 (ORANGE COUNTY)
UTILITY: SCE
OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB
# OF STORIES: 2 BLDG AREA (SQFT):1939
SPRINKLERS: NONE ROOF AREA (SQFT): 2028
MAIN SERVICE PANEL INFORMATION
EXISTING: YES UPGRADE: NO
BUS RATING: 200A MAIN BREAKER SIZE: 200A
PHASE: 1PH MB POSITION: CENTER
# OF WIRES: 3 DERATE?: YES
VOLTAGE: 240V DERATE SIZE:175A
UTILITY FED: OH
METER#: 222012-787231
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
Bldg #101112441
Elect #20177702
Permits issued on
10/21/22
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E5
INVERTER
DATA SHEET
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E6
AC COMBINER
DATA SHEET
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S1
STANCHION
DATA SHEET
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S2
RACKING
DATA SHEET
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S2.1
RACKING
ENGINEERING
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S3
GROUNDING
DATA SHEET
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S4
RACKING
CERTIFICATION
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
S4.1
RACKING
CERTIFICATION
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
LEGEND:
(E) - EXISTING
(N) - NEW
SITE PLAN
SCALE: 1" = 20'
2 - STORY
1939 SQFT
A1
SITE PLANW W A L N U T S T
(E) 200A AMP MAIN
SERVICE PANEL
(N) 27 - Q.PEAK DUO BLK ML-G10+400
HANWHA Q.CELL MODULES WITH
(N) 27 - IQ8PLUS-72-2-US (240V) [SI1]
ENPHASE MICRO INVERTERS
(N) X-IQ-AM1-240-4
ENPHASE IQ COMBINER
BOX
(N) 60A AC
DISCONNECT
(E) DRIVEWAY
(E) GARAGE
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
A L L E Y
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1035 W Walnut St
10/24/22
MS
P
JB
3'
SP
1
2
3'
D
1
8
"
3'3'
±4
"
2.
5
"
MI
N
±4
"
2.
5
"
MI
N
A2
MOUNTING
PLAN
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91 21 4
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (81 8) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
MOUNTING PLAN
SCALE: 3/32" = 1'
50 TOTAL
ATTACHMENTS @
6FT OC MAX
FIRE ACCESS POINT
(NOT TO BE OVER
ANY DOORS,
WINDOWS OR OTHER
OBSTRUCTIONS)
(N) 3/4" EMT CONDUIT RUN
ABOVE ROOF OR UNDER EAVES
WHERE POSSIBLE
WIRING/CONDUIT RACEWAY
WILL BE 7/8'' MINIMUM ABOVE THE ROOFTOP
PER CEC 31 0.1 5(B)(3)(C)
1
8
0
°
A
Z
I
M
U
T
H
1
9
°
S
L
O
P
E
(E) 200A AMP MAIN
SERVICE PANEL
(N) 27 - Q.PEAK DUO BLK ML-G10+400
HANWHA Q.CELL MODULES WITH
(N) 27 - IQ8PLUS-72-2-US (240V) [SI1]
ENPHASE MICRO INVERTERS
CIRCUIT A - 9 MODULES
CIRCUIT B - 9 MODULES
CIRCUIT C - 9 MODULES
(N) X-IQ-AM1-240-4
ENPHASE IQ COMBINER
BOX
(N) 60A AC
DISCONNECT FIRE ACCESS POINT
(NOT TO BE OVER
ANY DOORS,
WINDOWS OR OTHER
OBSTRUCTIONS)
270° AZIMUTH
1 9° SLOPE
90° AZIMUTH
1 9° SLOPE
18" FIRE SETBACK
3'
F
I
R
E
P
A
T
H
W
A
Y
3' FIRE PATHWAY3' FIRE PATHWAY
2X10
RAFTERS @
24" OC
2X10
RAFTERS @
24" OC
2X6 RAFTERS
@ 16" OC
18
"
F
I
R
E
S
E
T
B
A
C
K
18
"
F
I
R
E
S
E
T
B
A
C
K
A A
A A
A A
A
A
A
B
B
B
B
B
B
B
B
BC C C C C C
C C C
SOLAR PANEL DEAD WEIGHT CALCULATION
MODULE HANWHA Q CELLS
WIDTH (IN) LENGTH (IN) AREA (SQFT) WEIGHT (LBS) QTY
TOTAL
MODULE
AREA
TOTAL
MODULE
WEIGHT
41.1 74.00 21.12 48.50 27 570.26 1309.50
RACKING IRONRIDGE
RACKING
WEIGHT
LBS/LNFT
MOUNTING
SYSTEM
WEIGHT
TOTAL
SYSTEM
WEIGHT
TOTAL
ATTACHMENT
POINTS
POINT
LOAD
CALCS
DISTRIBUTED LOAD
CALCULATION
.75 163.69 1473.19 50 29.46 2.58 PSF
NOTE: THE POINT LOADING AND DISTRIBUTED LOADING SHOULD BE MAX 5 LBS/FT2
ROOF COVERAGE
TOTAL
MODULE
AREA
ROOF FACE
AREA (SQFT)
ROOF
COVERAGE COMPLIANCE WITH R324.6.2 SET BACK AT RIDGE
570.26 2028 28.12 28.1 2 </= 33% = OK
ROOF INFORMATION
ROOF TYPE COMP SHINGLE - 2 LAYERS
RAFTERS AND/OR TRUSS RAFTER SPACING (IN)ATTACHMENT
SPACING
2 X 6 - BACK 16" OC 72" OC
2 X 6 - FRONT 24" OC 72" OC
LEGEND
(E) EXISTING
(N) NEW
(P) NEW
CONDUIT RUN
VIF VERIFY IN FIELD
JUNCTION BOX
MAIN SERVICE PANEL
AC COMBINER
INVERTER
AC DISCONNECT
SUBPANEL
SOLAR METER
FIRE ACCESS POINTS
FIRE PATHWAY/SETBACKS
x
JB
MSP
D
SP
INV
AC
M
ROOF ATTACHMENT DETAIL
SCALE: 1 1/2" = 1'
FRONT VIEW
SIDE VIEW
SOLARMOUNT
LIGHT RAIL
UNIRAC
FLASHLOC BASE
ITEM#004085
5/1 6" Ø SS LAG BOLT
W/ SS EPDM BONDED WASHER
1 LAG PER ATTACHMENT
2.5" MIN EMBEDMENT
EXISTING
RAFTERS
MODULE
ROOF
SHEATHING
SOLARMOUNT
LIGHT RAIL
5/1 6" Ø SS LAG BOLT
1 LAG PER ATTACHMENT
2.5" MIN EMBEDMENT
MODULE
ROOF
SHEATHING
UNIRAC
FLASHLOC BASE
ITEM#004085
NOTE:
MODULES WILL BE INSTALLED
FLUSHED TO EXISTING ROOF SLOPE
www. Loyd W Martin .com
Solar Structures Engineering
#2022-3515 Structural Only
August 31, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
72
Max Attachment Span
48
Ma
x
R
a
i
l
S
p
a
n
RACKING DETAILS
NOTE:
Engineer of Record assumes that all structural components of the existing
building were permitted and met the requirements of the Building Code at
the time of construction. Solar Contractor shall field verify that the roof
framing is in its existing permitted condition and capable of supporting
required live loads. Framing specified on solar plans shall be assumed to be
minimum size and spacing, actual framing may be different.
(1) 5/16" x 3.5" SS LAG SCREWS
WITH 2.5" MIN EMBEDMENT
INTO WOOD
(1) 5/16" x 3.5" SS LAG
SCREWS WITH 2.5" MIN
EMBEDMENT INTO WOOD
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E1
ELECTRICAL
LINE DIAGRAM
WIRE/CONDUIT SCHEDULE
NOTE: TERMINATE LUGS AT 75°. WIRING/CONDUIT RACEWAY WILL BE MIN 7/8'' ABOVE THE ROOF
TAG DESCRIPTION CONDUCTOR TYPE/SIZE/QUANTITY CONDUIT
SIZE/TYPE
AC1 ARRAY TO JBOX
6 #12 AWG ENPHASE AC CABLE
FREE AIR
1 #6 AWG GND-BARE COPPER
AC2 JBOX TO AC COMBINER
6 #10 AWG 3L1 & 3L2 THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC3 AC COMBINER TO AC
DISCONNECT
3 #6 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC4 AC DISCONNECT TO
MAIN SERVICE PANEL
3 #6 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
(N) 27 - Q.PEAK DUO BLK ML-G10+400
HANWHA Q.CELL MODULES WITH
(N) 27 - IQ8PLUS-72-2-US (240V) [SI1]
ENPHASE MICRO INVERTERS
(N)50A
PV OCPD
EXISTING
200A MAIN SERVICE PANEL
240V, 1P, 3W; CENTER FED
N
G
M (N) 175A
MCB
SCE
METER#
222012-
787231
EARTH
GROUND
(N) JBOX
nema 3r AC1
A - 9
(N) ENPHASE IQ
COMBINER BOX
(X-IQ-AM1-240-4)
*NO ADDITIONAL LOADS*
(N)20A
IQ
ENVOY
PCB
N
G
CT
AC2
AC4
(N)15A B - 9
(N)20A
(N) 60 AC
DISCONNECT
G
N
AC3
(N)20A
C - 9
INTERCONNECTION COMPLIANCE PER 705 CODE
SUM OF CIRCUITS WITH 125%
MAX AC OUTPUT (AMPS) TOTAL # OF
MICROS
TOTAL MAX AC
OUTPUT 125% RESULT (AMPS)OCPD SIZE
1.21 27 32.67 1.25 40.84 50A
SERVICE PANEL CALCULATIONS WITH 120%
BUS RATING SIZE MUTIPLIER (120%) RESULT MAIN
BREAKER
INVERTER AC
OUTPUT+125%RESULT
200 1.20 240 175 40.84 215.84
240.00 >/= 215.84 = OK
NOTE:
705.12(B)(2)(3) BUSBARS
(B) WHERE TWO SOURCES, ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER
SOURCE, ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125
PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE
OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE
AMPACITY OF THE BUSBAR. THE BUSBAR SHALL BE SIZED FOR THE LOADS CONNECTED IN
ACCORDANCE WITH ARTICLE 220. A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE
DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE POWER SOURCE THAT
DISPLAYS THE FOLLOWING OR EQUIVALENT WORDING:
WARNING: POWER SOURCE OUTPUT CONNECTION — DO NOT RELOCATE THIS OVERCURRENT
DEVICE.
THE WARNING SIGN(S) OR LABEL(S) SHALL COMPLY WITH 110.21(B).
BRANCH CIRCUIT CALCULATION
CIRCUIT MAX AC OUTPUT
(AMPS)
# OF
MODULES RESULT (AMPS) 125%RESULT
(AMPS)ocpd size
A 1.21 9 10.89 1.25 13.61 20A
B 1.21 9 10.89 1.25 13.61 20A
C 1.21 9 10.89 1.25 13.61 20A
NOTE:
THE ENPHASE IQ MICROINVERTER SYSTEM USES A NEW AND IMPROVED CABLING SYSTEM. THE Q CABLE IS DG
TYPE AND CONTAINS ONLY TWO #12 AWG LINE CONDUCTORS. THE Q CABLE MALE CONNECTORS PLUG
DIRECTLY INTO THE IQ MICROS, WHOSE DOUBLE INSULATION RATING REQUIRES NO NEUTRAL OR GROUND
CONDUCTORS
PV MODULE MAXIMUM DC VOLTAGE
MAX NUMBER OF MODULES PER INVERTER × {VOC + [(TL-25) × (Ǻ× VOC)/100]} = VOLTS
MODULE
VOC
MODULES PER
INVERTER
VOC TEMP
COEFFICIENT
%/°C
Tl -25 ( β x VOC)(TL-25) × (β ×
VOC)/100 VOLTS
45.30 1.00 -0.26 -35 -11.78 4.12 49.42
49.42V < 60V = OK
NOTE: MAXIMUM DC VOLTAGE SHALL NOT EXCEED INVERTER MANUFACTURER'S MAXIMUM INPUT VOLTAGE
MODULE SPECIFICATION
MANUFACTURER HANHWA Q.CELLS
MODEL NO.Q.PEAK DUO BLK ML-G10+400
PEAK POWER 400 W
MPP VOLTAGE (VMPP)37.13 V
MPP CURRENT (IMPP)10.77 A
OPEN CIRCUIT VOLTAGE (VOC)45.30 V
SHORT CIRCUIT CURRENT (ISC)11.14 A
INVERTER SPECIFICATION
INVERTER MAKE ENPHASE ENERGY
INVERTER MODEL NO.IQ8PLUS-72-2-US (240V) [SI1]
MAX INPUT DC VOLTAGE 60V
MAX CONT. OUTPUT POWER 290 VA
PEAK OUTPUT POWER 300 VA
NOMIMAL AC VOLTAGE/RANGE 240V/ 211-264V
MAX AC CURRENT 1.21A
NOTE:
1) PV BREAKER MUST BE INSTALLED
AT THE FARTHEST, OPPOSITE END
OF MAIN BREAKER
2) SOLAR GROUND TYING INTO THE
UFER GROUND POINT
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
OSWALDO GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E1.1
SERVICE LOAD
CALCULATIONS
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C10
PROJECT NAME
E2
ELECTRICAL
CALCULATIONS
LOCATION INFORMATION
NEC TABLE 310.15 (B)(2)(a)-TEMP CORRECTION FACTORS
WIRE TERMINATIONS AT 75° AMPACITY
HIGH TEMP 34 °C
LOW TEMP 2 °C
VOLTAGE CORRECTION FACTOR -TABLE
690.7(A)1.10
ROOF TEMP + 33°-IF RACEWAY CONDUIT IS LESS
THAN 7/8" ABOVE ROOF 67 °C
TEMP CORRECTION FACTOR (ABOVE ROOF)0.65
TEMP CORRECTION FACTOR (INSIDE CONDUIT) 0.96
AC CONDUCTOR AMPACITY CALCULATIONS - SUM OF CIRCUITS
BETWEEN AC COMBINER TO MAIN SERVICE PANEL
A AMBIENT TEMPERATURE ADJUSTMENT
EXPOSED CONDUIT 34 CELSIUS
TEMPERATURE CORRECTION FACTOR 0.96 CEC TABLE 310.15 (B)(2)(A)
# OF CURRENT CARRYING CONDUCTORS 2 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT)
CONDUIT FILL CORRECTION 1.00 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT)
CEC TABLE 310.15 (B)(3)(A)
CIRCUIT CONDUCTOR SIZE #6 AWG MINIMUM #10 AWG CU, 90°C WET (USE-2, PV WIRE, THWN-2, RHW-2)
CIRCUIT CONDUCTOR AMPACITY @ 90° 75 AMPS CEC TABLE 310.15 (B)(16)
INVERTER'S MAXIMUM AC OUTPUT CURRENT 1.21 AMPS INVERTER MANUFACTURER SPECIFICATIONS
B REQUIRED AC CONDUCTOR AMPACITY 40.84 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = 1.25 X AC MODULE OUTPUT CURRENT X TOTAL # OF AC MODULES
C DERATED AMPACITY OF CIRCUIT CONDUCTORS 72.00 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY
CEC TABLE 310.15 (B)(2)(A)
NOTE: "C" MUST BE GREATER THAN "B" 72.00A > 40.84A = OK
AC CONDUCTOR AMPACITY CALCULATIONS
JBOX/COMBINER BOX TO AC COMBINER - PER RANCH CIRCUIT
A EXPECTED WIRE TEMPERATURE (FREE AIR)34 CELSIUS
310.15(B)(3)(C) RACEWAYS AND CABLES EXPOSED TO SUNLIGHT ON ROOFTOPS. WHERE RACEWAYS OR CABLES
ARE EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR CABLES SHALL BE INSTALLED A
MINIMUM DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY OR CABLE OF 23 MM (7∕8 IN.).
B ADD 33°C FOR CONDUITS EXPOSED TO
SUNLIGHT ON OR ABOVE ROOF 67 CELSIUS WIRING/CONDUIT RACEWAY WILL BE EQUAL TO 7/8'' OR MORE ABOVE THE ROOFTOP PER CEC 310.15(B)(3)(c)
TEMPERATURE CORRECTION FACTOR
CEC TABLE 310.15 (B)(2)(A)0.96
C # OF CURRENT CARRYING CONDUCTORS 6 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT)
D CONDUIT FILL CORRECTION 0.80 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT)
CEC TABLE 310.15 (B)(3)(A)
E CIRCUIT CONDUCTOR SIZE #10 AWG MINIMUM #10 AWG CU, 90°C WET (USE-2, PV WIRE, THWN-2, RHW-2)
F CIRCUIT CONDUCTOR AMPACITY@75°35 AMPS CEC TABLE 310.15 (B)(16)
G REQUIRED CIRCUIT CONDUCTOR AMPACITY 14.74 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = 1.25 X AC MODULE OUTPUT CURRENT X # OF AC MODULES PER
CIRCUIT
H DERATED AMPACITY OF CIRCUIT CONDUCTOR 26.88 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY
CEC TABLE 310.15 (B)(2)(A)
NOTE: "H" MUST BE LARGER THAN "G" 26.88A > 14.74A = OK - CIRCUIT WITH 9 MODULES
INVERTER SPECIFICATION
INVERTER MAKE ENPHASE ENERGY
INVERTER MODEL NO. IQ8PLUS-72-2-US (240V) [SI1]
MAX INPUT DC VOLTAGE 60V
MAX CONT. OUTPUT POWER 290 VA
RECOMMENDED INPUT POWER 235W - 440W
NOMIMAL AC VOLTAGE/RANGE 240V/ 211-264V
MAX AC CURRENT 1.21A
MODULE SPECIFICATION
MANUFACTURER HANHWA Q.CELLS
MODEL NO. Q.PEAK DUO BLK ML-G10+400
PEAK POWER 400 W
MPP VOLTAGE (VMPP) 37.13 V
MPP CURRENT (IMPP) 10.77 A
OPEN CIRCUIT VOLTAGE (VOC) 45.30 V
SHORT CIRCUIT CURRENT (ISC) 11.14 A
1035 W Walnut St
10/24/22
PHOTOVOLTAIC AC DISCONNECT
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E3
REQUIRED
SIGNAGE
SIGNAGE NOTES:
A L L E Y
DIRECTORY PLACARD
MAIN SERVICE
PANEL
SOLAR
ARRAYS
6"
5"
CAUTION
POWER TO THIS BUILDING ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS AS SHOWN
DRIVEWAY
J
AC COMBINER
AC DISCONNECT
ADDRESS: 1035 W WALNUT ST
W WALNUT ST
· ALL INTERIOR AND EXTERIOR DC CONDUIT, ENCLOSURES, RACEWAYS, CABLE ASSEMBLIES,
JUNCTION BOXES, COMBINER BOXES AND DISCONNECTS ARE MARKED.
·THE MARKINGS ON THE CONDUITS, RACEWAYS AND CABLE ASSEMBLIES ARE EVERY 10 FEET,
WITHIN ONE FOOT OF ALL TURNS OR BENDS AND WITHIN ONE FOOT ABOVE AND BELOW ALL
PENETRATIONS OF ROOF/CEILING ASSEMBLIES, WALLS AND BARRIERS.
·MARKING IS PLACED ADJACENT TO THE MAIN SERVICE DISCONNECT IN A LOCATION CLEARLY
VISIBLE FROM WHERE THE DISCONNECT IS OPERATED. (CFC 605.11.1.3 & CRC R324)
·THE MARKINGS SAY WARNING: PHOTOVOLTAIC POWER SOURCE
AND HAVE 3/8-INCH (9.5 MM) MINIMUM-SIZED WHITE LETTERS ON A RED BACKGROUND. THE
SIGNS ARE MADE OF REFLECTIVE WEATHER RESISTANT MATERIAL.
·WHERE PV CIRCUITS ARE EMBEDDED IN BUILT-UP, LAMINATE OR MEMBRANE ROOFING
MATERIALS IN ROOF AREAS NOT COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT, THE
LOCATION OF CIRCUITS SHALL BE CLEARLY MARKED.
· REQUIRED LABELS SHALL BE PERMANENT AND SUITABLE FOR THE ENVIRONMENT.
MICROINVERTER AND ACM SYSTEMS PV LABELING
CEC ARTICLES 690 AND 705 AND CA RESIDENTIAL CODE SECTION R324 REQUIRE THE FOLLOWING
LABELS OR MARKINGS BE INSTALLED AT THESE COMPONENTS OF THE PHOTOVOLTAIC SYSTEM:
AC
DISCO
M
MAIN SERVICE
PANELAC COMBINER/
SUBPANEL
PV ARRAY
JBOX
A A
NEC 690.13(B)
D
RATED AC OUTPUT CURRENT
NORMAL OPERATING VOLTAGE
A
V
NEC 690.54
NEC 690.56 (C)(3)
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
REQUIRED AT LOCATION ON OR NO
MORE THAN 1 METER (3 FT) FROM THE
SWITCH
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
NEC 690.56(C)(1)
WARNING: PHOTOVOLTAIC
POWER SOURCE
NEC 705.12 (B)(2)(c)
A
NEC 690.31(G)(3)(4)
F
C
E
B
!PV SYSTEM
DISCONNECT
G
NEC 705.12(B)(3-4) & NEC 690.59
POWER SOURCE OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
WARNING ! !
WARNING ! !
TERMINAL ON THE LINE AND
LOAD SIDES MAY BE ENGERGIZED
IN THE OPEN POSITION
ELECTRIC SHOCK HAZARD
H
WARNING ! !
SOURCES: UTILITY GRID AND
PV SOLAR ELECTRIC SYSTEM
DUAL POWER SUPPLY
IF THERE IS NO INVERTER PLACE LABEL ON
COMBINER BOX, IF THERE IS NO COMBINER BOX
PLACE ON MAIN SERVICE PANEL.
PHOTOVOLTAIC SYSTEM
COMBINER PANEL
DO NOT ADD LOADS
i
DIRECTORY PLACARDJ
B
G H I
C G
D
F
C
E
B
J
NEC 705.10 & NEC 690.56(B) REQUIRES A
PERMANENT PLAQUE OR DIRECTORY DENOTING ALL
ELECTRIC POWER SOURCE ON OR IN THE PREMISES
OR RAPID FIRE SHUTDOWN EQUIPMENT; INSTALL AT
MAIN SERVICE PANEL
ALL ROOF CONDUIT
C
32.67
240
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E4
MODULE
DATA SHEET
1035 W Walnut St
10/24/22
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
GUERRA
RESIDENCE
1 035
W WALNUT ST
SANTA ANA, CA
92703
CONTRACTOR
SIGNATURE OF LICENSE HOLDER
1 0.800 DC kW
SYSTEM
9.730 CEC AC RATING
MICRO INVERTER SYSTEM
DATE DESCRIPTION
REVISION
DATE
DRAWN
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
08-08-22
3857 FOOTHILL BLVD
GLENDALE, CA, 91214
EMAIL: INFO@MAGICSOLAR.NET
PHONE: (818) - 388 - 5478
MAGIC SUN POWER INC
dba MAGIC SOLAR ELECTRIC
LIC# 999485
B & C1 0
PROJECT NAME
E4.1
MODULE
CERTIFICATION
1035 W Walnut St
10/24/22
Certificate Of Completion
Envelope Id: 9D3FCE1783894B4BA70F07A71E738F2E Status: Completed
Subject: Please DocuSign: Guerra - Santa Ana Auth Letter (1).pdf
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 1 Initials: 0 Western 2 Ops Team
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
2683 Via De La Valle #G321
Del Mar, CA 92014
OpsTeamW2@powur.com
IP Address: 162.204.182.13
Record Tracking
Status: Original
9/23/2022 9:01:33 AM
Holder: Western 2 Ops Team
OpsTeamW2@powur.com
Location: DocuSign
Signer Events Signature Timestamp
Oswaldo Guerra
owguerra.6906@gmail.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 104.28.85.145
Signed using mobile
Sent: 9/23/2022 9:02:41 AM
Viewed: 9/23/2022 9:03:36 AM
Signed: 9/23/2022 9:04:00 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Jeustin Caguioa
Jeustin.Caguioa@gmail.com
Security Level: Email, Account Authentication
(None)
Sent: 9/23/2022 9:02:41 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 9/23/2022 9:02:41 AM
Certified Delivered Security Checked 9/23/2022 9:03:36 AM
Signing Complete Security Checked 9/23/2022 9:04:00 AM
Completed Security Checked 9/23/2022 9:04:00 AM
Payment Events Status Timestamps
1035 W Walnut St
10/24/22
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Oswaldo Guerra Residence
1035 W Walnut St,
Santa Ana, CA 92703
Applicable Codes:
2019 California Building Code, 2019 California Electric Code,
2019 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 7
2021-072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1035 W Walnut St
10/24/22
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R214'
Total load on Rafter = 60 plf x 14 ft. = 840 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x10 Roof Rafters @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 2020 2020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 2020 2020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 2020 2020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 2020 2020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2158 ilum Solar Paul Kiehn Residence Date: September 13, 2020 2020-2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020-2762 ilum Solar Andre James Residence Date: October 21, 20202020-3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020-3189 ilum Solar Michael Ireland Residence Date: November 12, 2020 2020- 3252 ilum Solar Viorato Residence Date: November 13, 20202021-072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 2021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
1035 W Walnut St
10/24/22
Check Existing 2x10 Roof Rafters @ 24" O.C.:
Sht # 3 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 2020 2020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 2020 2020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 2020 2020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 2020 2020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2158 ilum Solar Paul Kiehn Residence Date: September 13, 2020 2020-2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020-2762 ilum Solar Andre James Residence Date: October 21, 20202020-3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020-3189 ilum Solar Michael Ireland Residence Date: November 12, 2020 2020-3252 ilum Solar Viorato Residence Date: November 13, 2020 2020- 3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021-072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 2021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 2021
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on Rafter = 60 plf x 3 ft. + 28 plf x 11 ft + ( 6' x 2.75' x 3 psf x 4 ) psf
x 2 )
= 686 lbs < 840 lbs OK
R1 R2
14'
w LLw DL
2021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021
P
2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022
11' 3'
2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
P P P
1035 W Walnut St
10/24/22
Sht # 4 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 2020 2020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 2020 2020-1723 Grid Alt IE Sandra West Residence Date: August 5, 2020 2020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 2020 2020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 2020 2020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 2020 2020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 2020 2020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 2020 2020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 2020 2020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 2020 2020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3816 ilum Solar Wolf Residence Date: December 22, 2020 2020-3809 RNR Contreras Residence Date: December 22, 2020 2020-3843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 2020-3842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 2020-3841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 2020-3839 CAD for Cali Wheeler Residence Date: December 23, 2020 2020-3838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 2020-3853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 2020- 3857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021-007 Sasha Intl Doti Odell Residence Date: January 4, 2021 2021-034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021-030 Mohr Power Carpenter Residence Date: January 6, 20212021-029 Solar Journey Ryan Cai Residence Date: January 6, 20212021-027 Better Earth Cheryl Brady Residence Date: January 6, 2021 2021-024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021-050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 2021 2021-199 Solar Journey Terri Shaw Residence Date: January 19, 2021 2021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 2021 2021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4-7 ASCE 7-16
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγEÞðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7-16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγEÞðγa Þð
qh =20 psf
p = 20 psf (-2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10-1 ASCE 7-16
GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GC p = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4-8 ASCE 7-16
Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs
Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress
Load per lag screw = 416 lbs / 1 = 416 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
1035 W Walnut St
10/24/22
Sht # 5 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 2020 2020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 2020 2020-1723 Grid Alt IE Sandra West Residence Date: August 5, 2020 2020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 2020 2020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 2020 2020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 416 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3.5" lag screws per connection minimum.
2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 2020 2020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 2020 2020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 2020 2020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 2020 2020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 2020 2020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3816 ilum Solar Wolf Residence Date: December 22, 2020 2020-3809 RNR Contreras Residence Date: December 22, 2020 2020-3843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 2020-3842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 2020-3841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 2020-3839 CAD for Cali Wheeler Residence Date: December 23, 2020 2020-3838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 2020-3853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 2020- 3857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021-007 Sasha Intl Doti Odell Residence Date: January 4, 2021 2021-034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021-030 Mohr Power Carpenter Residence Date: January 6, 20212021-029 Solar Journey Ryan Cai Residence Date: January 6, 20212021-027 Better Earth Cheryl Brady Residence Date: January 6, 2021 2021-024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021-050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 2021 2021-199 Solar Journey Terri Shaw Residence Date: January 19, 2021 2021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 2021 2021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
1035 W Walnut St
10/24/22
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building = Approximately 2,000 Sq. ft.
Approximate
Effective
Seismic Weight
= 2,000 sq. ft. x 30 psf ave. = 60,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =
SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS
SMS =
F A x SS
SMS =
1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =
1.2
6.5
1
=0.185
Sht # 6 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
EQ'N 11.4- 3 ASCE 7- 16
EQ'N 11.4- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 2020 2020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 2020 2020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 2020 2020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 2020 2020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2158 ilum Solar Paul Kiehn Residence Date: September 13, 2020 2020-2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020-2762 ilum Solar Andre James Residence Date: October 21, 20202020-3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020-3189 ilum Solar Michael Ireland Residence Date: November 12, 2020 2020-3252 ilum Solar Viorato Residence Date: November 13, 2020 2020- 3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021-072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 2021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
1035 W Walnut St
10/24/22
V = 0.185 x 60,000 LBS = 11,100 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
=60,000 LBS
NEW SOLAR
ARRAY =3 PSF x 27 PANELS x 3.3' x 5.5' = 1,470 LBS
NEW
SEISMIC
WEIGHT
= 60,000 LBS + 1,470 LBS = 61,470 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 61,470 = 11,372 LBS
% CHANGE =11,372 LBS - 11,100 LBS
11,100 LBS x 100 = 2.5 % < 10% OK
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic force-resisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 1 ASCE 7- 16
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 2020 2020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 2020 2020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 2020 2020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 2020 2020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 2020 2020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 2020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 2020 2020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 2020 2020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2158 ilum Solar Paul Kiehn Residence Date: September 13, 2020 2020-2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020-2762 ilum Solar Andre James Residence Date: October 21, 20202020-3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020-3189 ilum Solar Michael Ireland Residence Date: November 12, 2020 2020-3252 ilum Solar Viorato Residence Date: November 13, 2020 2020- 3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021-072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 2021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 2021 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3515 Magic Solar Oswaldo Guerra Residence Date: August 31,2022
1035 W Walnut St
10/24/22