HomeMy WebLinkAbout1802 S Garnsey - PlanExpedited Permit Process for PV Systems1
Expedited Permit Process for PV Systems
Standard String System
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Standard String System to use with the Expe-
dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1802 S Garnsey
10/19/22
Expedited Permit Process for PV Systems2
Expedited Permit Process for Small-Scale PV Systems
Standard String System
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
1802 S Garnsey
10/19/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Standard String System Site Plan
6RODU6\PSKRQ\&RQVWUXFWLRQ,QF
3DFLILF2DNV3O6XLWHHUANG, JOHN
(VFRQGLGR&$
1802 S Garnsey St焁Santa Ana, CA 92707
8.83
1802 S Garnsey
10/19/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Standard String System Electrical Diagram
6RODU6\PSKRQ\&RQVWUXFWLRQ,QF
3DFLILF2DNV3O6XLWHHUANG, JOHN
(VFRQGLGR&$
1802 S Garnsey St焁Santa Ana, CA 92707
8.83
1802 S Garnsey
10/19/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Notes for Standard String System Electrical Diagram
Contractor Name,
Address and Phone:
_________________
_________________
_________________
_________________
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name: __________________________
Site Address: ________________________
System AC Size: ______________________
SIZE FSCM NO DWG NO REV
SCALE NTS Date:SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
A
V
V
A
A
W
V
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
V
W
V
A
A
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?
YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC
2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE ® REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND
AC DISCONNECT (IF USED)
RATED MPP CURRENT
RATED MPP VOLTAGE
MAX SYSTEM VOLTAGE
MAX CIRCUIT CURRENT
A
V
V
A
PHOTOVOLTAIC POWER SOURCE
WARNING: ELECTRICAL SHOCK
HAZARDLINE AND LOAD MAY BE
ENERGIZED IN OPEN POSITION
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
A
V
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
6RODU6\PSKRQ\&RQVWUXFWLRQ,QF
3DFLILF2DNV3O6XLWHHUANG, JOHN
(VFRQGLGR&$
1802 S Garnsey St焁Santa Ana, CA 92707
8.83
1802 S Garnsey
10/19/22
_____________________________________________________________________________________
Telephone: _______________________________
OWNER AUTHORIZATION FORM
013-244-06 PARCEL #:
STREET ADDRESS: ______________________________________________________________________
PROPERTY OWNER(S): __________________________________________________________________
1802 S GARNSEY ST SANTA ANA CA 92707
John Huang
The undersigned, registered property owners of the above noted property, do hereby authorize:
_________________________________________, of _______________________________________
(Contractor / Agent) (Name of consulting firm)
Jose Gomez Solar Symphony Construction Inc
(513) 602-1350
I hereby certify the above information submitted in this application is true and accurate to the best of
our knowledge.
_________________________________________
Authorized Signature
Date: ____________________________________
To install solar panels on the property listed in this document and act on my behalf and take
all actions necessary for the processing, issuance and acceptance of this permit or
certification and any and all standard and special conditions attached.
Property Owner’s Address (if different than property listed above):
DocuSign Envelope ID: 053C398E-F72C-402A-B58B-1F7B3F912762
10/10/2022
1802 S Garnsey
10/19/22
10/04/2022
RE: Structural Certification for Installation of Residential Solar
HUANG, JOHN:1802 S GARNSEY ST, SANTA ANA, CA 92707
Attn: To Whom It May Concern
Design Criteria
Code 2019 California Building Code (ASCE 7-16)
Risk category II Wind Load (component and Cladding)
Roof Dead Load Dr 10 psf V 95 mph
PV Dead Load DPV 3 psf Exposure C
Roof Live Load Lr 20 psf
Ground Snow S 0 psf
If you have any questions on the above, please do not hesitate to call.
Sincerely,
Eugene Munyanziza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
Exp: 06/30/2024
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. From the field observation report, the roof is made of Composition shingle
roofing over roof plywood supported by 2X4 Rafters at 24 inches. The slope of the roof was approximated to be
18 degrees and the allowable maximum rafter span is 6 feet between supports.
After review of the field observation data and based on our structural capacity calculation, the existing roof
framing has been determined to be adequate to support the imposed loads without structural upgrades.
Contractor shall verify that existing framing is consistent with the described above before install. Should they
find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity
calculations were done in accordance with applicable building codes.
projects@evengineersnet.com
http://www.evengineersnet.com
1802 S Garnsey
10/19/22
Structural Letter for PV Installation
Date: 10/04/2022
Job Address: 1802 S GARNSEY ST
SANTA ANA, CA 92707
Job Name: HUANG, JOHN
Job Number: 221004HJ
Scope of Work
Table of Content
Sheet
1 Cover
2 Attachment Uplift checks
3 Roof Framing Check
4 Seismic Check and Scope of work
Engineering Calculations Summary
Code 2019 California Building Code (ASCE 7-16)
Risk category II
Roof Dead Load Dr 10 psf
PV Dead Load DPV 3 psf
Roof Live Load Lr 20 psf
Ground Snow S 0 psf
Wind Load (component and Cladding)
V 95 mph
Exposure C
References
NDS for Wood Construction
Sincerely,
Eugene Munyanziza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com Exp: 06/30/2024
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. All PV mounting equipment shall be designed and installed per
manufacturer's approved installation specifications.
projects@evengineersnet.com
http://www.evengineersnet.com
1802 S Garnsey
10/19/22
Wind Load Cont.
95 mph ASCE 7-16 Figure 26.5-1B
C
1.0 ASCE 7-16 Sec 26.8.2
0.85 ASCE 7-16 Table 26.10-1
0.85 ASCE 7-16 Table 26.6-1
1.00 ASCE 7-16 Table 26.9-1
16.65 psf
18.0 Degrees
1.5 Conservatively assuming all exposed
0.8 conservatively assuming 10 ft2 effective area
Uplift (W)Zone(1) Zone(2r) Zone(2e)Zone(3)
Fig. 30-3-2 GCp=-2.1 -2.6 -2.7 -2.7
Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-41.97 -51.96 -53.96 -53.96
GCp=0.3 Figure 30.3-2
P=qh(GCp)(γE)(γa)=4.50 Equation 29.4-7
Rafter Attachments: 0.6D+0.6W (CD=1.6)
Connection Check
Attachment max. spacing= 4 ft
5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A - NDS
2.5 in DFL Assumed
Prying Coefficient 1.4
Allowable Capacity= 760 lbs
Zone Trib Width Area (ft) Uplift (lbs) Down (lbs)
Zone(1) 4 11.0 222.6 82.5
Zone(2r) 4 11.0 272.0 82.5
Zone(2e) 4 11.0 281.9 82.5
Zone(3) 4 11.0 281.9 82.5
Conservative Max= 281.9 < 760
CONNECTION IS OK
Risk Category =
KZ =
Kd =
Ke =
2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw.
Embedment in sheading or other material does not count.
II
V=
Exposure =
1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift
governs
γE=
γa=
KZt =
qh= 0.00256KzKztKdKeV2=
Pitch =
Lag Screw Penetration
projects@evengineersnet.com
http://www.evengineersnet.com
1802 S Garnsey
10/19/22
Vertical Load Resisting System Design
Roof Framing Rafters
Snow Load Fully Exposed
pg= 0 psf Ct = 1.1
Ce = 0.9 Is = 1.0
pf = 0 psf
pfmin. = 0.0 psf
ps = 0 psf Conservatively (Cs=1) 0 plf
Max Length, L = 6.0 ft (Rafter maximum Allowable Horizontal Span)
Tributary Width, WT = 24 in
Dr = 10 psf 20 plf
PvDL = 3 psf 12 plf
Load Case: DL+0.75(0.6W+S)
0.75(Pnet+Ps)+ Ppvcos(θ)+PDL= 36 plf
Mdown= 162 lb-ft
Mallowable = Sx x Fb' (wind)= 456 lb-ft > 162 lb-ft OK
Load Case: DL+S
Ps+ Ppvcos(θ)+PDL= 32 plf
Mdown= 144 lb-ft
Mallowable = Sx x Fb' (wind)= 456 lb-ft > 144 lb-ft OK
Load Case: DL+0.6W
Pnet+ Ppvcos(θ)+PDL= 37.4 plf
Max Moment, Mu= 168 lb-ft
Mallowable = Sx x Fb' (wind)= 634 lb-ft > 168 lb-ft OK
Pv max Shear= 82.5 lbs
Shear, Vu=wL/2+Pv Point Load = 178 lbs
Max Shear, Vu=wL/2+Pv Point Load = 178 lb
Member Capacity
DF-L No.2
2X4 CL CF Ci Cr KF φ λ
Fb = 900 psi 1.0 1.5 1.0 1.15 2.54 0.85 0.8 1553 psi
Fv = 180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi
E = 1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi
Emin = 580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi
Depth, d = 3.5 in
Width, b = 1.5 in
Cross-Sectonal Area, A = 5.25 in2
Moment of Inertia, Ixx = 5.35938 in4
Section Modulus, Sxx = 3.0625 in
Allowable Moment, M all = Fb'Sxx = 396.2 lb-ft DCR=Mu/Mall = 0.36 < 1 Satisfactory
Allowable Shear, Vall = 2/3Fv'A = 630.0 lb DCR=Vu/Vall = 0.28 < 1 Satisfactory
Design Value Adjusted Value
projects@evengineersnet.com
http://www.evengineersnet.com
1802 S Garnsey
10/19/22
Siesmic Loads Check
Roof Dead Load 10 psf
% or Roof with Pv 33%
Dpv and Racking 3 psf
Average Total Dead Load 11.0 psf
Increase in Dead Load 4.0%OK
Limits of Scope of Work and Liability
The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
We have based our structural capacity determination on information in pictures and a drawing set titled PV plans -
HUANG, JOHN. The analysis was according to applicable building codes, professional engineering and design
experience, opinions and judgments. The calculations produced for this dwelling's assessment are only for the
proposed solar panel installation referenced in the stamped plan set and were made according to generally
recognized structural analysis standards and procedures.
projects@evengineersnet.com
http://www.evengineersnet.com
1802 S Garnsey
10/19/22
PV-1
REFERENCES
98
8
1
4
6
-
C
-
4
6
AUTHORIZED SIGNEE
September 25, 2022
AP
N
1
3
2
4
4
0
6
SOLAR SYMPHONY
(5
1
3
)
6
0
2
-
1
3
5
0
APN 1324406
CONTRACTOR
SOLAR SYMPHONY
1291 PACIFIC OAKS PL SUITE 117
PROPERTY OWNER
(24) HANWHA Q.PEAK DUO BLK ML-G10+
400 MODULES
ESCONDIDO, CA 92029
DESCRIPTION
SCOPE OF WORK
IRONRIDGE XR-10 WITH IRONRIDGE
FLASHFOOT2
HUANG, JOHN
(513) 602-1350
SANTA ANA, CA 92707
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
EQ
U
I
P
M
E
N
T
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
CU
S
T
O
M
E
R
HU
A
N
G
,
J
O
H
N
Designed &
Drafted -
John@
designs.solar
CO
N
T
R
A
C
T
O
R
2019 CALIFORNIA
PLUMBING CODE
2019 CALIFORNIA ELECTRICAL
CODE (2017 NEC ADOPTION)
FOR OFFICIAL JURISDICTION USE ONLY
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
SO
L
A
R
S
Y
M
P
H
O
N
Y
18
0
2
S
G
A
R
N
S
E
Y
S
T
76
0
-
3
0
0
-
4
1
4
1
1 TITLE PAGE
5
6
SINGLE LINE
PLACARDS
SPEC SHEETS
2019 CALIFORNIA ENERGY
CODE
ANY SANTA ANA CODE
AMENDMENTS
2019 CALIFORNIA ENERGY
EFFICIENCY STANDARDS
7+
4
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
2019 CALIFORNIA FIRE
CODE
NOTES
3 MOUNTING DETAILS
1802 S GARNSEY ST
INSTALLATION OF A 9.6DC kW(8.83AC kW)
ROOF MOUNTED PHOTOVOLTAIC SYSTEM
SITE PLAN
SERVICE UPGRADE TO: 200A
2
2019 CALIFORNIA
RESIDENTIAL CODE
2019 CALIFORNIA
MECHANICAL CODE
VICINITY MAP
988146 - C-46
760-300-4141
(1) SOLAREDGE SE7600H-US (240)
INVERTER(S) & (24) SolarEdge S440
OPTIMIZERS
2019 CALIFORNIA
BUILDING CODE
SHEET
ROOF ACCESS SHALL BE PROVIDED FOR
INSPECTION PER THE FOLLOWING:
A. LOCATED IN AREAS NOT REQUIRING
PLACEMENT OF GROUND LADDERS
OVER OPENINGS SUCH AS DOORS OR
WINDOWS.
B. LOCATED AT STRONG POINTS OF
BUILDING CONSTRUCTION IN
LOCATIONS WHERE ACCESS POINT DOES
NOT CONFLICT WITH OVERHEAD
OBSTRUCTIONS SUCH AS TREE LIMBS,
WIRES, OR SIGNS.
GENERAL NOTES
J O H N L A V E N D E R
Bldg permit #101112340
Elect permit #20177610
Permits issued on 10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
PV-2
September 25, 2022
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
(5
1
3
)
6
0
2
-
1
3
5
0
AP
N
1
3
2
4
4
0
6
76
0
-
3
0
0
-
4
1
4
1
98
8
1
4
6
-
C
-
4
6
AUTHORIZED SIGNEE
EQ
U
I
P
M
E
N
T
DISCONNECT MEANS MUST HAVE
DEDICATED CLEAR UNOBSTRUCTED
WORKING SPACE NOT LESS THAN 3'
DEEP BY 2.5' WIDE TO NOT LESS
THAN 6.5' ABOVE WALKABLE
SURFACES IN FRONT OF
DISTRIBUTION PANEL.
ALL SOLAR MODULES, EQUIPMENT,
AND METALLIC COMPONENTS TO
BE BONDED.
PV ARRAY NOT TO EXCEED
HIGHEST POINT OF THE ROOF.
RAPID SHUTDOWN IS ACTIVED AT
THE INVERTER BY THE DC
DISCONNECT
SOLAR SYMPHONY
CU
S
T
O
M
E
R
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
HU
A
N
G
,
J
O
H
N
Designed &
Drafted -
John@
designs.solar
SO
L
A
R
S
Y
M
P
H
O
N
Y
18
0
2
S
G
A
R
N
S
E
Y
S
T
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
GENERAL NOTES
CO
N
T
R
A
C
T
O
R
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
Azimuth: Different azimuths.° ROOF AREA: 1518 - ARRAY AREA: 507 COVERAGE: 33.4%
SITE PLAN
Slope: 18° or 4:12 pitch
J O H N L A V E N D E R
Structural
Only
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
18
0
2
S
G
A
R
N
S
E
Y
S
T
CO
N
T
R
A
C
T
O
R
SO
L
A
R
S
Y
M
P
H
O
N
Y
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
HU
A
N
G
,
J
O
H
N
(5
1
3
)
6
0
2
-
1
3
5
0
PV-3
SOLAR SYMPHONY
76
0
-
3
0
0
-
4
1
4
1
98
8
1
4
6
-
C
-
4
6
AUTHORIZED SIGNEE
CU
S
T
O
M
E
R
September 25, 2022
EQ
U
I
P
M
E
N
T
Designed &
Drafted -
John@
designs.solar
SIDE VIEW OF PV ARRAY (NOT TO SCALE)
PV MODULES AND ARRAY RACKING
SHALL NOT OBSTRUCT OR
INTEFERE WITH FUNCTION OF
MECHANICAL VENTS, EXHAUSTS,
OR INTAKES.
ROOF SHEETED WITH 1/2"
PLYWOOD. UPPER SURFACE OF
PLYWOOD FACED WITH FELT
PAPER, FINISHED ROOF SURFACE IS
SHINGLE ROOF MOUNTING SYSTEM
TO BE ATTACHED TO 2X4 RAFTER.
24
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
AP
N
1
3
2
4
4
0
6
2.3
507
MODULE WEIGHT (LBS)
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
SIDE VIEW OF FOOTING
487
LOADING (PSF)
PV ARRAY PLAN (NOT TO SCALE)
2 - 1/2" MIN. EMBEDMENT INTO ROOF RAFTER
TOTAL MODULE WEIGHT
(LBS)
TOTAL AREA
1164
TOTAL WEIGHT
RACKING
48.5
GENERAL NOTES
LOADING (PSF)
1651
TOTAL LOADING (PSF)
# OF MODULES
0.96
MOUNTING SURFACE:SHINGLE (1 LAYERS)
24" OC
6' OC
3.26
J O H N L A V E N D E R
PV ARRAY TO REMAIN BELOW
Structural
Only
1802 S Garnsey
10/19/22
COFF. VOC
WATT
GENERAL NOTES
ISC
3
UL 2703
ALL EXPOSED NON-CURRENT CARRYING METAL PARTS SHALL BE
GROUNDED WITH LISTED HARDWARE COMPATIBLE WITH PANELS,
RACKS AND ANY OTHER EQUIPMENT AS APPROVED BY THE
EQUIPMENT MANUFACTURER AND INSTALLED PER THE INSTALLATION
INSTRUCTIONS. DOCUMENTATION SHALL BE PROVIDED TO THE FIELD
INSPECTOR SHOWING THAT GROUNDING HARDWARE IS APPROVED FOR
THE APPLICATION FOR WHICH IT IS USED.
ALL MODULES WILL BE GROUNDED IN ACCORDANCE WITH CODE AND
MANUFACTURERS INSTALLATION INSTRUCTIONS.
AP
N
1
3
2
4
4
0
6
September 25, 2022
RACKING INFO
8 WIRE = 55Ax0.87(113)x1(CONDUIT FILL)= 47.85A
E
MODULE INFO
A
LOADS
E
WIRE DERATING PER NEC 110.14(c )
PV-4
3
2 4/ #10 THWN-2 WIRE WITH #10THWN-2 GROUND INSIDE 1/2" EMT(OR LARGER)
VOLTAGE DROP: 0.09% @ 14 FEET & 11.14 AMPS
WIRE CALCS
2 / #10 PV WIRE(PER STRING) WITH #10 BARE GROUND IN OPEN AIR
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
B
C
D
VOLTAGE DROP: 0.08% @ 5 FEET & 32 AMPS
RAPID SHUTDOWN SWITCH
LOCATED AT INVERTER(S)
PV
3/ #8 THWN-2 WIRE WITH #8 THWN-2 GROUND INSIDE 3/4" EMT(OR LARGER)
TOTAL VOLTAGE DROP: 0.43%
400 OUTPUT 7600
UL 1703 UL
D
60 AMP NON FUSED KNIFE BLADE UL LISTED AC DISCONNECT
GROUNDING LUG IS COPPER UL 2703 LISTED
#GBL-4DBT. GROUNDING WILL UTILIZE
IRONRIDGE XR-10 INTEGRATED METHOD
48.83
UL LISTED NEMA 3R J-BOX WITH WEATHERPROOF COVER
(AS NEEDED)
EQUIPMENT DETAILS
(24) SOLAREDGE S440 OPTIMIZER(S)
WIRE DETAILS
(2) STRING(S) OF 12
10 WIRE = 40Ax0.58(40 +113)x1(CONDUIT FILL)= 23.2A1
HANWHA Q.PEAK
DUO BLK ML-G10+
CENTERFED EXISTING 100A BUS WITH 100A BREAKER. UPGRADE
TO 200A BUS WITH 200A BREAKER. PV BREAKER(S) WILL BE (1) 40A
LOCATED AT OPPOSITE END OF BUS FEED
C
1
200 [N]
BUS
(1) Solaredge
SE7600H-US
B
(24) - HANWHA Q.PEAK DUO BLK ML-G10+ 400 MODULES
BREAKER
2
VOLTAGE DROP: 0.26% @ 41 FEET & 11.14 AMPS
10 WIRE = 40Ax0.58(40 +113)x0.8(CONDUIT FILL)= 18.56A
GROUNDING ELECTRODE CONDUCTOR #6 BARE (1) 5/8" X 8' EMBEDDED GROUND ROD(S) OR
EQUIVALENT AND / OR UFER TO BE USED AT SERVICE. SUPPLEMENTAL GROUND ROD MAY BE
USED IF UFER IS NOT LOCATED. PROVIDE IF NOT PRESENT
A
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
INVERTER INFO
3
18
0
2
S
G
A
R
N
S
E
Y
S
T
M
EQ
U
I
P
M
E
N
T
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
SOLAR SYMPHONY
200 [N]
40
(5
1
3
)
6
0
2
-
1
3
5
0
76
0
-
3
0
0
-
4
1
4
1
CU
S
T
O
M
E
R
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
AUTHORIZED SIGNEE
VOC 45.3 MAX AC AMP
45
IMPP 10.77
32
VMPP 37.13
CO
N
T
R
A
C
T
O
R
Designed &
Drafted -
John@
designs.solar
98
8
1
4
6
-
C
-
4
6
1741
MIC 20
11.14 MISCC
HU
A
N
G
,
J
O
H
N
PV BREAKER TO SERVE AS AC DISCONNECT (NEC 690.15)(D)(1)
120% RULE 200(BUS) x 1.2 = 240A - 200(BREAKER) = 40A
BACKFEED 32A (INV AMPS x #) x 1.25 = 40A
PER NEC 705.12(B)(2)(3) 40A ≥ 40A - SERVICE ADEQUATE
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
SO
L
A
R
S
Y
M
P
H
O
N
Y
J O H N L A V E N D E R
1802 S Garnsey
10/19/22
18
0
2
S
G
A
R
N
S
E
Y
S
T
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
98
8
1
4
6
-
C
-
4
6
AP
N
1
3
2
4
4
0
6
SHORT CIRCUIT CURRENT
PV SYSTEM OUTPUT
76
0
-
3
0
0
-
4
1
4
1
LOCATED AT INVERTER
TURN RAPID SHUTDOWN SWITCH
TO THE "OFF" POSITION TO SHUT
DOWN PV SYSTEM AND REDUCE
SHOCK HAZARD IN THE ARRAY.
GENERAL NOTES
LOCATED AT PV CIRCUIT BREAKERS
THE INSTALLATION FOLLOWS THE CAL-FIRE GUIDELINES FOR
SIZE, COLOR, TYPE AND DURABLE, WEATHER RESISTANT
MATERIALS.
RED BACKGROUND WITH WHITE LETTERING. MINIMUM 3/8"
LETTER HEIGHT. ALL CAPITAL LETTERS IN ARIAL OR SIMILAR
FONT, NON-BOLD, REFLECTIVE, WEATHER RESISTANT
MATERIAL SUITABLE FOR THE ENVIRONMENT
PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING
SHALL BE INSTALLED IN A METALLIC RACEWAY AND SHALL
BE IDENTIFIED EVERY 10 FEET AND WITH IN 1 FOOT OF TURNS
OR BENDS AND WITHIN 1 FOOT ABOVE AND BELOW
PENETRATIONS OF ROOF/CEILING ASSEMBLIES, WALLS, OR
BARRIERS WITH MINIMUM 3/8"HIGH WHITE LETTERING ON
RED BACKGROUND FOR THE ENTIRE LENGTH AS FOLLOWS
CAUTION DC CIRCUIT OR EQUIVALENT.
ALTERNATE POWER SOURCE PLACARD SHALL MEET THE
SPECIFICATION OF THE CITY'S AREA ELECTRICAL
NEWSLETTER. PLAQUE TO BE METAL OR PLASTIC, WITH
ENGRAVED OR MACHINE PRINTED LETTERS IN A
CONTRASTING COLOR TO THE PLAQUE. INCLUDES THE
LOCATION OF METER, DISCONNECTS, INVERTER, THE ARRAY
AND THE FOOTPRINT OF THE BUILDING. PLAQUE TO BE
ATTACHED BY POP-RIVETS OR SCREWS.
EACH PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS
SHALL BE PERMANENTLY MARKED TO IDENTIFY IT AS A
PHOTOVOLTAIC SYSTEM DISCONNECT. CEC692.13(2)
COMPLIANT.
INVERTER OUTPUT CONNECTION: UNLESS THE PANEL BOARD
IS RATED NOT LESS THAN THE SUM OF THE AMPERE RATING
OF ALL OVERCURRENT DEVICES SUPPLYING IT, A
CONNECTION IN A PANEL BOARD SHALL BE POSITIONED AT
THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER
LOCATION OR MAIN CIRCUIT LOCATION. THE BUS OR
CONDUCTOR RATING SHALL BE SIZED FOR THE LOAD
CONNECTED IN ACCORDANCE WITH ARTICLE 220. A
PERMANENT WARNING LABEL SHALL BE APPLIED TO THE
DISTRIBUTION EQUIPMENT WITH THE FOLLOWING
EQUIVALENT MARKING - "WARNING! INVERTER OUTPUT
CONNECTION. DO NOT RELOCATE THIS OVERCURRENT
DEVICE".
CU
S
T
O
M
E
R
RAPID SHUTDOWN SWITCH FOR
SOLAR PV SYSTEM
LOCATED AT MAIN PANEL
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
WARNING EQ
U
I
P
M
E
N
T
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
ELECTRIC SHOCK HAZARD
THIS EQUIPMENT FED BY MULTIPLE SOURCES.
TOTAL RATING OF ALL OVERCURRECT DEVICES, EXCLUDING
MAIN SUPPLY OVERCURRENT DEVICES SHALL NOT EXCEED
AMPACITY OF BUS BAR
OPERATING DC CURRENT
MAXIMUM AC OPERATING VOLTAGE
32A
PERMANENT SIGNAGE
LOCATED AT AC DISCONNECT
LOCATED AT INVERTER
OPERATING DC VOLTAGE
AUTHORIZED SIGNEE
PV-5
500 V
13.71
Designed &
Drafted -
John@
designs.solar
POWER SOURCE OUTPUT CONNECTION
DO NOT RELOCATE THIS OVERCURRENT
DEVICE
LOCATED AT AC DISCONNECTS
September 25, 2022
240V
INVERTER OUTPUT (BELOW) WILL BE LOCATED AT INVERTER/DC DISCONNECT
MAP PLACARD (BELOW) WILL BE ATTACHED AT MAIN SERVICE ENTRANCE
MAX SYSTEM VOLTAGE
LOCATED AT MAIN PANEL
LOCATED AT MAIN PANEL
PV SYSTEM DISCONNECT
350 V
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH THE LINE AND LOAD
SIDES MAY BE ENERGIZED IN THE OPEN
POSITION
WARNING
FOR CONDUIT, RACEWAYS, ENCLOSURES,
CABLE ASSEMBLES AND JUNCTION BOXES.
WARNING: PHOTOVOLTAIC
POWER SOURCE
CO
N
T
R
A
C
T
O
R
SO
L
A
R
S
Y
M
P
H
O
N
Y
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
SOLAR SYMPHONY
30
(5
1
3
)
6
0
2
-
1
3
5
0
HU
A
N
G
,
J
O
H
N
MAXIMUM AC OPERATING CURRENT
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
WARNING
J O H N L A V E N D E R
1802 S Garnsey
10/19/22
PV-6
AUTHORIZED SIGNEE
98
8
1
4
6
-
C
-
4
6
Designed &
Drafted -
John@
designs.solar
18
0
2
S
G
A
R
N
S
E
Y
S
T
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
CO
N
T
R
A
C
T
O
R
SO
L
A
R
S
Y
M
P
H
O
N
Y
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
AP
N
1
3
2
4
4
0
6
76
0
-
3
0
0
-
4
1
4
1
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
(5
1
3
)
6
0
2
-
1
3
5
0
EQ
U
I
P
M
E
N
T
September 25, 2022
SOLAR SYMPHONY
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
MUST HAVE A LETTER OF AUTHORIZATION FROM HOMEOWNER
STATING CONTRACTOR AND SCOPE OF WORK.
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
CU
S
T
O
M
E
R
HU
A
N
G
,
J
O
H
N
ALL BREAKERS TO BE USED FOR SOLAR INSTALLATION SHALL BE A (2)- POLE
BREAKER WITH (1) POLE ON EACH PHASE OF THE ELECTRIC SERVICE BUS BAR.
LAG SCREWS SHALL BE AT LEAST 6" AWAY FROM ANY TRUSS JOINT
GROUNDING ELECTRODE CONDUCTORS FROM INVERTER SHALL BE RAN
CONTINUOUSLY TO THE GROUNDING ELECTRODE AND CONNECTED WITH A
LISTED CONNECTOR OR IRREVERSIBLY SPLICED TO THE EXISTING GROUNDING
ELECTRODE CONDUCTOR.
SYSTEM NOT TO BE ENERGIZED UNTIL APPROVED BY THE UTILITY
DISCONNECT MEANS MUST BE SIZED AT NO LESS THAN 156% OF SYSTEM
UPSTREAM OF PROPOSED DISCONNECT.
DISCONNECT MEANS MUST BE OPERABLE WITH OUT EXPOSING OPERATOR TO
LIVE PARTS
ALL PLUMBING AND MECHANICAL ROOF VENTS TO BE CLEAR FROM
PHOTOVOLTAIC ARRAY OR EXTEND ABOVE SOLAR PANELS. MODULES AND
ARRAY RACKING SHALL NOT OBSTRUCT OR INTERFERE WITH FUNCTION OF
MECHANICAL VENTS, EXHAUST, OR INTAKES. CPC 904.1, CMC 802.3
ALL EQUIPMENT SHALL BE LABELED WITH LISTING BY AN APPROVED
NATIONALLY RECOGNIZED TESTING LABORATORY PER CEC 110.3
A LADDER OR A MEAN TO ACCESS ROOF TO BE ON SITE AND IN PLACE FOR EACH
INSPECTION PER CMC 904.10
ALL ROOF PENETRATION TO BE WEATHERPROOFED
A CARBON MONOXIDE DETECTOR SHALL BE INSTALLED IN THE SPECIFIC
EXISTING DWELLING UNIT THAT HAVE ATTACHED GARAGES OR FUEL-BURNING
APPLIANCES FOR WHICH A PERMIT IS ISSUED FOR ALTERATIONS, REPAIRS OR
ADDITIONS EXCEEDING $1,000.00. LISTED SINGLE- OR MULTI-STATION CARBON
MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE
SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY
LEVEL OF A DWELLING UNIT INCLUDING BASEMENTS. COMBINED
SMOKE/CARBON MONOXIDE ALARMS MAY BE USED. THE ALARM SHALL
RECEIVE ITS PRIMARY POWER FROM THE BUILDING WIRING EXCEPT IT IS
PERMITTED TO BE SOLELY BATTERY OPERATED WHERE REPAIRS OR
ALTERATIONS DO NOT RESULT IN THE REMOVAL OF WALL AND CEILING
FINISHES OR THERE IS NO ACCESS BY MEANS OF AN ATTIC. INCLUDING
BASEMENTS. COMBINED SMOKE/CARBON MONOXIDE ALARMS MAY BE USED.
THE ALARM SHALL RECEIVE ITS PRIMARY POWER FROM THE BUILDING WIRING
EXCEPT IT IS PERMITTED TO BE SOLELY BATTERY OPERATED WHERE REPAIRS
OR ALTERATIONS DO NOT RESULT IN THE REMOVAL OF WALL AND CEILING
FINISHES OR THERE IS NO ACCESS BY MEANS OF AN ATTIC.
A SMOKE DETECTOR, APPROVED AND LISTED BY THE STATE FIRE MARSHAL,
SHALL BE INSTALLED IN EACH DWELLING WHEN A PERMIT FOR ALTERATIONS,
REPAIRS OR ADDITIONS EXCEEDS $1,000.00. A BATTERY POWERED SMOKE
DETECTOR SATISFIES THE REQUIREMENTS FOR A SMOKE DETECTOR. (R314.6.2
CRC)
CEC REQUIREMENTS
J O H N L A V E N D E R
1802 S Garnsey
10/19/22
Designed &
Drafted -
John@
designs.solar
PV-7
SOLAR SYMPHONY
EQ
U
I
P
M
E
N
T
(2
4
)
H
A
N
W
H
A
Q
.
P
E
A
K
D
U
O
B
L
K
M
L
-
G1
0
+
4
0
0
M
O
D
U
L
E
S
(1
)
S
O
L
A
R
E
D
G
E
S
E
7
6
0
0
H
-
U
S
(
2
4
0
)
IN
V
E
R
T
E
R
(
S
)
&
(
2
4
)
S
o
l
a
r
E
d
g
e
S
4
4
0
OP
T
I
M
I
Z
E
R
S
SE
R
V
I
C
E
U
P
G
R
A
D
E
T
O
:
2
0
0
A
CU
S
T
O
M
E
R
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
(5
1
3
)
6
0
2
-
1
3
5
0
AP
N
1
3
2
4
4
0
6
HU
A
N
G
,
J
O
H
N
AUTHORIZED SIGNEE
NOTES:
18
0
2
S
G
A
R
N
S
E
Y
S
T
September 25, 2022SERIAL NUMBER MAP (FOR INSTALLATION PURPOSES ONLY)
CO
N
T
R
A
C
T
O
R
SO
L
A
R
S
Y
M
P
H
O
N
Y
12
9
1
P
A
C
I
F
I
C
O
A
K
S
P
L
S
U
I
T
E
1
1
7
ES
C
O
N
D
I
D
O
,
C
A
9
2
0
2
9
76
0
-
3
0
0
-
4
1
4
1
98
8
1
4
6
-
C
-
4
6
J O H N L A V E N D E R
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
1802 S Garnsey
10/19/22
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address: 1802 S Garnsey St. Santa Ana, CA 92707
Solar Symphony Construction Inc
988146 C-46
X
X
X
X
X
X
X
X
X
X
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
Jose Gomez
760-691-6029 10/04/2022
Rev: 7/15/2021
ops@solarsymphony.com
1802 S Garnsey
10/19/22
Certificate Of Completion
Envelope Id: 053C398EF72C402AB58B1F7B3F912762 Status: Completed
Subject: Complete with DocuSign: sample-owner-authorization-form - copia.pdf
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 5 Initials: 0 Solar Symphony
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
1291 Pacific Oaks, Suite 117
1291 Pacific Oaks, Suite 117
Escondido, CA 92029
info@solarsymphony.com
IP Address: 187.189.90.10
Record Tracking
Status: Original
10/10/2022 10:45:06 AM
Holder: Solar Symphony
info@solarsymphony.com
Location: DocuSign
Signer Events Signature Timestamp
John Huang
johnleehuangdpt@gmail.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 172.58.20.188
Signed using mobile
Sent: 10/10/2022 10:53:17 AM
Viewed: 10/10/2022 10:54:06 AM
Signed: 10/10/2022 10:54:22 AM
Electronic Record and Signature Disclosure:
Accepted: 10/10/2022 10:54:06 AM
ID: 315b2c31-c7ae-4c49-9bae-52e5547b9753
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
David Morales
dmorales@solarsymphony.com
Security Level: Email, Account Authentication
(None)
Sent: 10/10/2022 10:53:17 AM
Electronic Record and Signature Disclosure:
Accepted: 5/21/2021 3:33:06 PM
ID: 272d8001-323c-4e97-a907-e6445e0be077
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 10/10/2022 10:53:17 AM
Certified Delivered Security Checked 10/10/2022 10:54:06 AM
Signing Complete Security Checked 10/10/2022 10:54:22 AM
Completed Security Checked 10/10/2022 10:54:22 AM
1802 S Garnsey
10/19/22
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
1802 S Garnsey
10/19/22
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Solar Symphony (we, us or Company) may be required by law to provide to
you certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through the DocuSign, Inc.
(DocuSign) electronic signing system. Please read the information below carefully and
thoroughly, and if you can access this information electronically to your satisfaction and agree to
these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the
bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
Electronic Record and Signature Disclosure created on: 4/4/2014 2:11:28 PM
Parties agreed to: John Huang, David Morales
1802 S Garnsey
10/19/22
How to contact Solar Symphony:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: aeriksson@solarsymphony.com
To advise Solar Symphony of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at aeriksson@solarsymphony.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from Solar Symphony
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to aeriksson@solarsymphony.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with Solar Symphony
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to aeriksson@solarsymphony.com and in the body of such request
you must state your e-mail, full name, US Postal Address, and telephone number. We do
not need any other information from you to withdraw consent.. The consequences of
your withdrawing consent for online documents will be that transactions may take a
longer time to process..
Required hardware and software
Operating
Systems:Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X
Browsers:
Final release versions of Internet Explorer® 6.0 or above (Windows only);
Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above
(Mac only)
PDF Reader: Acrobat® or similar software may be required to view and print PDF files
Screen
Resolution:800 x 600 minimum
1802 S Garnsey
10/19/22
Enabled Security
Settings:Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the ‘I agree’ button below.
By checking the ‘I agree’ box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify Solar Symphony as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by Solar Symphony during the course of my relationship with you.
1802 S Garnsey
10/19/22