HomeMy WebLinkAbout1812 S Van Ness Ave - PlanRev: 11/19/2015
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
Kevin Pham
1812 S Van Ness
Ave03/14/22
Expedited Permit Process for PV Systems1
Expedited Permit Process for PV Systems
Standard String System
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Standard String System to use with the Expe-
dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1812 S Van Ness
Ave03/14/22
Expedited Permit Process for PV Systems2
Expedited Permit Process for Small-Scale PV Systems
Standard String System
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
4
4
Flashing
4
24
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
Composition Shingles
Snap N Rack SnapNRack Ultra
943
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
4
235
362
2.6
1812 S Van Ness
Ave03/14/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Standard String System Site Plan
1812 S Van Ness
Ave03/14/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Standard String System Electrical Diagram
SELECTED IN FIELD
SOLAR EDGE INTEGRAL TO INVERTER
D22RB,240V,60A,2P,3R NEM 3R
n
n
n
SQUARE D OR EQUAL
240 225200
#6 1
5 A St Auburn MA, 01501
QUANITY 20
SE6000H-USRGM QUANITY 1
US000NNR2 INTEGRAL TO INVERTER
10
#10 4 Bright Planet Solar
#10 & #6 4& (1)G EMT 3/4"8889974469
# & #10 3 & (1)G EMT 1" 3.8kW/AC
1812 S Van Ness
Ave03/14/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Notes for Standard String System Electrical Diagram
Contractor Name,
Address and Phone:
_________________
_________________
_________________
_________________
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
A
V
V
A
A
W
V
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
V
W
V
A
A
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?
YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC
2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE ® REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND
AC DISCONNECT (IF USED)
RATED MPP CURRENT
RATED MPP VOLTAGE
MAX SYSTEM VOLTAGE
MAX CIRCUIT CURRENT
A
V
V
A
PHOTOVOLTAIC POWER SOURCE
WARNING: ELECTRICAL SHOCK
HAZARDLINE AND LOAD MAY BE
ENERGIZED IN OPEN POSITION
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
A
V
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
SOLAR EDGE
39
58
1
n
Bright Planet Solar
5 A St Auburn MA, 01501 Mark Talley
8889974469
1000
1000
240
Duo Blk Ml-G10+395
10.65
36.62
11.07
480
SE6000H-USRGM
20
15
20
25
1812 S Van Ness
Ave03/14/22
VICINITY MAP
A. A LADDER SHALL BE IN PLACE FOR ANY INSPECTIONS IN COMPLIANCE WITH OSHA REGULATIONS.
B. PV MODULES ARE NON-COMBUSTIBLE IN NATURE.
C. THIS SYSTEM IS A UTILITY INTERACTIVE (GRID CONNECTED) SYSTEM AND DOES NOT HAVE STORAGE BATTERIES (UNLESS SPECIFICALLY INDICATED ON SHEET PV3 & PV3.1).
D. A GROUND ELECTRODE SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH CEC 690.47 & 250.50 - 250.166. GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED WHEN
BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED
AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8FT GROUND ROD WITH ACORN CLAMP. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER
THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE GROUNDING SYSTEM.
E. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
F. THE EXPOSED METALLIC TABS OF THE SOLAREDGE OPTIMIZERS SHALL BE BONDED AND/OR GROUNDED PER NEC/CEC 690.43(A) AND THE MANUFACTURERS' INSTRUCTIONS.
G. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER CEC 110.26.
H. ALTERNATE POWER SOURCE PLACARD SHALL BE PLASTIC, ENGRAVED IN A CONTRASTING COLOR (WHITE). THIS PLAQUE WILL BE PERMANENTLY ATTACHED & UV RESISTANT.
I. ALL PLAQUES AND SIGNS WILL BE INSTALLED AS REQUIRED BY 2019 CEC.
J. A SMOKE DETECTOR, APPROVED AND LISTED BY THE STATE FIRE MARSHAL, SHALL BE INSTALLED IN EACH DWELLING WHEN A PERMIT FOR ALTERATIONS, REPAIRS OR ADDITIONS EXCEEDS
$1,000.00. A BATTERY POWERED SMOKE DETECTOR SATISFIES THE REQUIREMENTS FOR A SMOKE DETECTOR. APPROVED COMBINED SMOKE ALARMS AND CARBON DIOXIDE ALARMS SHALL
BE ACCEPTABLE. A CARBON MONOXIDE DETECTOR SHALL BE INSTALLED IN THE SPECIFIC EXISTING DWELLING UNIT THAT HAVE ATTACHED GARAGES OR FUEL-BURNING APPLIANCES FOR
WHICH A PERMIT IS ISSUED FOR ALTERATIONS, REPAIRS OR ADDITIONS EXCEEDING $1,000.00. LISTED SINGLE- OR MULTI-STATION CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE
OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY LEVEL OF A DWELLING UNIT INCLUDING BASEMENTS. COMBINED SMOKE/CARBON
MONOXIDE ALARMS MAY BE USED. THE ALARM SHALL RECEIVE ITS PRIMARY POWER FROM THE BUILDING WIRING EXCEPT IT IS PERMITTED TO BE SOLELY BATTERY OPERATED WHERE REPAIRS
OR ALTERATIONS DO NOT RESULT IN THE REMOVAL OF WALL AND CEILING FINISHES OR THERE IS NO ACCESS BY MEANS OF AN ATTIC.
K. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG
COPPER WIRE AS PER CEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AS BUSBARS WITHIN LISTED EQUIPMENT AS PER CEC
250.64C.
L. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THE BUILDING CODE OF THE LOCAL JURISDICTION.
M. PV SYSTEMS CONNECTION IN THE SWITCH GEAR (PANEL) SHALL BE POSITIONED AT THE OPPOSITE END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AS PER CEC
705.12(B)(2)(3)(b).
N. ALL EQUIPMENT SUPPLIED SHALL BE UL LISTED OR LISTED BY A LISTING AGENCY RECOGNIZED BY THE STATE IN WHICH THE SYSTEM IS CONSTRUCTED.
O. AC DISCONNECTS SHALL BE IN COMPLIANCE WITH CEC 690.17.
P. ALL DC CONDUCTORS SHALL BE 90° RATED THHW, THWN-2, USE-2 OR PV WIRE. ALL AC CONDUCTORS SHALL BE 75° RATED THWN WIRE.
Q. ANY DC RUNS INSIDE THE BUILDING MUST BE IN METAL CONDUIT AND LABELED EVERY 10'.
R. THE UTILITY DISCONNECT HAS VISIBLE BLADES, IS LOCKABLE AND IS ACCESSIBLE TO THE UTILITY 24/7.
S. ALL BREAKERS SHALL BE SUITABLE FOR BACK FEED. WHEN BACK FED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION THE BREAKER SHALL NOT READ 'LINE AND LOAD'.
T. COORDINATE ANY POWER OUTAGE WITH LOCAL UTILITY AND PROPERTY OWNER. NOTIFY UTILITY BEFORE ACTIVATION OF PV SYSTEM.
U. CITY BUILDING INSPECTOR SHALL INSPECT ACCESSIBLE STRUCTURAL CONNECTIONS AND THE HOUSE CURRENT SIDE OF THE SYSTEM, ALL OTHER EQUIPMENT SHALL BE UL LISTED AND
APPROVED.
V. PHOTOVOLTAIC MODULES SHALL NOT BE INSTALLED OVER ANY ATTIC, PLUMBING OR MECHANICAL VENT. PLUMBING VENTS TO EXTEND A MIN OF 6" ABOVE ROOF OR MODULE. NO BLDG,
PLBG OR MECH VENTS TO BE COVERED, OBSTRUCTED OR ROUTED AROUND MODULES.
W. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER THE OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT A
STRONG POINT OF BUILDING CONSTRUCTION. FIELD VERIFY EXACT LOCATION.
X. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIAL OR
WASTEWATER GENERATED ON CONSTRUCTION SITE OR BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM.
Y. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE AND WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF
THE ROOF SURFACE.
Z. ALL EQUIPMENT AND CONDUITS SHALL BE PAINTED TO MATCH ITS EXISTING BACKGROUND COLOR OF THAT LOCATION.
SYSTEM NOT TO BE ENERGIZED UNTIL APPROVED BY THE LOCAL UTILITY.
AA. NO ROOFTOP CONDUIT RUNS, J-BOXES, VENTS, OR OTHER EQUIPMENT OR OBSTRUCTIONS ARE ALLOWED IN THE STATE FIRE MARSHALL'S EDGE SETBACKS, LESS THAN 5' WIDE.
CONSTRUCTION NOTES
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:26 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:26 PM
TITLE SHEET
PV1
Bldg permit# 101109726
Elect permit#20175615
Permits issued on 3/14/22
1812 S Van Ness
Ave03/14/22
ROOF A
RO
O
F
C
RO
O
F
D
RO
O
F
B
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:43 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:43 PM PV9
JOB HAZARD
ANALYSIS
JOB HAZARD ANALYSIS
SITE NOTES (INCLUDE ANY HAZARD, NUMBERED AND EXPLAINED):
CLOSEST URGENT CARE / MEDICAL FACILITY:
PUBLIC PROTECTION:
EXCLUSION ZONES
MARKED ENTRYWAYS
FALL PROTECTION:
ANCHORS
ROPES / CARABINERS & ROPE GRAB
HARNESS
LANYARDS
PPE:
SAFETY GLASSES
GLOVES
HARD HATS
ARC FLASH SUIT / HOT GLOVES
FIRST AID KIT
COVID-19 PPE ON SITE
CREW ADHERING TO BPS COVID-19 PLAN
DATE:
CREW LEAD:
CREW MEMBERS:
LEGEND
EXCLUSION ZONE
ELECTRICAL ZONE
XXXXXXXXXXXXX
L LADDER
A ANCHOR
ANCHOR
WORK ANGLES
V VEHICLES
HAZARD NUMBER
& EXPLAINH#
TREE
HOME
ENTRANCESE
1812 S Van Ness
Ave03/14/22
PICKED BY: RECEIVED BY:
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:44 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:44 PM PV10
BOM SHEET
1812 S Van Ness
Ave03/14/22
7
PV MODULES
JUNCTION BOX ROOF SIZED DETERMINED IN FIELD
8
9 CONDUIT RUN IS SURFACE MOUNTED
(ACTUAL CONDUIT RUNS TO BE
DETERMINED IN THE FIELD)
6 OPTIMIZER (TYPICAL FOR EACH MODULE)
NOT USED5.1
10 NOT USED
0' 5' 10'
SYMBOL LEGEND
= FLUE / PLUMBING VENT
= MECHANICAL VENT
MAIN SERVICE PANEL
AC DISCONNECT
UTILITY METER2
1
3
INVERTER & INTEGRATED DC DISCONNECT5
W E
S
N
4 NOT USED
CALIFORNIA FIRE CODE SETBACKS 3'
ROOF A
RO
O
F
C
8
9
7
6
1 2
3
5
CEC 110.26 RO
O
F
D
RO
O
F
B
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:27 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:27 PM
ROOF/SITE PLAN
PV2
1812 S Van Ness
Ave03/14/22
N
G
G
8
UTILITYDISCO
VISIBLE BLADE
LOCKABLE
W/UTILITY
ACCESS 24/7
11
GND
ELECT.
NOTE 1
L2 L1
N
TO
UTILITY
GRID
4
4
1
J-BOX
1
MODULES/OPTIMIZERS IN A STRING
+
-
RED
BLACK
SE SE SE
3
MODULES/OPTIMIZERS IN A STRING
+
-
RED
BLACK
SE SE SE
L1
L2
G
L1
L2
5
L1
L2
L1
L2
G
INTEGRATED MODULE & RACKING GND METHOD UL 2703 APPROVED
2 4
L1
L2
G
N
3
28.2
910
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:32 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:32 PM
RISER DIAGRAM
PV3
1812 S Van Ness
Ave03/14/22
FOR ILLUSTRATION ONLY (NOT ACTUAL MSP)
PV SUB PANEL (IF USED) MAIN SERVICE PANEL
AC
DISCONNECT
(IF USED)
PLACARD
INVERTER
CONDUITS/RACEWAYS
NOTE: PLAQUES SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH NON CORROSIVE, POP-RIVETS, SCREWS, OR APPROVED ADHESIVE.
LOCATION: MAIN PANELCONDUIT, RACEWAYS & ENCLOSURES LOCATION: MAIN SERVICE PANEL
& AC DISCONNECT
LOCATION: MAIN SERVICE PANEL
PV BACK-FED BREAKER
LOCATION: MAIN SERVICE PANEL
PV BACK-FED BREAKER
LOCATION: UTILITY METER
LOCATION: PV SUB PANEL (IF USED)
1
5
6
10
1
7
1
9
11
2
3
112
4
8
5
6 11
4
3
2
13 14
13
LOCATION: MAIN SERVICE PANEL / AC DISCONNECT13
LOCATION: AC DISCONNECT14
LOCATION: DC DISCONNECT/INVERTER #17
LOCATION: MAIN SERVICE PANEL8
LOCATION: MAIN SERVICE PANEL
LOCATION: INVERTER10
9
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:38 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:38 PM PV4
EQUIPMENT
LABELS
1812 S Van Ness
Ave03/14/22
PV4.1
PLACARD
PLACARD 12 CAUTION
POWER TO THIS BUILDING IS ALSO
SUPPLIED FROM THE FOLLOWING
SOURCES WITH
DISCONNECTS AS SHOWN
SOLAR
INVERTER & DC
DISCONNECT
EXISTING MAIN
SERVICE ENTRANCE
UTILITY AC DISCO
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:39 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:39 PM
1812 S Van Ness
Ave03/14/22
Table R802.5.1(2) - Continued
RAFTER SPANS FOR COMMON LUMBER SPECIES
(Roof live load = 20 psf, ceiling attached to rafters, L/Δ = 240
DEAD LOAD = 20 psf
RAFTER
SPACING
(inches)
SPECIES AND GRADE
Douglas fir-larch SS
Douglas fir-larch #1
Douglas fir-larch #2
Douglas fir-larch #3
Him-fir SS
Him-fir #1
Him-fir #2
Him-fir #3
Southern Pine SS
Southern Pine #1
Southern Pine #2
Southern Pine #3
Spruce-pine-fir SS
Spruce-pine-fir #1
Spruce-pine-fir #2
Spruce-pine-fir #3
24
8-3
8-0
7-10
6-2
7-10
7-8
7-3
6-1
8-1
7-10
7-4
5-8
7-8
7-6
7-6
6-1
(feet-
inches)
2 x 4
DEAD LOAD = 10 psf
13-0
12-6
11-11
9-1
12-3
12-0
11-5
8-10
12-9
12-3
11-0
8-4
12-0
11-9
11-9
8-10
(feet-
inches)
2 x 6
17-2
15-10
15-1
11-6
16-2
15-8
14-8
11-3
16-10
16-2
13-11
10-6
15-10
14-10
14-10
11-3
(feet-
inches)
2 x 8
21-10
19-5
18-5
14-1
20-8
19-2
17-10
13-8
21-6
18-11
16-6
12-9
20-2
18-2
18-2
13-8
(feet-
inches)
2 x 10
Note b
22-6
21-4
16-3
25-1
22-2
20-9
15-11
Note b
22-6
19-6
15-1
24-7
21-0
21-0
15-11
(feet-
inches)
2 x 12
Maximum rafter spans*
8-3
7-5
7-0
5-4
7-10
7-4
6-10
5-3
8-1
7-5
6-4
4-11
7-8
6-11
6-11
5-3
(feet-
inches)
2 x 4
13-0
10-10
10-4
7-10
12-3
10-9
10-0
7-8
12-9
11-1
9-6
7-3
12-0
10-2
10-2
7-8
(feet-
inches)
2 x 6
16-10
13-9
13-0
10-0
16-2
13-7
12-8
9-9
16-10
14-0
12-1
9-1
15-4
12-10
12-10
9-9
(feet-
inches)
2 x 8
16-9
15-11
12-2
19-10
16-7
15-6
11-10
20-10
16-5
14-4
11-0
18-9
15-8
15-8
11-10
(feet-
inches)
2 x 10
23-10
19-6
18-6
14-1
23-0
19-3
17-11
13-9
24-8
19-6
16-10
13-1
21-9
18-3
18-3
13-9
(feet-
inches)
2 x 12
13-0 20-7
=
3'
6'
STRUCTURAL FRAMING
MEMBER @ 24" O.C.
MIDCLAMP
(2 PER MODULE)
MOUNT ATTACHMENT
RAIL
ENDCLAMP, TYP.
2'
6'
STRUCTURAL FRAMING
MEMBER @ 24" O.C.
MIDCLAMP
(2 PER MODULE)
MOUNT ATTACHMENT
RAIL
ENDCLAMP, TYP.
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:40 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:40 PM PV5
ATTACHMENT
PLAN
1812 S Van Ness
Ave03/14/22
8" 1' 2-1/2"
2' or 3'
SOLAR MODULE
ROOF COVERING IS
COMPOSITION SHINGLE
OVER PLYWOOD
RAIL
OPTIMAL SPACING FROM EDGE AND IN BETWEEN CLAMPS
LANDSCAPE PANELS PORTRAIT PANELS
MODULE CLAMP
MODULE
CLAMP
LAG BOLT
NOTE:
· SHALL BE AT LEAST 6" FROM ANY TRUSS JOINTS
· 5
16" DIAMETER
· MINIMUM EMBEDMENT OF 2.5" INTO STRUCTURAL MEMBER
</= 6"
SNAPNRACK ROOF MOUNT SYSTEM
ALL DIMENSIONS IN INCHES
SEE PV5 FOR STRUCTURAL
INFORMATION
**INSTALLER TO VERIFY RAFTER SIZE & SPACING
SNAPNRACK SPEEDSEAL MOUNT
·SEALANT APPLIED UNDERNEATH, APPROVED SEALANTS
INCLUDE: GEOCELL 2300, GEOCELL 4500, AND CHEMLINK M1
**FIELD TO DETERMINE WHICH SEALANT IS APPROPRIATE BASED ON INSTALL CONDITIONS5
4
3
2 1
ITEM QTY
1
2
3
4
5
PARTS LIST
DESCRIPTION
1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER / BLACK
1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS
1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS
1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR / BLACK
1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR / BLACK
.30
1.86 1.08
1.37
.38
1.00
SLOT
3.05
2.78
1.78
.25
.17 Ø2.24
2.58
3.20
Ø.33
R1.12
R.82
1.21
1.99
1.50
LAG BOLT
RAIL
SPEEDSEAL MOUNT
.30 Ø1.00
4.20
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:41 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:41 PM PV6
STRUCTURAL
COMPONENTS
1812 S Van Ness
Ave03/14/22
ROOF A
RO
O
F
C
RO
O
F
D
RO
O
F
B
W E
S
N
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:41 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:41 PM PV7
PROPERTY
LINES
PR
O
P
E
R
T
Y
LI
NE
PR
O
P
E
R
T
Y
LI
NE
PROPERTY LINE
PROPERTY LINEPROPERTY LINE
PR
O
P
E
R
T
Y
LI
NE
PR
O
P
E
R
T
Y
LI
NE
PROPERTY LINE PROPERTY LINE PROPERTY LINE
1812 S Van Ness
Ave03/14/22
ROOF A
RO
O
F
C
RO
O
F
D
RO
O
F
B
SHEET TITLE
SHEET #
PROJECT #
SYSTEM SIZE
DESIGNER:
DATE:2/9/2022 7:56:42 PM
REV DATE
----
DESCRIPTION
----
----
----
----
----DATE:
BRIGHT PLANET SOLAR
103A MILLBURY ST,
AUBURN MA 01501
888-997-4469
SIGNATURE:
CONTRACTOR LICENSE:
C-10#1020761
2/9/2022 7:56:42 PM PV8
OPTIMIZER
TRACKING
INVERTER(S) SERIAL NUMBERS
#_______________________
#_______________________
#_______________________1 2 3 4 5
7 8 9 10
MAPPING INSTRUCTIONS:
12 13 14 15
1. REMOVE THE 'SQUARE' OPTIMIZER STICKER
AND PLACE NEATLY ON THE APPROPRIATE
NUMBERED SPACE.
2. WRITE THE CORRESPONDING NUMBER ON
THE APPROPRIATE MODULE WITHIN THE ARRAY.
17 18 19 20
22 23 24 25
27 28 29 30
32 33 34 35
37 38 39 40
42 43 44 45
6
11
16
21
26
31
36
41
1812 S Van Ness
Ave03/14/22
1812 S Van Ness
Ave03/14/22