Loading...
HomeMy WebLinkAbout2035 N Tustin Ave - PlanBldg permit#101108542 Elect permit#20174738 Permits issued on 4/12/22 Planning approved by HJ Building approved by KA Electrical approved by MS 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 2035 N Tustin Ave - 101108542 and 2017473804/12/22 (x43) QCELL SOLAR 430 Q.PEAK DUO 430W (x23) SOLAR EDGE P960 4 2 SOLAR EDGE SE17.3KUS (208V) G 1 JB1 DCA 13 MODULES/ 7 OPTIMIZERS IN STRING 13 MODULES/ 7 OPTIMIZERS IN STRING 17 MODULES/ 9 OPTIMIZERS IN STRING L3L2L1G N G TO (E) GROUNDING ELECTRODE G (Е) MAIN PANEL SERVICE 208Y/120V, 3Ø, 4W MAIN BUSS: 2000A MAIN BREAKER SIZE: (2000 A x 1.2 ) - 2000 A = 400 A N (E) MAIN 2000A (E) UTILITY METER TO UTILITY GRID 208Y/120V, 3Ø CB3 125A/3P NOTE: RAPID SHUTDOWN INITIATION DEVICE (RSID) CONFORMING WITH 690.12.THE RAPID SHUTDOWN CAN ALSO BE INITIATED BY ONE OF THE FOLLOWING METHODS: · AC BREAKER IS TURNED OFF. · AC TO THE INVERTER IS DISCONNECTED BY ANOTHER METHOD (INTENTIONALLY OR AS RESULT OF A FAULT) · INVERTER ON/OFF SWITCH IS TURNED OFF. · ALL THE ABOVE SHUTS DOWN PV OPTIMIZER WHENEVER SUNSPEC SIGNAL IS INTERRUPTED. INTERCONNECTION METHOD 705.12 (B)(2)(3)(b). AC DISCONNECT 240 VAC, 200 A, 3Ø, 4W DISCONNECT TO BE WITHIN 10' OR LESS FROM INTERCONNECTION 5 EQUIPMENT ABOVE LINE IS (N) NEW EQUIPMENT BELOW LINE IS (E) EXISTING UNLESS OTHERWISE NOTED. TO (E) LOADS (x42) QCELL SOLAR 430 Q.PEAK DUO 430W (x22) SOLAR EDGE P960 SOLAR EDGE SE17.3KUS (208V) G 1 JB3 FEB L3L2L1G N G G JB2 2 16 MODULES/ 8 OPTIMIZERS IN STRING 13 MODULES/ 7 OPTIMIZERS IN STRING 13 MODULES/ 7 OPTIMIZERS IN STRING 3 3 G L3 L2 L1 70A/3P CB1 N 70A/3P CB2(N) AC PANEL BOARD 240 VAC, 3Ø, 4W 125 A, NEMA 3R NEW PV SYSTEM: 36.490 kWp ENGINEER OF RECORD DATE: 09.12.2021 DESIGN BY: V.H CHECKED BY: M.M. DS-423-35KW SANTA ANA CARWASH 2035 N. TUSTIN AVE SANTA ANA, CA 92705 APN: 396-291-07 PAPER SIZE: 36" x 24" (ARCH D) A B C D E F G H I J K L M N O 1 2 3 4 5 6 7 8 9 10 11 12 A B C D E F G H I J K L M N O CONTRACTOR OPTIMUM SOLAR POWER INC. PHONE: (951) 290-0446 LIC. NO.: 1024381 UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. P P NO. DESCRIPTION DATE PROJECT REVISION / RELEASE SHEET NUMBER: SHEET TITLE: 1 AHJ COMMENTS 01.21.2022 2 CONTRACTOR COMMENTS 02.18.2022 E-601 THREE LINE DIAGRAM (SHEET 5) 2 3 CONTRACTOR COMMENTS 04.06.2022 3 3 2035 N Tustin Ave - 101108542 and 2017473804/12/22