HomeMy WebLinkAbout2035 N Tustin Ave - PlanBldg permit#101108542
Elect permit#20174738
Permits issued on 4/12/22
Planning approved by HJ
Building approved by KA
Electrical approved by MS
2035 N Tustin Ave -
101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
2035 N Tustin Ave
- 101108542 and
2017473804/12/22
(x43) QCELL SOLAR
430 Q.PEAK DUO
430W
(x23) SOLAR EDGE
P960
4
2
SOLAR EDGE
SE17.3KUS (208V)
G
1
JB1
DCA
13 MODULES/
7 OPTIMIZERS
IN STRING
13 MODULES/
7 OPTIMIZERS
IN STRING
17 MODULES/
9 OPTIMIZERS
IN STRING
L3L2L1G N
G
TO (E) GROUNDING
ELECTRODE
G
(Е) MAIN PANEL SERVICE
208Y/120V, 3Ø, 4W
MAIN BUSS: 2000A
MAIN BREAKER SIZE:
(2000 A x 1.2 ) - 2000 A = 400 A
N
(E) MAIN 2000A
(E)
UTILITY
METER
TO UTILITY
GRID
208Y/120V, 3Ø
CB3
125A/3P
NOTE:
RAPID SHUTDOWN INITIATION DEVICE (RSID) CONFORMING WITH
690.12.THE RAPID SHUTDOWN CAN ALSO BE INITIATED BY ONE
OF THE FOLLOWING METHODS:
· AC BREAKER IS TURNED OFF.
· AC TO THE INVERTER IS DISCONNECTED BY ANOTHER
METHOD (INTENTIONALLY OR AS RESULT OF A FAULT)
· INVERTER ON/OFF SWITCH IS TURNED OFF.
· ALL THE ABOVE SHUTS DOWN PV OPTIMIZER WHENEVER
SUNSPEC SIGNAL IS INTERRUPTED.
INTERCONNECTION METHOD 705.12 (B)(2)(3)(b).
AC DISCONNECT
240 VAC, 200 A, 3Ø, 4W
DISCONNECT TO BE WITHIN 10' OR LESS FROM INTERCONNECTION
5
EQUIPMENT ABOVE LINE
IS (N) NEW
EQUIPMENT BELOW LINE IS
(E) EXISTING UNLESS
OTHERWISE NOTED.
TO (E) LOADS
(x42) QCELL SOLAR
430 Q.PEAK DUO
430W
(x22) SOLAR EDGE
P960
SOLAR EDGE
SE17.3KUS (208V)
G
1
JB3
FEB
L3L2L1G N
G
G
JB2
2
16 MODULES/
8 OPTIMIZERS
IN STRING
13 MODULES/
7 OPTIMIZERS
IN STRING
13 MODULES/
7 OPTIMIZERS
IN STRING
3 3
G
L3
L2
L1 70A/3P
CB1
N
70A/3P
CB2(N) AC PANEL BOARD
240 VAC, 3Ø, 4W
125 A, NEMA 3R
NEW PV SYSTEM: 36.490 kWp
ENGINEER OF RECORD
DATE: 09.12.2021
DESIGN BY: V.H
CHECKED BY: M.M.
DS-423-35KW
SANTA ANA CARWASH
2035 N. TUSTIN AVE
SANTA ANA, CA 92705
APN: 396-291-07
PAPER SIZE: 36" x 24" (ARCH D)
A B C D E F G H I J K L M N O
1
2
3
4
5
6
7
8
9
10
11
12
A B C D E F G H I J K L M N O
CONTRACTOR
OPTIMUM SOLAR POWER INC.
PHONE: (951) 290-0446
LIC. NO.: 1024381
UNAUTHORIZED USE OF THIS
DRAWING SET WITHOUT WRITTEN
PERMISSION FROM CONTRACTOR IS IN
VIOLATION OF U.S. COPYRIGHT LAWS
AND WILL BE SUBJECT TO CIVIL
DAMAGES AND PROSECUTIONS.
P
P
NO. DESCRIPTION DATE
PROJECT
REVISION / RELEASE
SHEET NUMBER:
SHEET TITLE:
1 AHJ COMMENTS 01.21.2022
2 CONTRACTOR COMMENTS 02.18.2022
E-601
THREE LINE DIAGRAM
(SHEET 5)
2
3 CONTRACTOR COMMENTS 04.06.2022
3
3
2035 N Tustin Ave
- 101108542 and
2017473804/12/22