Loading...
HomeMy WebLinkAbout2106 N Deodar St - PlanExpedited Permit Process for PV Systems - AC Module1 Expedited Permit Process for PV Systems AC Module The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the AC Module to use with the Expedited Permit Process. The Standard String, Micro-Inverter, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2106 Deodar 04/14/22 Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems AC Module The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2106 Deodar 04/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 AC Module Site Plan                                                          Urban Energy Solar Manzo10192 Constitution Drive, HB 92646 562 447 4971 2106 Deodar Street 7497 W 2106 Deodar 04/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 AC Module Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for AC Module PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A CONDUIT SIZE N/A N/A N/A DESCRIPTIONTAG 1 2 3 4 5 6 7 PART NUMBER NOTES FOR UNUSED AC MODULES PUT "N/A” in BLANK ABOVE 1 2 2 3 EQUIPMENT SCHEDULE J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 5 6 7 5 3 4 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC 1 10192 Constitution Drive, HB 92646 562 447 4971 Urban Energy Solar Manzo 2106 Deodar Street 7497 W 2106 Deodar 04/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for AC Module Electrical Diagram Contractor Name, Address and Phone: Bill Ted Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAXIMUM OCPD RATING AC MODULE MAKE AC MODULE MODEL AC MODULE RATINGS (Guide Appendix C) 1)IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2)IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3)SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT (N/A) 4)SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5)TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH AC MODULE CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ___oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR 6 OR LESS CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a)12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 12 AMPS OR LESS WHEN PROTECTED BY A 15- AMP OR SMALLER OCPD. b)10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 16 AMPS OR LESS WHEN PROTECTED BY A 20- AMP OR SMALLER OCPD. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix F): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) N/A since no dc wiring AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Urban Energy Solar 10192 Constitution Drive, HB 92646 2106 Deodar Street Manzo 562 447 4971 7497 W 2106 Deodar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ϯͬϭϴͬϮϬϮϮ 6WUXFWXUDO&DOFXODWLRQVIRU 62/$532:(56<67(0&211(&7,21&+(&.$7 -RE R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C I V I L No. C70784 Exp. 06/30/2023 S T A T E O F C A L I F O R N I A 2*10)64710) 2106 Deodar 04/14/22 2106 Deodar 04/14/22 $6&(5RRIWRS6RODU3DQHOV3DUDOOHOWRWKH5RRI6XUIDFHRQ%XLOGLQJVRI$OO+HLJKWVDQG5RRI6ORSHV 5RRI6ORSH T Σ 5RRI6KDSH *DEOH 7ULEXWDU\:LG WK V IW 7ULEXWDU\/HQJWK O IW (IIHFWLYH$UHD $H IW +HLJKWRI6WUXFWXUH K IW :LQG6SHHG 9 PSK ([SRVXUH&DWHJRU\ & %XLOGLQJ:LG WK % IW %XLOG LQJ/HQJWK / IW =RQH:LG WK D IW (OHYDWLRQ+HLJKW ]J IW :LQG'LUHFWLRQDOLW\.G  7RSRJUDSK\)DFWRU .W  *URXQG(OHYDWLRQ)DFWRU .H  9HORFLW\3UHVVXUH([SRVXUH&RHIILFLHQW .]  9HORFLW\3UHVVXUH T ] .].]W.G.H9 SVI 6RODU$UUD\3UHVVXUH(T XDOL]DWLRQ JD  $UUD\(GJH)DFWRU J(  =RQH *&S S T] *&S J( JD  U  H   U  H  Q    2106 Deodar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eodar 04/14/22 $6&('HVLJQ:LQG3UHVVXUH %HDP7RS&KRUG&KHFN 5RRI6ORSH T Σ 5RRI6KDSH *DEOH 7ULEXWDU\:LG WK V IW 7ULEXWDU\/HQJWK / IW (IIHFWLYH$UHD $ / 0$;>V/@ IW +HLJKWRI6WUXFWXUH K IW :LQG6SHHG 9 PSK ([SRVXUH&DWHJRU\ & %XLOGLQJ:LG WK % IW %XLOG LQJ/HQJWK / IW =RQH:LG WK D IW (OHYDWLRQ+HLJKW ]J IW :LQG'LUHFWLRQDOLW\.G  7RSRJUDSK\)DFWRU .W  *URXQG(OHYDWLRQ)DFWRU .H  9HORFLW\3UHVVXUH([SRVXUH&RHIILFLHQW .]  9HORFLW\3UHVVXUH T ] .].]W.G.H9 SVI ,QWHUQDO3UHVVXUH&RHIILFLHQW *&SL  =RQH *&S S T ]> *&S  *FSL @  U  H   U  H  Q    2106 Deodar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ƉĚ͕ũ;ůďƐͿ Ɖǁ͕ũ;ůďƐͿ ƉƐ͕ũ;ůďƐͿ 3RUWUDLW       3RUWUDLW   (DYH         3RUWUDLW       3RUWUDLW          3RUWUDLW   3RUWUDLW  $7 IW   SG OEV  SZ OEV SV OEV   [              '&5 SVL 'SVL    &' )E  &' )E $6'/RDG 0D 6[ SVL '6 SVL 2.$< 2.$< SVL '/U SVL 2.$< SVL    ':SVL 2.$<     &RPS   SVL ':6 SVL 2.$< SVL ':/U SVL 2.$< ࡹ ࢞ ൌ ࡾ ࢏ሺ࢞ െ ࡸ࢏ሻ െ ࡼ࢐ ࢞ െ ࢒ ࢐ െ ࢝ࢊ࢞૛ ૛ ͲϲϬϬ͘Ϭ ͲϰϬϬ͘Ϭ ͲϮϬϬ͘Ϭ Ϭ͘Ϭ ϮϬϬ͘Ϭ ϰϬϬ͘Ϭ ϲϬϬ͘Ϭ Ϭ͘ϬϬϬ ϱ͘ϬϬϬ ϭϬ͘ϬϬϬ ϭϱ͘ϬϬϬ ϮϬ͘ϬϬϬ Ϯϱ͘ϬϬϬ 2106 Deodar 04/14/22 (,60,&:(,*+7&203$5,621$1$/<6,6 3(5&(%&3DUW&KDSWHU6HFWLRQ 396\VWHP:HLJKW 0RGXOH0RGHO 635 3DQHO:HLJKW :SDQHO OEV 1XPEHURI3DQHOV 139  7RWDO396\VWHP:HLJKW :39 :SDQHO 139 OEV ([LVWLQJ5RRI:HLJKW 5RRI:HLJKW Yс SVI %XLOGLQJ/HQJWK /EXLOG с IW %XLOGLQJ: LGWK :EXLOG с IW 5RRI$UHD ďƵŝůĚ с IW %XLOGLQJ3HULPHWHU WďƵŝůĚ с IW :DOO+HLJKW Śƚ с IW :DOOZHLJKW YǁĂůů с SVI ,QWHULRUZDOOZHLJKW Y ŝŶƚ с SVI 5RRI/RDG :IORRU $EXLOG  4' с ϮϴϬϬϬ OEV :DOO/RDG :ZDOO  KW 4ZDOO  3EXLOG $EXLOG  4LQW с ϮϳϮϬϬ OEV 7RWDO6WRU\:HLJKW :EXLOG :IORRU:ZDOO с ϱϱϮϬϬ OEV 3HUFHQWDJH:HLJKW,QFUHDVH :39:EXLOG 2.$< 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-1 Title Sheet Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature Scope of Work: - Install photovoltaic system on roof of residence - Connect system to existing electrical service Current Codes: - 2019 CEC - 2019 CRC - 2019 Fire Code - 2019 CBC - 2017 NEC Major Components: (23) 360W ACPV Modules (N) 225A Main Service Panel (N) 2 14-50 Outlets System Type: ACPV Module / Grid Interactive All work to be performed by: Urban Energy Solar, Inc. 10192 Constitution Drive Huntington Beach, CA 92646 (562) 447-4971 C-46 Lic. # 944115 AHJ: Santa Ana Sheet Index: PV-1 Title Sheet & Site Plan PV-2 Mounting Details PV-3 Single Line Diagram PV-4 Notes & Signage PV-5 Equipment Data Sheets PV-6 Equipment Data Sheets PV-7 Equipment Data Sheets PV-8 Equipment Data Sheets PV-9 Equipment Data Sheets PV-10 Equipment Data Sheets PV-11 Installer Sheet N 1-story SFD Romex in attic, >18” from ridge (N) Main Service Panel Deodar St (N) Proposed Solar Array(s) (N) SunPower monitoring box (N) Combiner Panel (E) Chimney Property Line Bldg permit #101110065 Elect permit #20175916 Issued 4/14/22 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-10 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-11 Installer Sheet Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-2 Mounting Details Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature Installation is 404 ft2. One Module is 17.54 ft2. One Module is 42.9 lbs. Weight of Racking is 6 lbs / Module. Load of Installation is 2.79 lbs/ft2. Roofing Material is Comp Shingle PV Roof Attachments are Pegasus Comp Shingle Mounts PV Rails are SunPower Invisimount Max Rail Span is 6’ OC between Roof Attachments. N Azimuth: 180 & 270° Roof Pitch: 33º 2x6 Rafters @ 24” OC 5/16 x 3.5" Lag min. 2.5" embed Framing Member Pegasus Comp Mount Sheathing Flashing L-foot Framing Member Rail 3'-6" 6'-4" 6'-8" 3'-0" 3'-0" 1'-4" 3'-2" 2'-9" 3' FD Access Pathway and Setback R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C I V I L No. C70784 Exp. 06/30/2023 S T A T E O F C A L I F O R N I A 2*10)64710) 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-3 Single Line Diagram Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s SignatureNew System Modules and Inverters: 23 SunPower SPR-X22-360-E-AC (334.3W PTC) 23 SunPower SPR-X22-360-E-AC [240V](97.5% CEC Eff.) Modules and Rails are Bonded with SunPower Invisimount Integrated (UL-2703) Grounding System 2P 200A SunPower trunk cable 1 #6 Bare Cu in free air (N) J-box NEMA 3R (N) End-fed Main Service Panel, 225A Bus Bar Solar breaker to be installed at opposite end of bus bar from main breaker 8 3 6 (N) 1 Circuit of 12 ACPV Modules (N) 1 Circuit of 11 ACPV Modules (N) SunPower Monitoring PVS6, NEMA 3R 2 4 #14 THWN-2 (HHNG) in min. 1/2" Conduit (2) 12/3 NM-B (Romex) in attic, >18” from ridge 2P 15A 2P 40A 2P 20A 2P 20A 3 #8 THWN-2 (HHN) 1 #8 THWN-2 EGC in min. 3”/4 Conduit (N) 100A AC Combiner Sub Panel 7 2P 50A 2P 50A (N) 2 14-50 Outlets in garage 6HUYLFHLV$ 992: 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-4 Notes & Signage Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature Notes: 1. Utility is 120V/240V 1Ø3W. 2. PV System is Utility Interactive. 3. Inverter is fully compliant with 2019 CEC 705.40 concerning Lack of Interactive System Power. 4. All PV system components shall be listed by a recognized testing agency. 5. Wiring material shall be suitable for the sun exposure and wet locations. 6.Where the terminal of the disconnecting means may be energized in the open position, a warning sign shall be mounted on or adjacent to the disconnecting means. The sign shall be clearly legible and have the following words or equivalent: “WARNING - ELECTRIC SHOCK HAZARD, DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION." 7. Signs shall be posted adjacent to each PV disconnect and inverter to indicate, "Photovoltaic System”. 8. All PV modules and associated equipment and wiring material shall be protected from any physical damage. 9. In one- and two-family dwelling, live parts in PV source circuits and PV output circuits over 150 Volts to ground shall not be accessible to other than qualified persons while energized. 10. All field installed junction, pull and outlet boxes located behind modules or panels shall be accessible directly or by displacement of a module(s) or panel(s) secured by removable fasteners. 11. Pressure terminals tightened to the recommended torque specification 12. Crimp-on terminals listed and installed with listed crimping tools by the same manufacturer. 13. User accessible fuses in "touch-safe" holders or capable of being changed without touching live contacts. Signage: Signage material shall be reflective, weather-resistant material suitable for the environment. All signage shall fall within the format: Minimum 3/8” Letter Height All Letters Shall be Capitalized Arial or Similar Font, Non-Bold On DC Conduit, Raceways, Enclosures, Cable Assemblies, DC Combiners and Junction Boxes: Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns above and / or below penetrations, all DC combiners, and junction boxes. “WARNING: PHOTOVOLTAIC POWER SOURCE” 30.13 240 CAUTION PV MODULES MAIN SERVICE PANEL COMBINER PANEL urbanenergysolar.com (562) 447-4971 CSLB# 944115 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PARAMETERS 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-5 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-6 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-7 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-8 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 Ur b a n E n e r g y S o l a r , I n c . 10 1 9 2 C o n s t i t u t i o n D r i v e Hu n t i n g t o n B e a c h , C A 92 6 4 6 (5 6 2 ) 4 4 7 4 9 7 1 C- 4 6 L i c . # 9 4 4 1 1 5 8280 W DC 7497 W CEC-AC APN: 396-292-06 Drawn by: M.A. Date: 03/15/2022 PV-9 Equipment Data Sheets Ma n z o , G e n a e & J a v i e r 21 0 6 D e o d a r S t r e e t Sa n t a A n a , C A 9 2 7 0 5 Contractor’s Signature 2106 Deodar 04/14/22 2106 Deodar 04/14/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2106 Deodar St Urban Energy Solar 944115 x x x x x x x x x x Mitch Alexander 530 515 5561 3/21/22 mitch@urbanenergysolar.com 2106 Deodar 04/14/22