Loading...
HomeMy WebLinkAbout2050 W Rembrandt - PlanPROPERTY PLAN - SCALE: 2050 Rembrandt Santa Ana, CA 92704 33 Hanwha Q CELLS Q.PEAK DUO ML-G9+380 Modules in 3 Branches of 11 Modules Each on ExisjiDq Roof Structure :3'-10Z„ 22'-8" 9'-7Z° Rooftop ]-Box to Transition Exposed PV Wire to THWN-2 Conductiors in 4" Conduit Rembrandt 12'-72" L (N) PV Combiner with Monitoring and PV Branch Breakers (located inside of garage) Property Line NW-1 6-42" 11 (E) All -In -One Service Equipment With 60-Amp PV Breaker as AC Disconnect and Rapid Shutdown Driveway Lot Size: 17,424 sq ft Square Feet: 3,441 Type: single family residence Year Built 1965 Last Sold: 06/30/2020 County Name: Orange County Legal Description: Parcel #: 41255142 Roof Area: 4,986 SQFT Solary Array Area: 428.38 SQFT % of Solar Array Coverage: 8.592% C E V E dv' City of Santa Ana CONTRACTOR: Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW SITE PLAN (PLACARD) DATE, 12/20/2021 SCALE AS INDICATED DRAWN BY ALAN SHIH PV=1 SITE PLAN - SCALE: 3/32" = 1'-0" LEGEND - SYSTEM COMPONENTS: CONTRACTOR: f. NEMA 3R JUNCTION BOX LOCATED ON THE Solar Contractors Inc. ADDRESS: ROOF 5628 Baldwin Ave. N 2. EMT ON ROOFTOP OR ON EXTERIOR WALL OR FLEX Temple City, ME(S):0 CONTACT NAME(S): IN WALL, FROM J-BOX OR TRANSITION BOX TO PV Alan Shih W E SUB PANEL OR INVERTER PHONE:626-353-4787 gg 7 t� LICENSE TYPE: B, C-46 E C xE Y V E -� 3. (33) Enphase Energy IQ7A-72-2-US UNDER EACH LICENSE#: 1007552 r MODULE i Oa rand iwau�u change 4. 225A RATED SERVICE PANEL WITH 225A BUS AND PROJECT UTILITY METER, 240V 5. DEDICATED PV SUB PANEL, 2P, 240V MAIN LUG INFORMATION: WITH (3) 20A 2P FOR SOLAR, AND (1) 10A 2P FOR MONITORING OCPDS Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com PV ARRY: SYSTEM DC: 12.54 kW ❑A. (33) Hanwha Q CELLS Q.PEAK DUO ML-G9+380 380W Monocrystalline Modules. 13 deg Tilt // 90, 180, 270 deg Azimuth One Micro Inverter Under Each Module CONSIST OF: 11 Modules A to Inverter Branch Circuit A 11 Modules B to Inverter Branch Circuit B 11 Modules C to Inverter Branch Circuit C NOTES: • ROOF PENETRATIONS TO BE SECURE AND WATER TIGHT • PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED BY PV ARRAY OR SHALL BE REROUTED ROOF PLAN TO ALLOW PROPER VENTILATION • ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA3R RATING. REV DESCRIPTION DATE • ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURE'S INSTALLATION INSTRUCTIONS. • MINIMUM HEIGHT OF CONDUIT FROM ROOF: 7/8" • MODULES HEIGHT FROM ROOF: 3" TO 6" DAT1.E 12/20/2021 • ALL WORK TO COMPLY WITH 2O19 CALIFORNIA BUILDING CODE, 2019 CALIFORNIA ELECTRIC CODE, ARTICLE 690, AND ALL MANUFACTURE'S LISTINGS SATE AS INDICATED DRAWN . .. ALANswH , , 1. , AND INSTALLATION INSTRUCTIONS • Except for panels, inverters and rails, equipment shall be painted to match adjacent surfaces —a •m - ---- • Solar system is utility interactive and without battery storage _ • Roofing material will not be changed under solar panels E r� Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2050 W Rembrandt 11/13/2023 Expedited Permit Process for PV Systems — Micro-Inverter 2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2050 W Rembrandt 11/13/2023 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan             2050 W Rembrandt 11/13/2023 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 11 2050 W Rembrandt 11/13/2023 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone:Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THEREQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE.b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 2050 W Rembrandt 11/13/2023 2050 REMBRANDT, SANTA ANA, CA 92704 DO RESIDENCE Prepared For: BRIGHT SPOT SOLAR 5628 BALDWIN AVE., TEMPLE CITY, CA 91780 626-353-4787 Design Criteria 1- Code: CALIFORNIA BLDG CODE 2019 / ASCE 7-16 2 - Wind: 110 MPH, Exposure: C 3 - Wood Species: DF-L No. 2 (SG = 0.5 ) Notice: Use restrictions of these calculations. The attached Calculations are valid only when bearing original signature hereon. Contractor/Client to verify existing dimensions/conditions prior to construction & solar racking is installed per manufacturer span requirements. The use of these calculations is solely intended for the above mentioned project. 8/18/2021 Structural Calculations for SOLAR POWER SYSTEM CONNECTION CHECK AT: Job: (714) 332-2741 | info@getstructural.com 3000 E. Birch Street Suite 201 | Brea CA 92821 2050 W Rembrandt 09/28/21 ASCE 29.4.4 Rooftop Solar Panels Parallel to the Roof Surface on Buildings of All Heights and Roof Slopes. Roof Slope  = 13 ° Roof Shape Gable Tributary Width s = 4.00 ft Tributary Length l = 3.02 ft Effective Area A e = 6.76 ft2 Height of Structure h = 25 ft Wind Speed V = 110 mph Exposure Category C Building Width B = 45 ft Building Length L = 45 ft Zone Width a = 4.5 ft Elevation Height zg = 33 ft Wind Directionality Kd = 0.85 Topography Factor Kt = 1.00 Ground Elevation Factor Ke = 1.00 Velocity Pressure Exposure Coefficient Kz = 0.95 Velocity Pressure q z = 0.00256KzKztKdKeV2 = 24.86 psf Solar Array Pressure Equalization a = 0.80 Array Edge Factor E = 1.50 Zone GCp p = qz(GCp)(E)(a) 3 - - 3r 3.60 -107.39 3e 3.00 -89.49 2 - - 2r 3.00 -89.49 2e - - 2n 3.00 -89.49 1 - - 1' - - 2050 W Rembrandt 09/28/21 LAG SCREW ANALYSIS Loads Wind Pressures qz = -89.49 psf Solar Panel Load QD = 3 psf Panel Length l = 6.037 ft Panel Width b 3.3793 ft Attachment Spacing s = 4 ft Portrait Tributary Area At = 12.07 ft2 Wind Load P W = qz * At = -1080 lbs Dead Load P D = Q D * At = 36.22 lbs Uplift Pa = 0.6 P D + 0.6 Pw = -627 lbs Landscape Tributary Area At = b * s = 6.7585 ft2 Wind Load P W = qz * At = -605 lbs Dead Load P D = Q D * At = 20.276 lbs Uplift Pa = 0.6 P D + 0.6 Pw = -351 lbs Lag Screw Specific Gravity of Lumber SG = 0.50 (Douglas Fir-Larch) Diameter of Lag Screw D = 5/16 in Withdraw Design /in 1800*SG 3/2 *D 3/4 = 266 lbs/in Depth of Embedment lp = 2.50 in Total Nominal Withdrawal Value W = W * l p = 665 lbs Load Duration Factor CD = 1.6 Withdrawal Design Value W' = W * C D = 1064 lbs Demand Capacity Ratio DCR = Pa / W' = 0.59 < 1 OK 2050 W Rembrandt 09/28/21 ASCE 30.3.2 Design Wind Pressure Beam/ Top Chord Check Roof Slope  = 13 ° Roof Shape Gable Tributary Width s = 2.00 ft Tributary Length L = 25.50 ft Effective Area A = L ( MAX [ s , L/3] ) = 100 ft2 Height of Structure h = 25 ft Wind Speed V = 110 mph Exposure Category C Building Width B = 45 ft Building Length L = 45 ft Zone Width a = 4.5 ft Elevation Height zg = 33 ft Wind Directionality Kd = 0.85 Topography Factor Kt = 1.00 Ground Elevation Factor Ke = 1.00 Velocity Pressure Exposure Coefficient Kz = 0.95 Velocity Pressure q z = 0.00256KzKztKdKeV 2 = 24.86 psf Internal Pressure Coefficient (GCpi) = -0.18 Zone GCp p = q z [(GCp) - (Gcpi)] 3 - - 3r 1.80 -49.22 3e 2.25 -60.41 2 - - 2r 2.25 -60.41 2e - - 2n 2.25 -60.41 1 - - 1' - - 2050 W Rembrandt 09/28/21 Beam/ Top Chord Check Lumber: Moment Demand # of Attachment per Rafter N A = Span : Orientation Lenght (ft) : Dead Load Roof Material: Q D = psf Live Load QLr = psf Wind Load p = psf Snow Load QS = psf Rafter Spacing s = in Wind Load, Portrait Portrait UL = Wind Load, Landscape Landscape U W = Linear Dead Load wd = plf Live Load wLr = plf Start ft Start ft End ft End ft Snow Load ws = plf Start ft Start ft End ft End ft Ma, Moment D lb-ft D+Lr lb-ft D+S lb-ft 0.6D+0.6W lb-ft D+0.45W+0.75Lr lb-ft D+0.45W+0.75S lb-ft Moment Capacity Framing Member Size Lumber Grade : DF-L No. 2 C M = 1 Ct = 1 Cr= CF = fb = psi Cfu =C i = Breadth b = in Depth d = in Section Modulus Sx = bd 2 / 6 = in3 Bending Stress Capacity Fb = CM * C t * Cr * C F * fb = psi Table 4.3.1 NDS 2015 Deflection Limit E = ksi I = in4 Transient Deflection in Transient Deflection Allowed > [OKAY] Total Deflection in Total Deflection Allowed > [OKAY] 1.0 1 20 0.00 24 TILE 0.293 327 180 1.6 2484 psi D+0.45W+0.75S 906 psi 0.36 OKAY 1.6 2484 psi D+0.45W+0.75Lr 906 psi 0.36 OKAY 1.6 2484 psi 0.297 323 120 1600 5.36 0.6D+0.6W 1989 psi 0.80 OKAY 1.15 1785 psi D+S 1079 psi 0.60 OKAY OKAY 1.25 1941 psi D+Lr 1151 psi 0.59 OKAY DCR 0.9 1397 psi D 1079 psi 0.77 3.06 1553 CD Fb' = C D * F b ASD Load Ma * S x 2X4 1.15 1.5 25.50 21.11 25.50 900 1.50 3.50 275 294 275 508 231 231 0 0.0 0 3 0 0 0.0 Landscape 3 0.0 Landscape 0 0.0 0.0 AT (ft2) 12.073 6.7585 pd (lbs) 36.22 -729 p w (lbs) ps (lbs) 0 21.11 40 0.0 0.0 0.0 0.0 0 0.0 Portrait 0 0.0 20.276 -408 0 -729 0.0 Portrait 5 15.9 36.2 -729 0.0 34 1 2 3 4 Eave 2 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 6 20.3 36.2 0.0 8.00 8.00 8.00 0.00 1.50 Portrait 3 9.8 36.2 17.00 -60.41 DF-L No. 2 6 j lj (ft) pd,j  (lbs) pw,j  (lbs) ps,j  (lbs) Portrait 1 3.8 36.2 -729 0.0 8.3 36.2 -729 -729 0.0 4 14.3 36.2 -729 0.0 ൌ ሺ െ ሻ െ െ െ ‐600.0 ‐400.0 ‐200.0 0.0 200.0 400.0 600.0 0.000 5.000 10.000 15.000 20.000 25.000 30.000 2050 W Rembrandt 09/28/21 EISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2019 Part 10 Chapter 5 Section 502.5) PV System Weight Module Model HANWHA Panel Weight Wpanel = 42.9 lbs Number of Panels NPV = 33 Total PV System Weight W PV = Wpanel * NPV = 1416 lbs Existing Roof Weight Roof Weight QD =17.0 psf Building Length Lbuild =45 ft Building Width W build =45 ft Roof Area Abuild =2025 ft2 Building Perimeter Pbuild = 180 ft Wall Height ht = 8 ft Wall weight Qwall = 15 psf Interior wall weight Qint = 10 psf Roof Load Wfloor = Abuild * QD = 34425 lbs Wall LoadWwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2= 20925 lbs Total Story Weight Wbuild = Wfloor + Wwall = 55350 lbs Percentage Weight Increase WPV / Wbuild = 2.56%< 10% OKAY 2050 W Rembrandt 09/28/21 PV-0 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY COVER SHEET PROJECT SUMMARY : SCOPE OF WORK: Installation of a 12.54 kW DC roof mounted photovoltaic system on existing single family residence . Proposed installation to compose of (33 ) 380 W Panels and new electrical components including inverter, disconnects and racking equipment as required. UTILITY PROVIDER: SCE PV SYSTEM OUTPUT: 12.54 kW DC / 11.268 kW AC EQUIPMENT INFO: (33 ) Hanwha Q CELLS Q.PEAK DUO ML-G9+380 , STC rating 380 W, PTC rating 352 W (33 ) Enphase Energy IQ7A-72-2-US   CEC Eff. 97 % ARRAY PLACEMENT: Flush Mounted on Roof top of 2 Story Building ARRAY TILT // AZIMUTH: 13 deg Tilt // 90, 180, 270 deg Azimuth ROOF TYPE: Flat Tile PV MODULE WEIGHT+ RACKING WEIGHT: 1755.39 lb PV ARRAY AREA: 673.62 ft² PV MODULE + RACKING PSF: 2.61 lbs/ft² PV ARRAY HEIGHT: 3 to 6" from top of roofing INTERCONNECTION METHOD: Interconnect via Load Side Connection in (E) 225 A Rated Panel PROJECT NOTES: 1. Solar photovoltaic system to be installed on existing residential structure. 2. Design to comply with the latest edition of California Electrical Code, NEC, the applicable solar guidelines and all local ordinances and policies. 3. This project has been designed in accordance with CBC Section 1609 at 110 MPH Basic Wind Speed under Exposure C . 4. Existing house is 2 story(ies) tall. 5. Existing roof framing consists of 2 in x 4 in Truss at 24 in. on center. 6. This system will not be interconnected until approval from the local jurisdiction and the utility are obtained. 7. This system is an utility interactive system with no storage batteries. 8. The solar photovoltaic installation shall not obstruct any plumbing, mechanical or building roof vents. 9. If the existing main service panel does not have verifiable grounding electrode, it is the contractors responsibility to install a supplemental grounding electrode. 10. Each module will be grounded using the supplied connection points identified on the module and the manufactures installation instructions. 11. A ladder shall be in place for inspection in compliance with CAL-OSHA regulations. 12. Proper access and working clearance will be provided per section 110.210 CEC. 13. All exterior conduit to be painted to mach existing exterior color. 14. Roof access points shall be provided per the following: a. Located in areas not requiring placement of ground ladders over openings such as door or windows. b. Located at strong points of building construction in locations where access point does not conflict with overhead obstructions such as tree limbs, wires, or signs. 15. The maximum height of a solar collector shall not be two feet, measured perpendicular to the roof surface and may not exceed the maximum overall building height set by local AHJ. SHEET INDEX: PV-0 Cover Sheet PV-1 Site Plan PV-2 Roof Plan PV-3 Electrical Diagram SITE MAP PV-4 Spec Sheets PV-5 Notes & Signage PV-6 Mounting Calculations (If Required) PLANS TO COMPLY WITH ALL FOLLOWING CODES: A. 2019 California Building Code B. 2019 California Electrical Code C. 2019 California Residential Code D. 2019 California Fire Code N S EW PV-7 Mounting Details PV-8 Support Railing System Specs PV-9 Grounding Specs PV-10 Load Calculation R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C I V I L No. C70784 Exp. 06/30/2023 S T A T E O F C A L I F O R N I A PHONG TRUONG N/A 9/24/2021101107947 Bldg permit #101107947 Elect permit# 20174286 x x 2050 W Rembrandt 09/28/21 PV-1- Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY SITE PLAN (PLACARD) 2050 W Rembrandt 09/28/21 PV-2 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY ROOF PLAN SITE PLAN - SCALE: 3/32" = 1'-0"LEGEND - SYSTEM COMPONENTS: 1. NEMA 3R JUNCTION BOX LOCATED ON THE ROOF 2. EMT ON ROOFTOP OR ON EXTERIOR WALL OR FLEX IN WALL, FROM J-BOX OR TRANSITION BOX TO PV SUB PANEL OR INVERTER 3. (33 ) Enphase Energy IQ7A-72-2-US UNDER EACH MODULE 4. 225 A RATED SERVICE PANEL WITH 225 A BUS AND UTILITY METER, 240V 5. DEDICATED PV SUB PANEL, 2P, 240V MAIN LUG WITH (3) 20A 2P FOR SOLAR, AND (1) 10A 2P FOR MONITORING OCPDS 6. 60 A 240V 2P Solar AC Disconnect NOTES: · ROOF PENETRATIONS TO BE SECURE AND WATER TIGHT ·PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED BY PV ARRAY OR SHALL BE REROUTED TO ALLOW PROPER VENTILATION ·ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA3R RATING. ·ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURE'S INSTALLATION INSTRUCTIONS. ·MINIMUM HEIGHT OF CONDUIT FROM ROOF: 7/8" ·MODULES HEIGHT FROM ROOF: 3" TO 6" ·ALL WORK TO COMPLY WITH 2019 CALIFORNIA BUILDING CODE, 2019 CALIFORNIA ELECTRIC CODE, ARTICLE 690, AND ALL MANUFACTURE'S LISTINGS AND INSTALLATION INSTRUCTIONS ·Except for panels, inverters and rails, equipment shall be painted to match adjacent surfaces ·Solar system is utility interactive and without battery storage ·Roofing material will not be changed under solar panels PV ARRY: A. (33 ) Hanwha Q CELLS Q.PEAK DUO ML-G9+380 380 W Monocrystalline Modules. 13 deg Tilt // 90, 180, 270 deg Azimuth One Micro Inverter Under Each Module CONSIST OF: 11 Modules A to Inverter Branch Circuit A 11 Modules B to Inverter Branch Circuit B 11 Modules C to Inverter Branch Circuit C N S EW A 1 A A A A A A A A A A A B 3' 3' 3' 3' 3' Fire ClearanceB B B B BB B B B B C C C C C C C CC C C 2 3 4 5 R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C I V I L No. C70784 Exp. 06/30/2023 S T A T E O F C A L I F O R N I A PHONG TRUONG 2050 W Rembrandt 09/28/21 ELECTRICAL DIAGRAM PV-3 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/19/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY MODULE SPECIFICATIONS: MODULE QTY 33 No. MANUFACTURER Hanwha Q CELLS MODEL NUMBER Q.PEAK DUO ML-G9+380 MAX POWER OUTPUT (Pmax) 380 Wp PTC RATING 352 W CELL TYPE Monocrystalline EFFICIENCY 97% ELECTRICAL NOTES: 1. ALL WORK SHALL COMPLY WITH THE 2019 CBC, 2019 CEC, AND 2019 NEC WITH SPECIAL EMPHASIS ON ARTICLE 690. 2. ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600V AND 90°C WET ENVIRONMENT. 3. MODULE SUPPORT RAIL TO BE BONDED VIA SUNPOWER INTEGRATED BONDING. 4. WORKING CLEARANCE AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 5. SOLAR BACKFEED BREAKER TO BE INSTALLED AT OPPOSITE END OF THE CIRCUIT OR FURTHEST AWAY FROM THE MAIN PER 690.64 (B)(7). 6. ALL EQUIPMENT TO BE UL LISTED OR OTHER NRTL., AND LABELED FOR ITS APPLICATION.. 7. MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND SUPPORT RAIL, PER MANUFACTURE'S INSTRUCTIONS. 8. WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. 9. WHERE SIZES OF J- BOXES, RACEWAYS AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. 10. ALL LABELS AND MARKINGS SHALL BE ATTACHED PER NEC ARTICLES 690.5 (C), 690.14 (C)(2), 690.17, 690.53,690.35(F), 690.54, 690.64(B)(7), 705.1, AND THE LOCAL AHJ. 11. ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. OCPD CALCULATIONS: INVERTER OUTPUT CURRENT: 1.21A CONTINUOUS DUTY FACTOR: 1.45 BRANCH A,B,C INVERTERS: 11 B-CIRCUIT CURRENT: 11 X 1.45 X 1.25 = 19.9A-> 20A OCPD BRANCH B, INVERTERS: 8 B-CIRCUIT CURRENT: 8 X 1.21 X 1.25 = 13.61A->15A OCPD 33 x 1.45 x 1.25 = 59.8 -> 60A OCPD AT MAIN SERVICE WIRE SIZE CALCULATIONS J BOX TO AC SUBPANEL: (WORST CASE) MAX CONTINUOUS CURRENT:19.9 MULTIPLE CONDUCTOR 6 CCC FACTOR: 0.8 TEMP DERATE FACTOR =0.91 19.9/0.8/0.91=27.3 WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG AFTER AC SUBPANEL: MAX CONTINUOUS CURRENT:47.9 TEMP DERATE FACTOR =0.91 47.9/0.91=52.6 WIRE SIZE FROM NEC TABLE 310.15(b)16 - 6 AWG AMBIENT TEMP FACTOR 0.71 PER NEC 310.15(b)(2)(a) TEMPERATURE DATA: HIGH TEMPERATURE: ASHRAE 2% AVG. HIGH DESIGN TEMP. =104°F/40°C LOW TEMP: ASHRAE EXTREME ANNUAL MEAN MINIMUM DESIGN TEMP =30.2°F/-1°C INTERCONNECTION CALCULATION 225A BUS *1.20 = 270A - 200 MAIN CB =70 >= 60A OK ELECTRICAL DIAGRAM NOTE: a. PV ARRAY IS (33) Hanwha Q CELLSQ.PEAK DUO ML-G9+380 380W MODULES, EACH MODULE HAS A MICRO INVERTER UNDER THE MODULE. MODULES GROUNDED VIA MID/END CLAMPS TO RAILS PER MANUFACTURER INSTRUCTION. b. AC INTERCONNECTING CABLE SYSTEM SUPPLIED BY MANUFACTURE; BLACK-L 1, RED-L2, GREEN-GROUND. c.NEMA3R RATED JUNCTION BOX OR TRANSITION BOX. d.AC CONDUCTORS IN CONDUIT SHALL BE (6) #10 AWG (COPPER) THWN-2 CONDUCTORS + (1) #8 GROUND THWN-2 GREEN IN 3 4" EMT RAN ON THE ROOFTOP OR EXTERIOR WALL OR FLEX INSIDE WALL e. (N) 125A SOLAR AC SUB PANEL, 120/240V, NEMA 3R, WITH (3)20A 2-POLE FOR SOLAR AND (1) 10A 2-POLE MONITORING OCPD'S. f. (3) #6 AWG (COPPER) THWN-2 CONDUCTORS + (1)#8 GROUND THWN-2 GREEN IN 3/4" EMT ON EXTERIOR OR FLEX INSIDE WALL. g. SOLAR POINT OF CONNECTION IS (N) 225A MAIN SERVICE PANEL WITH (N) 200A MAIN BREAKER ON (N) 225A BUS, 120/240 VAC SINGLE PHASE. CONTRACTOR TO INSTALL (1) NEW 2-POLE 60A SOLAR OCPD. h. EXISTING GROUNDING ELECTRODE. IF NONE EXISTS, A NEW GROUND ROD MAY BE REQUIRED. i.BI-DIRECTIONAL UTILITY METER j.60A Non-Fusible, visible PV AC Disconnect 240V 2P. k.(3) #14 AWG (COPPER) THWN-2 CONDUCTORS (L1,L2,N)+ (1)#14 GROUND THWN-2 GREEN IN 1/2" EMT/LFNC DC AC DC AC DC AC MOD A11 MICRO-INVERTERS IN BRACH- CIRCUIT A MOD A2 MOD A1 DC AC DC AC DC AC MOD B11 MICRO-INVERTERS IN BRACH- CIRCUIT B MOD B2 MOD B1 M MAIN C/B 125A GND (N) 60A/2P UTILITY GRID (N) 10A/2P (N) 20A/2P (N) 20A/2P GN D 125A PV SUB PANEL 12 5 A B U S (N) MAIN C/B 200A (N) 225A MAIN SERVICE PANEL (NON CENTER FED) 22 5 A B U S b. b. c. d. e. f. g. h. i. BUILT IN ENVOY MONITORING a INVERTER SPECIFICATIONS: INVERTER QTY 33 No. MANUFACTURER Enphase Energy MODEL NUMBER IQ7A-72-2-US NOMINAL AC POWER 240 W OPERATING VOLTAGE 240 V MAX AC OUTPUT CURRENT 1.45 A MAX DC POWER 460 W MAX DC VOLTAGE 58 V MPPT VOLTAGE RANGE 18-58 V MAX INPUT CURRENT 15 A EFFICIENCY 97% DC AC DC AC DC AC MOD C11 MICRO-INVERTERS IN BRACH- CIRCUIT C MOD C2 MOD C1 b. (N) 20A/2P 2050 W Rembrandt 09/28/21 MODULE SPECS PV-4-1 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY 2050 W Rembrandt 09/28/21 INVERTER & COMBINER SPECS PV-4-2 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY 2050 W Rembrandt 09/28/21 GENERAL NOTES & SIGNAGE PV-5 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY GENERAL ELECTRICAL REQUIREMENTS. 1.ALL EQUIPMENT SHALL BE UL-LISTED FOR THE APPLICATION. 2.ALL WORK SHALL COMPLY WITH 2013 CALIFORNIA BUILDING CODE, 2013 CALIFORNIA ELECTRIC CODE, ARTICLE 690, AND ALL MANUFACTURER'S LISTINGS AND INSTALLATION INSTRUCTIONS. INSTALLER IS ENCOURAGED TO FOLLOW NEC-2011 WITH A FOCUS ON ARTICLE 690. 3. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. 4.ALL INSTALLED EQUIPMENT TO CONFORM TO NEC 690.61, AN INVERTER OR AN AC MODULE IN AN INTERACTIVE SOLAR PHOTOVOLTAIC SYSTEM SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED. 5.SYSTEM VOLTAGE CALCULATIONS ARE BASED ON EXPECTED AMBIENT TEMPERATURE OF #°C TO ##°C. 6.ALL INSTALLED EQUIPMENT SHALL BE RATED FOR USE WITH CONDUCTORS RATED FOR 90'C. 7.ALL CONDUCTORS SHALL BE COPPER AND SUITABLE FOR WET LOCATIONS. 8.WIRE TYPE TO BE THWN-2 90DEG C OR EQUAL, EXCEPT THOSE IN FREE AIR, IN FREE AIR USE USE-2. 9.ALL MC CONNECTORS BETWEEN MODULES SHALL BE MC4 TYPE OR EQUIVALENT AND CONNECT INSULATED WIRES RATED FOR 90' C AND WET AND EXPOSED CONDITIONS. 10.CLEAR WORKING SPACE ABOUT EQUIPMENT TO BE PROVIDED AS REQUIRED BY CEC 110.26. NO APPARATUS OR OTHER EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION SHALL BE LOCATED IN THE DEDICATED EQUIPMENT SPACE 11.UNDERGROUND CONDUIT RUNS SHALL BE BURIED TO AN 18" MINIMUM DEPTH, EXCEPT WHERE UNDER PARKING LOTS & DRIVEWAYS. A 24" MINIMUM DEPTH UNDER PARKING LOTS & DRIVEWAYS IS REQUIRED. ALL BELOW GRADE RUNS SHALL HAVE THEIR LOCATION IDENTIFIED BY A WARNING RIBBON THAT IS PLACED IN THE TRENCH AT LEAST 12" ABOVE THE UNDERGROUND INSTALLATION 12.ALL INSTALLATION IS ABOVE GROUND. 13.ALL FITTINGS AND HUBS SHALL BE RATED FOR RAIN OR WET LOCATION AND COMPLY WITH UL 514B. 14.WHERE A CONDUIT ENTERS A BOX, FITTING OR OTHER ENCLOSURE, A GROUNDING WIRE IS USED. BONDING JUMPERS TO BE INSTALLED AROUND CONCENTRIC OR ELECTRIC KNOCKOUTS. 15.GROUNDING METHOD SHALL BE CONTINUOUS AND SUCH THAT REMOVAL OF ANY PIECE OF EQUIPMENT SHALL NOT INTERRUPT THE GROUNDING OF ANY OTHER PIECE OF EQUIPMENT. 16.WHERE EVER FIRE RATED BUILDING ASSEMBLIES ARE PENETRATED, SEAL PENETRATION WITH FIRE-RATED SEALANT SO AS TO MAINTAIN REQUIRED RATING PER CBC, CHAPTER 7. 17.INVERTERS TO BE INSTALLED HAVE BEEN TESTED AND LISTED BY UNDERWRITERS LABORATORIES TO MEET THE REQUIREMENTS OF UL1741 STATIC INVERTERS AND CHARGE CONTROLLERS FOR USE IN PV POWER SYSTEMS AND UL1998 SOFTWARE PROGRAMMABLE COMPONENTS, AS WELL AS IEEE-929-2000. 18.DC CONDUCTOR SIZING BASED ON ISC MINIMUM AMPACITY PER NEC 690.9. TEMPERATURE DERATING BASED ON TABLE 310.16, CALC'D AT 90 DEGREES C. CONDUCTOR DERATING BASED ON NEC 310.15(B)(2)(A) AND ON NUMBER OF CURRENT CARRYING CONDUCTORS IN CONDUIT. CONDUIT SIZE PER NEC ANNEX C, TABLE C1. 19.DC DISCONNECT LOCATION SHALL BE IN COMPLIANCE WITH NEC690.14(C)(1). READILY ACCESSIBLE, OUTSIDE OF STRUCTURE OR IF INSIDE, NEAREST TO SYSTEM CONDUCTOR ENTRANCE POINT. 20.DC EQUIPMENT GROUND-CONTINUOUS DC GEC-BOND DIRECTLY TO MAIN AC GEC 21.INDIVIDUALLY GROUND ALL MODULE FRAMES, RAILS AND MOUNTING STRUCTURE USING BARE COPPER WIRE EMPLOYING SEPARABLE CONNECTION IN ACCORDANCE WITH NECK 250.124(A). USE APPROVED LAY-UP LUGS ATTACHED WITH STAINLESS STEAL: 18-8 GRADE OR HIGHER, 24 OR 32 THREADS PER INCH. 22.EQUIPMENT GROUNDING CONDUCTORS SMALLER THAN 6 AWG SHALL BE PROTECTED FROM PHYSICAL DAMAGE BY RACEWAY OR CABLE ARMOR EXCEPT WHERE NOT SUBJECT TO OR WHERE PROTECTED FROM PHYSICAL DAMAGE. 23.AC, DC DISCONNECT AND ALL OTHER APPLICABLE EQUIPMENT TO BE LABELED PER 690.54 AD A POWER SOURCE WITH OPERATING CURRENT & SHORT CIRCUIT CURRENT. 24.CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO CONSTRUCTION 25.SPLICING CONNECTORS: POLARIS CONNECTORS 26.DC ARRAY CONDUCTORS ARE TO REMAIN OUTSIDE OF BUILDING PRIOR TO FUSEABLE COMBINER BOX OR FUSEABLE DC DISCONNECTING MEANS. FUSEABLE DISCONNECTING MEANS IS REQUIRED OUTSIDE OF THE BUILDING, §690.14(C)(1) 27.INSPECTION REQUIRED FOR ROOF CONNECTION MOUNTING ASSEMBLIES PRIOR TO INSTALLATION OF SOLAR MODULE. 28.THE RESPONSIBILITY OF RE-CERTIFYING WINDOWS PER NFRC IS REQUIRED AND PROVIDED BY THE ARCHITECT. 29.EQUIPMENT OVER 600 VOLTS SHALL COMPLY WITH ARTICLE 490 30.FOR CIRCUITS OVER 250 VOLTS TO GROUND, THE ELECTRICAL CONTINUITY OF METAL RACEWAYS SHALL BE ENSURED BY CONNECTIONS USING THREADED COUPLINGS OR LISTED DEVICES SUCH AS BONDING TYPE LOCKNUTS OR BUSHINGS WITH BONDING JUMPERS. 31.RACEWAYS FOR GEC SHALL BE BONDED AT EACH END. 32.FOR DC EQUIPMENT INSTALLED ON THE ROOF, CONDUIT, WIRING SYSTEMS, AND RACEWAYS SHALL BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE, HIP, OR VALLEY AND SHALL RUN FROM THE RIDGE, HIP, OR VALLEY DIRECTLY TO AN OUTSIDE WALL. DC COMBINER BOXES SHALL BE LOCATED SO AS TO MINIMIZE CONDUIT RUNS IN PATHWAYS BETWEEN ARRAYS. DC WIRING LOCATED INSIDE BUILDING SHALL BE RUN IN METALLIC CONDUIT OR IN RACEWAYS AND SHALL BE RUN ALONG THE BOTTOM OF LOAD BEARING STRUCTURAL FRAMING MEMBERS WHEREVER FEASIBLE. 33.DIRECT-CURRENT PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT OF A UTILITY INTERACTIVE INVERTER FROM A BUILDING INTEGRATED OR OTHER PHOTOVOLTAIC SYSTEM SHALL BE RUN OUTSIDE A BUILDING UNLESS CONTAINED IN METALLIC RACEWAYS OR ENCLOSURES FROM THE POINT OF PENETRATION OF THE SURFACE OF THE BUILDING OR STRUCTURE TO THE FIRST READILY ACCESSIBLE DISCONNECTING MEANS. WARNING ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED CAUTION:SOLAR CIRCUIT PHOTOVOLTAIC DISCONNECT WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE PV SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT (A): 47.85A NOMINAL OPERATING AC VOLTAGE (V): 240V NEC 690.5(c) PLACE THIS LABEL ON INVERTER(S) OR NEAR GROUND FAULT INDICATOR NEC 690.14 (C)(2) PLACE THIS LABEL ON ALL DISCONNECTING MEANS NEC 690.17 PLACE THIS LABEL ON ALL DISCONNECTING MEANS WHERE ENERGIZED IN AN OPEN POSITION PLACE MARKINGS EVERY 10FT ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLIES, ALL TURNS, ABOVE AND BELOW PENETRATIONS, ALL DC COMBINERS, AND JUNCTION BOXES IN 3/8" WHITE LETTERING ON RED BACKGROUND, ON FADE RESISTANT MATERIAL *ROOFTOP DISCONNECT SHALL BE PERMANENTLY LABELED IN REFLECTIVE, FADE RESISTANT MATERIAL STATING "EMERGENCY DISCONNECT" NEC 690.64(B)(7) PLACE THIS LABEL AT POC TO SERVICE DISTRIBUTION EQUIPMENT (I.E. SUB OF MAIN PANEL) NEC 690.14, 690.15, 690.54 PLACE THIS LABEL AT "INTERCONNECTIVE POINT OF INTERCONNECTION" (I.E. CONNECTION W/ UTILITY SERVICE SUCH AS MSP) PV EQUIPMENT LABELS AND NOTES: 1. LABEL "CAUTION: SOLAR CIRCUIT" SHALL BE ON ALL EXPOSED CONDUIT, ENCLOSURES, CABLE ASSEMBLIES, JUNCTION BOXES. 2.LABELS SHALL HAVE WHITE LETTERING WITH RED BACKGROUND. 3.LABELS LETTERING SHALL BE ALL CAPITAL LETTERS, ARIAL OR EQUAL FONT, AND A MINIMUM OF 3/8" HEIGHT AND SIZE. 4.LABELS MINIMUM SIZE (HEIGHT =4", WIDTH =4") 5.LABELS SHALL BE REFLECTIVE, WEATHER RESISTANT MATERIAL. 6.ALL PV SYSTEM COMPONENTS SHALL BE LISTED BY A RECOGNIZED TESTING AGENCY. 7.WIRING MATERIAL SHALL BE SUITABLE FOR SUN EXPOSURE AND WET LOCATIONS. FILED APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 8.SIGNS SHALL BE POSTED ADJACENT TO EACH PV DISCONNECT AND INVERTER TO INDICATE "PHOTOVOLTAIC SYSTEM" 9.ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. 10.ALL FIELD INSTALLED JUNCTION, PULL AND OUTLET BOXES LOCATED BEHIND MODULES OR PANELS SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S) OR PANELS(S) SECURED BY REMOVABLE FASTENERS. 11.THE ROOF MOUNTED PHOTOVOLTAIC MODULES, PANELS, OR SOLAR VOLTAIC ROLL ROOFING MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING ROOF-COVERING MATERIAL. §690.5(C) LABELS AND MARKINGS: A WARNING LABEL SHALL APPEAR ON THE UTILITY-INTERACTIVE INVERTER OR BE APPLIED BY INSTALLER NEAR THE GROUNG-FAULT INDICATER AT A VISSIBLE LOCATION, SATTING THE FOLLOWING: WARNING ELECTRICAL SHOCK HAZARD IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED WHEN THE PHOTOVOLTAIC SYSTEM ALSO HAS BATTERIES, THE SAME WARNING SHALL ALSO BE APPLIED BY THE INSTALLER IN A VISIBLE LOCATION AT THE BATTERIES. §690.14(C)(2) MARKING: EACH PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS SHALL BE PERMANENTLY MARKED TO IDENTIFY IT AS A PHOTOVOLTAIC SYSTEM DISCONNECT. §690.15 DISCONNECTION OF PHOTOVOLTAIC EQUIPMENT MEANS SHALL BE PROVIDED TO DISCONNECT EQIPMENT, SUCH AS INVERTERS, BATTERIES, CHARGE CONTROLLERS, AND THE LIKE, FROM ALL UNGROUNDED CONDUCTORS OF ALL SOURCES. IF THE EQUIPMENT IS ENERGIZED FROM MORE THAN ONE SOURCE, THE DISCONNECTING MEANS SHALL BE GROUPED AND IDENTIFIED. §690.17 SWITCH OR CIRCUIT BREAKER: THE DISCONNECTING MEANS FOR UNGROUNDED CONDUCTORS SHALL CONSIST OF A MANUALLY OPERABLE SWITCH(ES) OR CIRCUIT BREAKER(S) COMPLYING WITH ALL THE FOLLOWING REQUIREMENTS: 1. LOCATED WHERE READILY ACCESSIBLE 2. EXTERNALLY OPERABLE WITHOUT EXPOSING THE OPERATOR TO CONTACT WITH LIVE PARTS 3. PLAINLY INDICATING WHETHER IN THE OPEN OR CLOSED POSITION 4. HAVING AN INTERRUPTING RATING SUFFICIENT FOR THE NOMINAL CIRCUIT VOLTAGE AND THE CURRENT THAT IS AVAILABLE AT THE LINE TERMINALS OF THE EQUIPMENT 5. WHERE ALL TERMINALS OF THE DICONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE MOUNTED ON OR ADJACENT TO THE DISCONNECTING MEANS. THE SIGN SHALL BE CLEARLY LEGIBLE AND HAVE THE FOLLOWING WORDS: WARNING ELECTRICAL SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. §690.53 DIRECT-CURRENT PHOTOVOLTAIC POWER SOURCE: APERMANENT LABEL FOR THE DIRECT-CURRENT PHOTOVOLTAIC POWER SOURCE INDICATING ITEMS (1) THROUGH (5) SHALL BE PROVIDED BY THE INSTALLER AT THE PHOTOVOLTAIC DISCONNECTING MEANS: 1. RATED MAXIMUM POWER-POINT CURRENT 2. RATED MAXIMUM POWER-POINT VOLTAGE 3. MAXIMUM SYSTEM VOLTAGE FPN TO (3): SEE 690.7(A) FOR MAXIMUM PHOTOVOLTAIC SYSTEM VOLTAGE. 4. SHORT-CIRCUIT CURRENT FPN TO (4): SEE 690.8(A) FOR CALCULATION OF MAXIMUM CIRCUIT CURRENT. 5. MAXIMUM RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER (IF INSTALLED) FPN: REFLECTING SYSTEMS USED FOR IRRADIANCE ENHANCEMENT MAY RESULT IN INCREASED LEVELS OF OUTPUT CURRENT AND POWER. §690.54 INTERACTIVE SYSTEM POINT OF INTERCONNECTION. ALL INTERACTIVE SYSTEM(S) POINTS OF INTERCONNECTION WITH OTHER SOURCES SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED MAX AC OUTPUT CURRENT AND THE NOMINAL OPERATING AC VOLTAGE. §690.56(B) FACILITIES WITH THE UTILITY SERVICES AND PV SYSTEMS. BUILDING OR STRUCTURES WITH BOTH UTILITY SERVICE AND PHOTOVOLTAIC SYSTEM SHALL HAVE A PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT LOCATED AT THE SAME LOCATION. §690.64(B)4) MARKING. EQUIPMENT CONTAINING OVERCURRNET DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES. GENERAL FIRE GUIDELINES & MARKING REQTS: SEC. 5. MARKINGS, LABELS, AND WARNING SIGNS. A. PURPOSE: PROVIDES EMERGENCY RESPONDERS WITH APPROPRIATE WARNING AND GUIDANCE WITH RESPECT TO ISOLATING THE SOLAR ELECTRICAL SYSTEM. THIS CAN FACILITATE IDENTIFYING ENERGIZED ELECTRICAL LINES THAT CONNECT THE SOLAR PANELS TO THE INVERTER, AS THESE SHOULD NOT BE CUT WHEN VENTING FOR SMOKE REMOVAL. B. MAIN SERVICE DISCONNECT: 1. RESIDENTIAL BUILDINGS: THE MARKING MAY BE PLACED WITHIN THE MAIN SERVICE DISCONNECT. THE MARKING SHALL BE PLACED ON THE OUTSIDE COVER IF THE MAIN SERVICE DISCONNECT IS OPERABLE WITH THE SERVICE PANEL CLOSED. 2. COMMERCIAL BUILDINGS: THE MARKING SHALL BE PLACED ADJACENT TO THE MAIN SERVICE DISCONNECT CLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER IS OPERATED. 3. MARKINGS: VERBIAGE, FORMAT, AND TYPE OF MATERIAL. A. VERBIAGE: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED B. FORMAT: (1) WHITE LETTERING ON A RED BACKGROUND. (2) MINIMUM 3/8 INCHES LETTER HEIGHT. (3) ALL LETTERS SHALL BE CAPITALIZED. (4) ARIAL OR SIMILAR FONT, NON-BOLD. C. MATERIAL: (1) REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL -- 969 AS STANDARD FOR WEATHER RATING). DURABLE ADHESIVE MATERIALS MEET THIS REQUIREMENT. C. MARKING REQUIREMENTS ON DC CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, DC COMBINERS, AND JUNCTION BOXES: 1. MARKINGS: PLACEMENT, VERBIAGE, FORMAT, AND TYPE OF MATERIAL. A. PLACEMENT: MARKINGS SHALL BE PLACED EVERY 10 FEET ON ALL INTERIOR AND EXTERIOR DC CONDUITS, RACEWAYS, ENCLOSURES, AND CABLE ASSEMBLIES, AT TURNS, ABOVE AND FOR BELOW PENETRATIONS, ALL DC COMBINERS, AND JUNCTION BOXES. B. VERBIAGE: CAUTION: SOLAR CIRCUIT NOTE: THE FORMAT AND TYPE OF MATERIAL SHALL ADHERE TO "V.B-3B, C" OF THIS REQUIREMENT. C. INVERTERS ARE NOT REQUIRED TO HAVE CAUTION MARKINGS. SEC. 7. DIRECT CURRENT (DC) CONDUCTOR LOCATIONS. A. CONDUIT, WIRING SYSTEMS, AND RACEWAYS: 1. LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE, HIP OR VALLEY AND FROM THE HIP OR VALLEY AS DIRECTLY AS POSSIBLE TO AN OUTSIDE WALL. B. CONDUIT RUNS BETWEEN SUB ARRAYS AND DC COMBINER BOXES SHALL: 1. USE DESIGN GUIDELINES THAT MINIMIZES THE TOTAL AMOUNT OF CONDUIT USED ON THE ROOF BY TAKING THE SHORTEST PATH FROM THE ARRAY TO THE DC COMBINER BOX. 2. THE DC COMBINER BOXES ARE TO BE LOCATED SUCH THAT CONDUIT RUNS ARE MINIMIZED IN THE PATHWAYS BETWEEN ARRAYS. C. DC WIRING: 1. DC WIRING SHALL BE RUN IN METALLIC CONDUIT OR RACEWAYS WHEN LOCATED WITHIN ENCLOSED SPACES IN A BUILDING. 2. WHEN POSSIBLE DC WIRING SHALL RUN ALONG THE BOTTOM OF LOAD- BEARING MEMBERS. SEC. 8. GROUND MOUNTED PHOTOVOLTAIC ARRAYS. A. SETBACK REQUIREMENTS: 1. DOES NOT APPLY TO GROUND MOUNTED FREESTANDING PHOTOVOLTAIC ARRAYS. 2. A 10 FEET MINIMUM CLEARANCE IS REQUIRED AROUND GROUND-MOUNTED PHOTOVOLTAIC SYSTEMS. 3. SHALL NOT OBSTRUCT FIRE DEPARTMENT ACCESS. SEC. 9. OVERHEAD ARRAYS ON ROOFTOPS (E.G. TRELLIS SYSTEMS). A. MINIMUM REQUIREMENTS: 1. OVERHEAD ARRAYS SHALL COMPLY WITH THE SAME MARKING, LABELING, AND WARNING SIGNS AS REQUIRED OF ROOF-MOUNTED SYSTEMS. 2. THERE SHALL BE AN UNOBSTRUCTED CLEARANCE OF SEVEN FEET OR MORE BETWEEN THE ROOF DECK SURFACE AND THE UNDERSIDE OF THE OVERHEAD ARRAY. 3. THE REGULATIONS IN 57.12.03, AND 57.138.04 OF THE LOS ANGELES FIRE CODE SHALL BE COMPLIED WITH. 4. AN UNINTERRUPTED SECTION OF SOLAR PHOTOVOLTAIC PANELS SHALL NOT EXCEED 150 FEET BY 150 FEET IN DIMENSION IN EITHER AXIS. 5. THE OVERHEAD CLEAR WIDTH BETWEEN ARRAYS OR SUB-ARRAYS SHALL BE FOUR FEET OR GREATER EXTENDING FROM THE EDGE OF THE ARRAY(S) TO THE ROOF DECK SURFACE, THEREBY, MAINTAINING AN UNOBSTRUCTED ACCESS PATHWAY, AND PROVIDING FOR EMERGENCY VENTILATION PROCEDURES. THE USE OF THE AREA BELOW ARRAYS IS PROHIBITED. WARNING DUAL POWER SOURCES SECOND SOURCE IS PHOTO-VOLTAIC SYSTEM RATED AC OUTPUT CURRENT (A): 47.85A AC NORMAL OPERATING VOLTAGE (V): 240V NEC 690.54 PLACE THIS LABEL MAIN SERVICE PANEL PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN NEC 690.56 (c) PLACE THIS LABEL AT RAPID SHUT DOWN DISCONNECT WHERE RAPID SHUT DOWN IS INSTALLED 2050 W Rembrandt 09/28/21 ROOF FLUSH MOUNT DETAILS PV-7 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY ARRAY DETAILS ROOF SPECS RAFTER SIZE 2 in x 4 in Truss O.C. DISTANCE 24 " ROOF MATERIAL Flat Tile ROOF SLOPE 13DEG CROSS SECTION ATTACHMENT LAYOUT 2 in x 4 in Truss 24"O.C. PV Module Attachment (Staggered) Mounting Rail Attachment 5 16" x 3.5" SS Lag Screw Min 2.5" Embedment Into Rafter/Truss Mounting Rail Rafter/Truss PV Module NUMBER OF MODULES 33 MODULE WEIGHT 43 LBS RACKING WEIGHT 257.8466667 LBS TOTAL WEIGHT 1755.39 LBS ARRAY SQUARE FEET 673.62 SQ.F NUMBER OF ATTACHMENTS 68 WEIGHT PER ATTACHMENT 25.81 LBS WEIGHT PER SQ FOOT 2.61 LBS/SQ.F MAX MOUNT SPAN 48" MAXIMUM RAIL OVERHANG 16" ALL SPLICES TO BE SUPPORTED ON BOTH SIDES 5" 4' 4' R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C I V I L No. C70784 Exp. 06/30/2023 S T A T E O F C A L I F O R N I A PHONG TRUONG 2050 W Rembrandt 09/28/21 RACKING SPECS PV-8 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY 2050 W Rembrandt 09/28/21 GROUNDING SPEC PV-9 Solar Contractors Inc. ADDRESS: 5628 Baldwin Ave. Temple City, CA 91780 CONTACT NAME(S): Alan Shih PHONE: 626-353-4787 LICENSE TYPE: B, C-46 LICENSE #: 1007552 CONTRACTOR: PROJECT INFORMATION: Do Residence ADDRESS: 2050 Rembrandt Santa Ana, CA 92704 OWNER NAME(S): Tuan Do PHONE: 812-272-8351 EMAIL: tuandns@gmail.com SYSTEM DC: 12.54 kW SYSTEM AC: 11.268 kW 8/18/2021 ALAN SHIH AS INDICATED REV DESCRIPTION DATE DATE SCALE DRAWN BY 2050 W Rembrandt 09/28/21 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2050 Rembrandt, Santa Ana, CA 92704 Bright Spot Solar 1007552 x x x x x x x x x x Alan Yun Tang Shih 9/13/2021626-353-4787 info@brightspotsolar.com 2050 W Rembrandt 09/28/21