Loading...
HomeMy WebLinkAbout2210 W Avalon Avenue - PlanExpedited Permit Process for PV Systems - AC Module1 Expedited Permit Process for PV Systems AC Module The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the AC Module to use with the Expedited Permit Process. The Standard String, Micro-Inverter, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems AC Module The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 4 Yes 4 flashing 4 Hanwha 340W Modules (Q.PEAK DUO BLK-G6 340) 659 37 17.81 72 285 2.31 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 AC Module Site Plan                                                            California Solar Group Abel Marica7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 2210 W Avalon Ave Santa Ana, CA 92706 +1 818 658 2362 4.64 Unique Solar Design 12/23/2021 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 AC Module Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for AC Module PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A CONDUIT SIZE N/A N/A N/A DESCRIPTIONTAG 1 2 3 4 5 6 7 PART NUMBER NOTES FOR UNUSED AC MODULES PUT "N/A” in BLANK ABOVE 1 2 2 3 EQUIPMENT SCHEDULE J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 5 6 7 5 3 4 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC 1 Hanwha 340W Modules (Q.PEAK DUO BLK-G6 340) 2 (N) Junction-Box Enphase IQ Combiner Box With Enphase Envoy IQ MODEL# X-1Q-AM1-240-3-ES 1 (N) 30A Non-Fused AC Disconnect (120/240V) (E) 200A Main Service Panel (120/240V, 1, 3W) 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 California Solar Group +1 818 658 2362 Abel Marica 2210 W Avalon Ave Santa Ana, CA 92706 4.64 Unique Solar Design 12/23/2021 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for AC Module Electrical Diagram Contractor Name, Address and Phone: Bill Ted Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAXIMUM OCPD RATING AC MODULE MAKE AC MODULE MODEL AC MODULE RATINGS (Guide Appendix C) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT (N/A) 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH AC MODULE CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ___oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR 6 OR LESS CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 12 AMPS OR LESS WHEN PROTECTED BY A 15- AMP OR SMALLER OCPD. b) 10 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 16 AMPS OR LESS WHEN PROTECTED BY A 20- AMP OR SMALLER OCPD. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix F): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) N/A since no dc wiring AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) 45.54 10.02 30 N/A 18.2 240 California Solar Group 7647 Hayvenhurst Ave., Unit 26 2210 W Avalon Ave Santa Ana, CA 92706 Abel Marica Van Nuys, CA 91406 +1 818 658 2362 4.64 Unique Solar Design 12/23/2021 Service Sub Panel OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note GENERAL NOTES: T PVC/RMC/EMT Type Conduit Main Service Panel (N) Solar PV Module Junction Box INDEX Solar Inverter Power Optimizer / Microinverter IQ Combiner Box PV Load Center Performance Meter DC Disconnect FMT Type Conduit (E) Solar PV Module SHEET INDEX TITLE PAGE LINE DIAGRAM CODE REQUIRED SIGNAGE ATTACHMENT LAYOUT INVERTER DATA SHEET MODULE DATA SHEET RACKING DATA SHEET GROUNDING SPECS ATTACHMENT DATA SHEET SITE PLAN PROJECT VICINITY MAP PROJECT SATELLITE VIEW T PV1 PV2 PV3 PV4 (E) Satellite (E) Chimney D1 D2 D3 D4 D5 D6 D7 COMBINER BOX DATA SHEET Setback Line MSP SSP INV DCD J.B IQB PVLC PM (E) AC Unit ALL ELECTRICAL WORK TO BE INSTALLED BY A QUALIFIED AND LICENSED ELECTRICAL CONTRACTOR. ALL SOLAR MODULES SHALL BE UL LISTED 1703 & CEC APPROVED. ALL INVERTERS SHALL BE UL LISTED 1741 CERTIFIED & CEC APPROVED. ALL ELECTRICAL COMPONENTS AND MATERIALS SHALL BE LISTED FOR IT'S PURPOSE AND INSTALLED IN A WORKMAN LIKE MANNER. ALL OUTDOOR EQUIPMENT SHALL MEET APPROPRIATE NEMA STANDARDS. THE ELECTRICAL CONTRACTOR IS ADVISED THAT ALL DRAWINGS AND COMPONENT MANUALS ARE TO BE UNDERSTOOD PRIOR TO INSTALLATION. THE CONTRACTOR IS ADVISED TO HAVE ALL SWITCHES IN THE OFF POSITION AND FUSES REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING COMPONENTS. THIS SYSTEM IS INTENDED TO BE OPERATED IN PARALLEL WITH THE UTILITY SERVICE PROVIDER. ANTI-ISLANDING PROTECTION IS A REQUIREMENT OF UL 1741 AND IS INTENDED TO PREVENT THE OPERATION OF THE PV SYSTEM WHEN THE UTILITY GRID IS NOT OPERATIONAL. PERMISSION TO OPERATE THE SYSTEM IS NOT AUTHORIZED UNTIL FINAL INSPECTIONS AND APPROVALS ARE OBTAINED FROM THE LOCAL AUTHORITY HAVING JURISDICTION AND THE LOCAL UTILITY SERVICE PROVIDER. THE METHOD OF ATTACHMENT CREATES A UNIFIED STRUCTURE TO MEET DEAD LOAD, WIND LOAD, AND SEISMIC REQUIREMENTS. SOLAR MODULES WILL BE SECURED TO THE EXISTING ROOF AS SPECIFIED ON THE STRUCTURAL SHEETS. EXISTING ROOF EQUIPMENT WILL NOT BE EFFECTED BY THE PV SYSTEM. ALL STRUCTURAL DESIGN AND INSTALLATION COMPONENTS ARE THE RESPONSIBILITY OF OTHERS AND OUTSIDE THE SCOPE OF THIS DOCUMENT. ALL FASTENERS SHALL BE CORROSION RESISTANT APPROPRIATE FOR SITE CONDITIONS. CONNECTORS SHALL BE TORQUED PER DEVICE LISTING OR ENGINEERING RECOMMENDATIONS. ALL ROOFING REPAIR MUST MAINTAIN EXISTING CLASS AND TYPE OF ROOF AND ALL WORK SHALL BE IN ACCORDANCE WITH THE ROOF IN MANUFACTURER'S INSTALLATION REQUIREMENTS. PROJECT DESCRIPTION: SYSTEM SIZE: DC STC: 5.10 kW AC CEC: 4.64 kW SOLAR MODULES: (15) HANWHA SOLAR 340W (Q.PEAK DUO BLK-G6 340) INVERTER: (15) ENPHASE IQ7PLUS-72-2-US [240V] [SI1-JUN20] MICROINVERTERS EXISTING MSP BUS: 200A EXISTING MAIN BREAKER: 200A NEW PV BREAKER: 30A ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' TRUSSES 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10158109 LOT AREA: 8,300 SQFT LIVING AREA: 2,031 SQFT Visible Lockable Labeled DisconnectVLLD APPLICABLE CODES 2019 CALIFORNIA ELECTRICAL CODE 2019 CALIFORNIA BUILDING CODE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE 2019 CALIFORNIA ENERGY CODE 2019 CALIFORNIA MECHANICAL CODE 2019 CALIFORNIA PLUMBING CODE RACKING & MODULE CERTIFICATIONS RACKING DETAILSD8 N Bldg# 101109038 Elec# 20175063 Issued 01/13/22 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D5 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D6 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D7 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D8 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note SCALE PV1 Roof access is not located in areas that require placement of ground ladders over exterior wall openings. 0 5 15 ft Roof Access EQUIPMENT INFORMATION 15 (N) Hanwha 340W Modules (Q.PEAK DUO BLK-G6 340) (Page D1) 15 (N) Enphase Microinverters IQ7PLUS-72-2-US [240V] [SI1-JUN20] (Page D2) 1 2 (N) Junction-Box 2 1 (N) Enphase IQ Combiner Box With Enphase Envoy IQ MODEL# X-1Q-AM1-240-3-ES (120/240V) (Page D3) 3 1 (N) 30A Non-Fused AC Disconnect (120/240V) 4 (E) 200A Main Service Panel (120/240V, 1ɸ, 3W) A 15 Hanwha Solar 340W / 15 IQ7+ Microinverters, Array Pitch 20° / Az. 215° 10 PROPERTY LINE 90 120 150 180 210 240 270 300 330 0 30 60 W E S N 80 70 50 4O 2010350 80 320 310 290 280 260 250 230 220 200 190 170 160 140 130 110 100 340 (2) (4)(3) 18'' fire setback 18'' fire setba c k 3' f ire setback 18'' fire setback 18 '' fire setbac k 18'' fire setback W Aval o n A v e Publ i c S i d e walk 75' 100' 105' 105' 15' 26' 27' 58' (A) (1) (1) (2) (3) (4) Drive w a y Gate 3' fire s e tba ck 18'' fire setback 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 Roof Access OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note G N L2 L1 TO UTILITY GRID L2 L1 PV2 5 Photovoltaic system is rapid shut down ready 3 ... 12 1 II J BOX NEMA 3R EQUIPMENT INFORMATION 1 15 (N) Hanwha 340W Modules (Q.PEAK DUO BLK-G6 340) (Page D1) 2 15 (N) Enphase Microinverters IQ7PLUS-72-2-US [240V] [SI1-JUN20] (Page D2) 3 2 (N) Junction-Box 4 1 (N) Enphase IQ Combiner Box With Enphase Envoy IQ MODEL# X-1Q-AM1-240-3-ES (120/240V) (Page D3) 5 1 (N) 30A Non-Fused AC Disconnect (120/240V) 6 (E) 200A Main Service Panel (120/240V, 1ɸ, 3W) PV SYSTEM OUTPUT CALCULATION MAX DC OUTPUT: 340W * 15 = 5.10kW MAX AC OUTPUT: 318.4 W PTC * 15 = 4.78kW * 0.97(CEC) = 4.64kW (2) #14 AWG THWN, (1) #10 AWG CU EGC [C] [D] WIRE TYPE/QTY/SIZE COPPER Enphase Q Cable (2) #10 GRD-SIZE #6, BARE CU WIRE AMP TERMINAL RATING CONDUIT OPEN AIR TEMP. CORRECTION 0.71>3.5 - 12'' AMP. ADJ C.C.C CURRENTWIRE TAG# A B 28.4 >= 18.2A1 ABOVE ROOF / Through Attic #8, EGC CU 0.91 36.4 >= 22.7A 40A 90° 3/4'' EMT 40A 90° C ALONG THE WALL 3/4'' EMT >3.5 - 12'' 4 (N)2P 20A 15A N G (1st) SERIES OF 3 MICROINVERTERS (2nd) SERIES OF 12 MICROINVERTERS 8' Minimum Embedment Rod at 6' From Equipment Ground Conductor Unless Existing Ground is UFER. 200A END FEED MAIN OCPD INSTALL 2P 30A CB(PV) FURTHEST FROM MAIN FEEDER CB #8, EGC CU 0.71THWN-2 (2) #10 L1, L2 28.4 >= 4.5A40A 90° MAIN SERVICE PANEL CALCULATION 120/240V 1ɸ, 3W BUS RATING: 200A MAIN BREAKER SIZE: 200A (200A X 1.2) - 200A MAIN BREAKER = 40A >= 30A (N) SOLAR BREAKER PV ARRAY A HANWHA SOLAR 340W (12) MODULES WIRED IN (2ND) SERIES OF (12) MICROINVERTERS THWN-2 (3) #10 (L1,L2,N)1 (N)2P 20A L1 L2 N G L1 L2 6 [D] 2 31 [A]PV ARRAY A HANWHA SOLAR 340W (3) MODULES WIRED IN (1ST) SERIES OF (3) MICROINVERTERS 21 I J BOX NEMA 3R [B] 0.8 (4 WIRES) 3/4'' EMT >3.5 - 12''#8, EGC CU 0.71THWN-2 (4) #10 L1(2), L2(2)22.7 >= 18.2A40A90° 1 D OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note PV ARRAY J BOX INVERTER *if applicable INTEGRATED DC DISCONNECT AC DISCONNECT * if applicable PV SUB-PANEL * if applicable SUB-PANEL * if applicable PV METER * if applicable METER MAIN SERVICE PANEL SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS PV3 7 DC DISCONNECT * if applicable 4 53 1 1 2 (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) 3 4 5 (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) 6 7 8 9 (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) 10 (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV SUB-PANEL ONLY CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. 11 (STICKER LOCATED ON THE PV SUB PANEL) PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. 12 PHOTOVOLTAIC SYSTEM IS EQUIPPED WITH RAPID SHUT DOWN WARNING: PHOTOVOLTAIC POWER SOURCE 13 705.12 (D)(3) CAUTION DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM 1 2 2 7 86 10 119 7 8 10 119 7 8 9 12 1310 AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: 18.2 A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING! ELECTRIC SHOCK HAZARD. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. ALL SIGNAGE/LABELS SHALL BE IN THE FOLLOWING FORMAT: 1. WHITE LETTERING ON A RED BACKGROUND AND WEATHER RESISTANT 2. MINIMUM 3/8'' LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT, NON-BOLD 5. SHALL BE IN ACCORDANCE WITH APPROPRIATE SECTIONS, TABLES AND ARTICLES OF THE NEC, IFC. METER 14 14 13 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: SERVICE PANEL & UTILITY METER SOLAR DISCONNECT DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE RATED MAX POWER POINT CURRENT- 10.02 AMPS RATED MAX POWER POINT VOLTAGE- 33.94 VOLTS MAXIMUM SYSTEM VOLTAGE- 45.54 VOLTS SHORT CIRCUIT CURRENT- 10.52 AMPS SOLAR MODULES IQ COMBINER BOX W Aval on A v e E S N W OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note PV4 Roof Attachment on 24'' O.C. Rafters PV Railing 72'' Max Rail Span SYSTEM MECHANICAL INFO SOLAR MODULE WEIGHT: 43.9 lbs. SOLAR ARRAY WEIGHT: 659 lbs MICROINVERTERS WEIGHT: 36 lbs SOLAR RACKING 132 lbs TOTAL SYSTEM WEIGHT 827 lbs SOLAR ATTACHMENT QUANTITY 37 SOLAR ARRAY WEIGHT PER ATTACHMENT: 22.4 lbs SOLAR ARRAY DEAD LOAD: 2.90 Ibs/ft2 TOTAL SOLAR AREA: 285 sqft TOTAL ROOF AREA: 3450 sqft % OF COVERED AREA: 8.3% WIND SPEED: 110 mph FOR EXPOSURE C SNOW LOAD: 0 psf SOLAR ARRAY MOUNTING RAIL TYPE: IRONRIDGE XR10 RAIL SOLAR ARRAY ATTACHMENT TYPES: FLASHFOOT2 ATTACHMENT SPACING: 72'' MAX STAGGERED. ROOF FRAMING: TRUSSES 2'' x 4'' @ 24'' O.C. ROOF SHEATHED WITH 1/2'' PLYWOOD AND UPPER SURFACE IS FACED WITH FELT PAPER. FINISHED ROOF SURFACE IS ONE LAYER OF COMPOSITION SHINGLE. 5" 2"x6" Blocking Exterior Load Bearing Wall Exterior Load Bearing Wall 2" BY 4" @ 24" O.C. TRUSSES 20° SOLAR MODULE 5/16'' Lag Bolts with 2.5'' Embedment OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D1 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D2 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D3 OCTOBER 21, 2021 PV SYSTEM AS INDICATED California Solar Group Project Name Address Project Description Contractor 7647 Hayvenhurst Ave., Unit 26 Van Nuys, CA 91406 casolargroup.com info@casolargroup.com Phone Number: +1 818 658 2362 Address & Phone Number CSLB # 1067781 Drawn By: Unique Solar Design SHEET SIZE 11''X 17'' ANSI B SHEET NUMBER Company Logo Signature 2210 W Avalon Ave Santa Ana, CA 92706Abel Marica 5.10KW DC Roof Mounted PV Electrical System 15-Hanwha 340W PV Modules 15-IQ7Plus Enphase Microinverters Note D4 Letter of authorization I, Abel Marica , customer of record at  2210  W Avalon Ave. Santa Ana CA 92706 authorize CA Solar Group (License 1067781 ) to get the City Permits and complete the Solar installation on my Behalf . Customer : Abel Marcia Date : 12/21/21 Signature Document Ref: KKUOV-BJ8PX-WT6QQ-QWUTZ Page 1 of 1 Signature Certificate Document Ref.: KKUOV-BJ8PX-WT6QQ-QWUTZ Document signed by: E-mail: a.marcia@gmail.com Signed via link IP: 91.103.58.19 Date: 23 Dec 2021 12:10:34 UTC Document completed by all parties on: 23 Dec 2021 12:10:34 UTC Page 1 of 1 Signed with PandaDoc.com PandaDoc is a document workflow and certified eSignature solution trusted by 25,000+ companies worldwide. Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.  Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.  Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.  Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.  Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.  Will the PV system be installed without using any ballast system or counter-weight system? 8.  Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2210 W Avalon Ave. Santa Ana CA 92706 California Solar Group 1067781           Danny Thomson anna@casolargroup.com 11/01/2021 801 941 0582 CITY OF SANTA ANA SOLAR PERMIT APPLICATION WORKSHEET PLEASE PRINT REV: 8/29/19 PROJECT ADDRESS:SUITE:SAPIN # USE OF BUILDING: RESIDENTIAL COMMERCIAL INDUSTRIAL OTHER MASTER ID# NATURE OF WORK: SOLAR P.V. SYSTEM SOLAR WATER HEATING/COLLECTOR SYSTEM OTHER JOB DESCRIPTIO N : ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ BUILDING OWNER’S NAME: PHONE NO: ADDRESS: CITY: STATE: ZIP: TENANT’S NAME (Comm/Ind):PHONE NO: CONTRACTOR’S NAME: STATE CONTR. #:LICENSE CLASS: PHONE NO: ADDRESS: CITY: STATE: ZIP: WORKERS COMP. POLICY#: EXP. DATE:INSURANCE COMPANY: SANTA ANA BUS. LIC. #: ARCHITECT/ENGINEER:STATE LICENSE #:PHONE NO: ADDRESS:CITY:STATE:ZIP: CONTACT NAME:PHONE NO: E-MAIL ADDRESS: BLDG. FEE $ OCC. GROUP:P/C FEE PD $ VALUATION: $SUBMITTAL DATE:____________________TYPE OF CONSTR: FLOOD ZONE:___________________PROCESSED________________________ PLANNING OK TO CHECK & DATE:__________________________ BLDG. DEPT. APPROVAL & DATE:___________________________ PLNG CONDITIONS: _________________________________________________________________________________________________ NUMBER OF PANELS: ___________________ SYSTEM kWA:_________________________ 2210 W Avalon Ave. Santa Ana CA 92706 x x Roofmounted PV System Installation with 5.10 kW DC System Size 15 5.1 2210 W Avalon Ave. Santa Ana CA 92706 Abel Marica anna@casolargroup.com Armen Vahanyan California Solar Group 7647 Hayvenhurst Ave., Unit 26 Van Nuys CA 91406 1067781 VB R3 6000 01/11/2021 323 208 1768 801 941 0582 CRUM & FORSTER INDEMNITY COMPANY10/08/2022 BAK86710 CITY OF SANTA ANA DEVELOPMENT FEES WORKSHEET -- ELECTRICAL PERMIT APP FOR ELECTRICAL 06-30-2020 APP-02 CEC2019 Project Address: Contractor: Tenant Name:Address: Building Owner: City: St.: Zip: Address: Contractor License No.: City: St.: Zip: Contractor Email: Phone:Phone: Contact Person: Contact E-Mail Strongly Recommended PLEASE PRINT: Contact Phone: NEW BUILDING OCCUPANCY CHANGE ELECTRICAL ITEM Count $ EACH ELECTRICAL ITEM Count $ EACH 125 Volt Receptacle Outlets 1.57 LOW VOLTAGE SYSTEMS – EACH: phone, data outlet, speaker, thermostat, door holder, doorbell, pull station, smoke detector, alarm device, card reader, etc. (circle items)Light Switches, Occupancy Sensors 1.70 Light Fixtures 1.13 COMMERCIAL: Air Conditioners, Heat Pumps 104.40 FIRST 10 devices or outlets 36.50 Factory-Wired Units (Solid Hook-Ups) 26.71 Additional devices, each 3.45 Dedicated Circuits (15 or 20 AMP Receptacles) 26.71 Each control panel, power supply annunciator, switch or aux equip.1 7.39Time Clock, Photo-Cell, Time Switch 1 3.03 Track-Light, Cable Tray, Special Raceway, Plugmold, Under-Floor Duct, Plug-In Busway, Surface Duct, Etc. (Each 100 Feet or any fraction thereof) 26.71 RESIDENTIAL: Single Dwelling unit 39.56 Each add’l dwelling unit (2 to 20)34.80 Each add’l unit (over 20)21.24 SERVICE METERS & PANELS: Service Meter, Reset Meter, Subpanel, Switchboard, Motor Control Center, Transfer Switch, Busduct, or other Distribution Equipment changes or modifications. (circle items as needed) MISCELLANEOUS Light Standard (Pole) with 1 Fixture 26.72 Additional Fixtures – same pole 0.00 Power Pole (Temporary)1 11.04 Use this column if a Service All others here Additional distribution poles 26.72 Under 400 amperes 57.40 Swimming Pool, Spa, Fountain 1 30.46 400 amperes to 1199 amperes 156.51 Above ground spa 56.37 1200 amperes and over 260.79 Demolition 52.21 POWER APPARATUS: Motor, Transformer, Welder, Industrial Equipment, Oven, Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic Panel, or other Power Equipment changes or modifications. (circle items as needed) Per HP, kW, or kVA SIGNS & neon/LED decorative lighting ($200 refundable sign bond) 80.95 NEW or TOTAL REWIRE for SINGLE FAMILY DWELLINGS SFD Per square foot .16 0 to 1 3.84 Garage Per square foot .1 6 Over 1 to 10 25.09 SUBTOTAL $ Over 10 to 50 49.78 P/C 65% of SUBTOTAL $ Over 50 to 100 1 13.06 MIN. FEE – (Nonresidential) $ 79.06 Over 100 to 500 1 62.45 ISSUANCE & General Plan Surcharge $ 59.30 + 23.79 = $83.09 Over 500 202.92 TOTAL $ OFFICE USE ONLY BLDG PMT RECEIPT BY DATE OCCUPANCY TYPE P/CPAID 2210 W Avalon Ave. Santa Ana CA 92706 2210 W Avalon Ave. Santa Ana CA 92706 Abel Marica California Solar Group 7647 Hayvenhurst Ave., Unit 26 Van Nuys CA 91406 1067781 anna@casolargroup.com 801 941 0582 801 941 0582 Armen Vahanyan Unique Solar Design 13535 Valerio Street Apt 204 Van Nuys CA, 91405 USA 8088008238 USER:Hrach Ghambaryan COMPANY NAME:Unique Solar Design SRC JOB ID:31375 JOB REPORT DATE:2021-10-28/Rev B JOB NUMBER:096 JOB NAME:Abel Marica (Santa Ana) JOB ADDRESS:2210 West Avalon Avenue Santa Ana, CA 92706 Digitally Signed by Phong Truong, P.E. Date: 2021.10.28 09:08:47 -0700 Program Version: 2020-05-08:7 1/2 gyp. Bd. 0 8.3 2x4@24 0 0.0 5/16 2.5 35 2.90 6.5 2Rail Comp. Shingle 20 20 Truss No 6.00 1.71 Yes C 110 69 41 Gable Roof Yes 2.00 Landscape 106 Page 3 of 10 FORMULA SYMBOLS: TAfp Tributary Area to RF Mounts with Portrait PV Orientation (sf) TAfl Tributary Area to RF Mounts with Landscape PV Orientation (sf) TA, Tributary Area to Rafters (sf) laf Pressure Equalization Factor for RF Mounts with Portrait PV Orientation '1af Pressure Equalization Factor for RF Mounts with Landscape PV Orientation Iar Pressure Equalization Factor for Rafters Pup Design Wind Pressure to RF Mounts with Portrait PV Orientation - Zone 1 (psf) PM Design Wind Pressure to RF Mounts with Landscape PV Orientation - Zone 1 (psf) p2fl Design re ure Ytoafters with V Orient on - Zo (ps Pmp Desig ind Pre ure to(ps Prdn Design a ure ow(p GCp1 External Pressure Coefficient for RF Mounts - Zone 1 (depends on TA Fastener) GCp2P'Ejea ernal Pressure Coefficient for RF Mounts - Zonefe depends n T a ever) GCpups oe ci n W I. r R p oAr) GCpdn := External Pressure Coefficient, for Rafters (depends on TAr) ti s Snow on Roof (psf} r— Sfh RF Mount Horizontal Spacing (ft) sf, .= RF Mount Vertical Spacing (ft) q% � � A r I ','� T = Rafter Spacing (ft) Lpv ,= PV Length (ft) i «'Pv PV Width (ft) Lr - Span of Rafter (ft) -T •= Edge Array Factor i QI 2.20 1.50 0.65 1.00 0.65 0.50 2.20 5.35 3.35 10.70 N/A N/A 1.00 110 0.85 C 1.00 1.00 0.90 23.61 0.79 N/A N/A N/A N/A N/A N/A N/A N/A 10.25 0.79 2.00 37.37 2.50 70.07 2.98 83.65 39.00 0.50 1.38 16.35 39.00 0.50 0.40 16.00 235.00 940.00 213.06 441.2% 414.15 227.0% 497.69 188.9% 39.26 29.72 N/A 113.62 98.25 N/A 211.87 1.04 293.3% 126.33 326.82 1.26 243.3% 0 29.72 113.62 0.61 503.1% 0 101.73 273.52 1.05 290.8% 14.20 14.44 1.7% 83.80 149.70 0.58 531.3% 3.00 3.06 1.13 1000 DATE: 10-28-2021/Rev B FOR: Unique Solar Design JOB: Abel Marica (Santa Ana) 13535 Valerio Street Apt 204 2210 West Avalon Avenue Van Nuys, CA 91405 Santa Ana, CA 92706 USA To Whom It May Concern This letter is to certify that we have performed a structural analysis of the existing roof members that are to support photovoltaic panels, as shown on the attached report. The calculations were performed in accordance with the latest editions of IBC, NDS, ASCE/SEI, CBC, and IRC, and the latest edition of the building codes for the state of California. Our analysis was based on the following design criteria: Ground Snow (psf)0 psf Sloped Snow (psf), reduced per ASCE, Sect. 7.4 0 psf Basic Wind Speed (mph):110 mph Roof Slope:20 degrees The PV module orientation:Landscape The maximum horizontal roof mount spacing:6 ft. The maximum vertical roof mount spacing:1.708 ft. Staggered roof mounts required?Yes Based on this analysis, we can certify that the individual existing roof framing members that support the PV panels; and the individual roof members as described in the attached report; are adequate to support the design loads as required by the various codes. This includes Dead Loads (including the weight of the PV panels), Live Loads, Snow Loads, and Wind Loads, on the roof members that support the PV panels, combined as required in the codes. If you have any questions on this or need further clarification, please contact us at your convenience. Sincerely, Paul Truong, P.E. NOTE: 1. Prior to commencement of work, the Solar Installer shall verify that the roof framing sizes, spacing, and spans (between supports), are as noted in these plans. The Engineer of Record must be notified if any discrepancies are discovered, before proceeding. 2. These plans are Stamped for Structural Code compliance of the roof members that support the PV solar system only. 3. These plans are not stamped for rain water leakage prevention. 4. As a precaution, old or wet snow should be removed from the roof, if the snow builds up to 18" or more. Digitally Signed by Phong Truong, P.E. Date: 2021.10.28 09:08:47 -0700 Date of Report: 10-28-2021/Rev B Job Name: Abel Marica (Santa Ana) Data Input by: Hrach Ghambaryan Job Number: 096 Contact E-mail: hrach@uniquesolardesign.com Job Address: 2210 West Avalon Avenue Contact Phone: ​(747) 217-1107 Santa Ana, CA 92706 ABSTRACT This Report is based on Engineering calculations using the input data supplied by the user, listed under Current Input Data. The user input has not been independently reviewed by a licensed Professional Engineer for appropriateness or accuracy, unless Stamped by a P.E. This Report indicates Compliance/Non-Compliance with the reference Codes listed below. The following items have been checked for Code Compliance: - Load Combination #1: Wind Uplift on the Standoff attachment to the Roof Framing members: Wind Uplift - 0.6 * DL Solar - Load Combination #2: Supporting Rafter Strength with: DL Rf + DL Solar + Roof Live Load - Load Combination #3: Supporting Rafter Strength with: DL Rf + DL Solar + Wind Down - Load Combination #4: Supporting Rafter Strength with: DL Rf + DL Solar + Snow - Load Combination #5: Supporting Rafter Strength with: DL Rf + DL Solar + .75Wind + .75Snow - Load Combination #6: Check Additional Seismic Load - Load Combination #7: Supporting Rafter Strength with: Wind Up - 0.6 * (DL Rf + DL Solar) Job Information Data Input By:Hrach Ghambaryan Job Number:096 Job Name:Abel Marica (Santa Ana) Job Address:2210 West Avalon Avenue City, State:Santa Ana, CA 92706 Current Input Data Payment Method Invoice Roof Type Truss Ceiling Type 1/2 gyp. Bd. Collar Tie Space 0 Coverage % 8.3 Frame Size 2x4@24 Ground Snow (psf) 0 Sloped Roof Snow Load (psf) 0 Lag Screw Diam. (in) 5/16 Lag Screw Embed. (in) 2.5 Overall Span (ft) 35 PV Weight (psf) 2.9 PV Module Orientation Landscape Rafter Span (ft) 6.5 Rail System 2Rail Roof Mean Height (ft) 20 Roof Slope (degrees) 20 Roofing Type Comp. Shingle Sloped Ceiling No Max. Horizontal Roof Mount(ft) 6 Max. Vertical Roof Mounts (ft) 1.708 Standoff Staggered Yes Wind Exposure C Wind Speed (mph) 110 6 Ft. 1. Installers to verify rafter size, spacing and sloped spans, and notify the E.O.R of any discrepancies before proceeding. 2. Any rotted or damaged rafters shall be replaced prior to proceeding. 6 Ft. Digitally Signed by Phong Truong, P.E. Date: 2021.10.28 09:08:48 -0700 SRC Job Id: 31375 Ceiling Type: 1/2 gyp. Bd. Collar Tie Space: 0 Coverage %: 8.3 Frame Size: 2x4@24 Ground Snow (psf): 0 Sloped Roof Snow Load (psf): 0 Lag Screw Diameter (in): 5/16 Lag Screw Embedment (in): 2.5 Overall Span (ft): 35 PV Orientation: Landscape PV Weight (psf): 2.9 Rafter Sloped Span (ft): 6.5 Rail System: 2Rail Roofing Type: Comp. Shingle Roof Mean Height (ft): 20 Roof Slope (degrees): 20 Roof Type: Truss Sloped Ceiling?: No Standoff Max. Horz. Space (ft): 6 Standoff Max. Vert. Space (ft): 1.708 Standoff Staggered?: Yes Wind Exposure: C Wind Speed (mph): 110 Unique Solar Design 13535 Valerio Street Apt 204 Van Nuys, CA 91405 USA 096 Abel Marica (Santa Ana) 2210 West Avalon Avenue Santa Ana, CA 92706 10-28-2021