Loading...
HomeMy WebLinkAbout2321 S Rene Dr - PlanRev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.Will the PV system weigh maximum 4 pounds per square feet or less? 5.Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.Will the PV system be installed without using any ballast system or counter-weight system? 8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2321 S Rene Dr. Santa Ana CA 92704 EXO ENERGY INC 1063308 Justin Amarillo (760) 258-4616 10/28/2022 permitting@goexoenergy.com 2321 S Rene Dr 01/25/23 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Coleman D. Larsen, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com October 18, 2022 EXO Energy 1247 Simpson Way Escondido, CA 92029 Re: Engineering Services Jimenez Residence 2321 S Rene Drive, Santa Ana, CA 3.200 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: 2x6 dimensional lumber at 24” on center. Roof Material: Tile Roofing Roof Slope: 23 & 24 degrees Attic Access: Accessible Foundation: Permanent C. Loading Criteria Used • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 psf • Live Load = 20 psf (reducible) – 0 psf at locations of solar panels • Ground Snow Load = 0 psf • Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 95 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2019 California Building Code, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. 2321 S Rene Dr 01/25/23 Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent EcoFasten installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non - uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5/16” lag screw is 235 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using one 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 48” on centers. 4. Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2019 California Building Code, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE California License No. 83664 2321 S Rene Dr 01/25/23 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com Existing Jimenez Residence Roof Dead Load 2321 S Rene Drive 2.0 psf Composite Shingle Santa Ana, CA 1.4 psf 7/16" Plywood Sheathing 2.3 psf 2x6 @ 24 in. o.c. 1.0 psf Ceiling, Mechanical, Electrical 5.8 psf Stucco Ceiling 12.5 psf TOTAL Second Floor Dead Load 0 psf Floor Finishes 0 psf 1 1/8" Subfloor Sheathing 0 psf Joists @ 16' o.c. 0 psf Partitions 0 psf Ceiling, Mechanical, Electrical 0 psf Miscellaneous 0 psf TOTAL Roof Live Load Floor Live Load 20 psf 0 psf Roof Snow Load Ground SnowLoad= 0 psf (to be divided by cosine of roof angle for horizontal projection ASCE 7 Sec. 7.4) pf = 0.7 Ce Ct I pg = 0 psf Ce = 1, Ct = 1.1 Flat Roof Snow Load (ASCE 7-16 Eq. 7.3-1) Cs = 0.85 ASCE 7-16 Figure 7.4-1 Additional Roof Dead Load - New Solar Panels 2 psf Roof Live Load at Solar Panels 0 psf Roof Snow Load at Solar Panels 0 psf Sloped Roof Snow Load (ASCE 7-16 Eq. 7.4-1) Total Total Existing Roof Load = (DLROOF + Max(LLROOF or S)) AreaROOF 71663 lbs Total New Roof Load = (DLROOF + DLADD + Max(LLROOF or S)) AreaROOF 68916 lbs Change in Demand = (Total New Roof Load - Existing Roof Load) / Existing Roof Load -3.83% 2018 IEBC Section 807.4 states: "Existing structural elements supporting any additional gravity loads as a result of the alterations, including the effects of snow drift , shall comply with the International Building Code. EXCEPTION: 1. Structural elements whose stress is not increased by more than 5%." Gravity Loads Total New Gravity Loads are less than Existing Loads. OK 10/18/2022 2321 S Rene Dr 01/25/23 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com V = 95 Basic Wind Speed Jimenez Residence Exposure C ASCE 7-16, Section 26.7 2321 S Rene Drive Kz = 0.85 Velocity Pressure Coefficient, ASCE 7-16, Figure 26.10-1 Santa Ana, CA Kzt = 1 Topographic Factor, ASCE 7-16, Section 26.8.2 Kd = 0.85 Directionality Factor, ASCE 7-16, Section 26.6 Ke = 0.996 Ground Elevation Factor, ASCE 7-16, Section 26.9 qh = 16.6 psf qh = 0.00256KzKztKdKeV2 (ASCE 7-16 Eq. 26.10-1) Roof Angle = 23 deg Roof Type Gable sanchor = 48 in Horizontal spacing of roof anchors Atrib = 11.52 sf Panel Area tributary to each roof anchor GCp External Pressure Coefficient, ASCE 7-16, Figure 30.3-2 Roof Zone Zone 1 2e 2n 2r 3e 3r -1.50 -1.50 -2.49 -2.49 -2.49 -3.31 ga = 0.79 Pressure Equalization Factor, ASCE 7-16 Figure 29.4.-8 gE = 1.00 Edge Array Factor, ASCE 29.4.4 edges < 0.5*building height, and panel spacing < 4ft. pnet = qhGCpgEga =Design Wind Pressure, ASCE 7-16, Equation 29.4-7 Roof Zone 1 2e 2n 2r 3e 3r -20 psf -20 psf -33 psf -33 psf -33 psf -44 psf Min Pressure = -16 psf Use 20 psf Use 20 psf Use 33 psf Use 33 psf Use 33 psf Use 44 psf ULTIMATE x 0.6 = 16 psf 16 psf 20 psf 20 psf 20 psf 26 psf ALLOWABLE Connection to Existing Roof Framing F.S. = 1 Additional Factor of Safety applied to withdrawl force, if desired Atrib = 11.5 ft2 DLpanel = 2 psf Roof Zone 1 2e 2n 2r 3e 3r Wuplift = 20 psf 20 psf 33 psf 33 psf 33 psf 44 psf Plag = F.S. x Atrib x (0.6D - 0.6W) =Withdrawl force for each roof anchor Roof Zone 1 2e 2n 2r 3e 3r -119.5 lbs -119.5 lbs -209.3 lbs -209.3 lbs -209.3 lbs -284.0 lbs Connection Capacity db = 5/16 in Lag Screw diameter Dpen = 2 1/2 in Lag Screw penetration into existing framing member No. of Screws 1 Screws per Connection Species of wood framing C D = 1.6 Load Duration Factor for Wind Loading, NDS Table 2.3.2 Ct = 0.7 Temperature Factor, NDS Table 10.3.4 W = 266 lb/in Withdrawl Capacity, NDS Equation 11.2-1 W' = C D x Ct x W = 298 lb/in Adjusted withdrawl value Pallow = Dpen x W' = 745 lbs Roof Zone 1 2e 2n 2r 3e 3r DEMAND = 119 lbs 119 lbs 209 lbs 209 lbs 209 lbs 284 lbs CAPACITY = 745 lbs 745 lbs 745 lbs 745 lbs 745 lbs 745 lbs up to72in okup to72in okup to72in okup to72in okup to72in okup to72in ok This analysis calculates the capacity of the lag screws only. For capacity of the complete mounting system, please see manufacturer's recommendations. Douglas Fir-Larch Wind Uplift Rooftop Solar Panels Parallel to Roof Surface ASCE 7-16, Section 29.4.4 10/18/2022 2321 S Rene Dr 01/25/23 0 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR COVER PAGE 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. 5.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 6.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS OVER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. 7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. OWNER SCOPE PROJECT ADDRESS PROJECT DATA GENERAL NOTES VICINITY MAP SHEET INDEX 0 COVER PAGE PHOTOVOLTAIC NOTES SATELLITE VIEW BUILDING INFORMATION: SINGLE LINE DIAGRAM CODE REQUIRED SIGNAGE 3 4 ATTACHMENT LAYOUT5 INVERTER DATA SHEET D1 MODULE DATA SHEET RACKING DATA SHEET ELECTRICAL INFORMATION MAIN SERVICE PANEL BUSBAR RATING MAIN SERVICE BREAKER RATING 1ɸ, 3W, 120/240V ROOF PLAN RACKING INFORMATION Main Service Panel Solar Module Micro Inverter / Optimizer EMT / FMT / PVC / RMC type conduit/ Romex NM Cable/ FNMT (Fluid non-metalic tube) 36'' SetbackInverter Utility Meter Production Meter PV Load Center IQ Combiner Box Junction Box Sunpower PV Supervisor 18'' Setback EV Outlet CONSTRUCTION TYPE: V-B ROOF TYPE AHJ APN LOT AREA LIVING AREA MSP UM PM INV PV PVS6 IQ J/B EV NICOLAS JIMENEZ 8 8 ENPHASE IQ8PLUS-72-2-US 2321 S RENE DR SANTA ANA, CA 92704 AC DisconnectACD SSP Service Sub Panel S CONCRETE TILE 1,431 SQFT 14022216 CITY OF SANTA ANA WIRE SIZE CALCULATIONS D2 D3 D4 D5 GROUNDING SPECS ROOF MOUNT INSTALLATION OF DC PHOTOVOLTAIC SYSTEM 3.20 KW DC 3.20 KW 2.88 KW AC NEW UPGRADED 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8 .INVERTER IS EQUIPPED W/ INTEGRATED GFCI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. 11. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PER 230.82(6) 12. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS SIZED AS PER SEC 250.122 13. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. 14. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS 2019 CALIFORNIA ELECTRICAL CODE 2019 CALIFORNIA BUILDING CODE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE 2019 CALIFORNIA ENERGY CODE 2019 CALIFORNIA MECHANICAL CODE 2019 CALIFORNIA PLUMBING CODE 2019 CALIFORNIA RESIDENTIAL CODE 2019 CALIFORNIA FIRE CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: IQ COMBINER BOX DATA SHEET 1 2 6,984 SQFT 1.1 SITE PLAN Battery BackupBB Auto TransformerAT Solar Edge Meter EnclosureSEM Distribution PanelDP Rapid Shutdown Controller RSC Rapid Shutdown Box RSB Itron MeterIM UNIT INDEX CODE REFERENCES ECOFASTEN CLICKFIT 2"X4" @ 24" O.CFRAMING OCCUPANCY: R ONE STORY BUILDING 200A 200A HANWHA 400W Q.PEAK DUO BLK ML-G10+ 400 (don't delete this note) D6 D7 SURVEY PHOTO ATTACHMENT DATA SHEET The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101113476 Elec# 20178435 Issued 01/24/23 2321 S Rene Dr 01/25/23 1.1 PV SYSTEM AS INDICATED OCTOBER 27, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR SITE PLAN N 0° S 180° E 90° W 270° SCALE 10ft5 1 0 PROPERTY LINE 95' 70' 90' 18' 47' Pu b l i c S i d e w a l k S R e n e D r Driveway MSP ACD PV IQ 24' 22' 2321 S Rene Dr 01/25/23 1 ROOF PLAN PV SYSTEM AS INDICATED OCTOBER 27, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR N 0° S 180° E 90° W 270° SCALE 0 5 1 10ft PHOTOVOLTAIC SYSTEM 8 Enphase Energy Microinverters (IQ8PLUS-72-2-US) FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER THE ROOF AT 1 1/2" HEIGHT, THEN UNDER THE EAVE TO PV EQUIPMENT3.20 KW DC 8 Hanwha 400W Modules (Q.PEAK DUO BLK ML-G10+ 400) ROOF AREA CALCULATIONS FIRE SPRINKLERS - NO TOTAL ROOF AREA (SQ.FT.) - 2,205 SOLAR AREA (SQ.FT.) - (N)168+(E)144=312 % OF COVERED AREA - 14.1% 18 ' ' fire s e t ba c k 36'' fire setbac k 18'' fire setb a c k 18 ' ' fi re s et ba c k MSP ACD PV IQ J/B Sa n t a An a Existing Solar System Solar Array 1 5 Hanwha Q.Cell 400W 5 IQ8+ Microinverters Pitch: 24 Deg Orientation: 105 Deg Solar Array 2 3 Hanwha Q.Cell 400W 3 IQ8+ Microinverters Pitch: 23 Deg Orientation: 195 Deg 2321 S Rene Dr 01/25/23 2 SINGLE LINE DIAGRAM PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR ITEM DESCRIPTION QTY# PV MODULE MAIN SERVICE PANEL MAIN SERVICE PANEL & UTILITY METER BUSBAR RATING BREAKER RATING 1 ITEM DESCRIPTION QTY # PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 1 1 1 4 3 1 8 15A 6 M MAIN SERVICE PANEL 120/240V 1P,3W 2 EXISTING GROUNDING SYSTEM UTILITY 2 3 INVERTER PEAK PWR TRACKING VOLTAGE CEC EFFICIENCY PROTECTION RATING: MAXIMUM INPUT CURRENT MAXIMUM OUTPUT CURRENT MAXIMUM INPUT POWER MAXIMUM CONTINUOUS OUTPUT POWER 4 8 Enphase Energy Microinverters (IQ8PLUS-72-2-US) 29-45 V 97.0 % NEMA 6 15.0 A 1.21 A 235-440 W 290 W IQ COMBINER INSTALL 15A PV 2-POLE C/B INSTALL 20A PV 2-POLE C/B 0 1 8 1 15A PV 2-POLE C/B (2)#14 AWG THWN-2 (L1+L2) (1)#14 AWG-NEUTRAL IQ GATEWAY INFORMATION ENPHASE IQ COMBINER BOX WITH ENPHASE IQ GATEWAY 120/240V, NEMA 3R MODEL# X-IQ-AM1-240-(4/4C) 30AAC DISCONNECT NON FUSED AC DISCONNECT LOCKABLE, BLADE TYPE, NEMA 3R, 120/240V 16 17 PV LOAD CENTER PV LOAD CENTER 120/240 1P/3W 125A NEW UPGRADED PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN AND COMPLIANT WITH NEC 690.12 2 1 4 Branch: (8) Modules, (8) Microinverters (N)200A 3 7 200A 200A FOR WIRE SIZE CALCULATIONS PLEASE SEE PAGE #3 INSTALL 2P 30A CB(PV) AT OPPOSITE END OF BUS FROM MAIN FEEDER CB 8 HANWHA 400W Q.PEAK DUO BLK ML-G10+ 400 Voc = 45.30V Vmp =37.13V Isc = 11.14A Imp = 10.77A 20A EXISTING (9) MODULES EXISTING JBOX EXISTING CONDUIT EXISTING CONDUIT 20A 20A 4 225A NEW EXISTING CONDUIT 15A EXISTING IQ COMBINER BOX EXISTING 30A AC DISCONNECT EXISTING CONDUIT 20A 2321 S Rene Dr 01/25/23 97% 0.97 1.21 1.21 8 IQ8PLUS-72-2-US (CEC) FROM JBOX TO IQ COMBINER BOX FROM IQ COMBINER BOX TO PV LOAD CENTER 1 1/2'' TEMP. DERATE FACTOR (TEMP - 39 + 22 = 61C)0.58 RACEWAY HEIGHT FROM ROOF PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR 3 WIRE SIZE CALCULATIONSFROM PV MODULES TO JBOX #12 AWG Q-CABLE, PV WIRE(2) 1 (1) #6 AWG BARE CU EGC 2 #8 AWG CU EGC, (3) 3 (1) #8 AWG CU EGC, MAXIMUM INVERTER OUTPUT CURRENT WALL TEMPERATURE FACTOR OUTPUT CALCULATIONS PV SYSTEM MAX DC OUTPUT PV SYSTEM MAX AC OUTPUT 1.25 0.91 (2) (1) 8 Pmax (PTC Rating) 3/4'' EMT TYPE CONDUIT 3/4'' EMT TYPE CONDUIT #10 AWG THWN-2 WIRE CHART WIRE CHART 1 NUMBER OF SERIES IN BRANCH CIRCUIT BRANCH CIRCUITS INVERTER OUTPUT MAX CURRENT COEFFICIENT 1.25 BRANCH CIRCUIT CURRENT: 8 BREAKER SIZE PER BRANCH CRCT 20A ADJST. FACTOR (1 thru 3 WIRES)1.0 **1.258 1.21 12.1A ADJUSTED CONDUCTOR AMPACITY / / 12.1 0.58 1.0 20.9A NUMBER OF MICROINVERTERS 3.20KW 2.88KW MAIN SERVICE PANEL RATING BUSBAR RATING MAIN BREAKER PV BACKFEED BREAKER SIZE 120% RULE: MAX ALLOWED FEED 30A 200A 200A 240A 200A''MB'' + 30A "SOLAR" = 230A ≤240A MAX WIRE CHART QTY CONSIDER CONTINUOUS COEFFICIENT CONSIDER CONTINUOUS (A)1.25**8 1.21 12.1 *1.25 / 0.91*8 1.21 13.3 #10 AWG THWN-2 TEMPERATURE ADJUSTMENT (A) 8 Attention!!!!!!! Need Calculation (don't delete this note) 8 8 400W * 400 371.5W * 371.5 * Q.PEAK DUO BLK ML-G10+ 400 8 (3) 4 (1) #8 AWG CU EGC, WALL TEMPERATURE FACTOR 3/4'' EMT TYPE CONDUIT MAXIMUM INVERTER OUTPUT CURRENT CONSIDER CONTINUOUS (A) #6 AWG THWN-2 TEMPERATURE ADJUSTMENT (A) FROM PV LOAD CENTER TO MAIN SERVICE PANEL 0.91 (E)10.9+(N)9.68=20.6 25.7 28.3 20.6 * 1.25 20.6 * 1.25 / 0.91 1.25 CONSIDER CONTINUOUS COEFFICIENT 2321 S Rene Dr 01/25/23 11.14 A CODE REQUIRED SIGNAGE 4 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR 60 Hz 290 W N/A CAUTION NEC 705.10(B) & NEC 690.56(B) Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). Plaques will have red background & white lettering. N 0° S 180° E 90° W 270° CONTACT EXO ENERGY SOLAR (888) 463-9667 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: JB B O X WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27(C) & OSHA 1910.145(f)(7) DC D i s c o n n e c t ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT NEC 690.53 NEC 690.13(B) In v e r t e r / P V L o a d WARNING THE DISCONNECTION OF THE GROUNDING CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE ON THE EQUIPMENT NEC 690.31(I) NEC 690.54 AC D i s c o n n e c t NEC 690.54 NEC 690.52 WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) PM M E T E R NEC 705.12(D)(3) & NEC 690.59 Ma i n / S u b P a n e l NEC 690.54 NEC 690.13 (F), NEC 705.12(B)(3-4) & NEC 690.59 NEC 705.12(D)(3) & NEC 690.59 NEC 690.15 (C) & NEC 690.33(E)(2) NEC 690.13(B) SINGLE 120-VOLT SUPPLY DO NOT CONNECT MULTIWIRE BRANCH CIRCUIT NEC 710.15(C) & 692.9 (C) TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27(C) & OSHA 1910.145(f)(7) WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) NEC 705.12 (B)(2)(c) LABELING REQUIREMENTS FOR ARTICLE 690 NEC 690.13(B) Each PV system disconnecting means shall plainly indicate whether in the open (off) or closed (on) position and be permanently marked “PV SYSTEM DISCONNECT” or equivalent. Additional markings shall be permitted based upon the specific system configuration. For PV system disconnecting means where the line and load terminals may be energized in the open position, the device shall be marked with the following words or equivalent. NEC 690.13(F) Type of Disconnect. A dc PV system disconnecting means shall be marked for use in PV systems or be suitable for backfeed operation. NEC 690.15(C) An isolating device shall be rated to open the maximum circuit current under load or be marked “Do Not Disconnect Under Load” or “Not for Current Interrupting.” NEC 690.31(B)(1) PV system circuit conductors shall be identified at all accessible points of termination, connection and splices. The means of identification shall be permitted by separate color coding, marking tape, tagging or other approved means. NEC 690.31(G)(1) Where circuits are embedded in build up, laminate or membrane roofing materials not covered by PV modules and associated equipment, the location of the circuits shall be clearly marked. NEC 690.31(G)(4) PV dc system circuit labels shall appear on every section of the wiring system that is separated by enclosures, walls, partitions, ceilings, or floors. Spacing between labels or markings, or between a label and a marking, shall not be more than 3 m (10 ft). Labels required in this section shall be suitable for the environment where they are installed. NEC 690.31(I) Solidly-grounded bipolar PV systems shall be clearly marked with a permanent, legible warning notice indicating that the disconnection of the grounded conductor(s) may result in overvoltage on the equipment. NEC 690.33(E)(2) Interruption of Circuit. Connectors shall be a type that requires the use of a tool to open and marked “Do Not Disconnect Under Load” or “Not for Current Interrupting.” NEC 690.52 Alternating-current modules shall be marked with identification of terminals or leads and with identification of the following ratings. NEC 690.53A permanent label for the dc PV power source indicating items (1) through (3) shall be provided by the installer at dc PV system disconnecting means and at each dc equipment disconnecting means required by 690.15. Where a disconnecting means has more than one dc PV power source, the values in 690.53 (1) through (3) shall be specified for each source. NEC 690.54 All interactive system(s) points of interconnection with other sources shall be marked as an accessible location at the disconnecting means as a power source and with the rated ac output current and the nominal operating ac voltage. NEC 690.55 The PV system output circuit conductors shall be marked to indicate polarity where connected to energy storage systems. NEC 690.56(B)Plaques or directories shall be installed in accordance with 705.10. NEC 690.56(C)(3) A rapid shutdown switch shall have a label located on or no more than 1 meter (3 ft) from the switch that includes the following wording. NEC 690.56(C)(1)(a-b) The type of PV system shall be labeled as described in a) or b): NEC 690.59 PV systems connected to other sources shall be installed in accordance with Parts I and II of Article 705. SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH ON THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY IFC 605.11.3.1(1) & 690.56(C)(1)(a) NEC 690.56(C)(3) NEC 690.31(G)(3)(4) NEC 690.31(G)(1)CO N D U I T RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT MAXIMUM VOLTAGE MAXIMUM CIRCUIT CURRENT MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED) DC DISCONNECT PHOTOVOLTAIC WARNING WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAX OVERCURRENT DEVICE RATING FOR AC MODULE PROTECTION RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING CAUTION PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED WARNING POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING DO NOT DISCONNECT UNDER LOAD RAPID SHUT DOWN SWITCH FOR SOLAR PV SYSTEM WARNING: PHOTOVOLTAIC POWER SOURCE WARNING PHOTOVOLTAIC POWER SOURCE DO NOT REMOVE UNLESS REPLACED IN EXACT LOCATION - PV POWER CIRCUIT DIRECTLY BELOW WARNING FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGH TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [CEC 690.56(C)(1)(A)] 50.7 V 240 Vac 240 Vac 240 Vac 240 Vac NEC 690.13(B) AC DISCONNECT PHOTOVOLTAIC 30 A 9.68 A 9.68 A 9.68 A 9.68 A IQ COMBINER BOX PV LOAD CENTER PV SYSTEM DISCONNECT FOR UTILITY OPERATION SERVICE POINT & UTILITY METERING SOLAR ARRAY ON THE ROOF Sa n t a A n a 2321 S Rene Dr 01/25/23 ATTACHMENT LAYOUT 5 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR STRUCTURAL STAMPROOF PITCH ROOFING TYPE ATTACHMENT TYPE FRAMING TYPE FRAMING SIZE PENETRATION PATTERN 24° RACKING TYPE MAX PENETRATION SPACING ROOFING LAYERS WIND SPEED EXPOSURE C LAG BOLTS MOUNTS AND MOUNTING HARDWARE WILL BE SEALED WITH CHEM LINK SEALANT OR EQUIVALENT. MODULE WEIGHT (LBS) # OF MODULES TOTAL MODULE WEIGHT (LBS) RACK WEIGHT (LBS) TOTAL SYSTEM WEIGHT (LBS) # OF STANDOFFS LOADING PER STANDOFF (LBS) TOTAL MODULE AREA (SQ.FT.) LOADING (PSF) WEIGHT LOAD CALCULATION INDEX ROOF SHEATHED WITH 1/2" PLYWOOD AND UPPER SURFACE IS FACED WITH FELT PAPER TOTAL ROOF AREA (Sq. FT) % OF COVERED AREA NEW SYSTEM PV MODULE MODEL # MICROINVERTER WEIGHT (LBS) 8 Roof 1 1 Layer S Concrete Tile EcoFasten Rafter Staggered 48" MIN 2.5" EMBEDMENT RACKING RAIL ATTACHMENT ROOF FRAMING 5/16" X 4.0" Ecofasten Tile Hook Flashing ATTACHMENT DETAILS ROOF SHEETING WATERPROOF MEMBRAIN ROOF TILE SOLAR MODULE ECOFASTEN RAIL 5/16"x4.0" LAG BOLT WITH 2 1/2"MIN THREAS PENETRATION ECOFASTEN'S CLICKFIT TILE HOOK TILE HOOK FLASHING 2''X6'' Blocking 2''X4'' Support 2''X4'' Purlin 2''X6'' Collar Tie SOLAR MODULE ROOF ASCE 7-16 Max 3.5'' 48.5 Q.PEAK DUO BLK ML-G10+ 400 20 168 2205 388 78 19 485 24.2 2.88 7.6 23° Roof 2 1 Layer S Concrete Tile EcoFasten Rafter StaggeredEcofasten Tile Hook Flashing 72'' 24'' 48" 24" Roof 1 Roof 2 2"X6" @ 24" O.C 2"X6" @ 24" O.C 95 MPH 48" 2321 S Rene Dr 01/25/23 D1 MODULE DATA SHEET PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR 2321 S Rene Dr 01/25/23 INVERTER DATA SHEET PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR D2 2321 S Rene Dr 01/25/23 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR IQ COMBINER BOX DATA SHEET D3 2321 S Rene Dr 01/25/23 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR D4 RACKING DATA SHEET 2321 S Rene Dr 01/25/23 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR ATTACHMENT DATA SHEET D5 2321 S Rene Dr 01/25/23 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR D6 GROUNDING SPECS 2321 S Rene Dr 01/25/23 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2321 S Rene Dr 01/25/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. No flashing Ecofasten Clickfit/Tile Hook Flashing #: 3013017 485 20 24.2 72/48 168 2205 2321 S Rene Dr 01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                          EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 Nicolas Jimenez 2321 S Rener Dr, Santa Ana, CA 92704 2.88KW 11.04.2022 18 ' ' fire se t ba c k 36'' fire setback 18'' fire setback 18'' fire se t ba c k MSP ACD PV IQ J/B Sa n t a An a Existing Solar System Solar Array 1 5 Hanwha Q.Cell 400W 5 IQ8+ Microinverters Pitch: 24 Deg Orientation: 105 Deg Solar Array 2 3 Hanwha Q.Cell 400W 3 IQ8+ Microinverters Pitch: 23 Deg Orientation: 195 Deg 2321 S Rene Dr 01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT Q.PEAK DUO BLK ML-G10+ 400 Hanwha 400W IQ8PLUS-72-2-US Enphase Energy Microinverters PVC JUNCTION BOX, 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 X-IQ-AM1-240-(4/4C) ENPHASE IQ COMBINER BOX WITH ENPHASE IQ GATEWAY 120/240V, NEMA 3R NON FUSED AC DISCONNECT LOCKABLE, 30A, BLADE TYPE, NEMA 3R, 120/240V 225/200 A End Fed main service panel 8 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 Nicolas Jimenez 2321 S Rener Dr, Santa Ana, CA 92704 2.88KW 11.04.2022 #6 1 3/4" 3/4" EMT EMT #10 #10 3 2 #8 1 #8 1 2321 S Rene Dr 01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram Nicolas Jimenez EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 9.68A 2321 S Rener Dr, Santa Ana, CA 92704 2.88KW 11.04.2022 HANWHA Q.PEAK DUO BLK ML-G10+ 400 10.77A 37.13V 45.30V 11.14A 20A 400W 1000V 50.7V Enphase IQ8PLUS-72-2-US 29-45V 290W 240V 240V 1.21A 20A 1 2321 S Rene Dr 01/25/23 2321 S Rene Dr 01/25/23 PV SYSTEM AS INDICATED SEPTEMBER 23, 2022 NICOLAS JIMENEZ 2321 S RENE DR SANTA ANA, CA 92704 Current Insight, LLC 2852 W. Amini Way South Jordan, UT 84095 EXO ENERGY Address: 1247 Simpson Way Escondido, CA 92029 Phone Number: 208-351-4153 CSLB:#1063308 Drafted By: CONTRACTOR D7 SURVEY PHOTO 2321 S Rene Dr 01/25/23