HomeMy WebLinkAbout2422 N Pacific Ave - Plan(N)JUNCTION
BOX OR EQUIV
2
(N)(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
WITH
(13)CERTAINTEED SOLAR CT370HC11-06 MODULES
1
(1) BRANCH OF (13) MICRO-INVERTERS(13 MODULES)
(N)CERTAINTEED SOLAR CT370HC11-06,
370W MODULES
3
(N)ENPHASE IQ COMBINER 3
AC COMBINER WITH ENPHASE
ENVOY-S X-IQ-AM1-240-3
120/240 NEMA 3R INSTALL (1)20A
PV 2P BREAKERS(ONLY FOR
SOLAR NO LOAD TO BE ADDED)
20A
15A
(N)100A
MAIN
BREAKER
M
PV BREAKER AT THE
OPPOSITE END OF
BUSBAR
30A 2P PV
BREAKER
EXISTING 120/240V
1PH 60HZ
UT
I
L
I
T
Y
GR
I
D
(E)GROUND
ELECTRODE
(N)125A END FED
MAIN PANEL
UTILITY:SCE
222013-580348
(N) 30A AC
DISCONNECT
AC DISCONNECT NON
FUSED 30A, 120/240V, 2P
3
SINGLE LINE DIAGRAM
E-1.0
SINGLE LINE DIAGRAM: DC SYSTEM SIZE - 4810W, AC SYSTEM SIZE - 3770W, CEC AC SYSTEM SIZE - 4360W
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATIONELECTRICAL NOTES:
1. MAXIMUM DC/AC VOLTAGE DROP SHALL BE NO
MORE THAN 2%.
2. BREAKER/FUSE SIZES CONFORMS TO CEC 240.6
CODE SECTION.
3. AC GROUNDING ELECTRODE CONDUCTOR SIZED
PER CEC 250.66.
4. AMBIENT TEMPERATURE CORRECTION FACTOR IS
BASED ON CEC 690.31(A).
5. AMBIENT TEMPERATURE ADJUSTMENT FACTOR IS
BASED ON CEC 310.15(B)(2).
6. MAX. SYSTEM VOLTAGE CORRECTION IS PER CEC
690.7.
7. CONDUCTORS ARE SIZED PER WIRE AMPACITY
TABLE CEC 310.15(B)(16).
8. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE
LISTED AS SUNLIGHT RESISTANT PER CEC 310.10(D).
9. CONDUCTORS EXPOSED TO WET LOCATIONS
SHALL BE SUITABLE FOR USE IN WET LOCATIONS
PER CEC 310.10(C).
NOTE:
1. MICRO INVERTERS ARE UL1741 RATED
2. EACH MICRO INVERTER IS RAPID SHUTDOWN COMPLIANT
OCPD CALCULATIONS:
MAIN PANEL RATING:125A,
MAIN BREAKER RATING:100A
120% RULE: (125AX1.2)-100A=50A
=>ALLOWABLE BACKFEED IS 50A
INVERTER OVERCURRENT PROTECTION=
INVERTER O/P I X CONTINUOUS LOAD(1.25)X
#OF INVERTERS =1.21x1.25x13=19.66 A
=>PV BREAKER = 30A
ALLOWABLE BACKFEED 50A =>30A PV BREAKER
THE DESIGNED INTERCONNECTION MEETS THE
705.12(B)(2) REQUIREMENTS
MODULE SPECIFICATION
MODEL CERTAINTEED SOLAR
CT370HC11-06
MODULE POWER @ STC 370W
OPEN CIRCUIT VOLTAGE:Voc 40.8V
MAX POWER VOLTAGE:Vmp 34.06V
SHORT CIRCUIT CURRENT:Isc 11.51A
MAX POWER CURRENT:Imp 10.87A
MICRO INVERTER SPECIFICATIONS
MODEL ENPHASE
IQ7PLUS-72-2-US(240V,1PH)
POWER RATING 290W
MAX OUTPUT CURRENT 1.21A
CEC WEIGHTED EFFICIENCY 97%
MAX NO OF MICRO INVERTERS/BRANCH 13
MAX DC VOLTAGE 60V
CONDUIT SCHEDULE
TAG ID CONDUIT SIZE CONDUCTOR NEUTRAL GROUND
1 NONE (2) 12 AWG ENPHASE Q CABLE PER
BRANCH CIRCUIT NONE (1) 6 AWG BARE COPPER
2 3/4"EMT OR EQUIV (2) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2
3 3/4"EMT OR EQUIV (2) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2
TAG
ID REQUIRED CONDUCTOR AMPACITY CORRECTED AMPACITY CALCULATION TERMINAL RATING CHECK DERATED CONDUCTOR AMPACITY CHECK
1 1.21 X 13 = 15.73 X 1.25 = 19.66A 30 X 0.96 X 1 =28.80A 19.66A <25A 19.66A <28.80A
2 1.21 X 13 = 15.73 X 1.25 = 19.66A 40 X 0.96 X 1 =38.40A 19.66A <35A 19.66A <38.40A
3 1.21 X 13 = 15.73 X 1.25 = 19.66A 40 X 0.96 X 1 =38.40A 19.66A <35A 19.66A <38.40A
ELECTRICAL CALCULATION
MAIN PANEL UPGRADE:REPLACE EXISTING MAIN SERVICE
PANEL WITH NEW 125/100A MAIN PANEL
1. NEW SERVICE PANEL MUST BE COMBINATION/ALL-IN-ONE, AND METER AND MAIN CANNOT BE SEPARATE.
2. LISTED COMBINATION OVERHEAD AND UNDERGROUND FEED SERVICE BOXES REQUIRED
3. 125A SERVICE REQUIRES A MINIMUM 6 AWG CONDUCTOR TO 10' OF UNDERGROUND METAL WATER PIPE
ELECTRODE. BOND ON THE INSIDE/OUTSIDE WITHIN FIRST 5' OF WHERE THE WATER ENTERS THE BUILDING. AN
ADDITIONAL CONNECTION UFER OR 2 NEW RODS IS NEEDED - LOCATED 6' FROM OTHER ELECTRODES. WATER
PIPE MAY NOT BE USED TO BOND ANY ELECTRODES UNLESS BURIED OR ENCASED, ELECTRODE CONNECTIONS
MUST BE ACCESSIBLE
2422 N Pacific Ave
10/07/22
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
2422 N Pacific Ave
10/07/22
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
2422 N Pacific Ave
10/07/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
LCMSP AC
19'-8"
12
'
-
6
"
34
'
-
9
"
1'-6" FIRE SETBACK
3' FIRE SETBACK
PHOTOVOLTAIC ARRAY ON THE ROOF
MICROINVERTERS UNDER ARRAY
(N) MAIN SERVICE PANEL (EXTERIOR
(N)N) AC DISCONNECT (EXTERI
(N)N) ENPHASE IQ COMBINER 3 (EXTERI
CONDUIT RUN
BVI SOLAR
JUAN HERNANDEZ7867 DUNBROOK RD SUITE D
SAN DIEGO CA 92126 2422 PACIFIC AVE. SANTA ANA CA 92706
3.77
2422 N Pacific Ave
10/07/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: 9/15/2022 SHEET
Drawn By: RVR
Checked By: ROBERTA
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
BVI SOLAR
7867 DUNBROOK RD SUITE D
SAN DIEGO CA 92126
JUAN HERNANDEZ
3.77
2422 PACIFIC AVE. SANTA ANA CA 92706
2422 N Pacific Ave
10/07/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
BVI SOLAR
7867 DUNBROOK RD SUITE D
SAN DIEGO CA 92126
JUAN HERNANDEZ
2422 PACIFIC AVE. SANTA ANA CA 92706
3.77
2422 N Pacific Ave
10/07/22
September 22, 2022.
To Whom It May Concern,
Please allow this letter to serve as authorization for Bitterend Ventures INC DBA BVI Solar to install
a 4.81kW photovoltaic system and perform an electric service upgrade on my property located at
2422 N Pacific Ave, in Santa Ana, CA 92706.
Please contact me if you have any questions or concerns.
Thank you,
___________________________
Property Owner's Name
___________________________
Signature
___________________________
Date
___________________________
Phone Number
DocuSign Envelope ID: 86E33B6A-0F21-4444-9072-E83EB46D2FF2
9/24/2022
Phone Number714 6733158
Juan F Hernandez
2422 N Pacific Ave
10/07/22
Certificate Of Completion
Envelope Id: 86E33B6A0F2144449072E83EB46D2FF2 Status: Completed
Subject: Please DocuSign: Letter of Authorization from Homeowner
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 5 Initials: 0 Tyler Field
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
191130 PO Box
San Diego, CA 92159
bvisolar@gmail.com
IP Address: 191.250.187.139
Record Tracking
Status: Original
9/23/2022 8:58:26 AM
Holder: Tyler Field
bvisolar@gmail.com
Location: DocuSign
Signer Events Signature Timestamp
Juan F Hernandez
jfhernandez64@icloud.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 172.117.26.254
Signed using mobile
Sent: 9/23/2022 9:05:45 AM
Viewed: 9/24/2022 8:05:36 AM
Signed: 9/24/2022 8:19:03 AM
Electronic Record and Signature Disclosure:
Accepted: 9/24/2022 8:05:36 AM
ID: 09725880-3c46-47e8-bd86-f60a38d74e5c
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Roberta Sartoretto
rsartoretto@bvisolar.com
Project Coordinator
Security Level: Email, Account Authentication
(None)
Sent: 9/23/2022 9:05:45 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 9/23/2022 9:05:45 AM
Certified Delivered Security Checked 9/24/2022 8:05:36 AM
Signing Complete Security Checked 9/24/2022 8:19:03 AM
Completed Security Checked 9/24/2022 8:19:03 AM
2422 N Pacific Ave
10/07/22
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
2422 N Pacific Ave
10/07/22
CONSUMER DISCLOSURE
From time to time, BVI Solar (we, us or Company) may be required by law to provide to you
certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through the DocuSign, Inc.
(DocuSign) electronic signing system. Please read the information below carefully and
thoroughly, and if you can access this information electronically to your satisfaction and agree to
these terms and conditions, please confirm your agreement by clicking the I agree button at the
bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign Withdraw Consent form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
Electronic Record and Signature Disclosure created on: 2/21/2018 2:31:16 PM
Parties agreed to: Juan F Hernandez
2422 N Pacific Ave
10/07/22
electronically from us.
How to contact BVI Solar:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: bvisolar@gmail.com
To advise BVI Solar of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at bvisolar@gmail.com and in the
body of such request you must state: your previous e-mail address, your new e-mail address. We
do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from BVI Solar
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to bvisolar@gmail.com and in the body
of such request you must state your e-mail address, full name, US Postal address, and telephone
number. We will bill you for any fees at that time, if any.
To withdraw your consent with BVI Solar
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to bvisolar@gmail.com and in the body of such request you must state
your e-mail, full name, US Postal Address, and telephone number. We do not need any
other information from you to withdraw consent.. The consequences of your withdrawing
consent for online documents will be that transactions may take a longer time to process..
Required hardware and software
Operating Systems:Windows® 2000, Windows® XP, Windows
Vista®; Mac OS® X
Browsers:Final release versions of Internet Explorer® 6.0
or above (Windows only); Mozilla Firefox 2.0
or above (Windows and Mac); Safari 3.0 or
above (Mac only)
PDF Reader:Acrobat® or similar software may be required
to view and print PDF files
Screen Resolution:800 x 600 minimum
Enabled Security Settings:Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
2422 N Pacific Ave
10/07/22
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the I agree button below.
By checking the I agree box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC CONSUMER DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify BVI Solar as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by BVI Solar during the course of my relationship with you.
2422 N Pacific Ave
10/07/22
September 22, 2022.
To Whom It May Concern,
Please allow this letter to serve as authorization for Bitterend Ventures INC DBA BVI Solar to install
a 4.81kW photovoltaic system and perform an electric service upgrade on my property located at
2422 N Pacific Ave, in Santa Ana, CA 92706.
Please contact me if you have any questions or concerns.
Thank you,
___________________________
Property Owner's Name
___________________________
Signature
___________________________
Date
___________________________
Phone Number
DocuSign Envelope ID: 86E33B6A-0F21-4444-9072-E83EB46D2FF2
9/24/2022
Phone Number714 6733158
Juan F Hernandez
2422 N Pacific Ave
10/07/22
Certificate Of Completion
Envelope Id: 86E33B6A0F2144449072E83EB46D2FF2 Status: Completed
Subject: Please DocuSign: Letter of Authorization from Homeowner
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 5 Initials: 0 Tyler Field
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
191130 PO Box
San Diego, CA 92159
bvisolar@gmail.com
IP Address: 191.250.187.139
Record Tracking
Status: Original
9/23/2022 8:58:26 AM
Holder: Tyler Field
bvisolar@gmail.com
Location: DocuSign
Signer Events Signature Timestamp
Juan F Hernandez
jfhernandez64@icloud.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 172.117.26.254
Signed using mobile
Sent: 9/23/2022 9:05:45 AM
Viewed: 9/24/2022 8:05:36 AM
Signed: 9/24/2022 8:19:03 AM
Electronic Record and Signature Disclosure:
Accepted: 9/24/2022 8:05:36 AM
ID: 09725880-3c46-47e8-bd86-f60a38d74e5c
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Roberta Sartoretto
rsartoretto@bvisolar.com
Project Coordinator
Security Level: Email, Account Authentication
(None)
Sent: 9/23/2022 9:05:45 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 9/23/2022 9:05:45 AM
Certified Delivered Security Checked 9/24/2022 8:05:36 AM
Signing Complete Security Checked 9/24/2022 8:19:03 AM
Completed Security Checked 9/24/2022 8:19:03 AM
2422 N Pacific Ave
10/07/22
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
2422 N Pacific Ave
10/07/22
CONSUMER DISCLOSURE
From time to time, BVI Solar (we, us or Company) may be required by law to provide to you
certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through the DocuSign, Inc.
(DocuSign) electronic signing system. Please read the information below carefully and
thoroughly, and if you can access this information electronically to your satisfaction and agree to
these terms and conditions, please confirm your agreement by clicking the I agree button at the
bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign Withdraw Consent form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
Electronic Record and Signature Disclosure created on: 2/21/2018 2:31:16 PM
Parties agreed to: Juan F Hernandez
2422 N Pacific Ave
10/07/22
electronically from us.
How to contact BVI Solar:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: bvisolar@gmail.com
To advise BVI Solar of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at bvisolar@gmail.com and in the
body of such request you must state: your previous e-mail address, your new e-mail address. We
do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from BVI Solar
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to bvisolar@gmail.com and in the body
of such request you must state your e-mail address, full name, US Postal address, and telephone
number. We will bill you for any fees at that time, if any.
To withdraw your consent with BVI Solar
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to bvisolar@gmail.com and in the body of such request you must state
your e-mail, full name, US Postal Address, and telephone number. We do not need any
other information from you to withdraw consent.. The consequences of your withdrawing
consent for online documents will be that transactions may take a longer time to process..
Required hardware and software
Operating Systems:Windows® 2000, Windows® XP, Windows
Vista®; Mac OS® X
Browsers:Final release versions of Internet Explorer® 6.0
or above (Windows only); Mozilla Firefox 2.0
or above (Windows and Mac); Safari 3.0 or
above (Mac only)
PDF Reader:Acrobat® or similar software may be required
to view and print PDF files
Screen Resolution:800 x 600 minimum
Enabled Security Settings:Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
2422 N Pacific Ave
10/07/22
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the I agree button below.
By checking the I agree box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC CONSUMER DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify BVI Solar as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by BVI Solar during the course of my relationship with you.
2422 N Pacific Ave
10/07/22
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Juan Hernandez Residence
2422 N Pacific Ave.,
Santa Ana, CA 92706
Applicable Codes:
2019 California Building Code, 2019 California Electric Code,
2019 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 7
2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R2
7.8'
Total load on rafter = 60 plf x 7.8 ft. = 468 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x4 Roof Rafters @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
( Assume max rafter span = 7.8 ft. )
2422 N Pacific Ave
10/07/22
Check Existing 2x4 Roof Rafters @ 24" O.C.:
Sht # 3 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 2020
Total load on rafter = 60 plf x 2.5 ft + 28 plf x 5.3 ft + ( 6' x 2.75' x 3 psf x 2 )
= 397 lbs < 468 lbs OK
2020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021
R1 R2
7.8'
w LLw DL
2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021
2.5'5.3'
2021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 2021
P
2021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 2021
P
2021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 2022
w DL + LL = 30 psf x 2 ft. = 60 plf
2022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
Sht # 4 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4- 7 ASCE 7- 16
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγEÞðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7- 16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγEÞðγa Þð
qh =20 psf
p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10- 1 ASCE 7- 16
GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GC p = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16
Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs
Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress
Load per lag screw = 416 lbs / 1 = 416 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 2021 2021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
Sht # 5 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 416 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3.5" lag screws per connection minimum.
2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
Note: Zone 2
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 2021 2021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building = Approximately 1,200 Sq. ft.
Approximate
Effective
Seismic Weight
= 1,200 sq. ft. x 30 psf ave. = 36,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =
SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS
SMS =
FA x SS
SMS =
1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =
1.2
6.5
1
= 0.185
Sht # 6 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
EQ'N 11.4- 3 ASCE 7- 16
EQ'N 11.4- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
V = 0.185 x 36,000 LBS = 6,660 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
= 36,000 LBS
NEW SOLAR
ARRAY = 3 PSF x 13 PANELS x 3.3' x 5.5' = 708 LBS
NEW
SEISMIC
WEIGHT
= 36,000 LBS + 708 LBS = 36,708 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 36,708 = 6,791 LBS
% CHANGE =6,791 LBS - 6,660 LBS
6,660 LBS x 100 = 2.0 % < 10% OK
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic force-resisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 1 ASCE 7- 16
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW .DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022
2422 N Pacific Ave
10/07/22
MSP LC AC
SITE PLAN-1
PV-1.0
JUAN HERNANDEZ - 4.810kW DC, 3.770kW AC, 4.360kW CEC AC
SITE PLAN-1
PV-1.0
A SITE PLAN-1
SCALE: 1/8" = 1'-0"
ELECTRIC CODE CEC 2019
FIRE CODE CFC 2019
RESIDENTIAL CODE CRC 2019
BUILDING CODE CBC 2019
WIND SPEED 95 MPH
SNOW LOAD 0 PSF
GENERAL INFORMATION
PV-1.0
A1 VICINITY MAP
SCALE: NTS
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
19'-8"
12
'
-
6
"
34
'
-
9
"
3' FIRE SETBACK
PHOTOVOLTAIC ARRAY ON THE ROOF
1'-6" FIRE SETBACK
(N) ENPHASE IQ COMBINER 3 (EXTERIOR)
(N) MAIN SERVICE PANEL (EXTERIOR)
CONDUIT RUN
TOTAL AREA OF ROOF 1941.07
SQFT
TOTAL ARRAY AREA 255.14 SQFT
TOTAL AREA OF ROOF COVERED IN
ARRAY 13.14%
(N) AC DISCONNECT (EXTERIOR)
INDEX
INDEX NO. DESCRIPTION
SITE PLAN-1&2
GENERAL NOTES
MOUNTING DETAILS
STRUCTURAL DETAILS
SINGLE LINE DIAGRAM
WARNING PLACARDS
MODULE SPEC SHEET
INVERTER SPEC SHEET
COMBINER SPEC SHEET
RACKING SPEC SHEET
MOUNT SPEC SHEET
GROUNDING SPEC SHEET
INTEGRATED GROUNDING
SPEC SHEET
FIRE RATING SPEC SHEET
PV-1.0&1.1
PV-2.0
S-1.0
S-1.1
E-1.0
PV-3.0
PD-1.0
PD-1.1
PD-1.2
PD-1.3
PD-1.4
PD-1.5
PD-1.6
PD-1.7
9-23
BLDG # 101112156
ELECT # 20177486
ISSUED: 10/07/2022
2422 N Pacific Ave
10/07/22
MSP LCAC
SITE PLAN-2
PV-1.1
JUAN HERNANDEZ - 4.810kW DC, 3.770kW AC, 4.360kW CEC AC
SITE PLAN-2
PV-1.1
A SITE PLAN-2
SCALE: 3/32" = 1'-0"
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
62
'
-
2
"
101'-9"
WA
L
K
W
A
Y
PHOTOVOLTAIC ARRAY ON THE ROOF
GATE
FENCEPROPERTY LINE
DR
I
V
E
W
A
Y
WALKWAY
N
P
A
C
I
F
I
C
A
V
E
9'-9"
18'-11"
9'
14
'
-
1
1
"
9-23
2422 N Pacific Ave
10/07/22
GENERAL NOTES
PV-2.0
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
GENERAL NOTES
GENERAL NOTES
1. MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS.
2. INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS.
3. DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL
SITE CONDITION MIGHT VARY.
4. WORKING CLEARANCES AROUND THE NEW PV ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN
ACCORDANCE WITH CEC CODE.
5. ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE
EQUIPMENT.
6.
7. WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA
REGULATIONS.
8. THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL
JURISDICTION AND/OR THE UTILITY.
9. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND
LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING
CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS
TREES, WIRES OR SIGNS.
10. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING
EQUIPMENT LOCATION:
11. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC CODE.
12. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING
TEMPERATURE AS SPECIFIED BY CEC CODE AND CEC TABLES.
13. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC CODE.
14. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE
AC SERVICING DISCONNECT.
15. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC
APPLICABLE CODES.
16. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE
.
STRUCTURAL NOTES:
17. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION
MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND
A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL
18. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT
SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS.
19. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL
SEALANT PER CODE BY A LICENSED CONTRACTOR.
20. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY
THE RACKING MANUFACTURER.
21. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF
FRAMING MEMBERS.
WIRING & CONDUIT NOTES:
22. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE
SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING.
23. CONDUCTORS SIZED ACCORDING TO CEC CODE.
24. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND
SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS.
25. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR
OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION
NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO
BE MARKED ORANGE [CEC CODE].
INTERCONNECTION NOTES:
26. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC CODE]
27. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR
RATING [CEC CODE].
28. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFED BREAKERS
MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC CODE].
29. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT
EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVER CURRENT DEVICE MAY BE EXCLUDED
ACCORDING TO CEC CODE.
30. FEEDER TAP INTER CONNECTION (LOAD SIDE) ACCORDING TO CEC CODE.
31. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC CODE WITH SERVICE ENTRANCE CONDUCTORS IN
ACCORDANCE WITH CEC CODE.
32. BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL
FASTENING [CEC CODE].
GROUNDING NOTES:
33. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES
EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE.
34. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC CODE AND MINIMUM CEC TABLE.
35. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN
ACCORD.
36. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC CODE AND MICRO INVERTER
MANUFACTURER'S INSTRUCTIONS.
37. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER
DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST
BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION
REQUIREMENTS.
38. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE
DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE.
39. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF
#4 AWG OR LARGER [CEC CODE]
40. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC CODE AND NEC CODE THROUGH . IF EXISTING
SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO
CEC CODE AND AHJ.
41. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC CODE IN GENERAL AND CEC CODE SPECIFICALLY.
42. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES.
43. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS
REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED (TYPICALLY THE UPPER
TERMINALS).
44. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A
VISIBLE-BREAK SWITCH
45. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING
WITHIN 10 SECONDS. CONTROLLED CONDUCTORS AND [CEC CODE]. LOCATION OF LABEL
ACCORDING TO AHJ.
46. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC CODE.
47. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH
CEC CODE. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO
CEC CODE AND UL1699B.
2422 N Pacific Ave
10/07/22
MSP LCAC
PV-3.0
POWER TO THIS BUILDING IS ALSO
SUPPLIED FROM THE FOLLOWING SOURCES
WITH DISCONNECTS LOCATED AS SHOWN
WARNING !
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
ALL PLACARDS SHALL BE OF WEATHER PROOF CONSTRUCTION, BACKGROUND ON ALL PLACARDS SHALL BE RED
WITH WHITE LETTERING U.O.N.
PLACARD SHALL BE MOUNTED DIRECTLY ON THE EXISTING UTILITY ELECTRICAL SERVICE.FASTENERS
APPROVED BY THE LOCAL JURISDICTION
NOTE:ALL SIGNAGE CANNOT BE HAND WRITTEN NEC 110.21
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
WARNING PLACARDS
SYSTEM UTILIZES
MICRO-INVERTERS
LOCATED UNDER
SOLAR MODULE
WARNING PLACARDS
WARNING
CAUTION: SOLAR CIRCUIT
LABEL LOCATION
POINT OF INTERCONNECTION
(PER CODE: CEC 705.12(2)(b)
[ Not Required if Panel board is rated not less than sum of ampere ratings
of all overcurrent devices supplying it]
WARNING
INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVER-CURRENT DEVICE
WARNING:PHOTOVOLTAIC
POWER SOURCE
LABEL LOCATION
CONDUIT, COMBINER BOX
[PER CODE: CEC690.31(G)(3)]
WARNING-Electric Shock Hazard
No User Serviceable Parts inside
Contact authorized service provide for
assistance
LABEL LOCATION
INVERTER, JUNCTION BOXES(ROOF),
AC DISCONNECT
[PER CODE: CEC 690.13]
LABEL LOCATION
DISCONNECT, POINT OF INTERCONNECTION
[PER CODE: CEC 690.13(B)]
LABEL LOCATION
AC DISCONNECT , POINT OF INTERCONNECTION
[PER CODE: CEC 690.54]
LABEL LOCATION
MARKINGS PLACED ON ALL INTERIOR AND EXTERIOR DC
CONDUIT, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLES AT
LEAST EVERY 10 FT, AT TURNS AND ABOVE/BELOW
PENETRATIONS AND ALL COMBINER/JUNCTION BOXES.
(PER CODE: CFC605.11.1.4)
LABEL LOCATION
POINT OF INTERCONNECTION
[PER CODE: CEC705.12(D)(4)]
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH LINE AND LOAD SIDES MAY
BE ENERGIZED IN THE OPEN POSITION
LABEL LOCATION
AC DISCONNECT,POINT OF INTERCONNECTION
[PER CODE: CEC 690.13(B)]
DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR
MODULES ARE EXPOSED TO SUNLIGHT
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE
ENERGIZED IN THE OPEN POSITION
WARNING
LABEL LOCATION
AC DISCONNECT,POINT OF INTERCONNECTION
[PER CODE: CEC 690.13(B)]
LABEL LOCATION
WEATHER RESISTANT MATERIAL, DURABLE ADHESDIVE,
UL969 AS STANDARD TO WEATHER RATING (UL LISTING
OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT
ARIAL OR SIMILAR FONT NON-BOLD,PLACED WITHIN
THE MAIN SERVICE DISCONNECT,PLACED ON THE
OUTSIDE OF THE COVER WHEN DISCONNECT IS
OPERATED WITH THE SERVICE PANEL CLOSED.
(PWER CODE: CEC690.15 ,690.13(B))
WARNING
DUAL POWER SOURCE SECOND
SOURCE IS PHOTOVOLTAIC SYSTEM
SOLAR DISCONNECT
RATED AC OPERATING CURRENT
AC NOMINAL OPERATING VOLTAGE
15.73
240
AMPS AC
VAC
PHOTOVOLTAIC SYSTEM AC DISCONNECT SWITCH
CAUTION: SOLAR ELECTRIC
SYSTEM CONNECTED
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
LABEL LOCATION
AC DISCONNECT, DC DISCONNECT, POINT OF
INTERCONNECTION
(PER CODE: CEC690.56(C)(1)
LABEL LOCATION
INVERTER,POINT OF
INTERCONNECTION
[PER CODE: CEC 690.56(C)(3)]
RAPID SHUTDOWN SWITCH
FOR SOLAR SYSTEM
PHOTOVOLTAIC ARRAY ON THE ROOF
(N) ENPHASE IQ COMBINER 3 (EXTERIOR)
(N) MAIN SERVICE PANEL (EXTERIOR)
(N) AC DISCONNECT (EXTERIOR)
2422 N Pacific Ave
10/07/22
MOUNTING DETAILS
S-1.0
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
S-1.0
B MOUNTING DETAILS
SCALE: 3/32" = 1'-0"
UPLIFT CALCULATIONS
UPLIFT 7654.3 LBS
PULL OUT STRENGTH 13530 LBS
POINT LOADING 27 LBS
MODULES DATA
CERTAINTEED SOLAR CT370HC11-06
MODULE DIMS 69.1"x40.9"x1.37"
LAG SCREWS 5/16"x3":2.5"MIN EMBEDMENT
AERIAL VIEW
SITE INFORMATION
SR.NO AZIMUTH PITCH NO. OF
MODULES
ARRAY AREA
(SQ. FT.)ROOF TYPE ATTACHMENT ROOF
EXPOSURE FRAME TYPE FRAME
SIZE
FRAME
SPACING
MAX RAIL
SPAN
OVER
HANG
MP-01 270 23 9 176.6 COMPOSITION
SHINGLE UNIRAC FLASHLOC ATTIC RAFTERS 2 X 4 2'-0"6'-0" 2'-0"
MP-02 180 23 4 78.5 COMPOSITION
SHINGLE UNIRAC FLASHLOC ATTIC RAFTERS 2 X 4 2'-0"6'-0" 2'-0"
MINIMUM FIRE ACCESS PATHWAYS PER CFC 2019
RIDGE TO ARRAY: 1'-6"
EAVE TO ARRAY : 3'-0"
HIP/VALLEY W/ ADJACENT ARRAY: 1'-6"
EACH SIDE HIP/VALLEY W/O ADJACENT ARRAY: 0'-0"
NOTE: INSTALLER TO VERIFY RAFTER SIZE, SPACING AND SLOPED
SPANS, AND NOTIFY ANY DISCREPANCIES BEFORE PROCEEDING.
FIRE SETBACK
DEAD LOAD CALCULATIONS
BOM QUANTITY LBS/UNIT TOTAL
WEIGHT (LBS)
MODULES 13 45.19 587.47
MID-CLAMP 20 0.050 1.00
END-CLAMP 12 0.050 0.60
RAIL LENGTH 91 0.680 61.88
SPLICE BAR 6 0.360 2.16
UNIRAC FLASHLOC 22 1.47 32.34
MICRO-INVERTER 13 2.38 30.94
TOTAL WEIGHT OF THE SYSTEM (LBS)716.39
TOTAL ARRAY AREA ON THE ROOF (SQ. FT.)255.14
WEIGHT PER SQ. FT.(LBS)2.81
WEIGHT PER PENETRATION (LBS)32.56
3'
1'
-
6
"
6'
ARRAY MP-01
ALUMINIUM RAILS
2 X 4 RAFTERS@ 2'-0" SPACING
ARRAY MP-02
3'
9-23
2422 N Pacific Ave
10/07/22
STRUCTURAL DETAILS
S-1.1
CUSTOMER INFORMATION
NAME&ADDRESS:
APN:001-054-01
AHJ:CA-CITY OF SANTA ANA
UTILITY:SCE
SYSTEM INFORMATION
DESIGNER/CHECKED BY:
RA/MR
PROJECT NUMBER:BVIS-006984
SCALE:AS NOTED PAPER SIZE:17"x11"
JUAN HERNANDEZ
2422 N PACIFIC AVE, SANTA ANA, CA 92706.
ENGINEER OF RECORD
DATE:8/25/2022 REV:A
DC SYSTEM SIZE: 4810W
AC SYSTEM SIZE: 3770W
CEC AC SYSTEM SIZE: 4360W
MODULES:
(13)CERTAINTEED SOLAR CT370HC11-06
INVERTER:
(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH)
BRANCH DETAILS:
1 BRANCH OF 13 MICRO INVERTERS (13 MODULES)
7867 DUNBROOK RD SUITE D, SAN DIEGO,
CA 92126.
TEL:(559)930-7163
LIC:#C46@1033754
CONTRACTOR INFORMATION
MID-CLAMP & END CLAMP DETAIL
GROUNDING DETAILS
RAIL
INTERNAL SPLICE
SELF-DRILLING SCREW
SCALE: NTS
RAIL TO RAIL
EQUIPMENT GROUND CONDUCTOR
LAY IN EQUIPMENT GROUND
CONDUCTOR AND TORQUE BOLT
TO 7FT-LB / 10 N-M.
GROUND CONDUTOR ASSEMBLY
SCALE: NTS
SCALE: NTS
ROOF FRAMING DETAIL
SCALE: NTS
2 X 4 RAFTERS@2'-0" SPACING
LOAD BEARING WALL
PV MODULE
RAIL END CLAMP
PV MODULE
RAIL
MID CLAMP
SCALE: NTS
UNIRAC FLASHLOC
SOLAR MODULE
RAIL
6" MAX
5/16 HEX-BOLT
BOLT 2.5" EMBEDMENT
PILOT HOLE REQUIRED
(E)COMPOSITION SHINGLE ROOF
UNIRAC FLASHLOC
UNIRAC RAIL
PV MODULE
(E) BUILDING STRUCTURE
ATTACHMENT DETAIL-UNIRAC FLASHLOC
9-23
2422 N Pacific Ave
10/07/22
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
2422 N PACIFIC AVE
BITTEREND VENTURES INC. DBA BVI SOLAR
1033754
X
X
X
X
X
X
X
X
X
X
ROBERTA SARTORETTO
858.203.9166 8/29/2022
rsartoretto@bvisolar.com
2422 N Pacific Ave
10/07/22