Loading...
HomeMy WebLinkAbout2422 N Pacific Ave - Plan(N)JUNCTION BOX OR EQUIV 2 (N)(13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) WITH (13)CERTAINTEED SOLAR CT370HC11-06 MODULES 1 (1) BRANCH OF (13) MICRO-INVERTERS(13 MODULES) (N)CERTAINTEED SOLAR CT370HC11-06, 370W MODULES 3 (N)ENPHASE IQ COMBINER 3 AC COMBINER WITH ENPHASE ENVOY-S X-IQ-AM1-240-3 120/240 NEMA 3R INSTALL (1)20A PV 2P BREAKERS(ONLY FOR SOLAR NO LOAD TO BE ADDED) 20A 15A (N)100A MAIN BREAKER M PV BREAKER AT THE OPPOSITE END OF BUSBAR 30A 2P PV BREAKER EXISTING 120/240V 1PH 60HZ UT I L I T Y GR I D (E)GROUND ELECTRODE (N)125A END FED MAIN PANEL UTILITY:SCE 222013-580348 (N) 30A AC DISCONNECT AC DISCONNECT NON FUSED 30A, 120/240V, 2P 3 SINGLE LINE DIAGRAM E-1.0 SINGLE LINE DIAGRAM: DC SYSTEM SIZE - 4810W, AC SYSTEM SIZE - 3770W, CEC AC SYSTEM SIZE - 4360W CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATIONELECTRICAL NOTES: 1. MAXIMUM DC/AC VOLTAGE DROP SHALL BE NO MORE THAN 2%. 2. BREAKER/FUSE SIZES CONFORMS TO CEC 240.6 CODE SECTION. 3. AC GROUNDING ELECTRODE CONDUCTOR SIZED PER CEC 250.66. 4. AMBIENT TEMPERATURE CORRECTION FACTOR IS BASED ON CEC 690.31(A). 5. AMBIENT TEMPERATURE ADJUSTMENT FACTOR IS BASED ON CEC 310.15(B)(2). 6. MAX. SYSTEM VOLTAGE CORRECTION IS PER CEC 690.7. 7. CONDUCTORS ARE SIZED PER WIRE AMPACITY TABLE CEC 310.15(B)(16). 8. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER CEC 310.10(D). 9. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER CEC 310.10(C). NOTE: 1. MICRO INVERTERS ARE UL1741 RATED 2. EACH MICRO INVERTER IS RAPID SHUTDOWN COMPLIANT OCPD CALCULATIONS: MAIN PANEL RATING:125A, MAIN BREAKER RATING:100A 120% RULE: (125AX1.2)-100A=50A =>ALLOWABLE BACKFEED IS 50A INVERTER OVERCURRENT PROTECTION= INVERTER O/P I X CONTINUOUS LOAD(1.25)X #OF INVERTERS =1.21x1.25x13=19.66 A =>PV BREAKER = 30A ALLOWABLE BACKFEED 50A =>30A PV BREAKER THE DESIGNED INTERCONNECTION MEETS THE 705.12(B)(2) REQUIREMENTS MODULE SPECIFICATION MODEL CERTAINTEED SOLAR CT370HC11-06 MODULE POWER @ STC 370W OPEN CIRCUIT VOLTAGE:Voc 40.8V MAX POWER VOLTAGE:Vmp 34.06V SHORT CIRCUIT CURRENT:Isc 11.51A MAX POWER CURRENT:Imp 10.87A MICRO INVERTER SPECIFICATIONS MODEL ENPHASE IQ7PLUS-72-2-US(240V,1PH) POWER RATING 290W MAX OUTPUT CURRENT 1.21A CEC WEIGHTED EFFICIENCY 97% MAX NO OF MICRO INVERTERS/BRANCH 13 MAX DC VOLTAGE 60V CONDUIT SCHEDULE TAG ID CONDUIT SIZE CONDUCTOR NEUTRAL GROUND 1 NONE (2) 12 AWG ENPHASE Q CABLE PER BRANCH CIRCUIT NONE (1) 6 AWG BARE COPPER 2 3/4"EMT OR EQUIV (2) 10 AWG THHN/THWN-2 NONE (1) 10 AWG THHN/THWN-2 3 3/4"EMT OR EQUIV (2) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 TAG ID REQUIRED CONDUCTOR AMPACITY CORRECTED AMPACITY CALCULATION TERMINAL RATING CHECK DERATED CONDUCTOR AMPACITY CHECK 1 1.21 X 13 = 15.73 X 1.25 = 19.66A 30 X 0.96 X 1 =28.80A 19.66A <25A 19.66A <28.80A 2 1.21 X 13 = 15.73 X 1.25 = 19.66A 40 X 0.96 X 1 =38.40A 19.66A <35A 19.66A <38.40A 3 1.21 X 13 = 15.73 X 1.25 = 19.66A 40 X 0.96 X 1 =38.40A 19.66A <35A 19.66A <38.40A ELECTRICAL CALCULATION MAIN PANEL UPGRADE:REPLACE EXISTING MAIN SERVICE PANEL WITH NEW 125/100A MAIN PANEL 1. NEW SERVICE PANEL MUST BE COMBINATION/ALL-IN-ONE, AND METER AND MAIN CANNOT BE SEPARATE. 2. LISTED COMBINATION OVERHEAD AND UNDERGROUND FEED SERVICE BOXES REQUIRED 3. 125A SERVICE REQUIRES A MINIMUM 6 AWG CONDUCTOR TO 10' OF UNDERGROUND METAL WATER PIPE ELECTRODE. BOND ON THE INSIDE/OUTSIDE WITHIN FIRST 5' OF WHERE THE WATER ENTERS THE BUILDING. AN ADDITIONAL CONNECTION UFER OR 2 NEW RODS IS NEEDED - LOCATED 6' FROM OTHER ELECTRODES. WATER PIPE MAY NOT BE USED TO BOND ANY ELECTRODES UNLESS BURIED OR ENCASED, ELECTRODE CONNECTIONS MUST BE ACCESSIBLE 2422 N Pacific Ave 10/07/22 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2422 N Pacific Ave 10/07/22 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2422 N Pacific Ave 10/07/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                        LCMSP AC 19'-8" 12 ' - 6 " 34 ' - 9 " 1'-6" FIRE SETBACK 3' FIRE SETBACK PHOTOVOLTAIC ARRAY ON THE ROOF MICROINVERTERS UNDER ARRAY (N) MAIN SERVICE PANEL (EXTERIOR (N)N) AC DISCONNECT (EXTERI (N)N) ENPHASE IQ COMBINER 3 (EXTERI CONDUIT RUN BVI SOLAR JUAN HERNANDEZ7867 DUNBROOK RD SUITE D SAN DIEGO CA 92126 2422 PACIFIC AVE. SANTA ANA CA 92706 3.77 2422 N Pacific Ave 10/07/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: 9/15/2022 SHEET Drawn By: RVR Checked By: ROBERTA DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT BVI SOLAR 7867 DUNBROOK RD SUITE D SAN DIEGO CA 92126 JUAN HERNANDEZ 3.77 2422 PACIFIC AVE. SANTA ANA CA 92706 2422 N Pacific Ave 10/07/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram BVI SOLAR 7867 DUNBROOK RD SUITE D SAN DIEGO CA 92126 JUAN HERNANDEZ 2422 PACIFIC AVE. SANTA ANA CA 92706 3.77 2422 N Pacific Ave 10/07/22 September 22, 2022. To Whom It May Concern, Please allow this letter to serve as authorization for Bitterend Ventures INC DBA BVI Solar to install a 4.81kW photovoltaic system and perform an electric service upgrade on my property located at 2422 N Pacific Ave, in Santa Ana, CA 92706. Please contact me if you have any questions or concerns. Thank you, ___________________________ Property Owner's Name ___________________________ Signature ___________________________ Date ___________________________ Phone Number DocuSign Envelope ID: 86E33B6A-0F21-4444-9072-E83EB46D2FF2 9/24/2022 Phone Number714 6733158 Juan F Hernandez 2422 N Pacific Ave 10/07/22 Certificate Of Completion Envelope Id: 86E33B6A0F2144449072E83EB46D2FF2 Status: Completed Subject: Please DocuSign: Letter of Authorization from Homeowner Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Tyler Field AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 191130 PO Box San Diego, CA 92159 bvisolar@gmail.com IP Address: 191.250.187.139 Record Tracking Status: Original 9/23/2022 8:58:26 AM Holder: Tyler Field bvisolar@gmail.com Location: DocuSign Signer Events Signature Timestamp Juan F Hernandez jfhernandez64@icloud.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 172.117.26.254 Signed using mobile Sent: 9/23/2022 9:05:45 AM Viewed: 9/24/2022 8:05:36 AM Signed: 9/24/2022 8:19:03 AM Electronic Record and Signature Disclosure: Accepted: 9/24/2022 8:05:36 AM ID: 09725880-3c46-47e8-bd86-f60a38d74e5c In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Roberta Sartoretto rsartoretto@bvisolar.com Project Coordinator Security Level: Email, Account Authentication (None) Sent: 9/23/2022 9:05:45 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/23/2022 9:05:45 AM Certified Delivered Security Checked 9/24/2022 8:05:36 AM Signing Complete Security Checked 9/24/2022 8:19:03 AM Completed Security Checked 9/24/2022 8:19:03 AM 2422 N Pacific Ave 10/07/22 Payment Events Status Timestamps Electronic Record and Signature Disclosure 2422 N Pacific Ave 10/07/22 CONSUMER DISCLOSURE From time to time, BVI Solar (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures Electronic Record and Signature Disclosure created on: 2/21/2018 2:31:16 PM Parties agreed to: Juan F Hernandez 2422 N Pacific Ave 10/07/22 electronically from us. How to contact BVI Solar: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: bvisolar@gmail.com To advise BVI Solar of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at bvisolar@gmail.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from BVI Solar To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to bvisolar@gmail.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with BVI Solar To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to bvisolar@gmail.com and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems:Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X Browsers:Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader:Acrobat® or similar software may be required to view and print PDF files Screen Resolution:800 x 600 minimum Enabled Security Settings:Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to 2422 N Pacific Ave 10/07/22 other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify BVI Solar as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by BVI Solar during the course of my relationship with you. 2422 N Pacific Ave 10/07/22 September 22, 2022. To Whom It May Concern, Please allow this letter to serve as authorization for Bitterend Ventures INC DBA BVI Solar to install a 4.81kW photovoltaic system and perform an electric service upgrade on my property located at 2422 N Pacific Ave, in Santa Ana, CA 92706. Please contact me if you have any questions or concerns. Thank you, ___________________________ Property Owner's Name ___________________________ Signature ___________________________ Date ___________________________ Phone Number DocuSign Envelope ID: 86E33B6A-0F21-4444-9072-E83EB46D2FF2 9/24/2022 Phone Number714 6733158 Juan F Hernandez 2422 N Pacific Ave 10/07/22 Certificate Of Completion Envelope Id: 86E33B6A0F2144449072E83EB46D2FF2 Status: Completed Subject: Please DocuSign: Letter of Authorization from Homeowner Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Tyler Field AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 191130 PO Box San Diego, CA 92159 bvisolar@gmail.com IP Address: 191.250.187.139 Record Tracking Status: Original 9/23/2022 8:58:26 AM Holder: Tyler Field bvisolar@gmail.com Location: DocuSign Signer Events Signature Timestamp Juan F Hernandez jfhernandez64@icloud.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 172.117.26.254 Signed using mobile Sent: 9/23/2022 9:05:45 AM Viewed: 9/24/2022 8:05:36 AM Signed: 9/24/2022 8:19:03 AM Electronic Record and Signature Disclosure: Accepted: 9/24/2022 8:05:36 AM ID: 09725880-3c46-47e8-bd86-f60a38d74e5c In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Roberta Sartoretto rsartoretto@bvisolar.com Project Coordinator Security Level: Email, Account Authentication (None) Sent: 9/23/2022 9:05:45 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/23/2022 9:05:45 AM Certified Delivered Security Checked 9/24/2022 8:05:36 AM Signing Complete Security Checked 9/24/2022 8:19:03 AM Completed Security Checked 9/24/2022 8:19:03 AM 2422 N Pacific Ave 10/07/22 Payment Events Status Timestamps Electronic Record and Signature Disclosure 2422 N Pacific Ave 10/07/22 CONSUMER DISCLOSURE From time to time, BVI Solar (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures Electronic Record and Signature Disclosure created on: 2/21/2018 2:31:16 PM Parties agreed to: Juan F Hernandez 2422 N Pacific Ave 10/07/22 electronically from us. How to contact BVI Solar: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: bvisolar@gmail.com To advise BVI Solar of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at bvisolar@gmail.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from BVI Solar To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to bvisolar@gmail.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with BVI Solar To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to bvisolar@gmail.com and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems:Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X Browsers:Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader:Acrobat® or similar software may be required to view and print PDF files Screen Resolution:800 x 600 minimum Enabled Security Settings:Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to 2422 N Pacific Ave 10/07/22 other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify BVI Solar as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by BVI Solar during the course of my relationship with you. 2422 N Pacific Ave 10/07/22 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Juan Hernandez Residence 2422 N Pacific Ave., Santa Ana, CA 92706 Applicable Codes: 2019 California Building Code, 2019 California Electric Code, 2019 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 7.8' Total load on rafter = 60 plf x 7.8 ft. = 468 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * *Note: Contractor to Field Verify Framing 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 ( Assume max rafter span = 7.8 ft. ) 2422 N Pacific Ave 10/07/22 Check Existing 2x4 Roof Rafters @ 24" O.C.: Sht # 3 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 2020 Total load on rafter = 60 plf x 2.5 ft + 28 plf x 5.3 ft + ( 6' x 2.75' x 3 psf x 2 ) = 397 lbs < 468 lbs OK 2020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 R1 R2 7.8' w LLw DL 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2.5'5.3' 2021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 2021 P 2021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 2021 P 2021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 2022 w DL + LL = 30 psf x 2 ft. = 60 plf 2022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 Sht # 4 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4- 7 ASCE 7- 16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγEÞðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7- 16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγEÞðγa Þð qh =20 psf p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf Eq'n 26.10- 1 ASCE 7- 16 GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GC p = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16 Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress Load per lag screw = 416 lbs / 1 = 416 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 2021 2021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 Sht # 5 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 416 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 Note: Zone 2 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 2021 2021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building = Approximately 1,200 Sq. ft. Approximate Effective Seismic Weight = 1,200 sq. ft. x 30 psf ave. = 36,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 EQ'N 11.4- 3 ASCE 7- 16 EQ'N 11.4- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 V = 0.185 x 36,000 LBS = 6,660 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT = 36,000 LBS NEW SOLAR ARRAY = 3 PSF x 13 PANELS x 3.3' x 5.5' = 708 LBS NEW SEISMIC WEIGHT = 36,000 LBS + 708 LBS = 36,708 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 36,708 = 6,791 LBS % CHANGE =6,791 LBS - 6,660 LBS 6,660 LBS x 100 = 2.0 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 1 ASCE 7- 16 OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 2020 2020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 2020 2020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 2020 2020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 2020 2020-3686 Bratton Solar Love Residence Date: December 14, 20202020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 2020 2020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 2021 2021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW .DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1398 Better Earth Saori Sierra Residence Date: April 27, 20212021-1809 Better Earth Valdemar Padilla Residence Date: May 22, 20212021-2463 Better Earth Virgie Santos Residence Date: June 29, 20212021-2556 Better Earth Carlos Orozco Residence Date: July 03, 20212022-047 Better Earth Alexis Ana Residence Date: January 6, 20222022-068 Better Earth Adriana Davila Residence Date: January 7, 20222022-070 Better Earth Sean Arechiga Residence Date: January 7, 20222022-3490 BVI Solar Juan Hernandez Residence Date: August 30, 2022 2422 N Pacific Ave 10/07/22 MSP LC AC SITE PLAN-1 PV-1.0 JUAN HERNANDEZ - 4.810kW DC, 3.770kW AC, 4.360kW CEC AC SITE PLAN-1 PV-1.0 A SITE PLAN-1 SCALE: 1/8" = 1'-0" ELECTRIC CODE CEC 2019 FIRE CODE CFC 2019 RESIDENTIAL CODE CRC 2019 BUILDING CODE CBC 2019 WIND SPEED 95 MPH SNOW LOAD 0 PSF GENERAL INFORMATION PV-1.0 A1 VICINITY MAP SCALE: NTS CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION 19'-8" 12 ' - 6 " 34 ' - 9 " 3' FIRE SETBACK PHOTOVOLTAIC ARRAY ON THE ROOF 1'-6" FIRE SETBACK (N) ENPHASE IQ COMBINER 3 (EXTERIOR) (N) MAIN SERVICE PANEL (EXTERIOR) CONDUIT RUN TOTAL AREA OF ROOF 1941.07 SQFT TOTAL ARRAY AREA 255.14 SQFT TOTAL AREA OF ROOF COVERED IN ARRAY 13.14% (N) AC DISCONNECT (EXTERIOR) INDEX INDEX NO. DESCRIPTION SITE PLAN-1&2 GENERAL NOTES MOUNTING DETAILS STRUCTURAL DETAILS SINGLE LINE DIAGRAM WARNING PLACARDS MODULE SPEC SHEET INVERTER SPEC SHEET COMBINER SPEC SHEET RACKING SPEC SHEET MOUNT SPEC SHEET GROUNDING SPEC SHEET INTEGRATED GROUNDING SPEC SHEET FIRE RATING SPEC SHEET PV-1.0&1.1 PV-2.0 S-1.0 S-1.1 E-1.0 PV-3.0 PD-1.0 PD-1.1 PD-1.2 PD-1.3 PD-1.4 PD-1.5 PD-1.6 PD-1.7 9-23 BLDG # 101112156 ELECT # 20177486 ISSUED: 10/07/2022 2422 N Pacific Ave 10/07/22 MSP LCAC SITE PLAN-2 PV-1.1 JUAN HERNANDEZ - 4.810kW DC, 3.770kW AC, 4.360kW CEC AC SITE PLAN-2 PV-1.1 A SITE PLAN-2 SCALE: 3/32" = 1'-0" CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION 62 ' - 2 " 101'-9" WA L K W A Y PHOTOVOLTAIC ARRAY ON THE ROOF GATE FENCEPROPERTY LINE DR I V E W A Y WALKWAY N P A C I F I C A V E 9'-9" 18'-11" 9' 14 ' - 1 1 " 9-23 2422 N Pacific Ave 10/07/22 GENERAL NOTES PV-2.0 CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION GENERAL NOTES GENERAL NOTES 1. MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. 2. INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. 3. DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. 4. WORKING CLEARANCES AROUND THE NEW PV ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC CODE. 5. ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT. 6. 7. WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 8. THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND/OR THE UTILITY. 9. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS. 10. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING EQUIPMENT LOCATION: 11. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC CODE. 12. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY CEC CODE AND CEC TABLES. 13. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC CODE. 14. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 15. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC APPLICABLE CODES. 16. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE . STRUCTURAL NOTES: 17. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL 18. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 19. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 20. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 21. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 22. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 23. CONDUCTORS SIZED ACCORDING TO CEC CODE. 24. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 25. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [CEC CODE]. INTERCONNECTION NOTES: 26. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC CODE] 27. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [CEC CODE]. 28. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC CODE]. 29. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVER CURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC CODE. 30. FEEDER TAP INTER CONNECTION (LOAD SIDE) ACCORDING TO CEC CODE. 31. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC CODE WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH CEC CODE. 32. BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [CEC CODE]. GROUNDING NOTES: 33. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 34. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC CODE AND MINIMUM CEC TABLE. 35. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD. 36. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC CODE AND MICRO INVERTER MANUFACTURER'S INSTRUCTIONS. 37. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 38. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 39. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [CEC CODE] 40. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC CODE AND NEC CODE THROUGH . IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC CODE AND AHJ. 41. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC CODE IN GENERAL AND CEC CODE SPECIFICALLY. 42. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES. 43. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED (TYPICALLY THE UPPER TERMINALS). 44. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 45. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS AND [CEC CODE]. LOCATION OF LABEL ACCORDING TO AHJ. 46. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC CODE. 47. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH CEC CODE. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC CODE AND UL1699B. 2422 N Pacific Ave 10/07/22 MSP LCAC PV-3.0 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN WARNING ! CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION ALL PLACARDS SHALL BE OF WEATHER PROOF CONSTRUCTION, BACKGROUND ON ALL PLACARDS SHALL BE RED WITH WHITE LETTERING U.O.N. PLACARD SHALL BE MOUNTED DIRECTLY ON THE EXISTING UTILITY ELECTRICAL SERVICE.FASTENERS APPROVED BY THE LOCAL JURISDICTION NOTE:ALL SIGNAGE CANNOT BE HAND WRITTEN NEC 110.21 2422 N PACIFIC AVE, SANTA ANA, CA 92706. WARNING PLACARDS SYSTEM UTILIZES MICRO-INVERTERS LOCATED UNDER SOLAR MODULE WARNING PLACARDS WARNING CAUTION: SOLAR CIRCUIT LABEL LOCATION POINT OF INTERCONNECTION (PER CODE: CEC 705.12(2)(b) [ Not Required if Panel board is rated not less than sum of ampere ratings of all overcurrent devices supplying it] WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVER-CURRENT DEVICE WARNING:PHOTOVOLTAIC POWER SOURCE LABEL LOCATION CONDUIT, COMBINER BOX [PER CODE: CEC690.31(G)(3)] WARNING-Electric Shock Hazard No User Serviceable Parts inside Contact authorized service provide for assistance LABEL LOCATION INVERTER, JUNCTION BOXES(ROOF), AC DISCONNECT [PER CODE: CEC 690.13] LABEL LOCATION DISCONNECT, POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] LABEL LOCATION AC DISCONNECT , POINT OF INTERCONNECTION [PER CODE: CEC 690.54] LABEL LOCATION MARKINGS PLACED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLES AT LEAST EVERY 10 FT, AT TURNS AND ABOVE/BELOW PENETRATIONS AND ALL COMBINER/JUNCTION BOXES. (PER CODE: CFC605.11.1.4) LABEL LOCATION POINT OF INTERCONNECTION [PER CODE: CEC705.12(D)(4)] ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LABEL LOCATION AC DISCONNECT,POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING LABEL LOCATION AC DISCONNECT,POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] LABEL LOCATION WEATHER RESISTANT MATERIAL, DURABLE ADHESDIVE, UL969 AS STANDARD TO WEATHER RATING (UL LISTING OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT ARIAL OR SIMILAR FONT NON-BOLD,PLACED WITHIN THE MAIN SERVICE DISCONNECT,PLACED ON THE OUTSIDE OF THE COVER WHEN DISCONNECT IS OPERATED WITH THE SERVICE PANEL CLOSED. (PWER CODE: CEC690.15 ,690.13(B)) WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM SOLAR DISCONNECT RATED AC OPERATING CURRENT AC NOMINAL OPERATING VOLTAGE 15.73 240 AMPS AC VAC PHOTOVOLTAIC SYSTEM AC DISCONNECT SWITCH CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN LABEL LOCATION AC DISCONNECT, DC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: CEC690.56(C)(1) LABEL LOCATION INVERTER,POINT OF INTERCONNECTION [PER CODE: CEC 690.56(C)(3)] RAPID SHUTDOWN SWITCH FOR SOLAR SYSTEM PHOTOVOLTAIC ARRAY ON THE ROOF (N) ENPHASE IQ COMBINER 3 (EXTERIOR) (N) MAIN SERVICE PANEL (EXTERIOR) (N) AC DISCONNECT (EXTERIOR) 2422 N Pacific Ave 10/07/22 MOUNTING DETAILS S-1.0 CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION S-1.0 B MOUNTING DETAILS SCALE: 3/32" = 1'-0" UPLIFT CALCULATIONS UPLIFT 7654.3 LBS PULL OUT STRENGTH 13530 LBS POINT LOADING 27 LBS MODULES DATA CERTAINTEED SOLAR CT370HC11-06 MODULE DIMS 69.1"x40.9"x1.37" LAG SCREWS 5/16"x3":2.5"MIN EMBEDMENT AERIAL VIEW SITE INFORMATION SR.NO AZIMUTH PITCH NO. OF MODULES ARRAY AREA (SQ. FT.)ROOF TYPE ATTACHMENT ROOF EXPOSURE FRAME TYPE FRAME SIZE FRAME SPACING MAX RAIL SPAN OVER HANG MP-01 270 23 9 176.6 COMPOSITION SHINGLE UNIRAC FLASHLOC ATTIC RAFTERS 2 X 4 2'-0"6'-0" 2'-0" MP-02 180 23 4 78.5 COMPOSITION SHINGLE UNIRAC FLASHLOC ATTIC RAFTERS 2 X 4 2'-0"6'-0" 2'-0" MINIMUM FIRE ACCESS PATHWAYS PER CFC 2019 RIDGE TO ARRAY: 1'-6" EAVE TO ARRAY : 3'-0" HIP/VALLEY W/ ADJACENT ARRAY: 1'-6" EACH SIDE HIP/VALLEY W/O ADJACENT ARRAY: 0'-0" NOTE: INSTALLER TO VERIFY RAFTER SIZE, SPACING AND SLOPED SPANS, AND NOTIFY ANY DISCREPANCIES BEFORE PROCEEDING. FIRE SETBACK DEAD LOAD CALCULATIONS BOM QUANTITY LBS/UNIT TOTAL WEIGHT (LBS) MODULES 13 45.19 587.47 MID-CLAMP 20 0.050 1.00 END-CLAMP 12 0.050 0.60 RAIL LENGTH 91 0.680 61.88 SPLICE BAR 6 0.360 2.16 UNIRAC FLASHLOC 22 1.47 32.34 MICRO-INVERTER 13 2.38 30.94 TOTAL WEIGHT OF THE SYSTEM (LBS)716.39 TOTAL ARRAY AREA ON THE ROOF (SQ. FT.)255.14 WEIGHT PER SQ. FT.(LBS)2.81 WEIGHT PER PENETRATION (LBS)32.56 3' 1' - 6 " 6' ARRAY MP-01 ALUMINIUM RAILS 2 X 4 RAFTERS@ 2'-0" SPACING ARRAY MP-02 3' 9-23 2422 N Pacific Ave 10/07/22 STRUCTURAL DETAILS S-1.1 CUSTOMER INFORMATION NAME&ADDRESS: APN:001-054-01 AHJ:CA-CITY OF SANTA ANA UTILITY:SCE SYSTEM INFORMATION DESIGNER/CHECKED BY: RA/MR PROJECT NUMBER:BVIS-006984 SCALE:AS NOTED PAPER SIZE:17"x11" JUAN HERNANDEZ 2422 N PACIFIC AVE, SANTA ANA, CA 92706. ENGINEER OF RECORD DATE:8/25/2022 REV:A DC SYSTEM SIZE: 4810W AC SYSTEM SIZE: 3770W CEC AC SYSTEM SIZE: 4360W MODULES: (13)CERTAINTEED SOLAR CT370HC11-06 INVERTER: (13)ENPHASE IQ7PLUS-72-2-US(240V,1PH) BRANCH DETAILS: 1 BRANCH OF 13 MICRO INVERTERS (13 MODULES) 7867 DUNBROOK RD SUITE D, SAN DIEGO, CA 92126. TEL:(559)930-7163 LIC:#C46@1033754 CONTRACTOR INFORMATION MID-CLAMP & END CLAMP DETAIL GROUNDING DETAILS RAIL INTERNAL SPLICE SELF-DRILLING SCREW SCALE: NTS RAIL TO RAIL EQUIPMENT GROUND CONDUCTOR LAY IN EQUIPMENT GROUND CONDUCTOR AND TORQUE BOLT TO 7FT-LB / 10 N-M. GROUND CONDUTOR ASSEMBLY SCALE: NTS SCALE: NTS ROOF FRAMING DETAIL SCALE: NTS 2 X 4 RAFTERS@2'-0" SPACING LOAD BEARING WALL PV MODULE RAIL END CLAMP PV MODULE RAIL MID CLAMP SCALE: NTS UNIRAC FLASHLOC SOLAR MODULE RAIL 6" MAX 5/16 HEX-BOLT BOLT 2.5" EMBEDMENT PILOT HOLE REQUIRED (E)COMPOSITION SHINGLE ROOF UNIRAC FLASHLOC UNIRAC RAIL PV MODULE (E) BUILDING STRUCTURE ATTACHMENT DETAIL-UNIRAC FLASHLOC 9-23 2422 N Pacific Ave 10/07/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2422 N PACIFIC AVE BITTEREND VENTURES INC. DBA BVI SOLAR 1033754 X X X X X X X X X X ROBERTA SARTORETTO 858.203.9166 8/29/2022 rsartoretto@bvisolar.com 2422 N Pacific Ave 10/07/22