Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3314 S Lowell St - Plan
PV (9) (N) HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) OP MC (9) (N) ENPHASE IQ7-60-2-US MSP (E) 100A MSP W/ (E) 100A MAIN BREAKER LC (1) (N) ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3 SUB RM AC (1) (N) 30А AC DISCONNECT A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 A-1 SITE PLAN R-DC INV JB (1) (N) JUNCTION BOX PROPOSED PV CONDUIT RUN ABOVE ROOF PROPOSED PV CONDUIT RUN THROUGH ATTIC PROPERTY LINE ROOF ACCESS POINT: ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. (R324.6 OF THE 2019 CRC) PV SOLAR MODULES - FLUSH MOUNTED VENTS, OBSTRUCTIONS & CHIMNEY N EW S NOTE: 1. PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED AND SHALL BE INDICATED. 2. ALL ROOF PENETRATIONS SHALL BE WATER TIGHT AND WATER PROOF. ALL WORK TO COMPLY WITH 2019 CALIFORNIA BUILDING CODE, 2019 CALIFORNIA ELECTRIC CODE, ARTICLE 690, AND ALL MANUFACTURE'S LISTINGS, AND INSTALLATION INSTRUCTIONS 3. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM 4. WHEN A BACKFED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ "LINE AND LOAD" 5. NEW SMOKE ALARM AND CARBON MONOXIDE DETECTORS WILL BE INSTALLED IF NEEDED. PER (CRC R314) AND (R315) 0 SCALE: 1/16"=1'-0" SITE PLAN01 8' 16' AC LC MSP JB PV MC P/L P/L S. L O W E L L STP/L P/L73'-9" 26'-7" 36'-9" 7'-1" 120'-10" 120'-10" 49'-5" www. Loyd W Martin .com Solar Structures Engineering #2022-2407 Structural Only June 7, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 BLDG # 101111215 ISSUED 7/26/22 ELEC # 20176783 ISSUED 7/26/22 3314 S. Lowell St 07/29/22 RAIL ASSEMBY SPECIFICATIONS MANUFACTURER:UNIRAC MODEL:SM MOUNT:UNIRAC FLASH KIT LOADING SUMMARY TOTAL MODULES:9 MODULE WEIGHT (LBS.):43.87 RAIL WEIGHT (PLF):0.8 TOTAL MOUNTS:20 TOTAL AREA (SFT):174 TOTAL WEIGHT (LBS.):476 WEIGHT PER ATTACHMENT (LBS.): 19.74 DISTRIBUTED LOAD (PSF):2.74 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 A-2 ATTACHMENT DETAIL PV MODULES FIRE CLEARENCE AREA OBSTRUCTIONS ROOF PENETRATION POINTS RAFTERS RAILS PROPERTY LINE UNIRAC FLASH KIT NOTE: ROOF TO BE DOUBLE FLASHED FROM ANCHOR POINT AND FROM UNDERNEATH THE TILE. NOTE: PANELS TO BE INSTALLER MIN 3" OFF ROOF, MAXIMUM 10" NOTE: DETAILED SPECIFICATION FOR RAILS AND ATTACHMENT PROVIDED IN DATA SHEET. NOTE: ALL PHOTO VOLTAIC RACEWAYS SHALL BE MARKED "CАUTION: SOLAR CIRCUIT" NOTE: 5/16" STAINLESS STEEL DIAMETER LAG SCREWS @64" O.C. WITH 2.5" PENETRATION INTO EXISTING FRAMING MEMBER. TOTAL AMOUNT OF LAG SCREWS PER ONE ATTACHMENT - 1 PCS. ROOF SEALANT AT EVERY PENETRATION OF THE LAG BOLTS INTO ROOF FRAMING NOTE: ARRAYS ARE SUPPORTED AT A MAXIMUM OF 64 IN. PANELS SHALL HAVE 3-INCH CLEARANCE FROM THE ROOF SURFACE TO THE LOWEST EDGE OF PANEL/ SUPPORT FRAMING. N EW S 0 SCALE: 1/8"=1'-0" PROJECT PLAN01 4' 8' UNIRAC FLASH KIT UNIRAC SM RAIL 2" X 6" RAFTERS @ 16" O.C. ROOF ATT. TYP.@ 64" MAXARRAY 1: 3.240 kW [9] (N) MODULES ROOF PITCH: 22° AZIMUTH: 180° MIN 3' 10'-3" www. Loyd W Martin .com Solar Structures Engineering #2022-2407 Structural Only June 7, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. Max Attachment Span 64" Rafters at 16" O.C. RACKING DETAILS 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-1 MODULE DATASHEET 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-3 ENPHASE CABLE SYSTEM 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-1 SIGNAGE ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING LABEL 1 AT EACH DISCONNECTING MEANS FOR PHOTOVOLTAIC EQUIPMENT (2" X 4"). [CEC 690.13]. POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING LABEL 2 AT POINT OF INTERCONNECTION OVERCURRENT DEVICE (2" X 4"). [CEC 705.12(B)(2)(3)(B)]. PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT DISCONNECTING MEANS (4" X 2"). [CEC 690.54] LABEL 4 AT EACH AC DISCONNECTING MEANS (4" X 1"). [CEC 690.13(B)]. INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED SOUTH SIDE OF THE HOUSE DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LOCATION (5 3/4" X 1 1/8"). [CEC 690.56(B)] WHERE THE PV SYSTEMS ARE REMOTELY LOCATED FROM EACH OTHER, A DIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE PROVIDED AT EACH PV SYSTEM DISCONNECTING MEANS. PV SYSTEM EQUIPMENT AND DISCONNECTING MEANS SHALL NOT BE INSTALLED IN BATHROOMS [CEC 690.4(D),(E)] WARNING: PHOTOVOLTAIC POWER SOURCE LABEL 9 AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS (5 3/4" X 1 1/8"). [CEC 690.31(G)] LETTERS AT LEAST 3/8 INCH; WHITE ON RED BACKGROUND; REFLECTIVE [IFC 605.11.1.1] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS LABEL 6 AT RAPID SHUTDOWN SYSTEM (3 3/4" X 5 1/4"). [CEC 690.56(C)(1)(A)]. WARNING DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM LABEL 7 AT POINT OF INTERCONNECTION (2 3/4" X 1 5/8"). [CEC 705.12(B)(3)] WARNING SOLAR ELECTRIC CIRCUIT BREAKER IS BACKFED PHOTOVOLTAIC SOLAR AC DISCONNECT LABEL 8 AT POINT OF INTERCONNECTION (2" X 1"). [CEC 705.12(B)(3)] CAUTION SOLAR ELECTRIC SYSTEM CONNECTED LABEL 10 AT UTILITY METER (5 3/4" X 1 1/8") [CEC 690.56(B)] RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL 5 AT RAPID SHUTDOWN DISCONNECT SWITCH (5 1/4" X 2"). [CEC 690.56(C)(3)]. 9 A V240 LABELING NOTES 1.1 LABELING REQUIREMENTS BASED ON THE 2019 CALIFORNIA ELECTRICAL CODE, INTERNATIONAL FIRE CODE CHAPTER 12, OSHA STANDARD 1910.145, ANSI Z535 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. 1.5 ALERTING WORDS TO BE COLOR CODED. “DANGER” WILL HAVE RED BACKGROUND; “WARNING” WILL HAVE ORANGE BACKGROUND; “CAUTION” WILL HAVE YELLOW BACKGROUND. [ANSI Z535] 3314 S. Lowell St 07/29/22 SW1 04 G F1-2 20A 30A AC DISCONNECT NOTE: DISCONNECT SHOULD BE CONNECTED WITH INVERTER ENERGIZED OUTPUT AT BOTTOM IF SWITCH SO BLADES WILL BE NOT ENERGIZED WHEN SWITCH IS IN OPEN POSITION 03 GROUNDING ELECTRODE CONDUCTOR MUST BE CONTINUOUS LC1 IN BRANCH BL A C K RE D 02 PM1-9 JB1 9 I1-9 G L1 N L2 CB1 15A20A ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3, 125A 120/240V, 1Ø, 3W ENPHASE IQ ENVOY COMMUNICATIONS GATEWAY WIRE FROM MICRO INVERTERS TO COMBINER BOX IS ENPHASE ENGAGE CABLE (12 AWG THWN-2, COPPER). DETAILS OF CABLE AT D-3 PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN AND COMLIANT WITH CEC690.12 01 CB2 DC SYSTEM GND ELECTRODE 3/4" C-1#4 "RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END" CEC 250.64(E) N G (E) UTILITY METER TAP (N) GROUND RODS 6'-0"(2) 3/4" Øx10' APART TYPICAL NOTE: IN EXISTING ELECTRICAL SYSTEMS THAT USE ONLY A WATER PIPING GROUNDING ELECTRODE SYSTEM, AN ADDITIONAL GROUNDING ELECTRODE (I.E. DRIVEN ROD) SHALL BE PROVIDE (CEC 250.50) TO UTILITY GRID (UG) L1 L2 N FOR MEP: (BUS SIZE: 100AX1.2=120A)>=(MAIN SIZE: 100A + PV OCPD: 20A=120A) TO (E) LOADS MAIN SERVICE PANEL 240/120 V 1Ø, 3W MAIN BUSS: 100A SUM OF THE SERVICE MAIN BREAKER AND BACKFEED BREAKER IS LESS THEN 120% OF SERVICE BUS RATING PV BREAKER POSITIONED AT THE OPPOSITE END OF THE MAIN BREAKER (E) MAIN 100A NL2 L1 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-2 THREE LINE DIAGRAM 3314 S. Lowell St 07/29/22 ID CONDUCTOR EGC CONDUIT NUMBER OF CONDUCTORS IN CONDUIT CONDUIT FILL PERCENT TEMP. CORR. FACTOR CONDUIT FILL FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. 1 12 AWG THWN-2, COPPER 8 BARE, COPPER AIR N/A N/A 0.96 (32°C) 1 9A 11.25A 40A 38.4A 2 12 NM-B 12 NM-B ATTIC \ WALL N/A N/A 0.96 (32°C) 1 9A 11.25A 20A 19.2A 3 10 AWG THWN-2, COPPER 8 AWG THWN-2, COPPER 0.75" DIA. EMT 4 18.8% 0.96 (32°C) 1 9A 11.25A 40A 38.4A 4 6 AWG THWN-2, COPPER 8 AWG THWN-2, COPPER 0.75" DIA. EMT 4 38.2% 0.96 (32°C) 1 9A 11.25A 75A 72A WIRE SEGMENTS ELECTRICAL CHARACTERISTICS LABEL DESCRIPTION EQUIPMENT PM1-9 SOLAR MODULES BRAND HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) Voc:41.18V, Isc:11.04A I1-9 INVERTER ENPHASE IQ7-60-2-US SW1 AC BLADE TYPE DISCONNECT SQUARE D D221NRB FUSIBLE, 2-POLE, 30A, 240VAC JB1 DC JUNCTION BOX TYP 4"x4" CB1 PV BREAKER CIRCUIT BREAKER, 20A, 240VAC CB2 BREAKER CIRCUIT BREAKER, 15A, 240VAC F1-2 FUSE FUSE, 20A, 240VAC LC1 COMBINER ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3, 125A MEP MAIN SERVICE PANEL BUS: 100A; MAIN: 100A EQUIPMENT DESCRIPTION INVERTER (9) ENPHASE IQ7-60-2-US MODULE HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) NUMBER OF MODULES 9 ARRAY CIRCUITS 1 BRANCH OF 9 (9A) STC POWER OF ARRAY 3 240W PTC POWER OF ARRAY 3 009W CEC POWER OUTPUT 2 250W MAX AC OUTPUT CURRENT 9A A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-3 THREE LINE DIAGRAM 1. PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER СEC 250.166(B). "THE GROUNDING ELECTRODE CONDUCTOR SHALL NOT BE SMALLER THAN THE LARGEST CONDUCTOR SUPPLIED BY THE SYSTEM AND NOT SMALLER THAN #8AWG." 2. EQUIPMENT OPERATING 150 VOLTS OR GREATER SHALL ONLY BE SERVICED OR REPLACED BY QUALIFIED PERSONNEL. FIELD PROTECTION MAY BE IN THE FORM OF CONDUIT, CLOSED CABINET OR AN ENCLOSURE WHICH REQUIRES USE OF TOOLS TO OPEN. 3. SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART. 690 OF THE 2019 CEC. 4. BACKFEED BREAKER TO BE INSTALLED ON OPPOSITE END OF MAIN BREAKER 5. MINIMUM HEIGHT OF CONDUIT ABOVE ROOF TO MATCH TEMPERATURE DERATING FACTOR. 6. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS WILL MEET THE NECESSARY REQUIREMENTS PER CRC R314, R315 7. UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM. 8. WHEN A BACKFED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ "LINE AND LOAD" 9. PER CEC 705.12 (D)(2)(3)(B) - MAIN PANEL BUS BAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUS BAR 3314 S. Lowell St 07/29/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-4 PLACARD CAUTION POWER TO THE BUILDINGS IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN N EW S NOTE: THE PLAQUE SHALL BE METAL OR PLASTIC, WITH ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE, INCLUDE THE LOCATION OF METER, DISCONNECTS, INVERTER, THE ARRAY AND A FOOTPRINT OF THE ENTIRE BUILDING AND SITE. THE PLAQUE WILL BE ATTACHED BY POP-RIVETS, SCREWS OR OTHER APPROVED FASTENERS NOTE: DIRECTORY PLACARD MUST BE INSTALLED ON THE FRONT OF THE MAIN PANEL AND THE LAYOUT MUST MATCH THE FIELD CONDITIONS AND THE APPROVED PLANS. PER 690.56(B). SOLAR PV ARRAY ROOF MOUNTED WITH MICRO INVERTERS COMBINER PV SYSTEM DISCONNECT FOR UTILITY OPERATION SERVICE POINT UTILITY METERING 3314 S. Lowell St 07/29/22 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 3314 S. Lowell St 07/29/22 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 3314 S. Lowell St 07/29/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan HARDY 3314 S. LOWELL ST 3.240 3314 S. Lowell St 07/29/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT HARDY 3.240 3314 S. LOWELL ST 3314 S. Lowell St 07/29/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNSSEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram HARDY 3314 S. LOWELL ST 3.240 3314 S. Lowell St 07/29/22 1.1.1 PROJECT NOTES: 1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH CEC 690.41(B) 1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY CEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO CEC 690.7. 1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [CEC 110.3]. 1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. 1.2.1 SCOPE OF WORK: 1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.3.1 WORK INCLUDES: 1.3.2 PV ROOF ATTACHMENTS - UNIRAC FLASH KIT 1.3.3 PV RACKING SYSTEM INSTALLATION - UNIRAC SOLARMOUNT 1.3.4 PV MODULE AND INVERTER INSTALLATION - HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 / ENPHASE IQ7-60-2-US 1.3.5 PV EQUIPMENT GROUNDING 1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.3.7 PV LOAD CENTERS (IF INCLUDED) 1.3.8 PV METERING/MONITORING (IF INCLUDED) 1.3.9 PV DISCONNECTS 1.3.10 PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.3.11 PV FINAL COMMISSIONING 1.3.12 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.3.13 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE GENERAL NOTES SCOPE OF WORK SYSTEM SIZE:STC: 9 X 360W = 3.240KW PTC: 9 X 334.3W = 3.009KW (9) HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (9) ENPHASE IQ7-60-2-US ATTACHMENT TYPE: UNIRAC FLASH KIT MSP UPGRADE: NO OWNER NAME: DAVE HARDY PROJECT MANAGER NAME: ROBERT DEAN PHONE: CONTRACTOR NAME:ILUM SOLAR INC. PHONE:(916) 905-0941 AUTHORITIES HAVING JURISDICTION BUILDING: CITY OF SANTA ANA ZONING: CITY OF SANTA ANA UTILITY: SCE DESIGN SPECIFICATIONS OCCUPANCY: II CONSTRUCTION: SINGLE-FAMILY ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: B WIND SPEED: 110 MPH APPLICABLE CODES & STANDARDS BUILDING: CBC 2019, CRC 2019 ELECTRICAL: NEC 2017,CEC 2019 FIRE: CFC 2019 PROJECT INFORMATION NEW PV SYSTEM: 3.240 kWp HARDY RESIDENCE 3314 S. LOWELL ST., SANTA ANA, CA 92707 ASSESSOR'S #: 41025315 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 COVER PAGE 01 AERIAL PHOTO NOT TO SCALE 02 VICINITY MAP NOT TO SCALE SHEET LIST TABLE SHEET NUMBER SHEET TITLE G-1 COVER PAGE G-2 NOTES A-2 ATTACHMENT DETAIL E-1 SIGNAGE E-2 THREE LINE DIAGRAM E-3 THREE LINE DIAGRAM E-4 PLACARD S-1 RACKING DETAILS D-2 INVERTER DATASHEET D-4 RAPID SHUTDOWN DATASHEET D-5 LOAD CENTER DATASHEET D-6 RACKING DATASHEET D-1 MODULE DATASHEET D-3 ENPHASE CABLE SYSTEM D-7 RACKING MOUNT DATASHEET D-8 INTEGRATED GROUNDING DATASHEET D-9 RACKING CERTIFICATION G-1 A-1 SITE PLAN www. Loyd W Martin .com Solar Structures Engineering #2022-2407 Structural Only June 7, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 3314 S. Lowell St 07/29/22 2.1.1 SITE NOTES: 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION CEC 110.26. 2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 2.2.1 EQUIPMENT LOCATIONS: 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC 110.26. 2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC 690.34. 2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC APPLICABLE CODES. 2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 2.3.1 STRUCTURAL NOTES: 2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 2.4.1 WIRING & CONDUIT NOTES: 2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2.4.3 CONDUCTORS SIZED ACCORDING TO CEC 690.8, CEC 690.7. 2.4.4 VOLTAGE DROP LIMITED TO 1.5%. 2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GRAY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [CEC 110.15]. 4.5.1 GROUNDING NOTES: 2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC 690.43 AND MINIMUM CEC TABLE 250.122. 2.5.4 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MICROINVERTER MANUFACTURERS' INSTRUCTIONS. 2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [CEC 250.119] 2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. 2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS 2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. 2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH CEC 110.3(B). 2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. 2.7.1 INTERCONNECTION NOTES: 2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC 705.12 (B)] 2.7.3 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUSBAR RATING [CEC 705.12(D)(2)(3)]. 2.7.4 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACK FEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC 705.12(B)(2)(3)]. 2.7.5 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC 705.12 (B)(2)(3)(C). 2.7.6 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO CEC 705.12 (B)(2)(1) 2.7.7 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH CEC 230.42 2.7.8 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [CEC 705.12 (B)(5)]. A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 NOTES G-2 www. Loyd W Martin .com Solar Structures Engineering #2022-2407 Structural Only June 7, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 3314 S. Lowell St 07/29/22 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Dave Hardy Residence 3314 S. Lowell St., Santa Ana, CA 92707 Applicable Codes: 2019 California Building Code, 2019 California Electric Code, 2019 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2021-166 Solar Journey Teresa Barajas Residence Date: January 15, 2021 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R210' Total load on rafter = 40 plf x 10 ft. = 400 lbs Check Existing 2x6 Roof Rafters @ 16" O.C.: * *Note: Contractor to Field Verify Framing 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 20212021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 2021 2021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 20222022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 2022 2022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 2022 w DL + LL = 30 psf x 1.33 ft. = 40 plf 2022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 Check Existing 2x6 Roof Rafters @ 16" O.C.: Sht # 3 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 2020 Total load on rafter = 40 plf x 3 ft + 18.7 plf x 7 ft + ( 5.33' x 2.75' x 3 psf x 3 ) = 383 lbs < 400 lbs OK 2020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 20212021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 20212021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-167 Solar Journey Sean Karmody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 20222022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 2022 w DL + LL = 30 psf x 1.33 ft. = 40 plf R1 R2 10' 7' w LLw DL 3' P P 2022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 20222022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 P 3314 S. Lowell St 07/29/22 Sht # 4 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 2020 2020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 20212021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 20212021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-167 Solar Journey Sean Karmody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 5.33 ft. x 2.75 ft. = 14.7 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4-7 ASCE 7-16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγEÞðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7-16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγEÞðγa Þð qh =20 psf p = 20 psf (-2.0) (1.5) (0.7) = 42 psf Eq'n 26.10-1 ASCE 7-16 GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GC p = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4-8 ASCE 7-16 Design (Factored) Uplift at each support = 0.6 x 616 lbs = 370 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 14.7 sq. ft. = 616 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Load per lag screw = 370 lbs / 1 = 370 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 2022 2022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 20222022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 20222022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 Sht # 5 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 2020 2020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 20202020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 2021 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 370 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 2021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 20212021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-167 Solar Journey Sean Karmody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 2022 2022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 20222022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 20222022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building = Approximately 1,200 Sq. ft. Approximate Effective Seismic Weight = 1,200 sq. ft. x 30 psf ave. = 36,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS =1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 EQ'N 11.4- 3 ASCE 7- 16 EQ'N 11.4- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 20212021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 20212021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-167 Solar Journey Sean Karmody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 20222022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 20222022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 20222022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 V = 0.185 x 36,000 LBS = 6,660 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT = 36,000 LBS NEW SOLAR ARRAY = 3 PSF x 9 PANELS x 3.3' x 5.5' = 490 LBS NEW SEISMIC WEIGHT = 36,000 LBS + 490 LBS = 36,490 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 36,490 LBS = 6,751 LBS % CHANGE =6,751 LBS - 6,660 LBS 6,660 LBS x 100 % = 1.4 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 2019 2019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 1 ASCE 7- 16 OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 2020 2020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 2020 2020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 20202020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 2020 2020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 2020 2020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020- 3795 ilum Solar Hae Lee Residence Date: December 27, 20202021-088 Penguin Solar Paynita Arnel Residence Date: January 12, 20212021-141 Solar Journey Kevin Jespersen Residence Date: January 14, 20212021-143 Solar Journey Emre Akalin Residence Date: January 14, 20212021-167 Solar Journey Sean Kamody Residence Date: January 15, 20212021-167 Solar Journey Sean Karmody Residence Date: January 15, 20212021-166 Solar Journey Teresa Barajas Residence Date: January 15, 20212021-211 New Power Teresa Rosiak-Proffit Residence Date: January 20, 20212021-232 Grid Alt Jose Arreola Residence Date: January 21, 2021 2021-331 ESD 21-064 Cortes Residence Date: January 29, 20212021-410 ESD 21-087 Smith Residence Date: February 5, 20212021-410 ESD 21-085 Arroyo Residence Date: February 5, 20212021-727 Sasha Intl Watch Hill Properties, LLC. Date: March 3, 20212021-736 AV Solar Larry Murakami Residence Date: March 3, 20212021-799 TG Roofing Onate Residence Date: March 9, 20212021-881 Vital Energy Plowshares Bldg. Date: March 16, 20212021-900 Sunrise Solar Fabiola Palacio Date: March 18, 20212021-969 TG Roofing Shane Ham Date: March 25, 20212021-969 TG Roofing Shane Ham Residence Date: March 25, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1103 Sasha Intl Jeremy Eslinger Residence Date: April 2, 20212021-1103 Sunnera Jeremy Eslinger Residence Date: April 2, 20212021-1227 Solar Journey Jerry Johnson Residence Date: April 14, 20212021-1408 Better Earth Eilif Trondsen Residence Date: April 27, 20212021-2356 Better Earth John Dwyer Residence Date: June 23, 20212021-2442 Vision CE Joel Rodas Residence Date: June 28, 20212021-2445 Better Earth Garry Moore Residence Date: June 29, 20212021-2469 Better Earth Kelly Bumbarger Residence Date: June 29, 20212021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 20212021-2737 Better Earth Ernie Ramos Residence Date: July 15, 2021 2021-2757 Better Earth Rajinder Dhaliwal Residence Date: July 16, 20212021-2773 Better Earth Calvin Cahoon Residence Date: July 16, 20212021-3048 Better Earth Matthew Weiner Residence Date: August 2, 20212021-3219 Better Earth Domingo Calabia Residence Date: August 12, 20212021-3579 Better Earth Allen Vidal Residence Date: September 1, 20212021-3789 Better Earth Antonio Garcia Residence Date: September 10, 20212021-4225 Better Earth Byron Chan Residence Date: October 5, 20212021-5322 Better Earth Maria Rodriguez Residence Date: Decenber 4, 20212021-5583 Better Earth Gabriel Rocha Residence Date: December 21, 20212021-5583 Better Earth Gabriel Rocha Residence Date: January 15, 20222022-275 Better Earth Jose Nelson Rodriguez Residence Date: January 25, 20222022-310 Better Earth Ericson Fello Residence Date: January 27, 20222022-336 Better Earth Paul Becnel Residence Date: January 28, 20222022-334 Better Earth Tim Campbell Residence Date: January 28, 20222022-404 Better Earth David Meyer Residence Date: February 3, 2022 2022-404 Better Earth David Meyer Residence Date: February 3, 20222022-435 Ilum Solar Thea Gonazalez Residence Date: February 4, 20222022-2089 Ilum Solar Ruth Tallada Residence Date: May 13, 20222022-2273 Ilum Solar Anthony Griffen Residence Date: May 27, 20222022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 3314 S. Lowell St 07/29/22 S-1 D5 20 11 1214 13 15 18 22 RO O F S L O P E 910 10 6 21 7 S-1 D4 3 1 5 4 25 24 23 8 27 2 SHEET KEYNOTES 1. ROOF MATERIAL: ASPHALT SHINGLE 2. ROOF STRUCTURE: RAFTERS 3. ATTACHMENT TYPE: UNIRAC FLASHING 4. MODULE MANUFACTURER: HANWHA Q-CELLS 5. MODULE MODEL: Q.PEAK DUO BLK G10+ 360 6. MODULE LENGTH: 67.59" 7. MODULE WIDTH: 41.14" 8. MODULE WEIGHT: 43.87 LBS. 9. SEE SHEET A-2 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 3' FROM RIDGE/RAKE, 18" FROM HIPS/VALLEYS 11. RAFTER SPACING: 16 IN. O.C. 12. RAFTER SIZE: 2X6 NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 20 16. TOTAL AREA: 174 SQ. FT. 17. TOTAL WEIGHT: 476 LBS. 18. WEIGHT PER ATTACHMENT: 19.74 LBS. 19. DISTRIBUTED LOAD: 2.74 PSF. 20. MAX. HORIZONTAL STANDOFF: 64 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 32 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER (OR EQUIV.): UNIRAC 24. RAIL MODEL (OR EQUIVALENT): SM STANDART 25. RAIL WEIGHT: 0.8 PLF. 26. MAX. RAFTER SPAN: 10 FT. 27. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE S-1 RACKING DETAILS www. Loyd W Martin .com Solar Structures Engineering #2022-2407 Structural Only June 7, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23(1) 5/16" x 3.5" SS LAG SCREWS WITH 2.5" MIN EMBEDMENT INTO WOOD 3314 S. Lowell St 07/29/22 SCOPE OF WORK: INSTALL (18) CANADIAN CS1Y-390MS SOLAR ELECTRIC MODULES AND (18) SOLAREDGE P401 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE SE6000H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. UPGRADE MAIN SERVICE PANEL TO 200 AMPS. HOMEOWNER: JESUS CERVANTES PH: 714.515.2269 ADDRESS: 2013 W. 12TH STREET SANTA ANA, CA 92703 DATE: 5/4/22 MAGIC SUN POWER INC 557 OLMSTED DRIVE GLENDALE, CA 91202 PH: 818.388.5478 EDVIN ARAKELIAN C10 - 999485 SYSTEM SIGNAGESYSTEM SIGNAGE ALL SIGNAGE SHALL BE REFLECTIVE, UV RESISTANT PLASTIC, RED IN COLOR WITH WHITE LETTERING, AND ATTACHED WITH WEATHERPROOF ADHESIVE OR OTHER APPROVED METHOD. ALL LETTERS SHALL BE A MINIMUM OF 3 8" HEIGHT AND ALL CAPITALIZED. ALL CONDUIT, JUNCTION BOXES AND OTHER ENCLOSURES SHALL BE MARKED AT 10' MAX INTERVALS AND AT ALL BENDS, TERMINATIONS, SPLICES OR CONNECTIONS WITH "WARNING: PHOTOVOLTAIC POWER SOURCE". WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION TO BE INSTALLED AT ALL SERVICEABLE PANELS OR BOXES AND AT ALL DISCONNECTS: WARNING ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED MAY BE ENERGIZED SERVICE POINT & UTILITY METERING PV SYSTEM DISCONNECT FOR UTILITY OPERATION CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN. ADDRESS: 2013 W. 12TH STREET, SANTA ANA, CA 92703 SOLAR ARRAY (ON ROOF) N INVERTER & DC DISCONNECT TO BE INSTALLED ON THE OUTSIDE COVER OF THE MAIN SERVICE DISCONNECT: PV SOLAR DC DISCONNECT MAXIMUM VOLTAGE = 480.00 V MAXIMUM CIRCUIT CURRENT = 30.00 A MAXIMUM RATED OUTPUT CURRENT OF THE DC-TO-DC CONVERTER = 15.00 A TO BE INSTALLED ON THE FRONT OF THE DC DISCONNECT: RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM RATED AC OUTPUT CURRENT = 31.25 A NOMINAL OPERATING AC VOLTAGE = 240 V TO BE INSTALLED ON THE FRONT OF THE AC DISCONNECT: WARNING POWER SOURCE OUTPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE TO BE INSTALLED AT THE BACKFED BREAKER SERVING THE PV SOLAR SYSTEM: TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TO BE INSTALLED ON THE FRONT OF THE MAIN SERVICE DISCONNECT: "SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" SHALL BE BLACK LETTERING ON YELLOW BACKGROUND. THE REMAINDER OF THE SIGN SHALL BE BLACK LETTERING ON WHITE BACKGROUND. SHEET NOTICE: ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. 4 OF 4 PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 SYSTEM CALCULATIONS: MODULE POWER = 390 W NUMBER OF MODULES IN LONGEST STRING = 9 (9) 390 W = 3510 W OPTIMIZER MAX POWER PER STRING = 5700 W 3510 W < 5700 W, OK OPERATING CURRENT = POWER RATING/OPERATING VOLTAGE = 3510 W/380 V = 9.24 A OPTIMIZER TO INVERTER TARGET VOLTAGE/OPERATING VOLTAGE = 380 V MAX SYSTEM VOLTAGE (Voc) CONTROLLED BY INVERTER = 480 V SHORT-CIRCUIT CURRENT (Isc) CONTROLLED BY OPTIMIZER = 15.00 A INVERTER MAX OUTPUT CURRENT = 25.00 A 25.00 A (1.25) = 31.25 A [Ic], USE 40 A BREAKER MAIN SERVICE PANEL BUS RATING = 200 A MAIN SERVICE PANEL MAIN OCPD = 200 A 200 A + 40 A SOLAR OCPD = 240 A 200 A BUS (1.2) = 240 A 240 A = 240 A, OKWIRE CALCULATIONS: FROM OPTIMIZERS TO INVERTER/DC DISCONNECT: AMBIENT TEMPERATURE = 34°C TEMPERATURE ADDER FOR CONDUIT NOT OFFSET FROM ROOF = 33°C ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C + 33°C = 67°C = 0.58 Isc = 15.00 A 15.00 A/0.58 = 25.86 A NUMBER OF CURRENT CARRYING CONDUCTORS IN CONDUIT = 4 ADJUSTMENT FACTOR PER TABLE 310.15(B)(3)(a) FOR CONDUIT FILL (4-6 CONDUCTORS IN CONDUIT) = 0.80 25.86 A/0.80 = 32.33 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 32.33 A, USE 10 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 40 A SELECT CONDUIT FOR (4) 10 AWG THWN-2 & (1) 8 AWG GROUND = 3 4" EMT CONDUIT FROM THE INVERTER TO THE MAIN SERVICE PANEL: ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C = 0.96 Ic = 31.25 A 31.25 A/0.96 = 32.55 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 32.55 A, USE 8 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 55 A SELECT CONDUIT FOR (3) 8 AWG THWN-2 & (1) 8 AWG GROUND = 3 4" EMT CONDUIT 79119PV 3314 S. Lowell St 07/29/22 SCOPE OF WORK: INSTALL (18) CANADIAN CS1Y-390MS SOLAR ELECTRIC MODULES AND (18) SOLAREDGE P401 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE SE6000H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. UPGRADE MAIN SERVICE PANEL TO 200 AMPS. HOMEOWNER: JESUS CERVANTES PH: 714.515.2269 ADDRESS: 2013 W. 12TH STREET SANTA ANA, CA 92703 DATE: 5/4/22 MAGIC SUN POWER INC 557 OLMSTED DRIVE GLENDALE, CA 91202 PH: 818.388.5478 EDVIN ARAKELIAN C10 - 999485 ELECTRICAL LINE DIAGRAM SHEET NOTICE: ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. 3 OF 4 PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 MAIN SERVICE INFO: 200 A, 120/240 VAC, 1Ø, 3-WIRE METER #222013-240421 40A 200A EXISTING BUILDING GROUNDING ELECTRODE SYSTEM M EXISTING SERVICE PANEL: 200 A BUS RATED, 240 VAC, 1Ø G L1 L2 60 A, 240 VAC, 1Ø AC DISCONNECT LOCKABLE, VISIBLE KNIFE-BLADE TYPE (3) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT (3) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT L1 L2 N G SOLAREDGE INTEGRATED DC DISCONNECT & RAPID SHUTDOWN DEVICE SOLAREDGE SE6000H-US 240 VAC, 1Ø TRANSFORMERLESS INVERTER - +CANADIAN CS1Y-390MS + - + - SOURCE CIRCUIT #1: 9 MODULES, 600 VDC + - + - (4) 10 AWG PV IN AIR (9) 600 VDC SOLAREDGE P401 OPTIMIZERS + - + - + - + - SOURCE CIRCUIT #2: 9 MODULES, 600 VDC + - + - + - + - (9) 600 VDC SOLAREDGE P401 OPTIMIZERS NEMA 3R, 600 VDC JUNCTION BOX (4) 10 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT USE UNIRAC INTEGRATED GROUNDING TO GROUND ALL MODULES, OPTIMIZERS, JUNCTION BOXES AND ANY OTHER METAL PARTS AND #6 AWG SOLID COPPER WHERE NECESSARY 79119PV CANADIAN CS1Y-390MS CANADIAN CS1Y-390MS CANADIAN CS1Y-390MS CANADIAN CS1Y-390MS CANADIAN CS1Y-390MS 3314 S. Lowell St 07/29/22 SCOPE OF WORK: INSTALL (18) CANADIAN CS1Y-390MS SOLAR ELECTRIC MODULES AND (18) SOLAREDGE P401 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE SE6000H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. UPGRADE MAIN SERVICE PANEL TO 200 AMPS. HOMEOWNER: JESUS CERVANTES PH: 714.515.2269 ADDRESS: 2013 W. 12TH STREET SANTA ANA, CA 92703 DATE: 5/4/22 MAGIC SUN POWER INC 557 OLMSTED DRIVE GLENDALE, CA 91202 PH: 818.388.5478 EDVIN ARAKELIAN C10 - 999485 NOTE: DIMENSIONS AND FEATURES SHOWN ARE CLOSE TO SCALE BUT WERE TAKEN FROM A FIELD SURVEY AND APPROXIMATIONS MADE USING GOOGLE EARTH. (E) 200 AMP MAIN SERVICE PANEL W. 12TH STREET N SCALE: 1/16"=1' 8 16 32 48 (N) AC DISCONNECT (N) INVERTER/ DC DISCONNECT SITE/ROOF PLAN ARRAY #1: (6) MODULES TILT = 17°, AZ = 0° SHEET NOTICE: ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. 2 OF 4 PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 EXISTING 1-STORY ROOF: ASPHALT SHINGLE, FELT & 1 2" SHEATHING OVER RAFTERS EXISTING 2 X 4 RAFTERS @ 24" OC MODULES: 79.6" X 39.2" 52.9 LBS EACH UNIRAC SOLARMOUNT RAIL MOUNTING SYSTEM WITH UNIRAC FLASHKIT PRO ROOF ATTACHMENTS (USE 5 16" STAINLESS STEEL LAG BOLTS @ 72" OC OR LESS WITH A MINIMUM EMBEDMENT OF 21 2" INTO ROOF RAFTERS), WATERPROOF ALL CONNECTION LOCATIONS PER MANUFACTURER'S INSTRUCTIONS 3" MIN. 8" MAX. NTS ELEVATION DETAIL 79119PV TOTAL ROOF AREA = 1776 SF TOTAL SOLAR AREA = 390 SF 390 SF/1776 SF = 0.22 ARRAYS COVER 22% OF TOTAL ROOF AREA PROPERTY LINE PROPERTY LINE PROPERTY LINE ARRAY #2: (5) MODULES TILT = 17°, AZ = 180° CHIMNEY VENT (TYP) 1 1.5' FIRE CLEARANCE ARRAY #3: (4) MODULES TILT = 17°, AZ = 270° ARRAY #3: (3) MODULES TILT = 17°, AZ = 90° 2 3 4 5 6 7 8 9 10 11 13 14 15 12 16 17 18 3'-3" 1'-6" 1'-6" 3' 3'-2" 1'-10"2'-3" 1'-4" 3314 S. Lowell St 07/29/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org X X X X X X X X X X JENNIFER KEMME 909-748-1300 sherrymanley@visionce.com 07/12/2022 3314 S. LOWELL ST ILUM SOLAR 1009260 3314 S. Lowell St 07/29/22 3314 S. Lowell St 07/29/22 32 :(5 23 7 , 0 , =(5 VRODUHGJHFRP 39SRZHURSWLPL]DWLRQDWWKHPRGXOHOHYHO SpeciÀcallydesigned toworkwithSolarEdge inverters Upto25%moreenergy Flexiblesystemdesignformaximumspace utilization Fastinstallationwithasinglebolt Nextgenerationmaintenancewithmodule- levelmonitoring MeetsNECrequirementsforarcfault protection(AFCI)and PhotovoltaicRapid ShutdownSystem(PVRSS) Module-levelvoltageshutdownforinstaller and À reÀ ghtersafety SuperiorefÀciency(99.5%) Mitigatesalltypesofmodulemismatchlosses, frommanufacturingtolerancetopartial shading 3RZHU2SWLPL]HU )RU1RUWK$PHULFD P320/P340/P370/P400/P401/P405/P485/P505 <($5 :$55$17< ©SolarEdgeTechnologiesLtd.Allrightsreserved.SOLAREDGE,theSolarEdgelogo,OPTIMIZEDBYSOLAREDGEaretrademarksorregisteredtrademarksofSolarEdgeTechnologies,Inc. Allothertrademarksmentionedhereinaretrademarksoftheirrespectiveowners.Date:07/2020/V02/ENGNAM.Subjecttochangewithoutnotice. (6)Fordetailedᐎringsizinginformationreferto:http://www.solaredge.com/sites/default/Àles/ᐎring_sizing_na.pdf (7)ItisnotallowedtomixP405/P485/P505withP320/P340/P370/P400/P401inoneᐎring (8)Aᐎringwithmorethan30optimizersdoesnotmeetNECrapidshutdownrequirements;safetyvoltagewillbeabovethe30Vrequirement (9)For208Vgrid:itisallowedtoinᐎallupto7,200Wperᐎringwhenthemaximumpowerdifferencebetweeneachᐎringis1,000W (10)For277/480Vgrid:itisallowedtoinᐎallupto15,000Wperᐎringwhenthemaximumpowerdifferencebetweeneachᐎringis2,000W 3RZHU2SWLPL]HU )RU1RUWK$PHULFD P320/P340/P370/P400/P401/P405/P485/P505 2SWLPL]HUPRGHO W\SLFDOPRGXOH FRPSDWLELOLW\ 3 IRUFHOO PRGXOHV 3 IRUKLJK SRZHU FHOO PRGXOHV 3 IRUKLJKHU SRZHU DQG FHOO PRGXOHV 3 IRU FHOO PRGXOHV 3 IRUKLJK SRZHU DQGFHOO PRGXOHV 3 IRUKLJK YROWDJH PRGXOHV 3 IRUKLJK YROWDJH PRGXOHV 3 IRUKLJKHU FXUUHQW PRGXOHV ,1387 RatedInputDCPower(1)320 340 370 400 405 485 505 W AbsoluteMaximumInputVoltage (Vocatloweᐎtemperature)48 60 80 60 125(2)83(2)Vdc MPPTOperatingRange 8-48 8-60 8-80 8-60 12.5-105 12.5-83 Vdc MaximumShortCircuitCurrent ,VF11 10.1 11.75 11 14 Adc MaximumEciency 99.5 Weighted Eciency98.8 98.6 OvervoltageCategory ,, 287387'85,1*23(5$7,21 32:(5237,0 ,=(5 &211(&7('7223(5$7,1*62/$5('*(,19(57(5 MaximumOutputCurrent 15 Adc MaximumOutputVoltage 60 85 Vdc 287387'85,1*67$1 '%<32:(5 237,0,=(5 ',6&211(&7(')52062/$5('*(,19(57(52562/$5('*(,19(57(5 2)) SafetyOutputVoltageperPower Optimizer 1±0.1 Vdc 67$1 '$5'&203/,$1&( EMC FCCPart15ClassB,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1 (classIIsafety),UL1741 Material UL94V-0,UVResiᐎant RoHS <HV ,167$//$7,2163(&,),&$7,216 MaximumAllowedSyᐎem Voltage 1000 Vdc Compatibleinverters AllSolarEdgeSinglePhaseandThreePhaseinverters Dimensions(WxLxH)129x153x27.5/5.1x6x1.1 129x153x33.5 /5.1x6x1.3 129x153x29.5 /5.1 x6x1.16 129x159x49.5/5.1x6.3x1.9 129x162x59/ 5.1x6.4x2.3 PP /in Weight(includingcables)630/1.4 750/1.7 655/1.5 845/1.9 1064/2.3 gr/lb InputConnector MC4(3) Singleordual MC4(3)(4)MC4(3) InputWireLength 0.16/0.52 m/ft OutputWireType/ConnectorDoubleInsulated/MC4 OutputWireLength 0.9/2.95 1.2/3.9 m/ft OperatingTemperatureRange(5)-40-+85/-40-+185 ˚C/˚F ProtectionRating IP68/NEMA6P RelativeHumidity 0-100 (1)RatedpowerofthemoduleatSTCwillnotexceedtheoptimizer“RatedInputDCPower”.Moduleswithupto+5%powertoleranceareallowed (2)NEC2017requiresmaxinputvoltagebenotmorethan80V (3)ForotherconnectortypespleasecontactSolarEdge (4)FordualversionforparallelconnectionoftwomodulesuseP485-4NMDMRM.InthecaseofanoddnumberofPVmodulesinoneᐎring,inᐎallingoneP485dualversionpoweroptimizerconnected toonePVmodule.Whenconnectingasinglemodulesealtheunusedinputconnectorswiththesuppliedpairofseals. (5)Forambienttemperatureabove+85°C/+185°Fpowerde-ratingisapplied.RefertoPowerOptimizersTemperatureDe-RatingTechnicalNoteformoredetails. 396\VWHP'HVLJQ8VLQJ D6RODU(GJH,QYHUWHU 6LQJOH3KDVH +':DYH 6LQJOHSKDVH 7 K UHH 3 K DVH IRU 9JULG 7KUHH3KDVHIRU 9JULG MinimumStringLength (PowerOptimizers) P320,P340,P370, P400,P401 8 10 18 P405,P485,P5058 14 MaximumStringLength(PowerOptimizers)25 25 50(8) MaximumPowerperString 5700(6000with SE7600-US-SE11400- US) 5250 600012750(10)W ParallelStringsofDifferentLengthsorOrientations <HV 3314 S. Lowell St 07/29/22 VRODUHGJ HFRP 2SWLPL]HGEDWWHU\VWRUDJHZLWK+':DYHWHFKQRORJ\ Record-breaking99%weightedefÀciencywith '&RYHUVL]LQJ ,QWHJUDWHGDUFIDXOWSURWHFWLRQDQGUDSLGVKXWGRZQ IRU1(&1(&DQG 1(&SHUDUWLFOH DQG (PEHG GHGUHYHQXHJUDGHSURG XFWLR QGDWD$16, &&ODVV Small,lightweight,andeasytoinstall Modulardesign,futurereadywithoptional XSJUDGHVWR 0XOWLLQYHUWHUVFDODEOHVWRUDJ HVROXWLRQ 6LQJ OH3KDVH(QHUJ\+XE ,QYHUWHUZLWK3ULVP 7HFKQRORJ\ IRU1RUWK$PHULFD 6(+866(+866(+866(+86 <($5 :$55$17< '&FRXSOHGVWRUDJHIRUIXOORUSDUWLDOKRPHEDFNXS %XLOWLQFRQVXPSWLRQPRQLWRULQJ 'LUHFWFRQQHFWLRQWRWKH6RODU(G JHVPDUW(9 FKDUJHU 6(+86 6(+86 6(+86 6(+86 81,76 287387$&21*5,' 5DWHG$&3RZHU : 0D[LPXP $&3RZHU2XWSXW $&2XWSXW9ROWDJH5DQJH 9DF $&)UHTXHQF\5DQJHPLQQRP PD[+] 0D[LPXP&RQWLQXRXV2XWSXW&XUUHQW$ *)',7KUHVKROG $ TotalHarmonicDiᐎortion(THD) 3RZHU)DFWRU 1,adjuᐎable-0.85to0.85 UtilityMonitoring,IslandingProtection,CountryConÀgurableThresholds <HV &KDUJH%DWWHU\IURP$& LIDOORZHG<HV 7\SLFDO1LJKWWLPH3RZHU&RQVXPSWLRQ : 287387$&%$&.83 5DWHG$&3RZHULQ%DFNXS2SHUDWLRQ: $&//2XWSXW9ROWDJ H5DQJHLQ%DFNXS 9DF $&/12XWSX W9ROWDJH5DQJHLQ%DFNXS 9DF $&)UHTXHQF\5DQJHLQ%DFNXSPLQQRPPD[+] 0D[LPXP &RQWLQXRXV2XWSXW&XUUHQWLQ%DFNXS2SHUDWLRQ $ *)',$ 7+' 28738760$57(9&+$5*(5 $& 5DWHG$&3RZHU $&2XWSXW9ROWDJH5DQJH 9DF $&)UHTXHQF\5DQJHPLQQRP PD[+] Maximum ContinuousOutputCurrent@240V(grid,PVandbattery)$DF ,1387'&39$1'%$77(5< 7UDQVIRUPHUOHVV8QJ URXQGHG <HV 0D[,QSXW9ROWDJH 9GF 1RP'&,QSXW9ROWDJH 9GF 5HYHUVH3RODULW\3URWHFWLRQ <HV *URXQG)DXOW,VRODWLRQ'HWHFWLRQ 600kΩSensitivity ,1387'&39 0D[LPXP'&3RZHU 0D[LPXP,QSXW&XUUHQW $GF Max.InputShortCircuitCurrent $GF MaximumInverterEciency CECWeightedEciency SROH'LVFRQQHFWLRQ <HV ,1387'&%$77(5< SupportedBatteryTypes LGChemRESU10H&RESU16HPrime NumberofBatteriesperInverter RU 0D[LPXP%DWWHU\&DSDFLW\SHU,QYHUWHU N:K &RQWLQXRXV3RZHU3HU,QYHUWHU: 3HDN3RZHU: 0D[,QSXW&XUUHQW#9 $GF SROH'LVFRQQHFWLRQ <HV 6(+866(+866(+866(+86 6LQJ OH3KDVH(QHUJ\+X E,QYHUWHU ZLWK3ULVP7HFKQRORJ\ IRU1RUWK$PHULFD 3314 S. Lowell St 07/29/22 6XSSRUWHGZLWK316(+860[[[[[[ (1) ThesespeciÀcationsapplytoinverterswithpartnumbersSExxxxH-USS3Bxxxx,SE3800H-USMxxBCxxorSE7600H-USSSHxxxxand connectionunitmodelnumberDCD-1PH-US-PxH-F-x (2) ForotherregionalsettingspleasecontactSolarEdgesupport 1RWGHVLJQHGIRUVWDQGDORQHDSSOLFDWLRQVDQGUHT XLUHV$&IRUFRPPLVVLRQLQJ (4) RatedACpowerinBackupOperationarevalidforinstallationswithmultipleinverters.Forasinglebackupinverteroperation,ratedACpowerinBackupis90%ofthevaluestated (5) Ahighercurrentsourcemaybeused;theinverterwilllimititsinputcurrenttothevaluesstated (6) RequiressupportinginverterFW forRESU16HPrimebattery (7) WhenconnectingtwoLGChemRESU10Hbatteries,eachbatterymusthaveadifferentpartnumber.LGChemRESU16HPrimeissupportedwithasinglebatteryonly 'LVFKDUJHSRZHULVOLPLWHGXSWRLQYHUWHUUDWHG$&SRZHU (9) Forconsumptionmeteringcurrenttransformersshouldbeorderedseparately:SEACT0750-200NA-20orSEACT0750-400NA-20.20unitsperbox. Revenuegrademeteringisonlyforproductionmetering (10)Forallcellularplanscustomermustverifythat: ·CustomerisresponsibleforverifyingthatthesitelocationhasadequatemobilecoveragebythethirdpartyserviceproviderpriortoanyinstallationbyaccessingKWWSVZZZVRODUHGJHFRPSURGXFWV FRPPXQLFDWLRQFHOOXODUFRPPXQLFDWLRQRSWLRQV ·SolarEdgeshallnotberesponsibleorliableforunavailabilityordiscontinuanceofnetworkcoverageinaspeciÀcareaorregion,anynetworkdowntime,orpermanentserviceshutdown (11)Fullpoweruptoatleast50°C/122°F;forpowerde-ratinginformationreferto:https://www.solaredge.com/sites/default/Àles/se-temperature-derating-note-na.pdf 6(+866(+866(+866(+86 6(+86 6(+86 6(+86 6(+86 81,76 60 $57(1(5*<&$3$%,/,7,(6 &RQVXPSWLRQ0HWHULQJ %XLOWLQ Backup& BatteryStorage WithBackupInterface(purchasedseparately)forserviceupto200A;Upto3inverters,15kWbackup power,and60kWhbackupcapacity (9&KDUJLQJ DirectconnectiontoSmartEVcharger $'',7,21$/)($785(6 SupportedCommunicationInterfaces RS485,Ethernet,Wi-Fi(optional),Cellular RevenueGradeMetering,ANSIC12.20 %XLOWLQ ,QWHJUDWHG$&'&DQG&RPPXQLFDWLRQ&RQQHFWLRQ8QLW <HV ,QYHUWHU&RPPLVVLRQLQJ :iththeSetAppmobileapplicationusingbuilt-inWi-FiAccessPointforlocalconnection DCVoltageRapidShutdown(PVandBattery)<HVDFFRUGLQJWR1(&1(&DQG1(& 67$1 '$5'&203/,$1 &( Safety UL1741,UL1741SA,UL1741PCS,UL1699B,UL1998,UL9540,CSA22.2 GridConnectionStandards ,(((5XOH5XOH+ (PLVVLRQV )&&SDUWFODVV% ,167$//$7,2163(&,),&$7,216 ACOutputConduitSize/AWGRange 3/4''maximum/ $:* 3/4''maximum/14-8AWG 1''maximum/14-4AWG1''maximum/14-4AWG* EVACOutputConduitSize/AWGRange 3/4''maximum/ $:* 3/4''maximum/14-8AWG 1''maximum/14-4AWG1''maximum/14-64AWG* DCInput(PV)ConduitSize/AWGRange 3/4''maximum/ $:* 3/4''maximum/14-8AWG 1''maximum/14-6AWG1''maximum/14-6AWG* DCInput(Battery)ConduitSize/AWGRange 3/4''maximum/ $:* 3/4''maximum/14-8AWG 1''maximum/14-6AWG1''maximum/14-6AWG* 'LPHQVLRQVZLWK&RQQHFWLRQ8QLW+[:['17.7x14.6x6.8/450x370x174 in/mm :HLJKWZLWK&RQQHFWLRQ8QLW 26/11.8 26/11.8 30.2/13.7 lb/kg30.2/13.7 1RLVH G%$ &RROLQJ 1DWXUDO&RQYHFWLRQ 2SHUDWLQJ7HPSHUDWXUH5DQJH-40to+140/-40to+60˚F/˚C 3URWHFWLRQ5DWLQJ1(0$ 6LQJ OH3KDVH(QHUJ\+X E,QYHUWHU ZLWK3ULVP7HFKQRORJ\ IRU1RUWK$PHULFD ©SolarEdgeTechnologies,Inc.Allrightsreserved.SOLAREDGE,theSolarEdgelogo,OPTIMIZEDBYSOLAREDGEaretrademarksorregisteredtrademarksofSolarEdgeTechnologies,Inc.Allothertrademarksmentioned hereinaretrademarksoftheirrespectiveowners.Date:03/2021/V02/ENGNAM.Subjecttochangewithoutnotice. &RQQHFWL QJ&7VWRWKH5HYHQXH*UDGHDQG&RQVXPSWLRQ0HWHU SinglePhaseEnergyHubInverter withPrismTechnology Grid 6LQJ OH3KDVH(QHUJ\+X E,QYHUWHU ZLWK3ULVP7HFKQRORJ\ IRU1RUWK$PHULFD 6(+866(+866(+866(+863314 S. Lowell St 07/29/22 3314 S. Lowell St 07/29/22 FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac’s patented SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. Kittedin10 packsformaximum convenience,ƜashingsandhardwareareavailableinMillorDarkƛnishes. With FLASHKIT pro, you have everything you need for a quick, professional installation. YOUR COMPLETE SOLUTION Flashings, lags, continuous slot L-Feet and hardware CONVENIENT 10 PACKS Packaged for speed and ease of handling FLASHKIT PRO TRUSTED WATER SEAL FLASHINGS FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 FLASH KITPROISTHECOMPLETEFLASHINGAND ATTACHMENTSOLUTIONFORCOMPOSITIONROOFS. FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 PRE-INSTALL • Locate roof rafters and snap chalk lines to mark the installation point for each roof attachment. • Drilla7/32ƌpilotholeateachroofattachment.Filleachpilothole with sealant. STEP 1 INSTALL FLASHKITPROFLASHING • AddaU-shapedbeadofroofsealanttotheundersideoftheƜashing with the open side of the U pointing down the roof slope. Slide thealuminumƜashingunderneaththerowofshinglesdirectlyup slopefromthepilotholeasshown.Aligntheindicatormarksonthe lowerendoftheƜashingwiththechalklinesontherooftocenter theraisedholeintheƜashingoverthepilotholeintheroof.When installedcorrectly,theƜashingwillextendunderthetwocoursesof shinglesabovethepilothole. STEP 2 INSTALL L-FOOT • FastenL-footandFlashingintoplacebypassingtheincludedlag boltandpre-installedstainlesssteel-backedEPDMwasherthrough theL-footEPDMgrommet,andtheraisedholeintheƜashing,into the pilot hole in the roof rafter. • DrivethelagboltdownuntiltheL-footisheldƛrmlyinplace. Itis normalfortheEPDMontheundersideofthestainlesssteelbacked EPDMwashertocompressandexpandbeyondtheoutsideedgeof the steel washer when the proper torque is applied. • Usecautiontoavoidover-torqueing thelag boltifusing animpactdriver. • RepeatSteps1and2ateachroofattachmentpoint. STEP 3 ATTACHL-FOOTTORAIL • Inserttheincluded3/8"-16T-boltsintothelowerslotontheRail (soldseparately),spacingtheboltstomatchthespacingbetween the roof attachments. • Position the Rail against the L-Foot and insert the threaded end of theT-BoltthroughthecontinuousslotintheL-Foot.Applyanti-seize toboltthreadstopreventgallingoftheT-boltandincluded3/8ƌ serratedƜangenut.Placethe3/8ƌƜangenutontheT-boltand ƛngertighten.RepeatSTEP 3untilallL-FeetaresecuredtotheRail withaT-bolt.AdjustthelevelandheightoftheRailandtorqueeach boltto30ft-lbs. INSTALL FLASHKITPROFLASHING STEP 1 STEP 2 STEP 3 INSTALL L-FOOT ATTACHL-FOOTTORAIL FLASHKIT PRO INSTALLATION GUIDE 3314 S. Lowell St 07/29/22 SCOPE OF WORK: INSTALL (18) CANADIAN CS1Y-390MS SOLAR ELECTRIC MODULES AND (18) SOLAREDGE P401 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE SE6000H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. UPGRADE MAIN SERVICE PANEL TO 200 AMPS. HOMEOWNER: JESUS CERVANTES PH: 714.515.2269 ADDRESS: 2013 W. 12TH STREET SANTA ANA, CA 92703 DATE: 5/4/22 MAGIC SUN POWER INC 557 OLMSTED DRIVE GLENDALE, CA 91202 PH: 818.388.5478 EDVIN ARAKELIAN C10 - 999485 VICINITY MAP CERVANTES RESIDENCE SHEET INDEX: SHEET 1 PROJECT INFO, VICINITY MAP, NOTES, SCOPE OF WORK SHEET 2 SITE/ROOF PLAN, ELEVATION DETAIL SHEET 3 ELECTRIC LINE DRAWING, GROUNDING DETAIL SHEET 4 CALCULATIONS, SIGNS ATTACHED MODULE, INVERTER, MOUNTING HARDWARE SPEC SHEETS, STRUCTURAL REPORT NTS SHEET NOTICE: ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. 1 OF 4 PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 (18) CANADIAN CS1Y-390MS PEAK POWER = 390 W MAX OPERATING CURRENT = 9.05 A MAX OPERATING VOLTAGE = 43.10 V OPEN CIRCUIT VOLTAGE = 51.90 V SHORT CIRCUIT CURRENT = 9.82 A MAX SERIES FUSE RATING = 16 A TEMP. COEFF. OF Voc = -0.28%/°C DIMENSIONS = 79.6" X 39.2" X 1.4" WEIGHT = 52.9 LBS GENERAL NOTES: 1. THIS SYSTEM COMPLIES WITH THE 2019 CRC, 2019 CBC, 2019 CFC, AND THE 2019 CEC. 2. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY HAS BEEN NOTIFIED. 3. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. 4. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. 5. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE UL 1741 COMPLIANT. 6. THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS FROM THE MAIN BREAKER. 7. CONDUCTORS ARE 90° C RATED COPPER WIRE. 8. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT RESISTANT. 9. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED IN A METAL RACEWAY. 10. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE PROTECTED IN CONDUIT. 11. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES AND RAILS AND SECURED IN PLACE. 12. THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 13. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED FOR USE IN WET LOCATIONS. 14. CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. 15. SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. 16. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE GROUNDING ELECTRODE SYSTEM, A GROUNDING ELECTRODE SYSTEM WILL BE INSTALLED PER CEC 250.50.THE ELECTRICAL SERVICE WILL BE BONDED TO THE WATER AND GAS PIPING PER SECTION 250.104 OF THE CEC. 17. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS. 79119PV INVERTER/DC DISCONNECT: (1) SOLAREDGE SE6000H-US MAX DC INPUT VOLTAGE = 480 V NOMINAL DC INPUT VOLTAGE = 380 V MAX DC INPUT CURRENT = 16.5 A DC DISCONNECT MAX INPUT CURRENT = 30.0 A NUMBER OF DC INPUTS = 2 RATED AC POWER = 6000 W AC VOLTAGE = 240 V MAX AC OUTPUT CURRENT = 25.0 A NEMA 4X ENCLOSURE DIMENSIONS = 17.7" X 14.6" X 6.8" WEIGHT = 30.2 LBS PHOTOVOLTAIC SOLAR PROJECT INFORMATION: SYSTEM SIZE: 7.020 kW (DC) MODULES: ARRAY: INSTALLED WEIGHT = 3.0 PSF ROOF COVERAGE = 390 SF, ARRAYS COVER 22% OF TOTAL ROOF AREA MOUNTING HARDWARE: UNIRAC SOLARMOUNT RAIL UNIRAC FLASHKIT PRO ATTACHMENTS 5 16" STAINLESS STEEL LAG BOLTS @ 72" OC OR LESS WITH A MINIMUM OF 21 2" PENETRATION INTO ROOF RAFTERS EXISTING ROOF INFO: 1 STORY, COMPOSITION SHINGLE 2 X 4 RAFTERS @ 24" OC MODULE ADD-ON: (18) SOLAREDGE P401 DC POWER OPTIMIZERS MAX DC INPUT VOLTAGE = 60 V OPERATING VOLTAGE RANGE = 8 V - 60 V MAX DC INPUT CURRENT = 11.75 A MAX DC OUTPUT CURRENT = 15 A DC OUTPUT VOLTAGE = 380 V MAX POWER PER STRING (CONTROLLED BY INVERTER) = 5700 W NEMA 6P ENCLOSURE DIMENSIONS = 5.1" X 6.0" X 1.2" WEIGHT = 1.5 LB Bldg permit #101111215 Elect permit #20176783 Permits issued on 7/26/22 3314 S. Lowell St 07/29/22 1.1.1 PROJECT NOTES: 1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH CEC 690.41(B) 1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY CEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO CEC 690.7. 1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [CEC 110.3]. 1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. 1.2.1 SCOPE OF WORK: 1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.3.1 WORK INCLUDES: 1.3.2 PV ROOF ATTACHMENTS - UNIRAC FLASH KIT 1.3.3 PV RACKING SYSTEM INSTALLATION - UNIRAC SOLARMOUNT 1.3.4 PV MODULE AND INVERTER INSTALLATION - HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 / ENPHASE IQ7-60-2-US 1.3.5 PV EQUIPMENT GROUNDING 1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.3.7 PV LOAD CENTERS (IF INCLUDED) 1.3.8 PV METERING/MONITORING (IF INCLUDED) 1.3.9 PV DISCONNECTS 1.3.10 PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.3.11 PV FINAL COMMISSIONING 1.3.12 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.3.13 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE GENERAL NOTES SCOPE OF WORK SYSTEM SIZE:STC: 9 X 360W = 3.240KW PTC: 9 X 334.3W = 3.009KW (9) HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (9) ENPHASE IQ7-60-2-US ATTACHMENT TYPE: UNIRAC FLASH KIT MSP UPGRADE: NO OWNER NAME: DAVE HARDY PROJECT MANAGER NAME: ROBERT DEAN PHONE: CONTRACTOR NAME:ILUM SOLAR INC. PHONE:(916) 905-0941 AUTHORITIES HAVING JURISDICTION BUILDING: CITY OF SANTA ANA ZONING: CITY OF SANTA ANA UTILITY: SCE DESIGN SPECIFICATIONS OCCUPANCY: II CONSTRUCTION: SINGLE-FAMILY ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: B WIND SPEED: 110 MPH APPLICABLE CODES & STANDARDS BUILDING: CBC 2019, CRC 2019 ELECTRICAL: NEC 2017,CEC 2019 FIRE: CFC 2019 PROJECT INFORMATION NEW PV SYSTEM: 3.240 kWp HARDY RESIDENCE 3314 S. LOWELL ST., SANTA ANA, CA 92707 ASSESSOR'S #: 41025315 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 COVER PAGE 01 AERIAL PHOTO NOT TO SCALE 02 VICINITY MAP NOT TO SCALE SHEET LIST TABLE SHEET NUMBER SHEET TITLE G-1 COVER PAGE G-2 NOTES A-2 ATTACHMENT DETAIL E-1 SIGNAGE E-2 THREE LINE DIAGRAM E-3 THREE LINE DIAGRAM E-4 PLACARD S-1 RACKING DETAILS D-2 INVERTER DATASHEET D-4 RAPID SHUTDOWN DATASHEET D-5 LOAD CENTER DATASHEET D-6 RACKING DATASHEET D-1 MODULE DATASHEET D-3 ENPHASE CABLE SYSTEM D-7 RACKING MOUNT DATASHEET D-8 INTEGRATED GROUNDING DATASHEET D-9 RACKING CERTIFICATION G-1 A-1 SITE PLAN 3314 S. Lowell St 10/31/22 2.1.1 SITE NOTES: 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION CEC 110.26. 2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 2.2.1 EQUIPMENT LOCATIONS: 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC 110.26. 2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC 690.34. 2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC APPLICABLE CODES. 2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 2.3.1 STRUCTURAL NOTES: 2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 2.4.1 WIRING & CONDUIT NOTES: 2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2.4.3 CONDUCTORS SIZED ACCORDING TO CEC 690.8, CEC 690.7. 2.4.4 VOLTAGE DROP LIMITED TO 1.5%. 2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GRAY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [CEC 110.15]. 4.5.1 GROUNDING NOTES: 2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC 690.43 AND MINIMUM CEC TABLE 250.122. 2.5.4 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MICROINVERTER MANUFACTURERS' INSTRUCTIONS. 2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [CEC 250.119] 2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. 2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS 2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. 2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH CEC 110.3(B). 2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. 2.7.1 INTERCONNECTION NOTES: 2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC 705.12 (B)] 2.7.3 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUSBAR RATING [CEC 705.12(D)(2)(3)]. 2.7.4 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACK FEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC 705.12(B)(2)(3)]. 2.7.5 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC 705.12 (B)(2)(3)(C). 2.7.6 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO CEC 705.12 (B)(2)(1) 2.7.7 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH CEC 230.42 2.7.8 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [CEC 705.12 (B)(5)]. A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 NOTES G-2 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-1 MODULE DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-2 INVERTER DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-3 ENPHASE CABLE SYSTEM 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-4 RAPID SHUTDOWN DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-5 LOAD CENTER DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-6 RACKING DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-7 RACKING MOUNT DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-8 INTEGRATED GROUNDING DATASHEET 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D-9 RACKING CERTIFICATION 3314 S. Lowell St 10/31/22 PV (9) (N) HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) OP MC (9) (N) ENPHASE IQ7-60-2-US MSP (E) 100A MSP W/ (E) 100A MAIN BREAKER LC (1) (N) ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3 SUB RM AC (1) (N) 30А AC DISCONNECT A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 A-1 SITE PLAN R-DC INV JB (1) (N) JUNCTION BOX PROPOSED PV CONDUIT RUN ABOVE ROOF PROPOSED PV CONDUIT RUN THROUGH ATTIC PROPERTY LINE ROOF ACCESS POINT: ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. (R324.6 OF THE 2019 CRC) PV SOLAR MODULES - FLUSH MOUNTED VENTS, OBSTRUCTIONS & CHIMNEY N EW S NOTE: 1. PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED AND SHALL BE INDICATED. 2. ALL ROOF PENETRATIONS SHALL BE WATER TIGHT AND WATER PROOF. ALL WORK TO COMPLY WITH 2019 CALIFORNIA BUILDING CODE, 2019 CALIFORNIA ELECTRIC CODE, ARTICLE 690, AND ALL MANUFACTURE'S LISTINGS, AND INSTALLATION INSTRUCTIONS 3. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM 4. WHEN A BACKFED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ "LINE AND LOAD" 5. NEW SMOKE ALARM AND CARBON MONOXIDE DETECTORS WILL BE INSTALLED IF NEEDED. PER (CRC R314) AND (R315) 0 SCALE: 1/16"=1'-0" SITE PLAN01 8' 16' AC LC MSP JB PV MC P/L P/L S. L O W E L L STP/L P/L73'-9" 26'-7" 36'-9" 7'-1" 120'-10" 120'-10" 49'-5" Revision #20177757 ISS 10/26/22 Revision to #20176783 ISS 07/26/2022 3314 S. Lowell St 10/31/22 RAIL ASSEMBY SPECIFICATIONS MANUFACTURER:UNIRAC MODEL:SM MOUNT:UNIRAC FLASH KIT LOADING SUMMARY TOTAL MODULES:9 MODULE WEIGHT (LBS.):43.87 RAIL WEIGHT (PLF):0.8 TOTAL MOUNTS:20 TOTAL AREA (SFT):174 TOTAL WEIGHT (LBS.):476 WEIGHT PER ATTACHMENT (LBS.): 19.74 DISTRIBUTED LOAD (PSF):2.74 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 A-2 ATTACHMENT DETAIL PV MODULES FIRE CLEARENCE AREA OBSTRUCTIONS ROOF PENETRATION POINTS RAFTERS RAILS PROPERTY LINE UNIRAC FLASH KIT NOTE: ROOF TO BE DOUBLE FLASHED FROM ANCHOR POINT AND FROM UNDERNEATH THE TILE. NOTE: PANELS TO BE INSTALLER MIN 3" OFF ROOF, MAXIMUM 10" NOTE: DETAILED SPECIFICATION FOR RAILS AND ATTACHMENT PROVIDED IN DATA SHEET. NOTE: ALL PHOTO VOLTAIC RACEWAYS SHALL BE MARKED "CАUTION: SOLAR CIRCUIT" NOTE: 5/16" STAINLESS STEEL DIAMETER LAG SCREWS @64" O.C. WITH 3.5" PENETRATION INTO EXISTING FRAMING MEMBER. TOTAL AMOUNT OF LAG SCREWS PER ONE ATTACHMENT - 1 PCS. ROOF SEALANT AT EVERY PENETRATION OF THE LAG BOLTS INTO ROOF FRAMING NOTE: ARRAYS ARE SUPPORTED AT A MAXIMUM OF 64 IN. PANELS SHALL HAVE 3-INCH CLEARANCE FROM THE ROOF SURFACE TO THE LOWEST EDGE OF PANEL/ SUPPORT FRAMING. N EW S 0 SCALE: 1/8"=1'-0" PROJECT PLAN01 4' 8' UNIRAC FLASH KIT UNIRAC SM RAIL 2" X 6" RAFTERS @ 16" O.C. ROOF ATT. TYP.@ 64" MAXARRAY 1: 3.240 kW [9] (N) MODULES ROOF PITCH: 22° AZIMUTH: 180° MIN 3' 10'-3" 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-1 SIGNAGE ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING LABEL 1 AT EACH DISCONNECTING MEANS FOR PHOTOVOLTAIC EQUIPMENT (2" X 4"). [CEC 690.13]. POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING LABEL 2 AT POINT OF INTERCONNECTION OVERCURRENT DEVICE (2" X 4"). [CEC 705.12(B)(2)(3)(B)]. PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT DISCONNECTING MEANS (4" X 2"). [CEC 690.54] LABEL 4 AT EACH AC DISCONNECTING MEANS (4" X 1"). [CEC 690.13(B)]. INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED SOUTH SIDE OF THE HOUSE DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LOCATION (5 3/4" X 1 1/8"). [CEC 690.56(B)] WHERE THE PV SYSTEMS ARE REMOTELY LOCATED FROM EACH OTHER, A DIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE PROVIDED AT EACH PV SYSTEM DISCONNECTING MEANS. PV SYSTEM EQUIPMENT AND DISCONNECTING MEANS SHALL NOT BE INSTALLED IN BATHROOMS [CEC 690.4(D),(E)] WARNING: PHOTOVOLTAIC POWER SOURCE LABEL 9 AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS (5 3/4" X 1 1/8"). [CEC 690.31(G)] LETTERS AT LEAST 3/8 INCH; WHITE ON RED BACKGROUND; REFLECTIVE [IFC 605.11.1.1] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS LABEL 6 AT RAPID SHUTDOWN SYSTEM (3 3/4" X 5 1/4"). [CEC 690.56(C)(1)(A)]. WARNING DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM LABEL 7 AT POINT OF INTERCONNECTION (2 3/4" X 1 5/8"). [CEC 705.12(B)(3)] WARNING SOLAR ELECTRIC CIRCUIT BREAKER IS BACKFED PHOTOVOLTAIC SOLAR AC DISCONNECT LABEL 8 AT POINT OF INTERCONNECTION (2" X 1"). [CEC 705.12(B)(3)] CAUTION SOLAR ELECTRIC SYSTEM CONNECTED LABEL 10 AT UTILITY METER (5 3/4" X 1 1/8") [CEC 690.56(B)] RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL 5 AT RAPID SHUTDOWN DISCONNECT SWITCH (5 1/4" X 2"). [CEC 690.56(C)(3)]. 9 A V240 LABELING NOTES 1.1 LABELING REQUIREMENTS BASED ON THE 2019 CALIFORNIA ELECTRICAL CODE, INTERNATIONAL FIRE CODE CHAPTER 12, OSHA STANDARD 1910.145, ANSI Z535 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. 1.5 ALERTING WORDS TO BE COLOR CODED. “DANGER” WILL HAVE RED BACKGROUND; “WARNING” WILL HAVE ORANGE BACKGROUND; “CAUTION” WILL HAVE YELLOW BACKGROUND. [ANSI Z535] 3314 S. Lowell St 10/31/22 A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-4 PLACARD CAUTION POWER TO THE BUILDINGS IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN N EW S NOTE: THE PLAQUE SHALL BE METAL OR PLASTIC, WITH ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE, INCLUDE THE LOCATION OF METER, DISCONNECTS, INVERTER, THE ARRAY AND A FOOTPRINT OF THE ENTIRE BUILDING AND SITE. THE PLAQUE WILL BE ATTACHED BY POP-RIVETS, SCREWS OR OTHER APPROVED FASTENERS NOTE: DIRECTORY PLACARD MUST BE INSTALLED ON THE FRONT OF THE MAIN PANEL AND THE LAYOUT MUST MATCH THE FIELD CONDITIONS AND THE APPROVED PLANS. PER 690.56(B). SOLAR PV ARRAY ROOF MOUNTED WITH MICRO INVERTERS COMBINER PV SYSTEM DISCONNECT FOR UTILITY OPERATION SERVICE POINT UTILITY METERING 3314 S. Lowell St 10/31/22 03 GROUNDING ELECTRODE CONDUCTOR MUST BE CONTINUOUS LC1 IN BRANCH BL A C K RE D 02 PM1-9 JB1 9 I1-9 G L1 N L2 CB1 15A20A ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3, 125A 120/240V, 1Ø, 3W ENPHASE IQ ENVOY COMMUNICATIONS GATEWAY WIRE FROM MICRO INVERTERS TO COMBINER BOX IS ENPHASE ENGAGE CABLE (12 AWG THWN-2, COPPER). DETAILS OF CABLE AT D-3 PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN AND COMLIANT WITH CEC690.12 01 CB2 SW1 G AC DISCONNECT NOTE: DISCONNECT SHOULD BE CONNECTED WITH INVERTER ENERGIZED OUTPUT AT BOTTOM IF SWITCH SO BLADES WILL BE NOT ENERGIZED WHEN SWITCH IS IN OPEN POSITION30A (E) MAIN 100A DC SYSTEM GND ELECTRODE 3/4" C-1#4 "RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END" CEC 250.64(E) N G (E) UTILITY METER L1 L2 A/2P (N) 20 CB3 (N) GROUND RODS 6'-0"(2) 3/4" Øx10' APART TYPICAL NOTE: IN EXISTING ELECTRICAL SYSTEMS THAT USE ONLY A WATER PIPING GROUNDING ELECTRODE SYSTEM, AN ADDITIONAL GROUNDING ELECTRODE (I.E. DRIVEN ROD) SHALL BE PROVIDE (CEC 250.50) NN TO UTILITY GRID (UG) L1 L2 N 04 FOR MEP: (BUS SIZE: 100AX1.2=120A)>=(MAIN SIZE: 100A + PV BREAKER: 20A=120A) TO (E) LOADS MAIN SERVICE PANEL 240/120 V 1Ø, 3W MAIN BUSS: 100A SUM OF THE SERVICE MAIN BREAKER AND BACKFEED BREAKER IS LESS THEN 120% OF SERVICE BUS RATING PV BREAKER POSITIONED AT THE OPPOSITE END OF THE MAIN BREAKER A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-2 THREE LINE DIAGRAM 09.10.20221 1 1 3314 S. Lowell St 10/31/22 ID CONDUCTOR EGC CONDUIT NUMBER OF CONDUCTORS IN CONDUIT CONDUIT FILL PERCENT TEMP. CORR. FACTOR CONDUIT FILL FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. 1 12 AWG THWN-2, COPPER 8 BARE, COPPER AIR N/A N/A 0.96 (32°C) 1 9A 11.25A 40A 38.4A 2 12 NM-B 12 NM-B ATTIC \ WALL N/A N/A 0.96 (32°C) 1 9A 11.25A 20A 19.2A 3 10 AWG THWN-2, COPPER 8 AWG THWN-2, COPPER 0.75" DIA. EMT 4 18.8% 0.96 (32°C) 1 9A 11.25A 40A 38.4A 4 10 AWG THWN-2, COPPER 8 AWG THWN-2, COPPER 0.75" DIA. EMT 4 18.8% 0.96 (32°C) 1 9A 11.25A 40A 38.4A WIRE SEGMENTS ELECTRICAL CHARACTERISTICS LABEL DESCRIPTION EQUIPMENT PM1-9 SOLAR MODULES BRAND HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) Voc:41.18V, Isc:11.04A I1-9 INVERTER ENPHASE IQ7-60-2-US SW1 AC BLADE TYPE DISCONNECT SQUARE D DU221RB NON-FUSIBLE, 2-POLE, 30A, 240VAC JB1 DC JUNCTION BOX TYP 4"x4" CB1 PV BREAKER CIRCUIT BREAKER, 20A, 240VAC CB2 BREAKER CIRCUIT BREAKER, 15A, 240VAC CB3 BACKFEED BREAKER CIRCUIT BREAKER, 20A, 240VAC LC1 COMBINER ENPHASE X-IQ-AM1-240-3 IQ COMBINER 3, 125A MEP MAIN SERVICE PANEL BUS: 100A; MAIN: 100A EQUIPMENT DESCRIPTION INVERTER (9) ENPHASE IQ7-60-2-US MODULE HANWHA Q-CELLS Q.PEAK DUO BLK G10+ 360 (360W) NUMBER OF MODULES 9 ARRAY CIRCUITS 1 BRANCH OF 9 (9A) STC POWER OF ARRAY 3 240W PTC POWER OF ARRAY 3 009W CEC POWER OUTPUT 2 250W MAX AC OUTPUT CURRENT 9A A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 E-3 THREE LINE DIAGRAM 1. PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER СEC 250.166(B). "THE GROUNDING ELECTRODE CONDUCTOR SHALL NOT BE SMALLER THAN THE LARGEST CONDUCTOR SUPPLIED BY THE SYSTEM AND NOT SMALLER THAN #8AWG." 2. EQUIPMENT OPERATING 150 VOLTS OR GREATER SHALL ONLY BE SERVICED OR REPLACED BY QUALIFIED PERSONNEL. FIELD PROTECTION MAY BE IN THE FORM OF CONDUIT, CLOSED CABINET OR AN ENCLOSURE WHICH REQUIRES USE OF TOOLS TO OPEN. 3. SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART. 690 OF THE 2019 CEC. 4. BACKFEED BREAKER TO BE INSTALLED ON OPPOSITE END OF MAIN BREAKER 5. MINIMUM HEIGHT OF CONDUIT ABOVE ROOF TO MATCH TEMPERATURE DERATING FACTOR. 6. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS WILL MEET THE NECESSARY REQUIREMENTS PER CRC R314, R315 7. UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM. 8. WHEN A BACKFED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ "LINE AND LOAD" 9. PER CEC 705.12 (D)(2)(3)(B) - MAIN PANEL BUS BAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUS BAR 09.10.20221 1 1 3314 S. Lowell St 10/31/22 S-1 D5 20 11 1214 13 15 18 22 RO O F S L O P E 910 10 6 21 7 S-1 D4 3 1 5 4 25 24 23 8 27 2 SHEET KEYNOTES 1. ROOF MATERIAL: ASPHALT SHINGLE 2. ROOF STRUCTURE: RAFTERS 3. ATTACHMENT TYPE: UNIRAC FLASHING 4. MODULE MANUFACTURER: HANWHA Q-CELLS 5. MODULE MODEL: Q.PEAK DUO BLK G10+ 360 6. MODULE LENGTH: 67.59" 7. MODULE WIDTH: 41.14" 8. MODULE WEIGHT: 43.87 LBS. 9. SEE SHEET A-2 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 3' FROM RIDGE/RAKE, 18" FROM HIPS/VALLEYS 11. RAFTER SPACING: 16 IN. O.C. 12. RAFTER SIZE: 2X6 NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 3.5 IN. 15. TOTAL # OF ATTACHMENTS: 20 16. TOTAL AREA: 174 SQ. FT. 17. TOTAL WEIGHT: 476 LBS. 18. WEIGHT PER ATTACHMENT: 19.74 LBS. 19. DISTRIBUTED LOAD: 2.74 PSF. 20. MAX. HORIZONTAL STANDOFF: 72 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 32 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER (OR EQUIV.): UNIRAC 24. RAIL MODEL (OR EQUIVALENT): SM STANDART 25. RAIL WEIGHT: 0.8 PLF. 26. MAX. RAFTER SPAN: 10 FT. 27. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. A B C D E F G H A B C D E F G H 1 2 3 4 5 6 NE W P V S Y S T E M : 3. 2 4 0 k W p DA V E H A R D Y 33 1 4 S . L O W E L L S T . , SA N T A A N A , C A 9 2 7 0 7 AP N : 4 1 0 2 5 3 1 5 DATE: 06.2.2022 DESIGN BY: V.P. CHECKED BY: REVISIONS R.D. ROBERT DEAN, ILUM SOLAR INC. 4135 NORTHGATE BLVD. SUITE 9. SACRAMENTO, CA 95834 PHONE: (916) 905-0941 LIC. No.: 1009260, C-46 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE S-1 RACKING DETAILS 3314 S. Lowell St 10/31/22