HomeMy WebLinkAbout4318 W McFadden Ave - PlanStructural Calculations for a Roof Mounted Solar Photovoltaic System for: Alberto Bernabe Residence 4318 W McFadden Ave., Santa Ana, CA 92704 Applicable Codes: 2019 California Building Code, 2019 California Electric Code, 2019 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS AL IFORNIAICI L -21 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 11.8' Total load on rafter = 60 plf x 11.8 ft. = 708 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x6 Roof Rafters @ 24" O.C.: * *Note: Contractor to Field Verify Framing 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-975 Penguin Solar Armida King Residence Date: March 25, 2021 2021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 2021 ( Assume max rafter span = 11.8 ft. ) 2021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 4318 W McFadden Ave01/14/22 Check Existing 2x6 Roof Rafters @ 24" O.C.: 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROF E SSIONALENGINEER C V L FOETATS A L IFORNIAICI L -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 3' + 28 plf x 8.8' + ( 6' x 3.25' x 3 psf x 2 ) + ( 6' x 1.65' x 3 psf x 2 ) = 603 lbs < 708 lbs OK 2020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020- 3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 R1 R2 11.8' w LLw DL P 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 2021 P 2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 2021 3'8.8' 2021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 Sht # 3 of 7 2021-975 Penguin Solar Armida King Residence Date: March 25, 2021 2021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 2021 P 2021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 P 4318 W McFadden Ave01/14/22 Sht # 4 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROF E SSIONALENGINEER C V L FOETATS A L IFORNIAICI L -21 Tributary Area to Each Solar Mount = 6 ft. x 3.25 ft. = 19.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4- 7 ASCE 7- 16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγEÞðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7- 16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγEÞðγa Þð qh =20 psf p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf Eq'n 26.10- 1 ASCE 7- 16 GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GC p = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16 Design (Factored) Uplift at each support = 0.6 x 819 lbs = 491 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 19.5 sq. ft. = 819 lbs Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress Load per lag screw = 491 lbs / 1 = 491 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 4318 W McFadden Ave01/14/22 Sht # 5 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 491 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 Note: Zone 2 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROF E SSIONALENGINEER C V L FOETATS A L IFORNIAICI L -21 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 4318 W McFadden Ave01/14/22 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building = Approximately 1,500 Sq. ft. Approximate Effective Seismic Weight = 1,500 sq. ft. x 30 psf ave. = 45,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 EQ'N 11.4- 3 ASCE 7- 16 EQ'N 11.4- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 4318 W McFadden Ave01/14/22 V = 0.185 x 45,000 LBS = 8,325 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT = 45,000 LBS NEW SOLAR ARRAY = 3 PSF x 24 PANELS x 3.3' x 6.5' = 1,307 LBS NEW SEISMIC WEIGHT = 45,000 LBS + 1,307 LBS = 46,307 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 46,307 = 8,567 LBS % CHANGE =8,567 LBS - 8,325 LBS 8,325 LBS x 100 = 2.9 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 2018 2018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 1 ASCE 7- 16 OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS 2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 2020 2020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 2020 2020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2524 Penguin Solar Stillwell October Residence Date: July 02, 20212021-5651 Solar Journey Alberto Bernabe Residence Date: December 26, 2021 4318 W McFadden Ave01/14/22 NOTE: CONDUIT SHALL BE PAINTED TO MATCH EXISTING SURFACE. Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 DRIVEWAY ⅊ SOLAR MODULES ___ LA Solar 450 Watt Model #LS450HC(166) 24 SITE MAP & PV LAYOUT PV (N) 125A PV Sub Panel LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 PV 01 EMT type Conduit Fire Setback Line JB (N)Junction Box Ara Panosyan SCALE Designed By : ROOF ACCESS * 3' working clearance in front of equipment is required by CEC 110.26 MSP (N) _____ Main Service Panel225A INVERTER INVERTER TYPE: Micro: ___ HoyMiles Model#HM-1500N(240V) [SI1] 6 N * Roof access is not located in areas that require placement of ground ladders over exterior wall openings CRC R331.4.1. A. ALL WORK AHLL COMPLY WITH THE CURRENT CALIFORNIA CODE OF REGULATIONS TILTLE 24 AND MANUFACTURERS LISTINGS. B. PRIOR TO CALLINGFOR FINAL ONSPECTION, THE CONTRACTOR SHALL: 1. BE COMPLETED WITH THE WORK. 2. HAVE A LADDER IN PLACE AND SECURED TO THE ROOF> HAVE THE SYSTEMENERGIZED READY FOR THE RUPID SHUTDOWN VERIFICATION BY THE CITY INSPECTOR.(FAILURE TO COMPLY WITH THE ABOVE ITEMS IS SUBJECT TO A RE-INSPECTION FEE.) PV MODULES SHALL MAINTAIN A MINIMUM 12" HORIZONTAL CLEARANCE FROM ALL PLUMBING VENTS UNLESS THE VENT IS EXTENDED SO AS TO BE ABOVE THE ARRAY. McFadden Ave 3' 3' 3' 3' 3' 3' 1'-6" 1'-6" 1'-6" PV Array 1 16 LA Solar 450W Modules 4 HM-1500 N Hoymiles Tilt: 19 Deg Azimuth: 180 Deg PV Array 2 8 LA Solar 450W Modules 2 HM-1500 N Hoymiles Tilt: 19 Deg Azimuth: 180 Deg 2" Pipe will be rerouted MSP PV 0 5' 10' 39'-1" 39'-8" 5' 23'-3" 21'-8" 1 1 1 1 1 1 11 2 2 2 2 2 2 2 2 3 3 3 3 3 3 33 JB www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 Bldg permit#101109073 Elect permit#20175088 Issued 1/14/2022 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 BOM LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 PV 02 Ara Panosyan Designed By : www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 PV 03 GROUNDING & BONDING DETAILS Ara Panosyan Micro Inverter Installation Micro Inverter Inverter Output Circuits Equipment Grounding Conductor Micro Inverter Grounding Notes 1. Grounding electrode conductor shall be minimum 6 AWG for a rounded micro inverter system. 2. An isolated system shall not require a grounding electrode conductor. 3. Grounding and Bonding of modules will be done per manufactures installation instructions (NEC 110.3 (B )) J/B Junction Box Trunk Cable GROUNDING DETAILS EGC per 250.122 EGC per 250.122 Module/ Racking Bonding see detail ARRAY Photovoltaic Roof Mounted GROUNDING NOTES Equipment grounding Conductor EGC/ Grounding Electrode Cunductor (GEC) a. Size Equipment Grounding Cunductor per NEC 250.122 b. Size Grounding Electrode Cunductor per NEC 250.166 c. EGC & GEC May be a combined conductor Per 690.47(C) (1), (2) or (3) d. All grounding and bonding of the PV system shall comply with Los Angeles County Requirements. Note: Weeb plates, washers and similar devices are not approved Combiner Box GEC EGC EGC INVERTER AC UTILITY DISCONNECT MAIN SERVICE SWITCHBOARD ATTACH NEW GEC TO EXISTING BY IRREVERSABLE MEANS * For grounding and bonding of module follow manufactures installation instructions listing & NEC 110.3 (B) M Lay-in-Lug Per UL 2703Photovoltaic Module Equipment Grounding Conductor Photovoltaic under panel Bonding 4 Modules Exhibit A Rail Interconnection Bonding Jumper Photovoltaic Racking system Exhibit B Rail Interconnection LA County does not accept WEEB Lay-in-Lug Listed to UL 2703 (See datasheet on page 8) SCHEMATIC GROUNDING DETAIL LA COUNTY Designed By : 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 ALL WIRES WILL BE CONNECTED WITH 600V RATED WIRE NUTS WITH SEALANT. CONNECTORS SHALL BE LOCKING, TOOL TYPE LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 PV 04 ELECTRICAL 1-LINE DIAGRAM Ara Panosyan Designed By : CONNECTION TO THE INTERIOR METAL WATER PIPING SHALL BE MADE WITHIN 5FT. FROM THE POINT OF ENTRANCE. PER SECTION 250.68(C)(1). Cold Water bond wwithin 5feet and at leaste 1 supplemental electrode are required. Art. 250.50 250.53(D)(2) LAEC Article 250.104 Bonding of Piping Systems and Exposed Structural Steel (A) Metal Water Piping. The metal water system shall be bonded as required in (A)(1), (A)(2),or (A)(3) of this section. The bonding jumper(s) shall be installed in accordance with 250.64(A), (B), and (E). The points of attachment of the bonding NOTE: Service Panel does not contain center fed Main breaker. __ _ _ _ B U S UTILITY MMAIN METER 22 5 A 200A INSTALL ____ 2P CB(PV) INSTALL AT OPPOSITE END OF BUS FROM MAIN FEEDER CB NON CENTER _____ MAIN C/B (N) GROUNDING ELECTRODE SYSTEM Main Panel Suitable for Back feed - NEC 705.12(D)(3) NEW UPGRADED MAIN PANEL WITH _____ BUS AND _____ MAIN BREAKER 120/240V, OVERHEAD 1P, 3W, 225A 200A GEC 6Feet Min GEC Size #4 AWG. 2 NEW GROUND RODS SHALL BE INSTALLED, MIN.6 FEET APART 12 5 A B U S INSTALL (3)20A PV 2-POLE C/B PV DISTRBT. PANEL 125A , 120/240V, NEMA 3R (2) #12 AWG PV WIRE (1)#6 AWG EGC FREE IN THE AIR J BOX NEMA3R (6) #10 AWG THWN/THWN-2 (1) #8 AWG GND 3/4" EMT, 35 FEET 1 2 8 1 2 8 1 2 8 BRANCH CIRCUIT #1 Modules - 8, Micros - 2 BRANCH CIRCUIT #2 Modules - 8, Micros - 2 BRANCH CIRCUIT #3 Modules - 8, Micros - 2 INSTALL NON CENTER _____ MAIN C/B 50A SOLAR MODULES ___ LA Solar 450 Watt Model #LS450HC(166) 24 INVERTER INVERTER TYPE: Micro: ___ HoyMiles Model#HM-1500N(240V) [SI1] 6 50A (8) #8 AWG THWN/THWN-2 (1) #8 AWG GND 3/4" EMT, 2 FEET 4318 W McFadden Ave01/14/22 CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED December 25, 2021 PV 05 SYSTEM LABELING DETAIL Ara Panosyan Designed By : MAIN SERVICE SYSTEM LABELING DETAIL PHOTOVOLTAIC REQUIREMENTS PER CALIFORNIA ELECTRICAL CODE ARTICLE 690 PHOTOVOLTAIC SYSTEM DISCONNECT AC OUTPUT CURRENT - 35.94 AMPS OPERATING VOLTAGE 240 VOLTS WARNING DO NOT TOUCH TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. Marking shall be placed on interior and exterior DC conduit, raceways, enclosures and cable assemblies every 10 ft (3048 mm) within 1 ft (305 mm) of turns or bands and within 1 ft (305 mm) above and below penetrations of roof/ceiling assemblies, walls or barriers. COMBINER / JUNCTION BOX ARRAY WARNING DO NOT TOUCH TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ON OFF DC DISCONNECT (if applicable)RAPID SHUTDOWN INVERTER (if applicable) ON OFF AC DISCONNECT WARNING RATED OUTPUT CURRENT 35.94 AMPS AC NORMAL OPERATING VOLTAGE 240 VOLTS WARNING: PHOTOVOLTAIC POWER SOURCE This lable is to be located adjacent to the PV breaker36'' to 75'' above the floor or grade level to center of performance meters (IF APPLICABLE) SERVICE METER METER SOCKET (if applicable) WARNING: PHOTOVOLTAIC POWER SOURCE WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE OPTIONAL SOLAR P.V. ONLY COMBINER PANEL BOARD PV SUB PANEL (if applicable) WARNING PHOTOVOLTAIC SYSTEM - DO NOT RELOCATE THIS BREAKER WARNING ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. Solar Source Only No Other Loads in This panel CEC 690.13(B) CEC 690.13(B) PHOTOVOLTAIC SYSTEM DISCONNECT CEC 690.13(B) WARNING ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. CEC 690.41(A) CEC 690.53 CEC 690.14(C)(2) PHOTOVOLTAIC SYSTEM DISCONNECT CEC 690.54 WARNING DUAL POWER SOURCES SECOND SOURCE IS PHOTOVOLTAIC SYSTEM CEC 705.12(B)(3) 705.12.(B)(2)(3)(b) PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN 690.56 CEC. 5. MAKINGS, LABELS AND WIRING SIGNS. A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated. 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1. Marking is required on all interior and exterior DC conduit, raceway, enclosures, cable assemblies, and junction boxes, combiner and disconnects. 2. The materials used for marking shall be reflective, weather resistant material suitable for the environment.Minimum 3/8" letter height; all upper case letters Arial or similar font; Red background with wight lettering. 3. Marking shall contain: WARNING: PHOTOVOLTAIC POWER SOURCE. 4. Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location were the disconnect is operated. FIRE DEPARTMENT REQUIREMENTS POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN : CAUTION North WARNING PLAQUE MAIN SERVICE INVERTER TYPE: Micro 264 V 14.98 A SERVICE POINT & UTILITY METERING PV SUB PANEL McFadden Ave 4318 W McFadden Ave01/14/22 CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA ATTACHMENTS QMLM-ST DO NOT SCALE DRAWING SCALE: 1:4 WEIGHT: ASIZE TITLE: PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. COPYRIGHT © 2016 QUICK MOUNT PV 1.0723 QMLM & QMLM-ST: L-MOUNT, 2-1/16" SLOT ITEM NO.DESCRIPTION QTY. 1 FLASHING, ROUNDED CORNERS, 9" X 12" X .040", .438" HOLE, 5052, MILL 1 2 L-FOOT, 2" X 3.30" FOR .438" O.D. FASTENER, 2-1/16" SLOT, 6061- T6/6005A-T61, MILL 1 3 WASHER, SEALING, 5/16" ID X 3/4" OD, EPDM BONDED SS 1 4 LAG SCREW, HEX HEAD, 5/16" x 4", 18-8 SS 1 *5 STRUCTURAL SCREW, QMPV, T-30 HEX WASHER HEAD, 5/16" X 4-1/2", 18-8SS 1 1 AVAILABLE IN MILL, AND BLACK FINISHES 2 3 4 *5 * STRUCTURAL SCREW AVAILABLE ON QMLM-ST VERSIONS ONLY 3.90 .05 (4.18) 2.36 (1.06) (2.95) Ø.469 2.46 1.18 QMLM 3.54 5.31 10.63 14.17 (4.96) THIS EDGE TOWARDS ROOF RIDGE 4.77 3.25 Quick Mount PV DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ± 1/8 TWO PLACE DECIMAL ± 19 THREE PLACE DECIMAL ± 094 UNLESS OTHERWISE SPECIFIED: 5/16'' SS LAG BOLTS W/2.5'' MIN. EMBEDMENT INTO WOOD QUICK MOUNT ATTACHMENT DETAILS ROOF TRUSSES PER TABLE LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 AS INDICATED PV SYSTEM Project Name and Address No. Revision/Issue Date General Notes Project Date Scale December 25, 2021 ORION RAIL PV 06 ATTACHMENT LAYOUT NOTE: MAXIMUM ATTACHMENT DISTANCE 6'-0'' Ara Panosyan Designed By : MODULES ON ROOF 1 Layer of _________ Plywood & Building Felt Roof Rafter Per Table SOLAR MODULE 6" ATTACHMENT 19° Shingle BLOCKING DF#2 2x6 8' Load bearing wall 8'8' 8' Load bearing wall Load bearing wall 6' www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFE SSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. 5/16"x3.5" SS LAG SCREW 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 INVERTER DATA SHEET LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 07 Ara Panosyan Designed By : HOYMILES UL CERTIFICATE 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 08 Ara Panosyan Designed By : HOYMILES UL CERTIFICATE Hoymiles UL Certificate www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 MODULE DATA SHEET MODULE DATA SHEET LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 09 Ara Panosyan Designed By : 4318 W McFadden Ave01/14/22 Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 MODULE CERTIFICATION MODULE CERTIFICATION LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 10 Ara Panosyan Designed By : www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 RACKING SPECS RACKING SPECS Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 11 Ara Panosyan Designed By : www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 RACKING CERTIFICATION AND ATTACHMENT SPECS RACKING CERTIFICATION Project Name and Address No. Revision/Issue Date General Notes Project Date Scale PV SYSTEM AS INDICATED CONTRACTOR: Lic # 974115 Ara Petrosyan ALBERTO BERNABE 4318 W McFadden Ave, Santa Ana,CA 92704,USA December 25, 2021 ATTACHMENT SPECS LA Solar Group 16238 B Raymer St., Van Nuys, CA 91406 Phone: (818) 373-0077 LIC TYPE: C-46, C-10, C-39 S 12 Ara Panosyan Designed By : www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 4318 W McFadden Ave,Santa Ana, CA 92704 LA Solar Group 974115 x Ara Petrosyan 1/10/2022818 483 8026 permitting@lasolargroup.com x x x x x x x x x 4318 W McFadden Ave01/14/22 RACKING SPECS RACKING CERTIFICATION AND ATTACHMENT SPECS ONE STORY HOUSE CONSTRUCTION TYPE: VB OCCUPANCY GROUP: R3 Ara Petrosyan CONTRACTOR LA SOLAR GROUP, INC ADDRESS: 16238 B Raymer St., Van Nuys, CA 91406 City of Santa Ana Single Family Residence PROPERTY INFORMATION PROPERTY ADDRESS: A.H.J. PROPERTY TYPE: OWNER:ALBERTO BERNABE 4318 W McFadden Ave,Santa Ana,CA 92704,USA SYSTEM RATING EQUIPMENT SUMMARY 10.8KW DC (9.18KW AC) STC SHEET INDEX T-01 COVER PAGE PV-01 PV-02 PV-03 PV-04 PV-05 PV-06 S-07 S-08 S-09 S-10 S-11 S-12 GENERAL NOTES GOVERNING CODES ALL CONSTRUCTION TO COMPLY WITH THE FOLLOWING CODES: UNDERWRITERS LABORATORIES (UL) STANDARTS OSHA 29 CFR 1910.296 SITE SPECIFICATIONS VICINITY MAP STREET VIEW December 25, 2021 DESIGNED BY: DATE: 18808201PARCEL NUMBER: SITE MAP & PV LAYOUT ELECTRICAL 1-LINE DIAGRAM INVERTER DATA SHEET SYSTEM LABELING DETAIL ATTACHMENT LAYOUT MODULE DATA SHEET MODULE CERTIFICATION GROUNDING & BONDING DETALS BILL OF MATERIAL Ara Panosyan EMAIL: Engineering@lasolargroup.com PHONE: (818) 373-0077 LIC #: 974115 LIC TYPE: C-46, C-10, C-39 · 2019 California Residential Code · 2019 California Green Building Standard Code · 2019 International Property Maintenance Code · 2019 California Building Code, · 2019 California Electrical Code, · 2019 California Plumbing Code, · 2019 California Mechanical Code, · 2020 California Fire Code, · 2019 California Energy Code, · 2019 California Administrative Code. All materials, equipment, Installation and work shall comply with the following applicable codes: 2019 CBC / 2019IBC, - 2019 CRC / 2019 IRC, - 2019 CEC,- 2019 CENC, - 2019 CMC / 2019 UMC, - 2019CPC/ 2019UPC, - 2019 CFC / 20191FC, - 2019 Building Energy Efficiency Standards • Existing plumbing vents, skylights, exhaust outlets, ventilations intake air openings shall not be covered by the solar photovoltaic system. • All outdoor equipment shall be NEMA 3R rated, including all roof mounted transition boxes and switches. • All equipment shall be properly grounded and bonded In accordance with CEC article 250. • All circuits connected to more than one source shall have over current devices located so as to provide over current protection from all sources. [CEC 690.9(A)] • The utility-interactive Inverters shall automatically de-energize Its output to the connected electrical production and distribution network upon loss of voltage in the system and shall remain in that state until the electrical production and distribution network voltage has been restored.[CEC 690.61] • Single conductor cable Type USE-2 and single conductor listed and identified as PV wire shall be permitted in exposed outdoor locations in PV source circuits within the PV array. PV wire shall be installed in accordance with 338.10(B)(4)(b) and 334.30. [CEC 690.31 (C)(1)] • The module conductors must be type USE-2 or listed for photovoltaic (PV) wire. [CEC 690.31(B)(1)] • PV system circuit conductors shall be identified at all accessible points of termination, connection, and splices . [CEC 690.31 (B(1)] • All grounded conductor shall be property color identified as white. [CEC 200.6] • PV system connected on the load side of the service disconnecting means of the other source(s) at any distribution equipment on the premises shall meet the following [CEC 705.12(B)] - Each source connection shall be made at a dedicated circuit breaker or fusible disconnecting means. [CEC 705.12(B)(1)] - The sum of the ampere rating of the over current devices in circuits supplying power to the bus bar or conductor shall not exceed 120% of the rating of bus bar or conductor. (CEC 705.12(B)(2)(3)(b) - The interconnection point shall be on the line side of all ground-fault protection equipment. [CEC 705.32] - Equipment containing over current devices In circuits supplying power to a bus bar or conductor supplied from multiple sources shall be marked to Indicate the presence of all sources. [CEC 705.12(B)(3)] - Circuit breaker, if back fed, shall be suitable for such operation. [CEC 705.12(B)(4)] • To minimize overheating of the bus bar In panel board, the panel board main circuit breaker and the PV power source circuit breaker shall be physically located at the opposite end of the bus bar.[CEC 705.12(B)(2)(3)(b)] • Marking and Labeling Methods and Locations. The labels or markings shall be visible after installation. The labels shall be reflective, and all letters shall be capitalized and shall be a minimum height of 9.5 mm (31 In.) in white on a red background. [CEC 690.31 (G)(4)] • Flexible, fine stranded cables shall be terminated only with terminals, lugs, devices or connector that are Identified and listed for such use. [CEC 690.31(H)] • Connectors shall be of latching or locking type. Connectors that are readily accessible and operating at over 30 volts shall require tool to open and marked "Do Not Disconnect Under Load' or 'Not For Current Interrupting". [CEC 690.33(C) & (E)(2)] • Equipment grounding conductor for PV modules smaller than 6AWG shall be protected from physical damage by a raceway or cable armor. [CEC 690.45 & 250.120(C)) • Equipment grounding conductor for PV systems without Ground Fault Protection (GFP) and installed on non-dwelling unit must have ampacity of at least 2 times the temperature and conduit fill corrected circuit conductor ampacity, [CEC 690.45(B)] • Fine-stranded cables used for battery terminals, devices, and connections requirelugs and terminals listed and marked for the use. [CEC 690.74 (A)] • A directory is not required where all inverters and PV disconnecting means are grouped at the main service disconnecting means, since the disconnects would all be located In close proximity to each other. CEC 690.4(D) • Fuses and Fixed-Trip Circuit Breakers. The standard ampere ratings for fuses and Inverse time circuit breakers shall be considered 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, BO, 90, 100, 110, 125, 150, 175, 200, 225, 250, 300, 350, 400, 450, 500, 600, 700,100, 1030, 1200, 1600, 2000, 2500, 3000,4000, 5030, and 6000 amperes. 690.9(A) • Protection devices for PV source circuits and PV output circuits shall be in accordance with the requirements of 690.9(C) • Where single overcurrent protection devices are used to protect PV source or output circuits, all overcurrent devices shall. be placed In the same polarity for all circuits within a PV system. The overcurrent devices shall be accessible but shall not be required to be readily accessible. 690.9 (C) •Equipment that performs the rapid shut down shall be listed and identified CEC.690.12 The rapid shutdown initiation methods shall be labeled in accordance with 690.56(B) •PV source circuits and PV output circuits shall not be contained in the same raceway. cable tray. cable. outlet box. junction box, or similar fitting as conductors, feeders, branch circuits of other non-PV systems, or Inverter output circuits, unless the conductors of the different systems are separated by a partition. CEC 690.31(B) • Where PV system dc circuits run inside a building, they shall be contained in metal raceways.[CEC 690.31 (G)] PROJECT DESCRIPTION HOYMILES UL CERTIFICATE 24 LA SOLAR 450 WATT MODULES WITH 6xHM 1500 MICROINVERTERS 24 LA SOLAR 450 WATT MODULES WITH 6xHM 1500 MICROINVERTERS 1 - 125A PV SUB PANEL www. Loyd W Martin .com Solar Structures Engineering #2021-5651 Structural Only December 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 4318 W McFadden Ave01/14/22