HomeMy WebLinkAbout4713 1%2 W Floyd Cir - PlanRev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. ‰ ‰ Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. ‰ ‰ Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. ‰ ‰ Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. ‰ ‰ Will the PV system weigh maximum 4 pounds per square feet or less? 5. ‰ ‰ Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. ‰ ‰ Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. ‰ ‰ Will the PV system be installed without using any ballast system or counter-weight system? 8. ‰ ‰ Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. ‰ ‰ Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. ‰ ‰ Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 4713 FLOYD CIRCLE ECOSOLAR USA ELECTRICAL 1045300 JENNIFER KEMME 909-748-1300 9/1/22 PERMITS@VISIONCE.COM X X X X X X X X X X 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 4713 1%2 W Floyd Cir09/22/22 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 4713 1%2 W Floyd Cir09/22/22 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 4713 1%2 W Floyd Cir09/22/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                        ECOSOLAR USA ELECTRICAL THUY NGUYEN13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 2.220 4713 1%2 W Floyd Cir09/22/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT ECOSOLAR USA ELECTRICAL 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 THUY NGUYEN 2.220 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 4713 1%2 W Floyd Cir09/22/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram ECOSOLAR USA ELECTRICAL 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 THUY NGUYEN 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 2.220 4713 1%2 W Floyd Cir09/22/22 6&23(2):25. INSTALL (6) SILFAB ELITE SIL-370 HC SOLAR ELECTRIC MODULES AND (6) ENPHASE IQ8PLUS-72-2-US MICROINVERTERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) AC COMBINER, AND INSTALL OCPD IN SUB PANEL. HOMEOWNER: THUY NGUYEN ADDRESS: 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 DATE: 9/7/22DATE: 9/7/22 (&262/$5 86$ (/(&75,&$///& 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 PH: 714.265.9077 DAVID Q HOANG C10 - 1045300 9,&,1 ,7<0$3 NGUYEN RESIDENCE 6+((7,1'(; SHEET 1 PROJECT INFO, VICINITY MAP, NOTES, SCOPE OF WORK SHEET 2 SITE/ROOF PLAN, ELEVATION DETAIL SHEET 3 ELECTRIC LINE DRAWING, GROUNDING DETAIL SHEET 4 CALCULATIONS, SIGNS ATTACHED MODULE, INVERTER, MOUNTING HARDWARE SPEC SHEETS, STRUCTURAL REPORT NTS 6+((7 127,&( $1<&+$1*(67225 86(62)7+(6('2&80(176'5$:,1*6:,7+2877+( :5,77(1&216(172)-(11,)(5 .(00(25 6&277+$55,6$5(675,&7/<352+,%,7(' 2) PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 (6) SILFAB ELITE SIL-370 HC PEAK POWER = 370 W MAX OPERATING CURRENT = 10.60 A MAX OPERATING VOLTAGE = 34.95 V OPEN CIRCUIT VOLTAGE = 41.75 V SHORT CIRCUIT CURRENT = 11.25 A MAX SERIES FUSE RATING = 20 A TEMP. COEFF. OF Voc = -0.28%/°C DIMENSIONS = 69.4" X 40.8" X 1.4" WEIGHT = 44.0 LBS *(1(5$/127(6 1. THIS SYSTEM COMPLIES WITH THE 2019 CRC, 2019 CBC, 2019 CFC, AND THE 2019 CEC. 2. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY HAS BEEN NOTIFIED. 3. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. 4. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. 5. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE UL 1741 COMPLIANT. 6. THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS FROM THE MAIN BREAKER. 7. CONDUCTORS ARE 90° C RATED COPPER WIRE. 8. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT RESISTANT. 9. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED IN A METAL RACEWAY. 10. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE PROTECTED IN CONDUIT. 11. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES AND RAILS AND SECURED IN PLACE. 12. THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 13. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED FOR USE IN WET LOCATIONS. 14. CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. 15. SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. 16. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE GROUNDING ELECTRODE SYSTEM, A GROUNDING ELECTRODE SYSTEM WILL BE INSTALLED PER CEC 250.50. THE ELECTRICAL SERVICE WILL BE BONDED TO THE WATER AND GAS PIPING PER SECTION 250.104 OF THE CEC. 17. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS. INVERTER/DC DISCONNECT: (6) ENPHASE IQ8PLUS-72-2-US MICROINVERTERS MAX DC INPUT VOLTAGE = 60 V START-UP VOLTAGE = 30 V OPERATING VOLTAGE RANGE = 25 V - 58 V MAX INPUT SHORT CIRCUIT CURRENT = 15.0 A RATED AC POWER = 290 W AC VOLTAGE = 240 V MAX AC OUTPUT CURRENT = 1.21 A MAX AC OVERCURRENT PROTECTION = 20.0 A MAX NUMBER OF INVERTERS PER CIRCUIT = 13 NEMA TYPE 6 ENCLOSURE DIMENSIONS = 8.3" X 6.9" X 1.2" WEIGHT = 2.4 LBS 3+27292/7$,&62/$5 352-(&7,1)250$7,21 SYSTEM SIZE: 2.220 kW (DC), 1.740 kW (AC) MODULES: ARRAY:INSTALLED WEIGHT = 2.9 PSF ROOF COVERAGE = 120 SF, ARRAYS COVER 9% OF TOTAL ROOF AREA MOUNTING HARDWARE: UNIRAC SOLARMOUNT RAIL UNIRAC FLASHKIT PRO ATTACHMENTS 5 16" STAINLESS STEEL LAG BOLTS @ 64" OC OR LESS WITH A MINIMUM OF 21 2" PENETRATION INTO ROOF RAFTERS EXISTING ROOF INFO: 1 STORY, ASPHALT SHINGLE 2 X 6 RAFTERS @ 16" OC Building Permit #101111887 Electrical Permit # 20177382 Issued 09/22/2022 4713 1%2 W Floyd Cir09/22/22 6&23(2):25. INSTALL (6) SILFAB ELITE SIL-370 HC SOLAR ELECTRIC MODULES AND (6) ENPHASE IQ8PLUS-72-2-US MICROINVERTERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) AC COMBINER, AND INSTALL OCPD IN SUB PANEL. HOMEOWNER: THUY NGUYEN ADDRESS: 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 DATE: 9/7/22DATE: 9/7/22 (&262/$5 86$ (/(&75,&$///& 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 PH: 714.265.9077 DAVID Q HOANG C10 - 1045300 NOTE: DIMENSIONS AND FEATURES SHOWN ARE CLOSE TO SCALE BUT WERE TAKEN FROM A FIELD SURVEY AND APPROXIMATIONS MADE USING GOOGLE EARTH. PROPERTY LINE (E) 200 AMP MAIN SERVICE PANEL :)/2<'&,5&/( N SCALE: 1/16"=1' 8 16 32 48 PROPERTY LINE (N) AC COMBINER (E) 100 AMP SUB PANEL 6,7(522)3/$1 ARRAY #1: (6) MODULES TILT = 16°, AZ = 180° 1 2 3 4 56 PROPERTY LINE 6+((7 127,&( $1<&+$1*(67225 86(62)7+(6('2&80(176'5$:,1*6:,7+2877+( :5,77(1&216(172)-(11,)(5 .(00(25 6&277+$55,6$5(675,&7/<352+,%,7(' 2) PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 EXISTING 1-STORY ROOF: ASPHALT SHINGLE, FELT & 1 2" SHEATHING OVER RAFTERS EXISTING 2 X 6 RAFTERS @ 16" OC MODULES: 69.4" X 40.8" 44.0 LBS EACH UNIRAC SOLARMOUNT RAIL MOUNTING SYSTEM WITH UNIRAC FLASHKIT PRO ROOF ATTACHMENTS (USE 5 16" STAINLESS STEEL LAG BOLTS @ 64" OC OR LESS WITH A MINIMUM EMBEDMENT OF 21 2" INTO ROOF RAFTERS), WATERPROOF ALL CONNECTION LOCATIONS PER MANUFACTURER'S INSTRUCTIONS 3" MIN. 8" MAX. NTS (/(9$7,21 '(7$,/ 1.5' FIRE CLEARANCE ROOF ACCESS POINTS ARE AT THE STRUCTURALLY STRONG PART OF THE BUILDING AND DO NOT REQUIRE LADDERING OVER OPENINGS. * TOTAL ROOF AREA = 1300 SF TOTAL SOLAR AREA = 120 SF 120 SF/1300 SF = 0.09 ARRAYS COVER 9% OF TOTAL ROOF AREA 8'-8" 10'-3" 3'-11" 42'-11" 3' 18'-9" * * (E) MAIN HOUSE (E) ADU 4713 1%2 W Floyd Cir09/22/22 6&23(2):25. INSTALL (6) SILFAB ELITE SIL-370 HC SOLAR ELECTRIC MODULES AND (6) ENPHASE IQ8PLUS-72-2-US MICROINVERTERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) AC COMBINER, AND INSTALL OCPD IN SUB PANEL. HOMEOWNER: THUY NGUYEN ADDRESS: 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 DATE: 9/7/22DATE: 9/7/22 (&262/$5 86$ (/(&75,&$///& 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 PH: 714.265.9077 DAVID Q HOANG C10 - 1045300 (/(&75,&$//,1 (',$*5$0 6+((7 127,&( $1<&+$1*(67225 86(62)7+(6('2&80(176'5$:,1*6:,7+2877+( :5,77(1&216(172)-(11,)(5 .(00(25 6&277+$55,6$5(675,&7/<352+,%,7(' 2) PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 EXISTING BUILDING GROUNDING ELECTRODE SYSTEM MAIN SERVICE INFO: 200 A, 120/240 VAC, 1Ø, 3-WIRE 100A M EXISTING MULTI-TENANT METER STACK, (2 METERS TOTAL): 125 A BUS RATED EA POSITION, 240 VAC, 1Ø M100A EXISTING SUB PANEL: 125 A BUS RATED 240 VAC, 1Ø 30A 20A 20A ENPHASE AC COMBINER 125 A BUS RATED 240 VAC, 1Ø (3) 10 AWG THWN-2 & (1) 10 AWG GROUND IN 3 4" EMT CONDUIT SILFAB ELITE SIL-370 HC + - + - SOURCE CIRCUIT #1: 6 MODULES, 600 VDC L1 L2 L1 L2 (6) ENPHASE MICROINVERTERS IQ8PLUS-72-2-US (240 VAC) + - + - L1 L2 L1 L2 MICROINVERTER CABLES ENPHASE TERMINATOR CAP ENPHASE CABLE (2) 12 AWG THWN-2 NEMA 3R, 240 VAC JUNCTION BOX USE UNIRAC INTEGRATED GROUNDING TO GROUND ALL MODULES, MICROINVERTERS, JUNCTION BOXES AND ANY OTHER METAL PARTS AND #6 AWG SOLID COPPER WHERE NECESSARY (2) 12 AWG THWN-2 & (1) 12 AWG GROUND IN 1 2" EMT CONDUIT SILFAB ELITE SIL-370 HC SILFAB ELITE SIL-370 HC SILFAB ELITE SIL-370 HC TO M O N I T O R I N G 4713 1%2 W Floyd Cir09/22/22 6&23(2):25. INSTALL (6) SILFAB ELITE SIL-370 HC SOLAR ELECTRIC MODULES AND (6) ENPHASE IQ8PLUS-72-2-US MICROINVERTERS ON THE EXISTING 1ST STORY COMPOSITION ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) AC COMBINER, AND INSTALL OCPD IN SUB PANEL. HOMEOWNER: THUY NGUYEN ADDRESS: 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 DATE: 9/7/22DATE: 9/7/22 (&262/$5 86$ (/(&75,&$///& 13962 SEABOARD CIRCLE GARDEN GROVE, CA 92840 PH: 714.265.9077 DAVID Q HOANG C10 - 1045300 6<67(0 6,*1$*( ALL SIGNAGE SHALL BE REFLECTIVE, UV RESISTANT PLASTIC, RED IN COLOR WITH WHITE LETTERING, AND ATTACHED WITH WEATHERPROOF ADHESIVE OR OTHER APPROVED METHOD. ALL LETTERS SHALL BE A MINIMUM OF 3 8" HEIGHT AND ALL CAPITALIZED. ALL CONDUIT, JUNCTION BOXES AND OTHER ENCLOSURES SHALL BE MARKED AT 10' MAX INTERVALS AND AT ALL BENDS, TERMINATIONS, SPLICES OR CONNECTIONS WITH "WARNING: PHOTOVOLTAIC POWER SOURCE". WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION TO BE INSTALLED AT ALL SERVICEABLE PANELS OR BOXES AND AT ALL DISCONNECTS: SERVICE POINT & UTILITY METERING PV SYSTEM DISCONNECT FOR UTILITY OPERATION CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN. ADDRESS: 4713 1/2 W. FLOYD CIRCLE, SANTA ANA, CA 92704 SOLAR ARRAY (ON ROOF) N TO BE INSTALLED ON THE OUTSIDE COVER OF THE MAIN SERVICE DISCONNECT: RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM RATED AC OUTPUT CURRENT = 9.08 A NOMINAL OPERATING AC VOLTAGE = 240 V TO BE INSTALLED NEXT TO THE SOLAR BREAKER: WARNING POWER SOURCE OUTPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE TO BE INSTALLED AT THE BACKFED BREAKER SERVING THE PV SOLAR SYSTEM: TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TO BE INSTALLED ON THE FRONT OF THE MAIN SERVICE DISCONNECT: "SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" SHALL BE BLACK LETTERING ON YELLOW BACKGROUND. THE REMAINDER OF THE SIGN SHALL BE BLACK LETTERING ON WHITE BACKGROUND. 6+((7 127,&( $1<&+$1*(67225 86(62)7+(6( '2&80(176'5$:,1*6:,7+2877+( :5,77(1&216(172)-(11,)(5 .(00(25 6&277+$55,6$5(675,&7/<352+,%,7(' 2) PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 6<67(0 &$/&8/$7,216 MODULE OPERATING CURRENT = 10.60 A INVERTER MAX INPUT CURRENT = 15.00 A 10.60 A < 15.00 A, OK MODULE OPERATING VOLTAGE = 34.95 V INVERTER INPUT OPERATING VOLTAGE RANGE = 25 V - 58 V 25 V < 34.95 V < 58 V, OK MODULE Voc = 41.75 V VOLTAGE CORRECTION FACTOR = 1.14 41.75 V (1.14) = 47.60 V INVERTER MAX INPUT VOLTAGE = 60 V 47.60 V < 60 V, OK MODULE Isc = 11.25 A 11.25 A (1.25)(1.25) = 17.58 A [Isc] NUMBER OF MICROINVERTERS IN CIRCUIT #1 = 6 INVERTER MAX OUTPUT CURRENT = 1.21 A (6) (1.21 A) (1.25) = 9.08 A [Ic], USE 20 A BREAKER TOTAL NUMBER OF MICROINVERTERS = 6 (6) (1.21 A) (1.25) = 9.08 A [I], USE 20 A BREAKER SUB PANEL BUS RATING = 125 A SUB PANEL MAIN OCPD = 100 A 100 A + 20 A SOLAR OCPD = 120 A 125 A BUS (1.2) = 150 A 120 A < 150 A, OK :,5(&$/&8/$7,216 FROM THE MICROINVERTERS TO THE AC COMBINER: AMBIENT TEMPERATURE = 34°C TEMPERATURE ADDER FOR CONDUIT NOT OFFSET FROM ROOF = 33°C ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C + 33°C = 67°C = 0.58 Ic = 9.08 A 9.08 A/0.58 = 15.66 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 15.66 A, USE 12 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 30 A SELECT CONDUIT FOR (2) 12 AWG THWN-2 & (1) 8 AWG GROUND = 1 2" EMT CONDUIT FROM THE AC COMBINER TO THE SUB PANEL: ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C = 0.96 I = 9.08 A 9.08 A/0.96 = 9.46 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 9.46 A, USE 10 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 40 A SELECT CONDUIT FOR (3) 10 AWG THWN-2 & (1) 10 AWG GROUND = 3 4" EMT CONDUIT SUB PANEL 4713 1%2 W Floyd Cir09/22/22 N 1 *8<(15(6,'(1&( 4713 1/2 W. FLOYD CIRCLE SANTA ANA, CA 92704 6 SILFAB ELITE SIL-370 HC 370 WATTS /2&$7('217+()52172)($&+ 02'8/($1'180%(5 3$1(/6,1 '5$:,1*)2//2:,1*7+(6(5,$/ 180%(56,125'(5$1'5(7851 7+$1.6 (9,'(1&(6<67(0 23(5$7,1*72(;3(&7$7,216 TIME OF THE DAY: TEMPERATURE: SKY CONDITIONS: WHITE CLOUDS/NO RAIN NO CLOUDS/SUNNY DARK CLOUDS/ RAIN VOLTAGE: L1-N L2-N L1-L2 AMP/CURRENT PV-L1 PV-L2 DATE:TECH NAME:INITIALS: IN HOUSE SUB CONTRACTOR       4713 1%2 W Floyd Cir09/22/22 SIL - 370 HC RELIABLE ENERGY. DIRECT FROM THE SOURCE. Introducing Silfab Prime Designed to outperform. Dependable, durable, high performance solar panels engineered for North American homeowners.S ILFABS OLAR.COM ELECTRICAL SPECIFICATIONS 370 Test Conditions STC NOCT Module Power (Pmax)Wp 370 267 Maximum power voltage (Vpmax)V 34.95 31.68 Maximum power current (Ipmax)A 10.60 8.43 Open circuit voltage (Voc)V 41.75 37.84 Short circuit current (Isc)A 11.25 8.94 Module eff iciency % 20.2% 18.3% Maximum system voltage (VDC)V 1000 Series fuse rating A 20 Power Tolerance Wp 0 to +10 Measurementconditions:STC1000W/m²•AM1.5•Temperature25°C•NOCT800W/m²•AM1.5•Measurementuncertainty≤3% Sun simulator calibration reference modules from Fraunhofer Institute. Electrical characteristics may vary by ±5% and power by 0 to +10W. TEMPERATURE RATINGS TemperatureCoeff icientIsc +0.064 %/°C TemperatureCoeff icientVoc -0.28 %/°C TemperatureCoeff icientPmax -0.36 %/°C NOCT (± 2°C)45 °C Operating temperature -40/+85 °C SHIPPING SPECS ModulesPer Pallet:26 or 26 (California) PalletsPer Truck 34 or 32 (California) ModulesPer Truck 884 or 832 (California) WARRANTIES Moduleproductworkmanship warranty 25 years** Linear power performance guarantee 30 years ≥97.1% end1styr ≥91.6% end12thyr ≥85.1% end25thyr ≥82.6% end30thyr CERTIFICATIONS Product ULC ORD C1703, UL1703, CEC listed***, UL 61215-1/-1-1/-2***, UL 61730-1/-2, IEC 61215-1/-1-1/-2***. IEC 61730-1/-2***, CSA C22.2#61730-1/-2***, IEC 62716 Ammonia CorrosionȀ IEC61701ǿ2011 Salt Mist Corrosion Certifed, UL Fire Ratingǿ Type 2 MECHANICAL PROPERTIES / COMPONENTS METRIC IMPERIAL Module weight 20kg±0.2kg 44lbs ±0.4lbs Dimensions(H xL xD)1762mm x1037mm x35mm 69.4inx40.8inx1.37in Maximum surfaceload(wind/snow)*5400Parear load/5400Pafrontload 112.8lb/ƞ^2rear load/112.8lb/ƞ ^2frontload Hail impact resistance ø25mm at83km/h ø 1 in at 51.6 mph Cells 120Halfcells-SimonoPERC 9busbar -83x166mm 120Halfcells-SimonoPERC 9busbar-3.26x6.53in Glass 3.2 mm high transmittance, tempered, DSM antirefl ectivecoating 0.126 in high transmittance, tempered, DSM antirefl ectivecoating Cables and connectors (refer to installation manual)1350 mm, ø 5.7 mm, MC4 from Staubli 53.15 in, ø 0.22 in (12AWG), MC4 from Staubli Backsheet Highdurability,superior hydrolysisandUV resistance,multi-layer dielectricfi lm,fl uorine-freePV backsheet Frame AnodizedAluminum (Black) Bypass diodes 3diodes-30SQ045T(45V maxDCblockingvoltage,30A maxforwardrectifi edcurrent) JunctionBox UL 3730Certifi ed,IEC62790Certifi ed,IP67rated * Warning.ReadtheSafetyandInstallationManualfor mountingspecifi cationsandbeforehandling,installingandoperatingmodules. ** 12yearextendableto25yearssubjecttoregistrationandconditionsoutlinedunder“Warranty”atsilfabsolar.com *** Certifi cationanticipatedMay2021. PANfi lesgeneratedfrom 3rdparty performance data are available for download atǿ silfabsolar.com/downloads Silfab - SIL-370 HC Noreproductionofanykindisallowed.Data andinformationissubjecttomodifi cations without notice. © Silfab 2020. Si d e Ba c k V i e w Pr o f i l e 40 . 8 " [ 1 0 3 7 m m ] 2.4" [60mm] 14" [356mm]41.34" [1050mm] 14" [356mm] 8" [200mm] 39 . 2 5 " [ 9 9 7 m m ] 53.15"[1350mm] Dr a i n a g e ( x 8 ) Mo u n t i n g H o l e ( x 4 ) Ø4 . 2 m m ( x 2 ) Gr o u n d i n g H o l e 69.4" [1762mm] 1. 4 " [ 3 5 m m ] 0. 3 "[7m m] 0.5"[12mm] 0. 6 " [1 5 m m ] C C 1. 4 " [ 3 5 m m ] 1.4" [35mm] 0.06"[1.5mm] 240Courtneypark DriveEast Mississauga ON L5T 2Y3 Canada +1 905.255.2501 +1 905.696.0267 T F T 800 Cornwall Ave Bellingham WA 98225 USA +1 360.569.4733 info@silfabsolar.com S ILFABS OLAR.COM SILFAB SOLAR INC. 4713 1%2 W Floyd Cir09/22/22 4713 1%2 W Floyd Cir09/22/22 4713 1%2 W Floyd Cir09/22/22 FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac’s patented SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. Kittedin10 packsformaximumconvenience,Ɯ ashingsandhardwareareavailableinMillorDarkƛnishes. With FLASHKIT pro, you have everything you need for a quick, professional installation. YOUR COMPLETE SOLUTION Flashings, lags, continuous slot L-Feet and hardware CONVENIENT 10 PACKS Packaged for speed and ease of handling FLASHKIT PRO TRUSTED WATER SEAL FLASHINGS FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM  OR CALL (505) 248-2702 FLASH KITPROISTHECOMPLETEFLASHINGAND ATTACHMENTSOLUTIONFORCOMPOSITIONROOFS. FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM  OR CALL (505) 248-2702 PRE-INSTALL • Locate roof rafters and snap chalk lines to mark the installation point for each roof attachment. • Drilla7/32ƌpilotholeateachroofattachment.Filleachpilothole with sealant. STEP 1 INSTALL FLASHKITPROFLASHING • AddaU-shapedbeadofroofsealanttotheundersideoftheƜ ashing with the open side of the U pointing down the roof slope. Slide thealuminumƜashingunderneaththerowofshinglesdirectlyup slopefromthepilotholeasshown.Aligntheindicatormarksonthe lowerendoftheƜashingwiththechalklinesontherooftocenter theraisedholeintheƜashingoverthepilotholeintheroof.When installedcorrectly,theƜashingwillextendunderthetwocoursesof shinglesabovethepilothole. STEP 2 INSTALL L-FOOT • FastenL-footandFlashingintoplacebypassingtheincludedlag boltandpre-installedstainlesssteel-backedEPDMwasherthrough theL-footEPDMgrommet,andtheraisedholeintheƜashing,into the pilot hole in the roof rafter. • DrivethelagboltdownuntiltheL-footisheldƛrmlyinplace.Itis normalfortheEPDMontheundersideofthestainlesssteelbacked EPDMwashertocompressandexpandbeyondtheoutsideedgeof the steel washer when the proper torque is applied. • Usecautiontoavoidover-torqueing thelag boltifusing animpactdriver. • RepeatSteps1and2ateachroofattachmentpoint. STEP 3 ATTACHL-FOOTTORAIL • Inserttheincluded3/8"-16T-boltsintothelowerslotontheRail (soldseparately),spacingtheboltstomatchthespacingbetween the roof attachments. • Position the Rail against the L-Foot and insert the threaded end of theT-BoltthroughthecontinuousslotintheL-Foot.Applyanti-seize toboltthreadstopreventgallingoftheT-boltandincluded3/8ƌ serratedƜangenut.Placethe3/8ƌƜangenutontheT-boltand ƛngertighten.RepeatSTEP 3untilallL-FeetaresecuredtotheRail withaT-bolt.AdjustthelevelandheightoftheRailandtorqueeach boltto30ft-lbs. INSTALL FLASHKITPROFLASHING STEP 1 STEP 2 STEP 3 INSTALL L-FOOT ATTACHL-FOOTTORAIL FLASHKIT PRO INSTALLATION GUIDE 4713 1%2 W Floyd Cir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`DBQ@;>=L&=R;& ?9YY9^B>J&^B>E&Q8;XXD8;X&^;8;&<AY<DYA=;E6 Q&a&`R&TC )QV&TJ;V&TJAV&a& M6Nb PHG6GN QX? `R&a& O6OONSU&cd&cd=&cE&c;&4!&a N76GU QX? cd&a& O6bS TOP7S&a&O6bSL&NO&a&O6MOL&NS&a&O6MHL&FO&a&O6MbL&HO&a&76OHV C)Q&a O6G PF6U T.99?&QB=<R&a& 7U E;JL&e9>;&a&NL&*;??&a& 7M6G X?V J;&a& 76SO JA&a& O6bO +AJ&/9Y=&)AQA<B=Z% S]7U\&YAJ&f9Y=&<AQA<B=Z&a&NGO&YfX&Q;8&B><R&;@f;E@;>= KB=R&N&7]N\&@B>B@D@ &;@f;E@;>=L&<AQA<B=Z&a&UGS&YfX .;`DB8;E&)AQA<B=Z% HG6GN QX?&g U @9EDY;X&g 7M6G X?&a SUHO6N YfX SUHO6N YfX&] 7H YAJ&f9Y=&<9>>;<=B9>X&a& HON6M YfX #R;&QDYYP9D=&<AQA<B=Z&9?&=R;&S]7U\&YAJ&f9Y=X&^B=R&A&@B>B@D@ &N&7]N\&;@f;E@;>=&B>=9&=R;&899?&8A?=;8&BX&XD??B<B;>= =9&@;;=&=R;&E;@A>E&9?&=R;&^B>E&DQYB?=&?98<;&9>&=R;&X9YA8&XZX=;@6 (;BX@B<&+9AE%&3;8&=R;&)$/)&NO7M&(;<=B9>&SOF6HL&B?&=R;&E;@A>EP<AQA<B=Z&8A=B9&9?&=R;&YA=;8AY&Y9AEP<A88ZB>J& ;Y;@;>=X&B><8;A X;X&Y;XX&=RA>&7Oh&ED;&=9&=R;&AEEB=B9>&9?&=R;&X9YA8&XZX=;@L&>9&XQ;<BAY&Q89_BXB9>X&98&X=8D<=D8AY @9EB?B<A=B9>X&A8;&8;`DB8;E6 $WBX=B>J&.99?&K;BJR=&a& 7N6S QX?&g 7FOO X?&a 7UNSO YfX K;BJR=&9?&(9YA8&(ZX=;@ &a& U @9EDY;X&g HU6H YfX&i SM YfX&9?&8A<jB>J&a& FFb YfX FFb YfX&]& 7UNSO YfX&a O6ON #R;&B><8;A X;&B>&Y9AE&?89@ &=R;&X9YA8&XZX=;@ &^BYY&>9=&B><8;AX;&=R;&E;@A>EP<AQA<B=Z&8A=B9&9?&=R;&;WBX=B>J&YA=;8AY Y9AEP<A88ZB>J&;Y;@;>=X&fZ&9_;8&7Oh6 !"#-)$%&4-(-"!&)-4-+&$!C -!$$.-!C %&k $!!-1$.&c$22$L&3$ *!5&)'*!C$(&#"&".&,($(&"1&#'$($&0"),2$!#(7NNGF&77#'&(#.$$#L&5,)*-3*L&)*&MNFMM K-#'",#&#'$&K.-##$!&)"!($!#&"1&4-(-"!MOM6GSH6bFOOL k $!c$22$[4-(-"!)$6)"2 )-4-+&$!C-!$$.-!C&-(&(#.-)#+5&3."'-/-#$06 .)$&GFOSHL&$l3&7N]F7]NN 38;QA8;E&fZ&k$!!-1$.&c$22$&b]NU]NONN 3AJ;& 4713 1/2 FLOYD CIRCLE, SANTA ANA, CA 92704 4713 1%2 W Floyd Cir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`:9ACP&29@=Q`Q &/C8P=8B&2>QC8A% ZJ% HMJ6] ?AU:T<&[ ]]67 ?AU:T<&R& WWI6M ?AU:T< a\ 77 E<?^&&&&&&&&&\ JJ ?AbN^c &U&S&R& HMJ6] ?AU:T< a\ NH6JJ :T<^&&&&&&&&&&\ JJ6O ?A^c &U&H&R ]]67 ?AU:T< ZN% JSM6J ?AU:T<&[ ]]67 ?AU:T<&[ M]6M ?AU:T<&[ NN]6M ?AU:T<&R WIM6N ?AU:T< a\ JN6W E<?^&&&&&&&&&\ JJ ?AbN^c &U&S&R& JSM6J ?AU:T< a\ NH6JJ :T<^&&&&&&&&&&\ JJ6O ?A^c &U&H&R ]]67 ?AU:T< IS67 :T<^&&&&&&\ JJ ?A^c &U&H&R& M]6M ?AU:T< O6IW&a\ NO E<?^&&&&&&&&&\ JJ ?AbN^c &U&S&R& NN]6M ?AU:T< Z7% JJ76H ?AU:T<&[ 7M6S ?AU:T<&_ ]]H6I ?AU:T<&R _WJJ6W ?AU:T< O6]&a\ JN6W E<?^&&&&&&&&&\ JJ ?AbN^c &U&S&R& JJ76H ?AU:T< O6]&a\ NH6JJ :T<^&&&&&&&&&&\ JJ6O ?A^c &U&H&R 7M6S ?AU:T< O6]&a\ HON6M :T<^&&&&&&&&&&\ JJ ?A^c &U&H&R ]]H6I ?AU:T< (CFA=>8&.Cd `=DCP% WIM6N ?AU:T<&\JN^&\O6I^&U&JWJS&E<=&R 76N F`&=8 (CFA=>8&3D>Y=PCP% J6W \ W6W bN^&U&]&R I6] F`&=8 I6] F`&=8&e 76N F`&=8L&"f )9:F`:9ACP&0C?:CFA=>8% aW\ 7N6W E<?&U&JN^&&&&&&&&&&&&&&\ J7N =8bH^c&U&a7SH&\JNOOOOO^&&&&&&&&&&&\ NO6S ^c &R O6H7 =8 *::>X9T:C&0C?:CFA=>8% J7N =8&U&NHO&R& O6WW =8 O6WW =8&e O6H7 =8L&"f !"#-)$%& 4-(-"!&)-4-+&$!G-!$$.-!G%&g$!!-1$.&f$22$L&3$ *!5&)'*!G$(&#"&".&,($(&"1&#'$($&0"),2$!#( JNNI7&JJ#'&(#.$$#L&5,)*-3*L&)*&MN7MM K-#'",#&#'$&K.-##$!&)"!($!#&"1&4-(-"! MOM6IWH6S7OOL g$!f$22$h4-(-"!)$6)"2 )-4-+&$!G-!$$.-!G&-(&(#.-)#+5&3."'-/-#$06 .)$&I7OWHL&$i3&JNU7JUNN O6IW&a\O6]^\ 3DCE9DCP&T;&g$!!-1$.&f$22$&SUN]UNONN 39BC& 4713 1/2 FLOYD CIRCLE, SANTA ANA, CA 92704 4713 1%2 W Floyd Cir09/22/22