Loading...
HomeMy WebLinkAbout719 W Jonquil Rd - PlanExpedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 719 W Jonquil Rd 1/23/2024 Expedited Permit Process for PV Systems — Micro-Inverter 2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 719 W Jonquil Rd 1/23/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan             719 W Jonquil Rd 1/23/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 719 W Jonquil Rd 1/23/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone:Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE.b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 719 W Jonquil Rd 1/23/2024 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Timothy Winger Residence 719 W. Jonquil Rd., Santa Ana, CA 92706 Applicable Codes: 2019 California Building Code, 2019 California Electric Code, 2019 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2021-5577 Better Earth Arturo Tapia Residence Date: December 21, 2021 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 Sht # 2 of 7 Check Existing 2x4 Roof Rafters @ 24" O.C.: * Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 7.8' Total load on rafter = 60 plf x 7.8 ft. = 468 lbs Loyd W. Martin Professional Engineer, Inc. 2510 W. 237th St. #206 orrance, CA 90505 el:1.310.464.1804TT Email: loydwmartin@gmail.com www.loydwmartin.com *Note: Contractor to Field Verify Framing 2017-4652 Solar Shoppers Richard Roth Residence Date: November 29, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-1289 Revolt Electric O Quinn Residence Date: May 1, 20182018-2637 Revolt Electric Christensen Residence Date: September 5, 20182018-2637 Revolt Electric Christensen Residence Date: October 1, 20182018-3818 Revolt Electric Ysidro Mendez Residence Date: December 12, 20182019-3131 Revolt Electric Greenfield Residence Date: September 18, 2019 2019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-688 Solar Shoppers Etpison Residence Date: March 17, 20202020-669 Axis Solar Old Oak Ranch Date: March 23, 2020 2020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020- 1567 Penguin Solar Anthony Robertson Residence Date: July 20, 20202021-124 ESD 20-914 Fritz Residence Date: January 13, 20212021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 20212021-4994 Better Earth Helena Feng Residence Date: November 15, 20212021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 2021 2021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 20212021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 21, 2021 2021-5577 Better Earth Arturo Tapia Residence Date: December 20, 20212021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20222022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 w = 30 psf x 2 ft. = 60 plf 2022-533 Better Earth Morris Scharff Residence Date: February 11, 20222022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 20222022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 2022 2022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 20222022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 20222022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 20222022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 2022 ( Assume max rafter span = 7.8 ft. ) 2022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 Sht # 3 of 7 Loyd W. Martin Professional Engineer, Inc. 2510 W. 237th St. #206 orrance, CA 90505 el:1.310.464.1804TT Email: loydwmartin@gmail.com www.loydwmartin.com Total load on rafter = (60 plf x 1.3') + (28 plf x 6.5') + (6' x 2.55' x 3 psf x 1) + (6' x 1.8' x 3 psf x 2) = 371 lbs < 468 lbs O.K. 2017-4652 Solar Shoppers Richard Roth Residence Date: November 29, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-1289 Revolt Electric O Quinn Residence Date: May 1, 20182018-2637 Revolt Electric Christensen Residence Date: September 5, 20182018-2637 Revolt Electric Christensen Residence Date: October 1, 20182018-3818 Revolt Electric Ysidro Mendez Residence Date: December 12, 20182019-3131 Revolt Electric Greenfield Residence Date: September 18, 2019 2019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-688 Solar Shoppers Etpison Residence Date: March 17, 20202020-669 Axis Solar Old Oak Ranch Date: March 23, 2020 2020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020- 1567 Penguin Solar Anthony Robertson Residence Date: July 20, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2021-124 ESD 20-914 Fritz Residence Date: January 13, 20212021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 20212021-4994 Better Earth Helena Feng Residence Date: November 15, 2021 w = 30 psf x 2 ft. = 60 plf 2021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 2021 2021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 20212021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 21, 2021 2021-5577 Better Earth Arturo Tapia Residence Date: December 20, 20212021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20222022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 2022-533 Better Earth Morris Scharff Residence Date: February 11, 20222022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 20222022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 2022 2022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 20222022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 2022 Check Existing 2x4 Roof Rafters @ 24" O.C.: 2022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 20222022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 20222022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 R1 R2 7.8' 1.3' w LLw DL P 6.5' P P 719 W Jonquil Rd 03/14/22 Sht # 4 of 7 2017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: November 4, 20172017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: January 31, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: May 22, 20182018-1630 Solar Energy 911 Ramon Puga Residence . Date: June 1, 20182018-1746 Sunrise Solar Design Ceasar Vazquez Residence Date: June 14, 20182018-1746 Sunrise Solar Design Ceasar Vazquez Residence Date: January 10, 2019 2019-101 Grid Alt IE Elizabeth Najar Residence Date: January 11, 20192019-101 Grid Alt IE Elizabeth Najar Residence Date: January 11, 20192019-125 ESD 18-798 Diebolt Residence Date: January 15, 2019 2019-126 SunDollar Solar Ted Matzen Residence Date: January 15, 20192019-126 SunDollar Solar Ted Matzen Residence Date: February 5, 20192019-319 EDiaz Designs Jempson Residence Date: February 6, 20192019-434 SunGrade Solar Scott Edmunds 37925 Residence Date: February 18, 20192019-445 Solar Journey Gary Atkins Residence Date: February 19, 20192019-724 Top View Solar William Arita Residence Date: March 14, 20192019-724 Top View Solar William Arita Residence Date: June 7, 20192019-724 Top View Solar William Arita Residence Date: June 7, 2019 2019-1882 New Power Breana Larock Residence Date: June 18, 20192019-1960 Solar Journey Ghufran Syed Residence Date: June 22, 20192019-1959 Solar Journey Tricia Craig O Connell Residence Date: June 22, 20192019-1959 Solar Journey Tricia Craig O Connell Residence Date: June 22, 20192019-2666 Hooked On Solar Highlands of Marin - BLDG 1 Date: August 19, 20192019-2666 Hooked On Solar Highlands of Marin - 1051 Date: August 21, 20192019-2666 Hooked On Solar Highlands of Marin - 1025 Date: August 21, 20192019-2721 Hooked on Solar Highland of Marin - 1025 Date: August 21, 20192019-2766 Sunrise Solar Design Teressa Gomez Date: August 22, 20192019-2951 Sunrise Solar Design Marcelino Residence Date: September 5, 20192019-2952 Sunrise Solar Design Quintero Residence Date: September 5, 20192019-3072 Univercity Solar Jessica Bousky Residence Date: September 16, 20192019-3162 First PV Kung Residence Date: September 23, 2019 2019-4642 NRG Clean Power Venkitachalam Residence Date: December 24, 20192019-4627 Sasha Intl Cory Strader Residence Date: December 24, 20192020-016 ilum Solar Shaun Rodriguez Residence Date: January 3, 20202020-012 Penguin Solar Deandre Johnson Residence Date: January 3, 20202020-024 Solar Journey Jeff Lin Residence Date: January 7, 20202020-024 Solar Journey Jeff Lin Residence Date: January 7, 20202020-025 Sasha Intl Matt English Residence Date: January 7, 20202020-026 Sasha Intl Tracy Ladd Project Date: January 7, 2020 2020-081 SolarTech Jonathan Peace Residence Date: January 13, 20202020-079 SolarTech Meraj Asari Residence Date: January 13, 20202020-077 Grid Alt IE Samuel Edmond Residence Date: January 13, 20202020-077 Grid Alt IE Cynthia Robinson Residence Date: January 13, 20202020-236 SolarTech J Ngo Residence Date: January 29, 2020 2020-278 Penguin Solar Lyle Short Residence Date: February 3, 20202020-278 Penguin Solar Lyle Short Residence Date: February 3, 20202020-278 Penguin Solar Lyle Short Residence Date: March 11, 20202020-278 Penguin Solar Lyle Short Residence Date: March 11, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 6 ft. x 2.55 ft. = 15.3 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4-7 ASCE 7-16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγEÞðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7-16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγEÞðγa Þð qh =20 psf p = 20 psf (-2.0) (1.5) (0.7) = 42 psf Eq'n 26.10-1 ASCE 7-16 GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GC p = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4-8 ASCE 7-16 Design (Factored) Uplift at each support = 0.6 x 643 lbs = 386 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 15.3 sq. ft. = 643 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Load per lag screw = 386 lbs / 1 = 386 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2020-641 New Power Cynthia Mason Residence Date: March 12, 20202020-697 Grid Alt IE Veronica Schneider Residence Date: March 17, 20202020-706 LexComm Patsy Gay Residence Date: March 18, 20202020-706 LexComm Patsy Gay Residence Date: March 18, 20202020-701 Sasha Intl Noah Kravitz Residence Date: March 18, 2020 2020-726 Solar Outsource Melissa Karolides Residence Date: March 23, 20202020- 761 Grid Alt IE Carl Houseman Residence Date: March 30, 20202019-3601 Solar Outsource Prashant Jagannathan Residence Date: April 1, 20202019-3601 Solar Outsource Prashant Jagannathan Residence Date: April 1, 20202020-774 ESD 20-135 Palma Residence Date: April 1, 20202020-774 ESD 20-135 Palma Residence Date: April 1, 20202020-775 Grid Alt IE Isabel Martinez Residence Date: April 1, 20202020-775 Grid Alt IE Isabel Martinez Residence Date: April 1, 20202020-776 Grid Alt IE Aidan Koch Residence Date: April 1, 20202020-785 Axis Solar 26132 Oroville Pl Residence Date: April 1, 2020 2020-789 Grid Alt IE Lisa Kim Residence Date: April 2, 20202020-791 Grid Alt IE Lisa Hill Residence Date: April 2, 20202020-791 Grid Alt IE Lisa Hill Residence Date: April 2, 20202020-787 Solar Deployed Gary Garcia Residence Date: April 2, 20202020-787 Solar Deployed Gary Garcia Residence Date: April 2, 20202020-786 Solar Journey Rosalyn Sterling Residence Date: April 2, 20202020-793 Sasha Intl Bob Fiddaman Residence Date: April 3, 2020 2020-794 Solar Deployed Scott Holmstrom Residence Date: April 3, 20202020-796 Solar Deployed Dilia Martinez Residence Date: April 3, 20202020-800 Papke Designs A Gonzalez Residence Date: April 3, 20202020-808 ESD 20-148 Arce Residence Date: April 7, 2020 2020-822 Grid Alt LA Tho Trong Do Residence Date: April 8, 20202020-820 Grid Alt IE Alivia McMath Residence Date: April 8, 20202020-823 Mohr Power White Kirkpatrick Residence Date: April 9, 2020 2020-824 Mohr Power Michelle Pickney Residence Date: April 9, 20202020-826 Axis Solar Ocampo Residence Date: April 9, 20202020-842 Sasha Intl Jorge Hernandez Residence Date: April 13, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020-1567 Penguin Solar Anthony Robertson Residence Date: July 20, 20202021-124 ESD 20-914 Fritz Residence Date: January 13, 20212021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 2021 2021-4994 Better Earth Helena Feng Residence Date: November 15, 20212021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 20212021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 2021 2021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 20, 2021 2021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 2022 2022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 2022-533 Better Earth Morris Scharff Residence Date: February 11, 2022 2022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 2022 2022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 20222022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 2022 2022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 20222022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 2022 2022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 20222022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 Sht # 5 of 7 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd 2017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: November 4, 20172017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: January 31, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2017-4316 Quick Solar Systems Daniel Dugan 20299 Residence Date: May 22, 20182018-1630 Solar Energy 911 Ramon Puga Residence . Date: June 1, 20182018-1746 Sunrise Solar Design Ceasar Vazquez Residence Date: June 14, 20182018-1746 Sunrise Solar Design Ceasar Vazquez Residence Date: January 10, 2019 2019-101 Grid Alt IE Elizabeth Najar Residence Date: January 11, 20192019-101 Grid Alt IE Elizabeth Najar Residence Date: January 11, 20192019-125 ESD 18-798 Diebolt Residence Date: January 15, 2019 2019-126 SunDollar Solar Ted Matzen Residence Date: January 15, 20192019-126 SunDollar Solar Ted Matzen Residence Date: February 5, 20192019-319 EDiaz Designs Jempson Residence Date: February 6, 20192019-434 SunGrade Solar Scott Edmunds 37925 Residence Date: February 18, 20192019-445 Solar Journey Gary Atkins Residence Date: February 19, 20192019-724 Top View Solar William Arita Residence Date: March 14, 20192019-724 Top View Solar William Arita Residence Date: June 7, 20192019-724 Top View Solar William Arita Residence Date: June 7, 2019 2019-1882 New Power Breana Larock Residence Date: June 18, 20192019-1960 Solar Journey Ghufran Syed Residence Date: June 22, 20192019-1959 Solar Journey Tricia Craig O Connell Residence Date: June 22, 20192019-1959 Solar Journey Tricia Craig O Connell Residence Date: June 22, 20192019-2666 Hooked On Solar Highlands of Marin - BLDG 1 Date: August 19, 20192019-2666 Hooked On Solar Highlands of Marin - 1051 Date: August 21, 20192019-2666 Hooked On Solar Highlands of Marin - 1025 Date: August 21, 20192019-2721 Hooked on Solar Highland of Marin - 1025 Date: August 21, 20192019-2766 Sunrise Solar Design Teressa Gomez Date: August 22, 20192019-2951 Sunrise Solar Design Marcelino Residence Date: September 5, 20192019-2952 Sunrise Solar Design Quintero Residence Date: September 5, 20192019-3072 Univercity Solar Jessica Bousky Residence Date: September 16, 20192019-3162 First PV Kung Residence Date: September 23, 2019 2019-4642 NRG Clean Power Venkitachalam Residence Date: December 24, 20192019-4627 Sasha Intl Cory Strader Residence Date: December 24, 20192020-016 ilum Solar Shaun Rodriguez Residence Date: January 3, 20202020-012 Penguin Solar Deandre Johnson Residence Date: January 3, 20202020-024 Solar Journey Jeff Lin Residence Date: January 7, 20202020-024 Solar Journey Jeff Lin Residence Date: January 7, 20202020-025 Sasha Intl Matt English Residence Date: January 7, 20202020-026 Sasha Intl Tracy Ladd Project Date: January 7, 2020 2020-081 SolarTech Jonathan Peace Residence Date: January 13, 20202020-079 SolarTech Meraj Asari Residence Date: January 13, 20202020-077 Grid Alt IE Samuel Edmond Residence Date: January 13, 20202020-077 Grid Alt IE Cynthia Robinson Residence Date: January 13, 20202020-236 SolarTech J Ngo Residence Date: January 29, 2020 2020-278 Penguin Solar Lyle Short Residence Date: February 3, 20202020-278 Penguin Solar Lyle Short Residence Date: February 3, 2020 Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 386 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 2020-278 Penguin Solar Lyle Short Residence Date: March 11, 20202020-278 Penguin Solar Lyle Short Residence Date: March 11, 20202020-641 New Power Cynthia Mason Residence Date: March 12, 20202020-697 Grid Alt IE Veronica Schneider Residence Date: March 17, 20202020-706 LexComm Patsy Gay Residence Date: March 18, 20202020-706 LexComm Patsy Gay Residence Date: March 18, 20202020-701 Sasha Intl Noah Kravitz Residence Date: March 18, 2020 2020-726 Solar Outsource Melissa Karolides Residence Date: March 23, 20202020- 761 Grid Alt IE Carl Houseman Residence Date: March 30, 20202019-3601 Solar Outsource Prashant Jagannathan Residence Date: April 1, 20202019-3601 Solar Outsource Prashant Jagannathan Residence Date: April 1, 20202020-774 ESD 20-135 Palma Residence Date: April 1, 20202020-774 ESD 20-135 Palma Residence Date: April 1, 20202020-775 Grid Alt IE Isabel Martinez Residence Date: April 1, 20202020-775 Grid Alt IE Isabel Martinez Residence Date: April 1, 20202020-776 Grid Alt IE Aidan Koch Residence Date: April 1, 20202020-785 Axis Solar 26132 Oroville Pl Residence Date: April 1, 2020 2020-789 Grid Alt IE Lisa Kim Residence Date: April 2, 20202020-791 Grid Alt IE Lisa Hill Residence Date: April 2, 20202020-791 Grid Alt IE Lisa Hill Residence Date: April 2, 20202020-787 Solar Deployed Gary Garcia Residence Date: April 2, 20202020-787 Solar Deployed Gary Garcia Residence Date: April 2, 20202020-786 Solar Journey Rosalyn Sterling Residence Date: April 2, 20202020-793 Sasha Intl Bob Fiddaman Residence Date: April 3, 2020 2020-794 Solar Deployed Scott Holmstrom Residence Date: April 3, 20202020-796 Solar Deployed Dilia Martinez Residence Date: April 3, 20202020-800 Papke Designs A Gonzalez Residence Date: April 3, 20202020-808 ESD 20-148 Arce Residence Date: April 7, 2020 2020-822 Grid Alt LA Tho Trong Do Residence Date: April 8, 20202020-820 Grid Alt IE Alivia McMath Residence Date: April 8, 20202020-823 Mohr Power White Kirkpatrick Residence Date: April 9, 2020 2020-824 Mohr Power Michelle Pickney Residence Date: April 9, 20202020-826 Axis Solar Ocampo Residence Date: April 9, 20202020-842 Sasha Intl Jorge Hernandez Residence Date: April 13, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020-1567 Penguin Solar Anthony Robertson Residence Date: July 20, 20202021-124 ESD 20-914 Fritz Residence Date: January 13, 20212021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 2021 2021-4994 Better Earth Helena Feng Residence Date: November 15, 20212021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 20212021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 2021 2021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 20, 2021 2021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 2022 2022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 2022-533 Better Earth Morris Scharff Residence Date: February 11, 2022 2022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 2022 2022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 20222022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 2022 2022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 20222022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 2022 2022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 20222022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Detached Garage Effective Existing Seismic Weight (System 1 Array 1) Area of (E) Building = Approximately 400 Sq. ft. Approximate Effective Seismic Weight = 400 sq. ft. x 20 psf ave. = 8,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 Loyd W. Martin Professional Engineer, Inc. 2510 W. 237th St. #206 orrance, CA 90505 el:1.310.464.1804TT Email: loydwmartin@gmail.com www.loydwmartin.com 2017-4652 Solar Shoppers Richard Roth Residence Date: November 29, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-1289 Revolt Electric O Quinn Residence Date: May 1, 20182018-2637 Revolt Electric Christensen Residence Date: September 5, 20182018-2637 Revolt Electric Christensen Residence Date: October 1, 20182018-3818 Revolt Electric Ysidro Mendez Residence Date: December 12, 20182019-3131 Revolt Electric Greenfield Residence Date: September 18, 2019 2019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 EQ'N 11.4- 3 ASCE 7- 16 EQ'N 11.4- 1 ASCE 7- 16 EQ'N 12.8- 2 ASCE 7- 16 2020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-688 Solar Shoppers Etpison Residence Date: March 17, 20202020-669 Axis Solar Old Oak Ranch Date: March 23, 2020 2020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020- 1567 Penguin Solar Anthony Robertson Residence Date: July 20, 20202021-124 ESD 20-914 Fritz Residence Date: January 13, 20212021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 20212021-4994 Better Earth Helena Feng Residence Date: November 15, 20212021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 2021 2021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 20212021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 21, 2021 2021-5577 Better Earth Arturo Tapia Residence Date: December 20, 20212021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20222022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 2022-533 Better Earth Morris Scharff Residence Date: February 11, 20222022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 20222022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 2022 2022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 20222022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 20222022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 20222022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 20222022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 V = 0.185 x 8,000 LBS = 1,480 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT = 8,000 LBS NEW SOLAR ARRAY = 3 PSF x 12 PANELS x 3.6' x 5.1' = 661 LBS NEW SEISMIC WEIGHT = 8,000 LBS + 661 LBS = 8,661 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 8,661 LBS = 1,602 LBS % CHANGE =1,602 LBS - 1,480 LBS 1,480 LBS x 100 % = 8.3 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 Loyd W. Martin Professional Engineer, Inc. 2510 W. 237th St. #206 orrance, CA 90505 el:1.310.464.1804TT Email: loydwmartin@gmail.com www.loydwmartin.com 2017-4652 Solar Shoppers Richard Roth Residence Date: November 29, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-1289 Revolt Electric O Quinn Residence Date: May 1, 20182018-2637 Revolt Electric Christensen Residence Date: September 5, 20182018-2637 Revolt Electric Christensen Residence Date: October 1, 20182018-3818 Revolt Electric Ysidro Mendez Residence Date: December 12, 20182019-3131 Revolt Electric Greenfield Residence Date: September 18, 2019 2019-3187 Revolt Electric Paraza Residence Date: September 23, 20192019-3187 Revolt Electric Paraza Residence Date: September 23, 2019 2019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 20192019-4671 Revolt Electric Leonar Colindres Residence Date: December 30, 2019 EQ'N 12.8- 1 ASCE 7- 16 EQ'N 12.8- 1 ASCE 7- 16 OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS 2020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-616 Revolt Electric Raddatz Residence Date: March 9, 20202020-688 Solar Shoppers Etpison Residence Date: March 17, 20202020-669 Axis Solar Old Oak Ranch Date: March 23, 2020 2020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-852 Grid Alt IE Jose Rodriguez Residence Date: April 15, 20202020-904 Grid Alt IE Reginaldo Duarte Residence Date: April 24, 20202020-913 Solar Journey Petros Petrosyan Residence Date: April 27, 20202020- 1567 Penguin Solar Anthony Robertson Residence Date: July 20, 20202021-124 ESD 20-914 Fritz Residence Date: January 13, 2021 2021-769 Solar Journey Ruben Simonyan Residence Date: March 5, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-986 Guasti Construction Steve Afton Residence Date: March 26, 20212021-1172 Solar Outsource Joseph Almanza Residence Date: Apri 8, 20212021-1394 Grid Alt LA David Chadwick Residence Date: Apri 27, 20212021-1508 Grid Alt LA Steve Siracusa Residence Date: May 4, 20212021-1881 Silverline Solar Asilia Wauls Residence Date: May 26, 20212021-2774 Better Earth Tammy Slater Residence Date: July 16, 20212021-4075 Better Earth Todd Dietzen Residence Date: September 27, 20212021-4920 Better Earth Eliette Ramos Residence Date: November 11, 20212021-4994 Better Earth Helena Feng Residence Date: November 15, 20212021-5021 Better Earth Don Dorwelo Residence Date: November 16, 20212021-5031 Next Solar Vijaya Gummadi Residence Date: November 17, 20212021-5034 Precis Solar Wilfried Voge Residence Date: November 17, 2021 2021-5178 Precis Solar Jonathan Campos Residence Date: November 24, 20212021-5214 Solar Deployed Emelie Porras Residence Date: November 29, 20212021-5223 Infinity Solar Robert Generoli Residence Date: November 30, 20212021-5346 Better Earth Satheesh Kumar Ulaganathan Residence Date: December 6, 2021 2021-5469 Better Earth Shauna Ghofranian Residence Date: December 14, 20212021-5575 Better Earth Brett Best Residence Date: December 21, 20212021-5577 Better Earth Arturo Tapia Residence Date: December 20, 20212021-5712 Better Earth Inderjit Sidhu Residence Date: December 31, 20212022-069 Better Earth Alfredo Martinez Residence Date: January 7, 20222022-095 Better Earth Patricia Dutra Residence Date: January 11, 20222022-151 Better Earth Cesar Contreras Residence Date: January 14, 20222022-250 Better Earth Manas Yadav Residence Date: January 22, 20222022-335 Better Earth Felicia Gross Residence Date: January 28, 20222022-350 Better Earth Julia Mireles Residence Date: January 29, 20222022-425 Better Earth Chuck Legg Residence Date: February 4, 20222022-425 Better Earth Chuck Legg Residence Date: February 9, 20222022-502 Better Earth Cory Halsey Residence Date: February 9, 2022 2022-533 Better Earth Morris Scharff Residence Date: February 11, 20222022-575 Better Earth Jolene Avila Residence Date: February 15, 20222022-583 Better Earth Mark Anthony Veliz Residence Date: February 15, 20222022-611 Better Earth Cesar Gastelum Residence Date: February 16, 20222022-617 Better Earth Tony Hatch Residence Date: February 16, 2022 2022-631 Better Earth Reaghan-Stokes Ayler-White Residence Date: February 17, 20222022-657 Better Earth Monte Livingston Residence Date: February 18, 20222022-682 Better Earth Osvaldo Linares Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 19, 20222022-699 Better Earth Amey Churi Residence Date: February 22, 20222022-701 Better Earth Cary Booker Residence Date: February 22, 20222022-749 Penguin Solar Rui Yang Residence Date: February 24, 2022 2022-753 Better Earth Daniel McIntosh Residence Date: February 24, 20222022-758 Better Earth Karthi Mohan Residence Date: February 24, 20222022-780 Better Earth Denny Rowbury Residence Date: February 25, 20222022-789 Better Earth Rosie White Residence Date: February 25, 20222022-803 Effect Energy Larry Chavez Residence Date: February 26, 20222022-804 Better Earth Ashley Lindsay Residence Date: February 26, 20222022-891 Better Earth Ernie Zamudio Residence Date: March 3, 20222022-892 Better Earth Jose Mata Residence Date: March 3, 20222022-894 Green Road Solar Jennifer Eichert Residence Date: March 3, 20222022-918 Plug It In Solar Timothy Winger Residence Date: March 4, 2022 719 W Jonquil Rd 03/14/22 Bldg permit# 101109758 Elect permit# 20175640 Permits issued on 3/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 719 W Jonquil Rd 03/14/22 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 719 W Jonquil Rd 03/14/22 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 719 W Jonquil Rd 03/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                        PLUG IT IN SOLAR WINGER RESIDENCE 15013 CALIFA ST VAN NUYS, CA 91411 719 WEST JONQUIL RD, SANTA ANA, CA 92706 818-670-7769 4.037 719 W Jonquil Rd 03/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT PLUG IT IN SOLAR 15013 CALIFA ST VAN NUYS, CA 91411 WINGER RESIDENCE 4.037 719 WEST JONQUIL RD, SANTA ANA, CA 92706 818-670-7769 719 W Jonquil Rd 03/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram PLUG IT IN SOLAR 15013 CALIFA ST VAN NUYS, CA 91411 818-670-7769 WINGER RESIDENCE 719 WEST JONQUIL RD, SANTA ANA, CA 92706 4.037 719 W Jonquil Rd 03/14/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 719 WEST JONQUIL RD, SANTA ANA, CA 92706 PLUG IT IN SOLAR 986882 X X X X X X X X X X ISAAC ALON 818-670-7769 3/3/22 INFO@PLUGITINSOLAR.COM Isaac Alon Digitally signed by Isaac Alon DN: cn=Isaac Alon, o, ou, email=isaac.alon@plugitinsolar.com, c=US Date: 2022.03.03 08:51:30 -08'00' 719 W Jonquil Rd 03/14/22