Loading...
HomeMy WebLinkAbout2215 S Standard Ave - Soils ReportQoxsrnucfloN fbsrrNc t f,xcrNEERrNG, INC. € 'ENGINEERING, INC SAII DIIOO, CA 2{14 \r'E:a!d ArG &rir. C EB.diIo, O{ 92029 O6a\ 7461955 (760) 7469806 Er uvlr$Dq cr {90 E Ptioded Cr- 9ritc 7 CoroE CA 91719 (909) 371-r890 (9o9)17l-2168 Fa VEXTUTA CA 1615 4.i5. Ars Suie 105 Osurd, C{ 9l0ll (80t){86-('47t (805) 48&9016 [.rr TIACY, C 212 Ig L:rd' Ri- Sritr F "htrr C,l.95)76 (209) 83+2390 e09l 839-2895 F8 uxc^srfr. or {2156 l0rh Sc V Uni. K LnJon r. CA 91514 (Eo5)776 /-6 luSl ne9676 Fd I :l I'ri I I Il i' .t REPORT OF SOILS INVESTIGATION 2215 SOUTE STANDARD AVE. PROPOSED ADDITION SANTA ANA, CALIFORNIA NUTECE ENTERPRISES, INC. 4749 OCEANSIDE BL\TD., SUITE J OCEANSIDE, CALIFOR}iIA 92056 Prepared by: CONSTRUCTION TESTING AND ENGINEERING, INC. 490 PRJNCELAND COURT, #7 CORONA, CALIFORNIA 9I7I9 I f:,::;,lD C\t,; o\ Sanu Ana JOB NO.40-06r3 APRTL 5. 1999 tot2t qc)a '11 GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION N N I w (i { 7 U ll U I : l' I il l 1 .i Jj I Prepared for: I I , II 1 QoNsrnucrroN fbsrrNc t f,NcrNEERrNG, INC. I s ENGINEERING, INC sAI{ Dt[Cn, Cr 2414 vin l"nd Av.. Suill G Es.ondilo, C 920?9 (760) 74549t5 (?60) 7a69406 ru mEnsrD[, c 490 E Pnn.3l.nd Cl. SuiE 7 Comnl' CA 91719 (909) 371.1890 (909) 371.21$ rar },EITTUNA CA 16,{5 P..ifr Avq Suit 105 Orr,r( CA 91033 (80r 486-64?5 (8O5) {861$16 t^x uNc srE& cA 421t5 l0rh Sr 9. Unir li l.rnc$r.r, CA 9ltY (805) 7269676 (80i) 7264246 rrl T[,ACY. CA 392 v. l4h nd Suit 19 Tr.q, C^ 9i376 (209) r3128t{ (209) t392895 r,ll I -1 I NuTech Enterprises, Inc. 4749 Oceanside BIvd., Suite J Oceanside, California 92056 Attention: PeteLavelle Subject Report of Soil Investigation 2215 South Standard Ave., Proposed Addition Santa Ana, California Dear Mr. Lavelle We are pleased to submit our Soils Investigation for the proposed addition at 2215 South Standard Avenue in the city of Santa Ana. The attached report contains the specifics of the investigation performed and provides conclusions and recommendations pertaining to the geotechnical engineering design aspects ofthe project. Our investigation found that the site consists of approximately l-2 feet of disturbed, dry, silt with sand at the surface, underlain by lean clay. Field exploration activities and laboratory testing indicated that the proposed project is feasible from a geotechnical standpoint, provided the recommendations presented in the following report are implemented during construction. Should additional design information be required during the project development, we will be pleased to provide supplementary recommendations. Respectfully, CONSTRUCTION TESTING & ENGINEERING, INC I :l !1,."wRodney D. Ballard, GE #2173 Geotechnical Engineering Manager a, CEG #2057 Senior Engineering Geologist GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION i J l 1 TABLE OF CONTENTS I,O IN\ESTIGATION STIT4N4-A.RY 2.0 INTRODUCTION 3.0 SCOPE OF SERVICE 4,0 SITE DESCRIPTIONS 5.0 STRUCTURALDESIGNCONSIDERATIONS 6,0 SITE IN\ESTIGATION General Exploratory Borings "Undisturbed" Soil Sampling "Disturbed" Soil Sampling Standard Penetration Testing Boring Logs 6.1 62 6.3 6.4 65 6.6 Page I Page 2 Page 2 Page 3 Page 3 Page 4 Page 4 Page 4 Page 4 Page 5 Page 5 Page 5 Page 6 Page 6 Page 6 Page 6 Page 6 Page 7 Page 7 Page 7 Page 7 Page 8 Page 8 Page 8 1 _l l l 7,0 LABORATORY TESTING PROGRAM 8.0 GEOLOGY General Geologic Site Materials 8l 6..J, d-: I General Silt with Sand (ML) Lean Clay (CL) Clayey Sand (SC) Poorly Graded Sand with Clay (SP-SC) Poorly Graded Sand (SP) 83 8.4 Groundwater Geologic Hazards 9)1 8.2.3 8.2 4 8.2.5 8.2 6 8.4.1 8 4.2 8.4.3 8.4.4 8.1 5 846 6+ / 848 General Local and Regional Faulting Seismic Zone and Coeflicients Seismic Effects Liquefaction Evaluation Seismic Settlement Evaluation Landsliding Tsunamies and Seiches Pa_ee 8 Page 9 Page l0 Page I 0 Page I I Page I 'l Page 12 Paqe 12 , I 9.0 GEOTECHMCAIIN\ESTIGATION Page 12 Page 12 Page 13 Page 13 Page 1 3 Page 14 Page 14 Page 14 Page I 5 Page 1 5 Page 1 5 Page 16 Page 16 Page I 7 Page I 7 Page 17 Page 'l 8 Page I 8 Page 18 Page 19 Page 20 Page 21 Page 2l Page 22 Page 23 Page 25 Page 25 Page 26 9.1 9.2 9.3 9.4 9.5 General Compressive Soils Expansive Soils Sulfate Resistance Groundwater General Grading and Earthwork I 1O,O CONCLUSIONS AND RECOMMENDATIONS I l I l t0.I 10.2 10.6 107 10 8 10.2. I 1n 1 ) 10.2.3 10.2.4 10.2.5 10.2.6 1027 10.2.8 Geotechnical Observation Site Preparation Excavation Operations Removals Overexcavation Preparation ofAreas to Receive Fill Fill Placement and Compaction Transition Pad Condition 10.3 Foundation Design 10.4 Lateral Resistance and Earth Pressures 10.5 Pavement Recommendations 10.5.1 General 10.5.2 Asphalt Pavement Design I Erterior Flatwork Drainage Construction Obsen ation I I,O LIMITATIONS OF IN\ESTIGATIOS'Pase 27 , 10.3. 1 Footings 10.3.2 Settlement of Building Slab 10.3.3 Floor Stab 10.3 .4 Moisture Conditioning and Concrete Placement I _l I l l l j ,l - I I I APPENDIX A: REFERENCES CITED APPENDIX B: FIELD IN\,ESTIGATION APPENDIXC. LABORATORYTESTING I Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana Califomia Page 1of27 Job No. 40-0613 Aoril 5. 1999 I -t 1.0 INVESTIGATION SUMMARY The investigation was perlormed to provide site-specific geotechnical information for the proposed construction of an approximately 27,000 square foot concrete tilt-up structure and associated improvements at the subj ect site. Our investigation found that the proposed building pad areas are underlain by Quaternary alluvium and colluvium to the maximum explored depth of 50 feet below the ground surface (fbg). Groundwater was encountered at a depth of approximately 22 fbg at the subject site but has been reported to have been as shallow as 8 fbg. Groundwater levels will likely fluctuate during periods of precipitation, and are not expected to directly impact foundation soils but will likely contribute to liquefaction during the predicted seismic event With respect to gmlogic and seismic hazards, the site is considered as safe as any within the general Orange County area. Orange County is an area of moderate to high seismic risk. Based on observed geologic conditions and available literature, no active surface faults are known to exist within the site. The site is not within an earthquake study zone; therefore, the possibility of surface rupture at the site due to faulting should be considered low. The site could be subject to ground shaking in the event ofa major earthquake on a distant fault. The site lies in an area of moderate to high seismic risk as does all of Southern California and special design considerations must be made. 1 I l :1 l -t J ) Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition Page 2 of 27 Job No. 40-061 3 I I -'l I I alifomia t9 The possibility of liquefaction occurring during a seismic event within the underlying supporting material is high due to the physical grain-size distribution ofthe deposits, in- place density characteristics, and depth to groundwater. 2.0 INTRODUCTION This repon presents the results of our preliminary soils investigation performed to provide planning and design criteria for the proposed development. Contained within are recommendations for site grading and design of structural foundations, selection of floor slab support, and design for structural pavement sections for the proposed building and surrounding area. The investigation for this report included field exploration, laboratory testing, geologic evaluation, and engineering analysis. 3.0 SCOPE OF SERVICE The scope of services followed for this investigation included: 3.1 Review of available geotechnical, geologic and seismic reports and maps pertinent to the project area. 3.2 Geologic hazard evaluation of the site including development of seismic loading parameters. 3.3 Subsurface exploration including excavation and field logging of 4 exploratory borings to depths that may be influenced by the proposed structure. 3.4 Laboratory testing of representative samples obtained during the field investigation for material properties. l ...1 I Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 3 of 27 Job No. 40-0613 April 5. 1999 3.5 3.6 Soils engineering analysis of field and laboratory data that will provide the basis lor our conclusions and recommendations. Preparations of this report presenting our findings, conclusions and recommendations pertaining to excavation and structure foundation design. I I I l l l 4.0 SITE DESCRIPTIONS The subject site is located at 2215 South Standard Avenue (Figure 1) in the city of Santa Ana. The subject site is partially developed with an approximately 24,560 square foot building in the western portion of the site. The east side of the property is undeveloped and covered with low grasses and minor construction debris. The remaining portion of the site is covered with asphalt and concrete paving. A wood frame building with stucco exerior is adjacent to and parallels the south side ofthe site. Development around the site consists of light industrial and commercial structures. A railroad right ofway borders the site on the east. 5.0 STRUCTURAL DESIGN CONSIDERATIONS Preliminary information indicates that the proposed development will consist of an approximately 20 foot high concrete tilt-up, slab- on -grade structure founded on shallow footings. Asphalt parking, light travel areas and associated utilities are to be constructed to the nofth ofthe proposed site. I J 1I rJ Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 4 of 27 Job No 40-0613 April 5. 1999 .t 1,I 6.0 SITE INVESTIGATION 6.1 General The field exploration conducted on March 30, 1999 included a site reconnaissance and subsurlace drilling program, which intended to assess the condition and depth of existing subsurface materials. 6.2 Exploratora Borings Four borings were excavated to dephs between 5 and 50 fbg. The borings were excavated using a truck-mounted, hollow-stem auger. Soils were continuously logged by an experienced geologist and were visually classified in accordance with the Unified Soil Classification System. The field descriptions have been modified, where appropriate, to reflect laboratory test results. 6,3 "Undisturbed" Soil Sampling Undisturbed samples of the near surface soils were obtained at selected intervals in the borings using a split barrel sampler with lined 2 % inch diameter brass sample rings. The drive sampling was conducted in general accordance with ASTM D 3550. The steel sampler was driven into the bottom of the borehole with successive drops of a driving weight. Blow counts required for one foot of sampler have been recorded on the boring logs in the section marked "blows/floot." I l 1 l I I -'1 Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ara^ Califomia Page 5 of 27 Job No. 40-0613 Aoril 5. 1999 -t I I I I .1 6.4 "Disturbed" Soil Sampling Disturbed samples of the near surface soils were obtained at selected intervals in the borings using a split barrel sampler during standard penetration testing. The steel sampler was driven into the bottom of the borehole with successive drops of a driving weight. Blow counts required for one foot of sampler penetration are shown on the boring logs in the column "blowVfoot." The soil was retained in plastic bags for determining soil moisture content and soil identification testing. Bulk samples of site soil were secured between 0-5 fbg in borings 1,3, and 4 and retained for laboratory testing. 6.5 Standard Penetration Testing Standard Penetration Tests (SPT) in accordance with ASTM D 1586 were performed at selected depths using a standard (1 4 in ID, 2-inch O.D.) split barrel sampler. The driving hammer of the SPT samples was a 140-pound weight falling 30 inches lor each blow. The recorded blow count (N) for one foot of sampler penetration after 6 inches of seating penetration is shown on the boring logs in column "blows/foot." The standard penetration test provides rough estimates of many properties of soil in-situ. Primarily rough estimates of relative density and lriction angle of uncemented, non-collapsible granular soils and unconfined compressive strenglh ofclays. 6,6 Boring Logs Logs of the borings for the investigation are presented in Appendix B on boring log summary sheets, which also include descriptions ol soil, field density data and supplementarv laboratory data. Boring locations can be lound on Figure 2. I II Repon of Soils lnvestigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 6 of 27 Job No. 40-0613 April 5. 1999 I I 7.0 LABORATORY TESTING PROGRAM Laboratory tests were conducted on representative soil samples for the purpose of classification and determination of physical properties and engineering characteristics. The laboratory testing program included tests for moisture content, maximum dry density, direct shear, atterberg limits, panicle size distribution, and R-Value. Appendix C contains descriptions ofthe test methods and summaries ofthe results. 8.0 GEOLOGY 8.1 General The site is located in the northwest portion of the Peninsular Ranges Geomorphic Province. The Peninsular Ranges are characterized by northwest-southeast trending mountains separated by similar trending fauits (Webb, l99O). The site is located approximately 5 miles north of the Upper Newpon Bay at approximately 60 feet above sea level. Based on the referenced geologic maps the overlying site materials consist of Quaternary Alluvium and Colluvium. 8.2 Geologic Site Materials 8.2.1 General The upper two feet consists of silt with sand in a dry, and disturbed condition. Lean clay soil is obsened to underlv silt, with sand to a depth of approximately 35 feet. Between i5 and 50 feet the soil profile consisted of Clayey sand. Poorly I l I I .i J { I Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. Califomia Page 7 of 27 Job No.40-0613 Aoril 5. 1999 I I graried sand with clay and Poorly graded sand.. General explanations are provided below, and detailed profiles ofthe borings are provided in Appendix B. 8.2.2 Silt with Sand (ML) Brown to gray silt with sand was encountered to a depth of approximately 2 fbg on the west side of the site @-2) urd 5 % fbg on the east side of the site (B-3). The upper 1 to 2 feet was found to be in a dry, Ioose, and disturbed condition. 8.2.3 Lean Clav (CL) Lean clay underlies the silt with sand to a depth of approximately 35 feet. Lean clay is described as brown to dark brown, moist and stiff. The soil moisture increases with depth and becomes saturated at approximately 22 fbg. 8.2.4 Clavev Sand (SC) Light brown clayey sand is encountered between 35 and 40 fbg and is described as fine to medium grained, medium- dense and saturated. 8.2,5 Poorlv Graded Sand With Cla v(SP.SC Between 35 to 45 fbg the soil is found to consist of, brown fine to medium grained poorly graded sand with clay in a medium dense to dense and saturated condition. I l l l I Repon of Soils investigation 2215 South Standard Ave., Proposed Addition Page 8 of 27 Job No. 40-0613 1 I MI A il 5 999 8.2.6 Poorlv Graded Sand (SP) Brown poorly graded sand is encountered at approximately 49 fbg. The material encountered is described as fine to medium grained, very dense, and saturated. 8.3 Groundwater Depth to groundwater was determined to be 22 fbg for the subject site. The soil profile for the site increased in moisture content becoming wet at 18 fbg. Boring 2 remained open for 2-3 hours after drilling was completed to allow for recovery ofthe groundwater table. Once the water stabilized, the depth to groundwater was approximately 22 {bg. Soils below 22 fbg ue saturated. 8.4 Geologic Hazards 8.4.1 General From our investigation it appears that geologic ha,^rdr ", the site are primarily limited to those caused by violent shaking from earthquake generated ground motion waves. The potential for damage from displacement or fault movement beneath the proposed structure should be considered unlikely due to distance to known active faults. The potential for liquefaction to occur during the predicted seismic event is high. I Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 9 of 27 Job No. 40-0613 Aoril 5- 1999 -t I I l I l 8.4.2 Local and Resional Fa u Ir ng The geologic structure of the Southern California area is dominated by northwest trending faults associated with the San Andreas system. Faults such as the Whiuier, Elsinore, San Jacinto, San Andreas, and Newpon-Inglewood are the major faults in the system. They are all known to be seismically active, and the San Andreas and San Jacinto faults are known to have ruptured the ground surface in historic time. Available geologic literature indicated that no active (Quaternary) faults are known to exist on the site. No evidence of active faulting was observed during our investigation. The closest known active fault is the Newport-Inglewood Fault Zone located approximately 7 miles west of the site. The principle faults in the site vicinity considered most likely to ruptue and possibly cause strong ground shaking at the site during the useful life ofthe proposed construction are listed in Table I. The listing includes a summary of important seismic characteristics estimated for each fault. .-1 .i. -t I I aAn Page l0 of 27 Job No 40-0613 9 I I I.l l. Greensfelder ( t 974) 2. Seed and Iris (1982) 3. Ploessel and Slosson (1974) 4. Caltech Website ( 1999) 8.4.3 Seismic Zone and Coefficients Referencing the 1997 Uniform Building Code, section 1629 wtd related tables, the seismic coefiicients for the subject site are. So 8..1.4 Seismic Effects In our opinion, the most significant seismic event with respect to the proposed structure would be an earthquake associated with the Newpon-Inglewood Fault System. The estimated peak bedrock acceleration produced at the site by the maximum probable event would be approxinrately 0.449. A 35 percent reduction in acceleration. for events within 20 miles ola site. is accepted for the anticipated j llIr Fau.lt Zone Estinnted Distance From Site ) Whittier I5 miles 7.s i .s+g 22c Chrno I8 miles 7.0 ? 50 l6g Elsinore l7 miles 7.5 32g 2tg San Jacinto 45 miles I )c7.5 l2e San Andreas 80 milcs 8.0 o6g o6g Newport- Inslewood 7 miles 7o 44g )Oa Nerrport- Inglewood-Rose Calvon l0 miles 1.0 369 23 Description Table Factor I6.I Zone 4, 0.40 Soi[ Profile Type l6-j 16-U B Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition TABIX I SEISMICITY TON PT,C,"TON TA ULTS l I I I I I I I Peak (2) BedrDck Acceleration Repeatable (3) High Bedrock Acceleralion I I I Seismic Zone Factor I I I I Seismic Source Type I I Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition anta ali a :l .l -I l repeatable high bedrock acceleration. The estimated repeatable acceleration is 0.299. Design of structures for seismic loading should comply with the requirements of governing jurisdictions, applicable building codes, and practices ofthe Association of Structural Engineers ofCalifornia. 8.45 I .iquefaction Evaluation Liquefaction occurs when saturated fine grained sands or silts lose their physical strengths during shaking and behave as a liquid. This is due to loss of point-to- point grain contact and transfer of normal stress to pore water. Liquefaction potential is a function of water level, soil type, material gradation, relative density, and probable intensity and duration ofground shaking. According to the referenced geologic maps, the subject site is located in a liquefaction zone. Based on in-place density, physical grain size characteristics and depth to groundwater, liquefaction potential is considered too be high. Senlement, due to liquefaction during the anticipated seismic events would be on the order of 0.9 inches. 8..{.6 Seismic Settlement Evaluation Seismic settlement occurs when loose to medium dense granular soils densify during seismic events. The underlying deposits were generally found to be stiffto very stiff; therefore, are not considered likely to experience significant seismic settlement- l Page l1of27 Job No. 40-0613 Anril 5 l9QQ I Repon of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa .{-na. Califomia Page 12 of 27 Job No. 40-0613 April 5. 1999 8..1.7 Landslidine No features typically associated with landsliding activity were noted during the site investigation. In the reference review, no evidence of landslides were found to have occurred within the area ofthe site. 8.4.8 Tsunamies and Seiches Due to site elevation and distance from large bodies of water, the site is not considered to be subject to tsunamies or seiches. 9.0 GEOTECHNICAL EVALUATION 9.1 General No geotechnical conditions were apparent during our investigation, which would preclude the site development as planned, provided the recommendations in this repon are followed. Geologic and seismic hazard potential for the subject site was evaluated. The site, as most of Southern Califomia, lies in an area of high risk from ground shaking on distant faults. Based on current geologic information, no active surface faults are known to exist within, or immediately adjacent to the site; therefore, surface rupture at the site due to faulting should be considered unlikely. I l I l l Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Sent: .qna. California Page 13 of27 Job No. 40-0613 April 5. 1999 I -l I l Liquefaction assessment olthe underlying deposits at the site indicated that the potential for liquefaction is considered high due to the physical grain size distribution, in-place density, depth to groundwater, and the location ofthe site in a liquefaction zone. 9.2 Compressive Soils Based on observation and laboratory testing, underlying soils materials exhibit low compressibility characteristics and are considered suitable for structure support. Any loose surficial materials should be removed beneath structure pad areas and reworked (10.2.4). All grading or treatment of these soils should be performed under the observation of a qualified geotechnical representative. 9.3 Expansive Soils Near surface soils encountered during the subsurface investigation were generally found to consist of silt with sand to approximately 2 Ibg and underlain by a lean clay. These materials were found to have a low potential for expansion. The expansion index for the site soil was determined to be 17. Should expansive clayey soils be exposed during grading, modified earthwork and loundation recommendations may be warranted. 9.4 Sulfate Resistance Moderate to high levels of sulfate containing solutions or soil can have a deleterious effect on the in-service performance of concrete foundations and reinforcement steel. In order to evaluate the loundation environment, a sample of the site soil was tested for soluble sulfate and pH. The test results rvere 0.957 and 7 19 respectivel)'. Review olthe Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Sanra Ana. Califosria Page 14 of27 Job No. 40-0613 April 5. 1999 I _I I "l UBC table l9-A-4 found that a sulfate exposure of 0.957 is considered to be Severe. A sulfate exposure of "Severe" warrants type V cement, with a maximum water- cementitious ratio of 0.45 and a concrete strength of 4500 psi. A pH level of 7. 19 is considered neutral. 9.5 Groundwater Depth to groundwater for the site was observed to be 22 fbg for the site. It was reported that the depth to groundwater has been as shallow as 8 fbg. As indicated hereiq groundwater is not expected to impact the improvernents, provided recommendations for site drainage are implemented. Contained below are our recommendations and foundation design parameters which are based on field testing, laboratory testing, site conditions, and our assumptions of the details ofthe proposed project, Ifthe proposed project should vary zubstantially from the zrssumptions made herein, this office should be contacted for revisions to our recommendations. IO.O CONCLUSIONS AND RECOMMENDATIONS l0.l General Based on the results of our evaluation, we conclude that the proposed construction at the subject site is feasible from a geotechnical standpoint. The major factors affecting the proposed development are (l) the presence ol loose surficial soils which will require IJ I I Report of Soils Investigation 2215 South Standard Ave,, Proposed Addition Santa .Ana. California Page 15 of27 Job No. 40-0613 April 5. 1999 I _I I l removal prior to the placement of fill or improvements, (2) the potential for liquefaction due to the groundwater observed at 22 tbg. The recommendations for design and construction of the foundation are based on empirical and analytical methods typical of the standards of practice in California. Should these recommendations appear not to cover a specific feature of the proposed development, please contact Construction Testing & Engineering, Inc. (CTE) lor revisions or additions to our recommendations. 10.2 Grading and Earthwork I 0.2. I Geotechnical Observation Upon commencement of construction, CTE should continuously observe the grading and earthwork operations for this project. Such observations are essential to identi$ field conditions that differ from those predicted by the preliminary investigations, to adjust designs to actual field conditions, and to determine that the grading is in general accordance with the recommendations ofthis report. Our personnel should perform adequate observation and sufticient testing of fill during grading to support the Geotechnical Consultant's professional opinion as to whether lhe work complies with compaction requirements and specifications contained herein. , I I Prior to grading, the site should be cleared of existing debris, organics, and other deleterious materials. Organically, impacted materials not suitable for backfill should be disposed of off-site. All materials excavated and removed should be disposed of at a legal disposal site. All underground utilities should be secured and/or relocated if necessary prior to excavation operations. 10.2.3 Excavation 0perations After site preparation has been completd areas to receive improvemems are to be excavated to a depth of competent material. Site materials are considered competent when all loose, dry and disturbed materials have been removed resulting in a firm and unyielding condition with a result in-place soil moisture content of + 3Yo of optimum. Following excavation, exposed subgrade areas should be scarified, moisture conditioned, aod recompacted prior to fill placement. 10.2..1 Removals Within the limit of site grading, eroded, burrowed, or otherwise disturbed soils shall be removed to the depth of competent material to a minimum of 2 fbg and a minimum of 5 feet laterally beyond the building pad where practical. l I l l J l I Report of Soils Investigation Page 16 of27 2215 South Standard Ave., Proposed Addition Job No. 40-0613 Santa Ana. California April 5. 1999 10.2.2 Site Preoaration Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ara. California Page 17 of 27 Job No. 40-0613 Aoril 5. 1999 I _l j I.l l 10.2.5 Overexcavation In order to provide uniform bearing conditions for structural support, it is recommended that the entire building pad area be over-excavated to a minimum depth of 1 foot below the bottom of the proposed footing elevation and a minimum of 5 feet laterally beyond the building pad where practical. Based on exploratory data, excavations can be accomplished using standard grading equipment. Prior to fill placement, exposed subgrades should be evaluated by the geotechnical representative to verify that suitable, uniform bearing conditions exist. Caution should be exercised when overexcavating along the south property line so as not to excavate supporting soil for the adjacent structure. 10.2.6 Preparation of Areas to Receive Fill The bottom of all excavations should be founded in competent fi materials. The exposed surface should be scarified to a minimum depth of 8 inches. properly moisture conditioned, and compacted to 90 percent mmpaction relative to ASTM D-1557. -.,) 10.2.7 Fill Placement and Comnaction All additional fill and backfill should be compacted to a minimurn relative compaction ol90 percent as evaluated by ASTM D-'1557 at a moisture content of optimum or slightly above. The optimum Iift thickness lor fill soils will be Repon of Soils Investigation 221 5 South Standard Ave., Proposed Addition Santa Ara. California Page l8 of 27 Job No 40-061 3 April 5. 1999 I .1 dependent on the type of compaction equipment utilized. Generally, fill soils should be placed in uniform horizontal lifts not exceeding 8-inches in loose thickness. Placement and compaction of fill should be performed in general conformance with geotechnical recommendations and local ordinances. 10.2.8 Transition Pad Condition Based on site elevations and materials present, there is no anticipated transition condition. Based on all excavation recommendations, it is anticipated that all footings will be founded on properly compacted materials. If deep foundations are proposed, additional earthwork recommendations will be provided. 10.3 Foundation Design Foundation and slabs should be designed in accordance with structural considerations and the following recommendations. These recommendations assume that the soils exposed at the finished pad grade will have a low potential for expansion as anticipated. 10.3.1 Footines The proposed building may be supported by continuous and spread footings founded at a minimum depth of 24 inches below the lowest adjacent subgrade. Continuous footings should have a minimum width of 15 inches and be reinforced with at least four No. 5 reinforcing bars, 2 top and 2 bottom. Isolated interior footings should have a minimum width of 24 inches and be founded at a minimum depth ol 24 inches belou, the lowest adjacent subgrade. No lootings l l I I.j -) Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 19 of 21 Job No. 40-0613 April 5. 1999 I l shouid srraddle a cut-fill interface. Continuous footings bearing in the well- compacted engineered fill material may be designed using a maximum allowable bearing capacity of 1,800 pounds per square foot. The ailowable bearing pressure may be increased by one third when considering loads of short duration such as wind or seismic forces. A.long the south property line footings of the building on the adjacent lot are parallel to and immediately adjacent to the proposed structure foundations. The bottom of footings @OF) for the proposed structure must match the BOF of the existing structure. Figure 4 shows the approximate dimensions of the existing structure to the south. l0.32Settlernent of Buildins Slab We have analyzed settlement potential anticipated during construction and for long term performance. Construction settlement is expected to occur as loads are applied and structures are brought to their operational weight. Long term settlement is expected to occur over time as a result of compression of wetted or partially saturated soil. Anticipated settlements are related to an applied bearing pressure of 1800 psf and a footing width of approximately I 25 feet. Presented below are tabulated settlement ranges, which can be anticipated within the identified layers. ! _l Repoa of Soils Investigation 22i5 South Standard Ave., Proposed Addition San Page 20 of27 Job No. 40-0613 I I l 't999 Total Lons Term Settlement inches 10.3.3 Floor Slabs Building slab minimum design recommendations presented herein are based on anticipated loading conditions. lnterior floor slabs subjected to loading should have a minimum thickness of 5 inches and be reinforced with a minimum of No. 3 reinforcing bars at 24 inches on center (each way) placed in the middle one-third of slab height. The correct placement ofthe reinforcement in the slab is vital for satisfactory performance under normal conditions. The floor slab on foundations should be tied together by extending the slab reinforcement into the footings. In the areas to receive moisture sensitive floor covering a polyethylene moisture barrier (6 mil or greater) should be placed beneath the slab. A four inch layer of coarse clean sand should underlie the polyethylene moisture barrier. Approximately 1" of clean fine sand should be placed over the polyethylene vapor barrier. I l ATED SET-TLEMENTSCIP Soil Laver Total Shon Term Construction Settlement (inches) Clay layer to 35fbg 0.5 10 I :t Prior to placement ofthe slab, we recommend that the subgrade soil be moisture conditioned under the observation of the geotechnical consultant. In order to reduce the potential for shrinkage cracks in the concrete during curing, we recommend that low water-cement ratio (.45 or less) concrete be placed with a maximum slump of 4 inches based on ASTM D-143. The slump should be periodically checked prior too placement. We further recommend that crack control joints be provided in the slabs in accordance with the recommendations of a structural engineer to reduce the potential for distress due to minor soils movements and concrete shrinkaee. Concrete should be placed in accordance with "ACI Manual of Concrete Practice," sections 301 Specification for Structural Concrete for Buildinqs and 305R Hot Weather Concreting 10.4 Laterd Reristrncc ind Earth Pressures The following recommendations may be used for shallow footings on the site. Foundations placed in firm, well-compacted, fill material may be designed using a coefficient of friction of 0.25 (total frictional resistance equals coefiicient of friction times the dead load). A design passive resistance value of 150 pounds per square foot per foot of depth (with a maximum value of 1800 pounds per square foot) may be used. The allowable lateral resistance can be taken as the sum of the frictional resistance and the passive resistance provided the passive resistance does not exceed two-thirds of the total allowable resistance. The passive resistance values may be increased by one-third when considering loads ofshort duration such as r.vind or seismic forces. J Report of Soils Investigation Page 21 of27 2215 South Standard Ave., Proposed Addition Job No. 40-0613 Santa Ana- Califomia April 5. 1999 10.3.4 Moisture Conditionins and Concrete Placement { l Repon of Soils lnvestigation 2215 South Standard Ave., Proposed Addition Santa Ana. California Page 22 of 27 Job No. 40-06i3 April 5. 1999 I l Retaining wall up to 10 feet high and backfilled using granular soils may be designed using the following equivalent fluid weights: Restrained Wall non-eldin The above values assume non-expansive backfill and free draining conditions. Measures should be taken to prsvent moisture build-up behind all retaining walls. Drainage measures should include free drainage backfill material and perforated drains, as designed by the project architect or structural engineer (Figure 3). These drains should outlet away from the structure. Walls should further be waterprooled in accordance with the recommendations ofthe projea architea, Retaining wall footings should be designed in accordance with the foundation design recommendations presented in this report and reinforced in accordance with structural considerations. 10.5 Pavement Recommendations -l J One sample of surficial soil believed to be representative ofthe site was obtained for R-Value determination (Test Method 301 ). Based on testing, a design R- Value of l0 was obtained for pavement thickness evaluation. The following pavement recommendations are based on a 20-vear sen'ice lifle. [QUIVALENT FLUID UNIT WEIGI{IS (pound pcr cubic foot) Level Backfill 2:l Slope backfill Cantilever Wall (yielding) 35 55 s5 80 I l I ) I I I 10.5.1 General I Repon of Soils Investigation 22i5 South Standard Ave,, Proposed Addition Santa Ana. California Page 23 of27 Job No. 40-0613 ils. 1999 The following preliminary structural pavement section is designed according to Caltrans Department of Transponation Highway Manual (Method 301) for flexible pavements based on the preliminary design R-Value of 10. Presented below are the structural pavement sections for flexible pavements lor auto parking areas It is recommended that subsequent R-Value testing be performed following parking and drive area grading in order to provide final structural pavement section recommendations. We recommend that soils underlying all proposed pavement areas be prepared in the following manner. Loose or disturbed subgrade soils should be removed to the depth of competent materials. Exposed soils should be moisture conditioned and compacted to 95 percent ofthe maximum dry density (ASTM D-1557). Soils should then be compacted in lifts not exceeding 8" to subgrade elevation at 95 percent of the maximum dry densit1,. All Class II Base materials should be compacted to at least 95 percent oflaboratory maximum densin'(ASTM D-1557). Traffic Area Traffic Index A.C. Thickness (in) Auto Travel Lanes and Parking Area 3.5 8 I0.5.2 .{sphalt Par ement Design I Class tr Base ] Thickness (in) I I Report of Soils lnvestigation 2215 South Standard Ave., Proposed Addition Santa Ana Califoruia Page 24 of 27 Job No. 40-0613 April 5. 1999 In addition, it is recommended that all pavement areas conform to the foliowing cfltena L All trench backfills, including utility and sprinkler Iines, should be properly placed and adequately compacted to provide a stable pavement subgrade An adequate drainage system should be provided to prevent surlace water or subsurface seepage from saturating the subgrade soil. Placement and construction of the recommended pavement section should be performed in accordance with the Standard Specifications for Public Works Construction. Class II Base should be used as outlined and should have a minimum R-Value of 78 and a minimum sand equivalent of25. Final in-place density of the Class II Aggregate Base should be 95 percent of the minimum dry density per ASTM D-1557. Surface run-off and irrigation water should be directed away from the parking areas to avoid contributing to wet or saturated materials beneath the pavement. 5. Pavement sections are prepared assuming that periodic maintenance of pavements rvill be done, including sealing of cracks and other measures I ) J, 4. J Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana- California Page 25 of 27 Job No. 40-0613 April 5. 1999 -t l 10.6 Exterior Flatwork To reduce the potential for distress to exterior flatwork caused by minor settlement of foundation soils, we recommend that such flatwork be installed with crack-control joints at appropriate spacing as designed by the structural engineer. Flatwork that should be installed with crack control joints includes driveways, sidewalks, and architectural features. AII subgrades should be prepared in accordance with the earthwork recommendations previously given prior to placing concrete. Positive drainage should be established and maintained adjacent to all flatwork. 10.7 Drainage Surface runoff should be collected and directed oflsite by means of appropriate erosion reducing devices. Roof gutters and downspouts should be installed on completed structures and positive drainage should be established. Positive drainage is defined as drainage away from structures at a gradient ofat least 2 percent for the distance ola least 5 feet. The project civil engineer should thoroughly evaluate the on-site drainage and make provisions as necessary to keep surface water from entering the structure area. .-.,| I Report ol Soils Investigation 2215 South Standard Ave., Proposed Addition Page 26 of 27 Job No. 40-0613 anta 10.8 Construction 0bsen,ation The recommendations provided in this report are based on preliminary design information for the proposed construction and the surface conditions lound in the exploratory boring locations. The interpolated subsurface conditions should be checked in the field during construction. Final project drawings should be reviewed by the geotechnical consultant prior to beginning construction. The recommendations provided in this report are based on the understanding and assumption that Construction Testing & Engineering, Inc. (CTE) will provide the observation and testing services for the project. I1.O LIMITATIONS OF INVESTIGATION The field evaluation, laboratory testing and geotechnical analysis presented in this report have been conducted in accordance with current engineering practice and the standard care exercised by reputable geotechnical consultants performing similar tasks in this area. No other warranty, expressed or implied, is made regarding the conclusions, recommendations and opinions expressed in this report. Variations may exist between boring locations and surface exposures, and conditions not observed or described in this repon may be encountered during construction. 9 I I I -1 I Report of Soils Investigation 2215 South Standard Ave., Proposed Addition Santa Ana. Califomia Page27 of27 Job No. 40-0613 April 5. 1999 Our conclusions and recommendations are based on analysis ofthe observed conditions. If conditions other than those described in this repon are encountered, our ofiice should be notified and additional recommendations, ifrequired, wilI be provided upon request. We appreciate this opportunity to be of service on this project. If you have any questions regarding this report, please do not hesitate to contact the undersigned. Respectfu lly submitted, CONSTRUCTION TESTING & ENGINEERING, INC_1 I tLlWbtl dn t)allard, GE #2173 Geotechnical Engineering Manager Vincent J. Patula, CEG #2057 Senior Engineering Geologist !/!,Mk^,, Staff Geologist l'0. 2.<73 Ep.6/30ffi 7E 0 s (o ** OF I I ar o l I 'I el 1 ll .Il 5 8 EI 'IFr1.l i E IItr E LT t an I altl ( 'F# n 319 r i|lr 'r t € Iil TSTr--r-a-rr- ri" Lrrl '1Ef rll 1l na!l6 3 I 9 , -{ll ElrF 5- 'I 3.J"- I \?I nt\a \ a5--ffi -L aI t Y E I-.ll _l rv! ir-uat Ltbl 4 "l,.t-?l " I IIE d a nf--[-.e M!.,l El;6t Et--3 {d . 5 0 I a .1 rlr I -].EE^,L!I F il .l E)l Il* I i6i---E"l -sl E [6tR I ; ctnn *s I =! n i 3 :Cf EiJ 6 t E d E- cal I l DI I I i a SITE -rt(r{ e- yrrrrn E!ii El e r-&I XAEXER I E 1 tr#i.*tE lr-H 6 g i 6 1 l ,lJ c-F 'di" I c !t- t qEg -!=: TU s aqo d SITE LOC-\TIO\ NI-{PCO\STRtCT]O\ TISTI\O & 0t0T[c ItclL r\D c0ISTttcTl0I tI0l\tiil\r; tt5Tl\c 1\D l\sptaTI]\ ll{ \EI1l0 $$tt.,lllt i licr\Dli il i:!:!,6lrr'ro.Jil: t \OI\IERI\O I\C T:El\:K r D!tr lr)-06 t1 FICTIRL I I I I I l I I T I .t I N r Tt i r TITT-[Lfil 1 ] TTI-I llTTImill-il a , I I .a t ,' n-,+ PROFOSED Bl-JlLDlr.l6 aDDrtan ,1,rr a_, (EarEa ]r:ao a, crFEt!rlr, B-3 ++ o-, L EXI9TII 6 BU|LD|^I3 I _i t).alD6 !-E ,Do.rlor , CO i NS'I'RUC'I'ION TESTING & ENGINEERINC, INC. I;TI)I TCIINI(]^I, AND CUNSTIUCTION ENCINTERINC TTSTING AND INSI,ECTION .rr{ vlNtY,\RD AvtNtit. srJtTE o EscoNDlDo c?t 91029 (6r9) 7l6.r9JJ Fr , \Ilkl.; t\a SAMPLE LOCATION MAP ,ob No. 40{6ll Apr-99 FIGTME 2 I I I I I el tl f,l lDl I I I IIlTI I,[] I ,lrX.ru* I lr./.r,/, tr\T t o"nr ! 0q 0\\ a \q o t 0 ot\ D o ot .v .4. A. ) A ) RETAT,\iNC WALL WALL BACK-FILL COMPACTED TO 90% RELATIVE DENSITY 3/4'GRAVEL SURROLNDED BY FILTER FABRIC (MIRAFI I40 N, OR EQUIVALENT) I'MN FINISH CRADE 4" DIA. PERTORATED PVC PIPE (SCHEDULE 40 OR EQUIVALENT). MINIMUM I% GRADIENT TO SUITABLE OUTLET WAIL FOOTING RETAINa*G WALL DRA,r-r^AC E DET.{IL D e Apnl 1999 FIG'L,TG l TISTI\O & I\CI\LIRI\0. IIIC CtoTtCllllCrI l:iD C0]\"STRlCTl0r- tI6lSif IlIC Ti!TlliC 1|{D INSPICTI0\ lIt llliIIllD rvtIlE.sLIM tSc0\Dl!rrcr !]01, i6t9t 6-1,!i }]E-1i:l( CO\STRI" CTIOI, .104613 MINIMUM 6" LAYER OF FILTER ROCK UNDERLYINC PIPE I I r Existrng Snrcco Building Grourtd l0 inches Concrete Footing ll inches CO\SIRI,CTIO\ IISTI\G & I\C1\IiRI\0. I\C, c[oT[cE]ilcrr IND c0xslllJclloN INGrr[[ntI0 r[sTr\c $D lIsPIiI0\ l r uiltYrtD rI[Itjt. slJtT[ c tlcotiDtD0 cr. !]0:e 16r9)'16-r9:j :\ jI--,5.S CROSS SECTION OF EXISTII\G FOOTL\-G Job \o .10-0(rll Drrc April 1999 I:IGLTRE .] J I 2 J 4 APPENDIX A REFERENCES CITED L Caltech Website. 1999 Miller, R.V. and MortorL P.K., Geologic Map of Orange County Califomia Showing Mines and Mineral Deposits, Scale I .48000, 1981 . Ploessel, Michael R. and Slosson, James E., Repeatable High Ground Accelerations from Earthquakes, 1974. Rogers, Thomas H., Geologic Map of Califomia, Santa Ana Sheet, Scale of 1:250,000, 1965. Thomas Guide, Orange County, page 829, G7, 1996 USGS,Seismic Hazard Map of Anaheim Ouadranele showinq Liquefaction and Referenced from seismic hazard evaluation on Anaheim and Newport Beach 7.5-minute quadrangle, Orange County: California Department of Conservation, Division of Mines and Geology Open file report 97-08, April 15, 1998. (Map obtained on Division of Mines and Geology Webpage, 1999). 5I 6 7 Landslid ') I Greensfelder, Roger W., Maximum Credible Rock Acceleration from Earthquakes in California, 1974. Webb, Robert, W. and Norris, Robert M., Geology of California, Peninsular Ranges, pages 277 -299, 1990. ) I 8 APPENDX B FIELD INVESTIGATION l --l I -1 l I l .l i DEFINITION OF TER},IS SECONDARY DIIISIONS .. Yal ^i-- llE l9'" uJt ,Pt GRAVETS. GRA!'EIAAND 1JTTLE OR NO FINES cWEII EDCLEAN GRA\EI.s < 5!'O FAIES POORLY GRADED GRAVEIS OR GR.A'IEL SAN D ITDITI,RES. LITTLE OF NO FINES -.!,- . ---rrt-i.ii cP.l:i; SILTY \EI,SANDSILTGRAG\EI.S.Ri. NON.PI.ASTIC FINES SAJ\'DS MOR! T}IA.\ HALF OF COARSE FRACTION IS IAAGER T}ln.\ NO. 4 SIE\E ,*rtrrG FL\ES CLA]TY GRAVEI-S. GR.A\'EISAND4IAY MAT,IaES, PUSTIC FI}IES :l-wS WELL GRADED SANDS. GRA\ELLY SANDS. UT]LE OR NO FINES CLEAN SA.\DS < t','. FBIES SP POORLY GRADE! SANDS. GRA\TI-LY SANDS. LTTTLE OR NO FN'ES rl l, sM ll SILTY SA.I{DS, SANDSE-T T'OCTUR.ES. NON.PL"{STIC FINES sA-l\i'Ds MORE I ru$: IIALF OF coAxsE FRACTIO.'r* lS SM.ALI.ER THAN NO. .t SIE\T SA.\DS VT,I TH FINES st,CIATEY SANDS, SAND4I.AY ML\TLN.ES. PI".A.STIC FINES INORGANIC SILTI VERY FINE SANI'S, ROCK Fl,oLTR. SILTY OR CLAYEY NNE SANDS. SLIGHTLY PI.ASTIC CI.AYEY SILTS INORGANIC CIAYS OF I.OW TO MEDIUM PT.ASTICITY, GRAITELLY. SANDY. SILTS OR LEAN CIAYS SILTS AND CL{YS uQLllD LIMIr rS LESS TIIAN 50 ilrli:ail fi ORGANIC SILTS AND ORGANIC CIAYS OF I-oW PTSSTICiT}' ll N.fi{ I ctr RiORGAMC SE.TS, NqCACEOUS OR DTATOMACEOUS FINE SANDY OR SILTY SOIl.s. EIASTIC SILTS INORGANIC CIAYS OF ltrGH PI-ASTICTTY, FAT CTAYS SILTS AflD CI.AYS UQUID LIMIT IS GRE.I.TER TIIAN 50 %.'on.'4 ORGANTC CIAYS OF MEDIIJM TO HICH PI.ASTICITY. ORGANIC SILTY C1AYS PT PEAT AND OTHER HIGHLY ORGANIC SOI1J PRI\IAR}' DNISIO:\S l z lc:-.1t.,!=: =Z:1'.'1r?;a a=;-c=='! (,r=j.;e oS=!,r9;).i=<.rA ==!?o GRAIN SIZESl GRA\EL SANDCOBBLESCOARSEcoense il\lEDruu FINEFTNE SILTS AND CLAYS CONSTRUCTION TESTING & ENCINEERING. INC ofotEiExtclL ltD coistt!ctlor rxotxalltro tr!tlxo .rlD Il!tlcllol lll. vtrtilrD ^vtrEt. !!ttt o t!coliDlDo cl- tlrlt laltl r.a..trl 3OULDERS 12' 3" 314" CLE.,\R SQUARE SIEVE OPENINC {t0 40 200 U.S. STANDARD SIE\E S17F ADDITIONAL TESTS (OT}ER TI{AN TEST PIT.\ND BOzu:\_G LOG COLU}{N HE.{DINGS) .1A-\- \'I&\rmum Dn Dcnstn ICS- Cr",n Sizc D rstnbutron l",E- s-o Eoul alcnt ii- Erllnston lndcx lCilu- Su.lfilc :rd C)rlonci:I Con,a", . pH Rc:rsitrrtr Plrl- Permcrbilin SC- Spcci.fic Gr:r'rn' H-{- Hr drornetcr .\rl,lir srs .{L- \ttcri:crg Lrmrs R\'- F.- \'aiuc CN- Consolidarron PP- Pockcr Pcncuomcrcr WA- Wash AnalYsrs DS- Dir€t Shcar UC- Unconfrncd Comprcssron l{D - iUolsruJcDcnsln' \1- )!'lorsn$c SC- Srrcll Comc;:lsron SYI}IBOI.S I EIGITLY ORGA.I\IC SOILS I :l l l .l C ONSTRUCTION TESTING & ENGINEERING, INC GEOTECHNICAL ,A.ND CONSTRUCTION ENOINEERINO IESfING AND INSPECTION :.lr vINtYARO AVENIJE,5UtTE 6 ESCOND!0O CA 92029 (619) 7a6.{9rJ PROJECT: CTE JOB NO LOGCED BY 2215 S, STANDARD AVE 40-0613 K. CRIST DRIIIER: DRILL METHOD: SAMPLE \IETHOD WESTERN HAZMAT 8" HS.{SPLITSPOOn- 140 LB / 30" SHEET: I DRILLING DATE: ELEVATION: I 380199 ^60 E F c & e a F U ,9 BORING LEGEND Laboraton Tesis DESCRIPTION _'l -)- {0- H5- ; 0 Bulk Sample Standard Penerarion Test Modiied Split-Banel Samplcr Ground\'ater Table -' Soil Trpe / Classrficatron Soil / Formation change. (Approximate boundaries are dashed lines) v CL \ B t_l J i C ONSTRUCTION TESTING & ENGINEERING, INCGEOTECHNIC L AND CONSTRUCTlON ENGINEERING TESITNO AND INSPECTION lata vtN!YARD AVENUE, SUITE G ESCONOTDO CA '202' (6t9) r{6-rtr! :t :l "1 l l PRO'ECT: CTE JOB NO: LOGCED BY 2215 S, STANDARD AVE_ 40-0613 K. CRIST DRILLER: DRILL \{ETHOD: SAM?LE \IETHOD WESTER.Ii HAZN,IAT 8" HSTSPLITSPOON- I40 LB /' 30" SHEET: DRILLNG DATE ELEVATIO.\..: of2 3,30,99 ^60 i BORING: B-lF .E t 2 C ,d A-.a e E v)!j ,9 DESCRIPTION Laboratorl Tests \IL lilt Sti-ff- Sandl Sr[. bro\\ush-Ea\'. \'en' Drsubed. Loose Materials vrum and Collulium(Oac) O ualernan'Aliu Bulli: MAX AL GS EI ru ,4 Ven stiffLean Clay, brown, Moist Stiff, Lean Clal', brosn, ven moist Ven strff, Lean Cla1, broln, r'en moist l8', t'eet. Lean Cla1, broln, r'en wet Ven strff Lean Cllv. brour, saturated rvater sceping out of soil.v l-0 H0- -.t 5- :0-..1 +_i- ) _.1 19.5 2t.4 22.4 24.6 26.t 25.4 40 l3 21 2l 3.r :l I01.7 I t2.l l0:.: GROUNDWATER AT :] WA - 200 Sidvc 80.:0.o WA - 200 Sicvc 85.6000 WA - 200 Sievc 88.90oo WA - 200 Sieve 94.l0oo WA - 2(,0 Siclc 97.i0"o B-I I I 36 I08.2 26.1 29.6 H(il it{l I I F H ONSTRUCTION TESTING & ENGINEERING, INCG€OTECHNIC^L ^ND CONS'RUCTION ENOII]EEiING TESTINC ^ND INSPECTION :.1. vlNE\,^RD AVENUE. SUrTE G ESCOND'DO CA 9lO:9 (6t9) r.6-a955 C PROJECTi CTE JOB NO: LOGCED BYI 2215 S, STANDARD A\€ 4046I3 K CRIST WESTERN TIAZI,{AT 8" HS.{,',SPLmSPOOn- 140 LB / 30" SHEET: 2 DRILLNG DATE: ELE\'AT'ONI of2 ji099 -60' BORNG: B-l(cont.)F 8 5 ! c 3 9. U DESCRIPTION Laborator\ Tests % CL Veq' stiffLean Clay $.ith Sand, broun Satura Ven s tifl, Lean CIay th Sand- brour ted. No seepage as 20'deptL SPT sample n\isted in the splir barrel tube dunng drivrng WA -200 Sreve 7t 900,0 WA - 2&) Sicvc 5:1,,o" SC light bro'^rL fine to medium graint-t ter seeping out ofsoil. Medlum dense Clave! Sand. Some eralel. Sanriarea w,WA - 200 Sicve 45 30qo SP.SC Sand \vili Clav, bro\\n, poorlY graded Medium to Coarse gxained. San[ated. WA - 200 Sicle 5.600" GS WA - 200 Sieve 6.m9o l7 l9 50 :9 :'1 i0 21.0 r 8.9 IJ E 11.6 l8 6 l8I SP Sald. brosl. poorl\ gtadcd. saturalcd.GS WA - 200 Siclc i.t0."'IOTAI DEPl.}l = 5t)'li-Ib - lt I r I F t L t 0 DRILLER: DRILL JUETHOD: S,d\TPLE TIETHOD F; t Medlurn dense Sand \rrtJr clar. bros,n. poorlr graded Saturated tL I I ONSTRUCTION TESTING & ENGINEERING, INCCEOTECHNICAI AND CONSTRUCTlON ENGINEERING TES]'NG AND INSPECTION ,!tla VINEYARD AVENUE. SUITE G ESCONOIDO CA 9:Ol9 (619) 7J6.r9J5 C PROJECT: CTE JOB NO: LOGGED B\' 22 I 5 S. STANDARD A\T 40-06 t3 K,CRIST/KBRADY DRILLER: DRJLL METHOD: SAMPLE N{ETHOD WESTERN HAZ]\IAT 8" HSTSPLITSPOOI- I40 LB i 30" SHEET: I DRILUN-G DATEi ELE\IATION: oil 3 3099 ^60' BORING: B-2,1 I h 6 a q i .2 DESCRtrTION Laboraton Tests \1L llll uateman' Alluvium and Collurrumac) I t brosn, dn. disrur StitrLean Clay, dark bro*n, slightlv moist. Veri' StiffLean Cla1,, 5Savish-brourr. moist StiffLean CIay, bro*n, moisr Sti-ffLean Clay, broun, moist v i0l !5- l0- {5- +0- l .l t l- .t t3 9 I l9 t9 :4 I{ :-( l0 104.1 98.2 98.J t1.2 24.4 27.5 27..3 21.5 :99 CL Stif Lean Cla1,, brorrn. sarurated TOTAI DEPTH = 15' GROUNDWATER AT :2' l II I I \ T DS Ijl(;U IUI I ONSTRUCTION TESTING & ENGINEERING, INCGEOTECIINICAL AND CONSTRUClION ENOINEERING TEST'tNC AND INSPECTION:.1. vtNEYARD AVENUE, SUTTE G ESCONDIDO CA 9!029 (6t9) ?r6-.9t5 C PROJECT: CTE JOB NO LOGGED BY 22I' S. STANDARD A\E 40-0613 K,CRJST/KBRADY DRILLER: DRILL \TETHOD: SAMPLE \IETHOD WESTER}i HAZNI.{T t, HSA,/SPLITSPOON 140 LB/ 30" BORING: B-3F 5a Ct a' 2, aq ,h, f a DESCRIPTION Laboraton Tests T{L uateman' Allu\1um and Colluuum Stiff Sandi Silt, dark broun, dry, disnrbed. Ver)' Stitr, Sand,v Silt, dn', dismrbed (Oac) O DS Bulk: CHM MAX Stitr, Lean Clay, bro$r1-el:a)', moist Ven Stii. Lean Clar'- brosn, moist v -0- -5! Flo- -l5- 20- -.]i- ! t2 l9 l5 2t 73 l1 l0 21 r6 t02.2 98.3 14.6 I5.0 26.9 27.6 25.5 :3.: CL StiIl'. Lcan Clar, brour. moist 'l-oTAI.DFPTIl=15' GROUNDUIATER AT 23 t: I(;t IIlt:B II NI N lt NI I I _l I I l SHEET: I of I DRILUNGDATE: 3t30t99 ELEVATION: ^60' Very Sdff, Lean Cla1, brosn, moist I J l APPENDD( C LABORATORY TESTING Laboratow Testinq Proqram Laboratory tests were performed on representative soil samples to determine their relative engineering propenies. Tests were performed in accordance with test methods ofthe American Society for Testing Materials or other accepted standards. The following presents a brief description ofthe various test methods used. Particle Size Analysis Particle Size Analysis was performed on selected representative samples in accordance with ASTM D-1440. Modified Proctor Laboratory compaction tests were performed according to ASTM D-I557, Method A. A mechanically operated hammer was used during the compaction process. Modified Proctor Analysis curve is presented in Appendix C. 1n Situ Moisture The in-place moisture content ofselected samples was determined using relatively undisturbed soil samples. The moisture content is shown on the attached Boring Logs R-Value The resistance "R"-Value was determined by the Califomia Department of Transportation Test Method No. 301 for representative subbase soils. Samples were prepared and exudation pressure and "R"-value determined. The graphically determined "R'-value at exudation pressure of300 psi is the value used for pavement section calculation. Direct Shear Tests Direct shear tests were perlormed on recompacted samples in general accordance with ASTM D-3080-72 to evaluate the shear strenglh characteristics of selected materials. The samples were inundated during shearing to represent adverse field conditions. ulfate Corro These tests were performed on soil samples in order to determine the amount of exposure of sulfates, pH and corrosive materials. High amounts ofeach can have a deleterious effect on the overall performance ofthe concrete or steel used in the foundation ofa building. I l l Classification Soils were classified visually according to the Unified Soil Classification System. Visual classifications were supplemented by laboratory testing ofthe selected samples in accordance with ASTM D-2487 . The soil classifications are shown on the Exploration Boring Logs in Appendix B. :l :r 1 l l j 145 140 I35 r30 F r.l z 120 I I 5 I I 0 105 100 95 90 85 0 5 l0 l5 20 25 l0 35 PERCENT MOISTURE (%) ASTM DlssT METEOD E A !n EC MODIFIED PROCTOR RESULTS tltt't I IIIIII I lttltl \-l+ ++t+-]+ -t+ffi I ',ar/aa IIIT lt trttltlltl !TT TTTIIIIIITIIII! lrratIITIIttttl!rrtlllrrt TITrIlttIlrattrattrlrlt[ ItnlgllEIITEE rEttraEt !NITTrrnl! rttl'rIITI!!I!ITrIIII I!rI IIllIIIIIEITIIIIIIITrllf, lrrTIIrlIITIIItllltafrrlIIITIltrT\l]laaErlrrrITIIIITEIT!TIITTIIIItrrrlttEtLalrtrtlrTIIIIIITIIatrrlttll[ItrttttlrfatalrattE TITIIT .IIrlIIIIIITIITIIIII!ralI llltlrtrtttltrrTTI'ITTII!TTIITlrrltlltrtlltrrtllltllt[tIIIrr LAB NUIUBER SAAI PLE NUMBER DEPTH (rEET)SOIL DESCRIPTION I\IAXI\I L )I DRY DENSIT\ (PCF) OPTI }T U Nt MOISTURE CONTENT (c/o ) cB22 I 0-5 ft DARK BROWN SANDY SILT ll8 8 13.5 CTE JOB NO CONSTRUCTION TESTING & ENGINEERING, INC CEOTICXNICAI AXD CONSTRUqT]ON ENCINEEXJT-C TEST]NC ANO INSPECTIO\ :1tr \k-EIAtOAVENUE, STEO ESCONDIDOCA 92029 (160) rr6-.t95t DATE: 03-99 40-061 3 FIGURE: C-l I I I ffi I I l',i t\l LLrrrlLi{}. T TT I-TI-r-T-ffi tltli lr rrJ\].J). I -I ! :l I l _1 I l l 'i PLASTICITY CHART 60 50 LrJ =!aFtt )e 1 0 2 0 l0 0 0 ro 20 30 40 50 60 Llout0 LtMtT 70 8o 90 l0o t'r'ty I ond uH I CL a UL ond 0L Natual Wale! Content o/o LL PL PI 0-5 ri r 3. l0%49 34.2 i 4.8 s nBol_ ML PLASTICITY C}IARTO]\STRLCTIO\ IESII\O & I\OI\IIRI\0. INC. C : 0 : : a : i . i .l : .! \ ) C0\::i a::)I:rt !::, \i -:i..ri ,t) )i:ii.:0r- :jlr ' \:;ll) rt:Il: .,::: a :ji,\l.l ar :':: . : 'r. r ,, l::,8-\i !r ,1 C D.(( J0.{)61i Aonl l9ao I:lGr 'Rli I mmH l- t,, t-arl I i CONSTRUCTION TESTING & ENGINEERING, INC GEOTECHNICAL AND CONSTRUCTION ENGINEEEING TESTING AND INSPECTIO}i :at. vINEYARD AVENUE, SUITE G ESCOtTDIDO CA 9:019 (6t9) 7a6..955 :l RESISTANCE 'R' VALUE TlDc of M.t.n.]DdI Brc*n Cl4v .lob Numb.r .{!0613 t0 Sdnc. of M&nd PuiJ,E Lor 9:ro N/C cA! 301 Da!.3BO!99 t0 EXI,'DATION PRESSIJ'RE CII{RT 80 ?0 60 50 40 30 20 l0 0 '7 600 500 .r00 100 0 Erudation Prcrsure PSI R vrlue by Erudation _t0 E)GANSION PRESSI,'RE CHART -1 I l Ll ='] I l Ih l0 20 30 40 50 60 70 80 90 60 50 .r0 R Value b) Expansion Prcssure -10 R \'rluc b\ Erpansion R vxluc bl Dcsign_ :0 NC l{) > --{l- 9o 80 '/0 l0 I ,l I lt-.b r I I I --r ltTE tt r------ -------r ttl I I I I I I I I I I I I III I Samplc DcscoptionDcplh (f1)Cohcsion Angle ofFriction 0-r0 ?5 psf l7 Brown Silw Smd CTE JOB NO.: 40{61-l FIGLN.ES c3 :l 6000 5C0l {0([ 3lOO l0@ rm0 a I ) I l 0 :t l 0 1000 2000 3000 NORrraL STRESS (PSF) 5000 6000 i Borin i82 .1000 SHEAR STRENGTH TEST CONSTRUCTION TESTING & ENGINEERING, INC CEOTECHN'CAL AND COXSTRUCTION ENGINEERIIiG TESTINC AllD INSPECTION 2.r. vrNEY^RD AVEXUE. SI]lTE C ESCONOTDO CA 92019 (6r9) 7r5-.95! I I I I --,E-0 '1d '11IIAV OUVONVJS IIJNOS EIZZ nt V3 .VNV VINVS t!uoS 66-S0-,0 n.q I -g orl ltlw9 lrD0 9@0 t00 500 l0 stltlnrlllr r/r ils tuuggo I 0t 09 m co,I +l I I I I ca iii; '_1 i;|ir I d ; I ---r-I II I I ol 0t J a 6 ---rr - -- -T- -.--f I I I I Jot: tr t0r lr 0; ot -l ot6 t-@0t _I 0r @r orl mI ol o' 0t 0f 0e 9ltl 0ll tulgnnN l^lrs ouYoNYlS s n J-lr Itr9 utunou(ur slllllt xt lritl{ldo u-}ls olror{Yts s n 0xvs i inrori IrnJ !o 116 5t 18€01 i;l :'r -i-,---.--.-, I'' I r'i r: ,ll: t I I I I I -l I -t- I I I ll;' t,., l l: I I I I I I 1 --l I i! I I i I iftlili o f--l r- r--] 53AUNf, NOII-VOVU9 ___L__ I ''-'-i' I I .l .,i I it I II II ! I I I I I I I trIrl lt 'll I III I lrl l,lt I -t---I I II I i-t- iII I Iil Iil ! -l I I --t-i iiit I L I-1 I I I II I I I I t t L*_I I :.-J t-iir :l I JI'i1 T.j. tl 1 a :> Io. |{lDQort I t n l a 5 ll0 lr16 20 -.1 l0 .o 30 70 lm lao lmu s stlnD^io gtYl ofirtnc lal lHcHls 6 r r 2l u s sllNo^no srtYt nur46tns t0ll I i l i .l I i I I I L II,I I I ll &) l0 a0 ?0 t0 0 +-1 t I iir _l -t I I .o; $E K I -1 I 1 I l 60 xI H a t t I --1-- .Jr., 1-l0 r-_llI oo)loot 0m1ot005I 0l GmN SU[ n r'ltrgtltRsl0@5oo3l) I I I ! ,!r i il 1t I I I I i I I I I llr, -,-,._l- rl lr t- coSBtts si0 9tl 0e tur Ltt{.1 r : ]4_2-. t4 .3 _ I -l Pt 4ql8.qLEAII CLA Y i\,ITII SAND30t,tt(, [|?v d Orplt tqta-?zI s lqury STANDARD AVE SANTA ANA, CA o4-05-99 !9Il'r xo B-l GRAOATION CURVES ENc ,:::i, 208/ I I : I II I I I I j+--- -- I iii1 : '-irt'l I I I -t--lliil Illll l-l- 'I I Iiili I I t_llllI :-Ll- I I I I I ,|,: Ili -I I I'ilil rl I -1" i I 1 I i I I I lrt. I li! I llii i I Itiitt; .. Iill.ri-rl-- tt_'-- _-__ I rl il .|-,-....I ! I llr.!iiI GRAVTL l; i I I I 1tl, Il!:_J 'u' :1 o ', L ,! I I u s sl^xo^ro 9m oPINrnc l'r lltcltts u s st^NoAno srtvt NUuBtis ffroPort]t n 5 I I :l I a 6 :to t. 15 20 !0 () !o ,0 lco lao l@ a l0L m lo to _1 I --t---i , r E!t H i I I i -l o :o I 50 ro !o ,0 ?0 i-l H--1-l j+ I Jr-m @ s l0 3 I 05GI^ SUt fi xl.Ur,ttrtf,s 0t 001 00t 0@!0011 co80t ts gtl oR Cur -1 *_]:llr i:-1 r--l-i Ii lrn i. - --:-- it-:1 I 1 I I l..-fl+- Il i I l I I -l I I I I I I I I II I i'-.--.,- -,-- I G'UYTT slnD tl.l r !tt PL 4 OI_IBG_ tr.v ol D.Dln P00RLY- cRA nED - SIIND-X,UIL -ClAL ]A,L_r4-g' I GRADATION CURVES 2215 SOLTTII STANDARD AVE SANTA ANA, CA o4-05-99 E9!!- D.r. &!!r to B-I I or. ENG ,:::i, 2087 :.I ! I I I I I I I I I I I I I I I I I +t - ,il I I I -i- -l_,_,i I lr.tI i I 1 t::i I I I-l I I I .J I I I T I_l-t- Wt__l__t- l4el--l-- a(I I I I T i ti.a= .:' ar ./ : r-: !-] - rT r---.tr---: r-: lst)z ':::l' cN3 s3^Unf, NO|I.VOVUo 8'rr iz'te__t --67 9'8l r{J.t fl cNvs 0u(vu3 rluood ,rv'13 J," lrt4a .r.o 66-E0-?0 V] .VNV VJNVS 1,."elflorl rr'll !0 llls 0rJG lllwx slt880l tao0 5m 0 t00 900 t0 sulllnr]llr rll !m xlvu9g0 I 0l (x mt @s or rl--ra 0 -l-ii -t_ I I I I 0t 7 o ot T tr Tti !, os o' I L-i 6 e, 0l I -L ; j-- -- --r --]- ll 0l @z ort ml 0(or or ot 0z gttl oll 9 t I tl I r 9 u 1llio{qr}l stnfM M g{rN}ro t t6 olloxYls s n I I I I I I I I l--r ---:--'l-- II It i I I t-l-I't l-, i I I I I t+li r I rl -l-';--:- I I I I I i I It;a-l. .t---r--:- I I I t --T-!. ___l t ir ;r 0 06 .o I I I .lAV CUVCNVJS IIJNOS 9I ZZ I I slt8Enll l^lrl olvoNils 5 n I I I Ir I I I :I I I J. I I I I I I It: I I _lI I ; I I I I I I I I-[ -l-I I I I I I I'I I ir T rd:rrlrt I I I , I t. Lir 'r..'.. r--: t--.]r- s3^Unf NOIVOVUC __t._g',rt i z'te 6,8'8I -ONY_S. GIIITITJ ',TIX c,BJ ,O.AAV OUVONVTS IIJOOS EIZZ Vf, .VNV VINYS t "otI-B OI 66-E0-r0 'r'o ld 'ld ,I'I l.r.x ,Od.O . ^.rl irll !o l lrs StlSgol'IIAYX! lal0 qa 0 t00 {o0 t0 su'lllirltDrt Nr tm Nruot0 I s 0l 05 (x)q)5c!rr-;T o+|i I 0t j+ i_l 0/ ;lTi 0t :L I I I 0, I l rtiI !r L I:- ot -'-t- ----t- I I !- I ;-I -r i II.l - -t- 0, t- 01 .t l-r ! I I 0l t tr!! 0rl @l ol (r or 0t 0z 9ltl 0ll iBlgllnt l^lrl odYoNvls s o 9ra tl e I 9 u I1,rod(ux 0ravs I I I I I - ['--'; I --r-- I I I I I I-t I I li IL-- I t+t.!l_il-.l I L I I I I ,Il-- .: -lI'r -Liri til ---:T-::-' -ll* n l:i a stHfkr ,r 9xll{lto lr\]6 olto}alt5 s n 06 l80u "^:;l' cNl .o I r- I I . ..,- -. .,-l l I r I !i I I I ' :il I I II I I I .trl L I I I I I rl I I I ---F- - .l-I I I 'I I I -t I ! I I L FI "lt1P/t99 O3:13 PH PSf Assaciated LaDs vid ySI-FAX Pdge7of7a7768 ''der. #:I I4601 Client: Consruction Testng & Eng Client Saople ID: Bonng #3 0-5 Feettrir: SOLID ete Saooled: 3,/30./99 inc Sampled: trpled lrY: Result DF DLR Units Date/Analyst 0.1 pH 1 II pH I zrel l NA 1I II99 SR 0 Solu Ie Soil Soluble Sulfate I o.eszf 2s 0.025 o/o I 2.!99 BGS l l 1 l l l I LR . Dcrecrrcn lrmt for repcntng purpcJcs \T) ' \ot Detectei l.elorv rndrcetril.jetcctton irmtt D! Lltlutrcn i r;:-'r l#; 0 €l A+ED - L).R O RJ.: f(lRlE^9*""t-,.- iesr:':s-+e::'r --{ Analyte I I Expansion Index Test ---\ i :l Proj ect Number: Project Name: Date: Location: 40-0613 22I5 South Standard Ave., Proposed Addition 4-1-99 Boringl@0-5feet I Date:Time Initial Reading: 0.04-t-99 2:40 pm Date Time:Fina[ Reading: 4-2-99 12:00 pm 0.0167 .I I I Expansion Index: 17 PotentialExpansion: LOW l Aug- L6-99 02: 15P TonJ,. Lum'-r. }'..i;''-- " " 760 7446355 Qr,o) 5 35aNtz P. O1 ll ] T6)L\ tfl FACSIMILE TRANSM]SSION v 1uo)tt('Ggrl A55OCl,ATE5 W<r 0as0x/rLrrr'raa0vrEccrr! Eaira:r-r.L TO ooo,0-1e'?? rn'a, r *csn"wzrc. l' 74 - /t*7. 6E7t - O17 . 5r7 7 ATT}I: FROM:G*t /t*t TET.EPHONE NO FACSTMILE NO. 060) 74J4355 TELEPI{ONE NO. (760) 7.H{31I'Qt.DJOB NO///, 4. * MESSAGE lrc TkfrAr* I TUT/,V rtv? tJlrL 77. ,, (INCLUDING THIS COVER SHEEI): #17 7- IF YOU DO NOT RECETVE THE COMPLETE TRANSMISSION, OR IT YOU E{PERIENCE ANY OTHER DIFTICIJLTIES WITH THE TRANSMSSIOI{, PI.TASE CONTA T OUR OFFICE TI{ANK YO{J cc cc CC cc cc CC hcc)r6ir sourx cJr cxo s^a.rA F€ ioao SlJtlE € s/r MAAcog cA 92(169.5!:7 I Gtlt raa a!lt t f.x <tcc I*.J 7 44 6375 RE: ftrl Aug-16-99 OZ: I5p T Al]0. ttj i999 12.lt).u a nyo Lum! !icul\l,)li.)u 760 7ztrl6355 l!v. f l'.,1 P -02r.1 t QoxsrnucrroN lbsnxc r f,xcrxEERrNG, rNC. sAN rltlco, cA l.aa rE!.r.,t lra Sltl G fs{aao, CA O€t1.,r4s OOI 'AIX rrr TIYEISIDf,. CA i E hi!&a Ct!.L, Corrr. CAl,'ltlt ,i9 rn-rrn rIr)rl.l[a'rt vrxnir, cr laa! H. A'. tdt l0l Oa( (l9f0l! rll).+aa?, (51) a*tal, ?rr TlACt, Cl to w.lrd Sdr. t fr&I, CrrrtL lD! rrlrDo(l,,l,ara..r LittcA.tII fl.. cl ar:r lGt tr *. trd ILe.r. Cttt${ {aal) rrararl (6al) 7]tf,li r^rENGINEERINC, INC. Augusr 6, 1999 Nutoch Eotcrprises, Inc. Ann: Pae lrvdle 4749 Occansidc Btvd., Suite J Occansidc, CA 92056 Subject. Addendum I - South Sundard Ave. Total and DilTcrential Sa cmen CTEJobNo 40{613 Refcrcnccd Report: Rcport of Soil InvEstigrlion 2215 Sotlh Strndard Aw. Proposcd Addition Srttr Am, Crlifomb Prepucd by CTE, tnc. Dared April 5, 1999 Dear Mr. Lrvcllg The followiry laler is prcser[ed to povirlc clarificarion regarding edthment values r"hted to comfuction aod li(lucfrctioa scttlcment. In scction 10.3 2 thc maximum tolrl long-t€rm structure scttlement was €,q)ected to bc less thrn I irch. Differcntial scttlcorent duc to lorg-term wnsuuction scttlement is expu:.ted to be lcss than % inch. ln soction E.4.5, totrl set crncnt as a rcsrlt of liquefaaion during thc predictcd scisrnic event was ostfuiated to be 0 9 inches Differcnrial scttlement as a rosult of this liqnefactioo is exgecred to bc in thc order of % irch Thcrcfore thc toal oombined diffeterlial Iloundation satlemcnt fronr long-term conswction scttlcment and liqucfaction from thc predictal seismic event is cstimotcd to be a maximum l-inch ovcr the lcogth ofthe hrilding. Based on our expcriencc comrcte til up *ruatnes cen typically rccommo<late di{fcrential sailement of this manindc without rigoificut srudunl dicrcss. It hrs bocn e pkasrrt to be ofscrvicc, if yur haw aay qucstions, plerse do not hesitate to call at qD-l7r-t890. Sincerely, CONSTRUCIION TESTING & GE t2t73 J. Patula, EG d2057 Geot*hnical Engio*ring Fnginccring Geologis , \ti!* (c(IEd la dls-Iln^|.-lri, &. No. 2173 E$. l,30mo GEOTECIINICAL AND CONSTf, UCTION ENGTNEERING TESTING AND II\SPLCTIO:{