HomeMy WebLinkAbout2010 S Main St - Misc. Permit-,-SANTA
NA
Pl.r\\11\c
&BUt,Dt\[
lcil0
Plan n ing & Building Agency
Building safety D ivision
20 Civic Center Plaza
P.0. Box 1988 (M-19)
Santa Ana, CA92102
(714) 647-5800
www.santa-ana.org
DISABLED ACCTSS COMPLIANCT
DOCUMENTATION FORM
ACC-01 CBC 2019
A. PURPOSE OF THIS DOCUf\i|ENTATION: (check one)
X finOing of ,nreasonable hardship for prolects UNDER the valuation threshold.
L_.1 Finding of unreasonable hardship for projects OVER the valuation threshold"
E Certification of Full Compliance with the 2019 California Building Code
. Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is $170,466.0o (as of January 2020)
B. PROJECT INFORIVIATION TO BT COMPTETED BY PETITIONER:
Permit Numb€rl
101104315
Projecl Descrlption:
Repair fire damage at floor framing
Floor Number
Business Name / Owner:
TBO - Tenant space is vacant
Business Phone Number
Phone Number:
Total Construction Cost or Project Valuation$ str,tso
1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold
based on the valuation of site and building improvements for the last three-year period.
Permit No lssuance Date Valuation of lmprovements
Total:
$ $2.630
$ $3,74s
4. Describe the impact of the proposed improvements on financial feasibility of the project.
Accessible parking space shall be re-asphalt to comply.
5. Describe the nature of the use of the facilily under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Burldrng wrll be vacant duflng conslruction.
Rev 02/0412020 Page 1 ol 2
Projecl Address:
2010 ftrain Sl.
Legal Property Owner:
Cost of Providing Completo Disabled Accessl$ $s,zas
2. 20ok of fol€l Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access:
6. ldentify the accessibility features and equivalent facilities that gllL be brought into compliance with the
latest edition of Title24 asa part of this project and an estimate of thecoslof each item: (Docunentation
may be required)
Accessible Features to be Made Accessible Cost of lm prove ment
a. Entrance
n Door E Landing E Stairway/Steps E Ramp $ Exg Complies
fl Path of travel from accessible parking to the building entrance
and area of remodel $ Exg Comp|€s
E Path of travel to sanitary facilities / public phone i drinking
fountain $
E Path of travelfrom the public way to the building entrance $
c. Sanitary facilities ( Floor no )$
d. Public phone(s)$
e. Drinkingfountain(s)$
f. Parking $ 3,7as
g. Signage & Alarms $
i. Other:$
$T ota l:
Accessible Features Not to be lmproved Cost of lm pro ve ment
a. Toilel room upgrades $ $2s,000
b $
c s
$Total
8. Petitioner must be the legal property owner or his/her legal representative:
I certify that the above noted information is true and correct.
E Legal Property owner ! ArchitecuEngineer E Contractor E Other
Richard ClarkePflnt Name:Phone No. 805459-160s
2775 Pjoneer Ranch Rd. Templelon, CA 93465
Date Feb 10,2021
Re\: O210412020
TOR AG ENCY USE ONLY
Date
t1q lr,t
Page 2 of 2
Approved by:
b. Path of Travel:
7. ldentify the accessibility features that Wll-t N0T comply if a request for unreasonable hardshrp rs
granted. Provide an estimated cost of compliance for each ilem: (Docunentation nay be required)
Address:
Signature: