Loading...
HomeMy WebLinkAbout2010 S Main St - Misc. Permit-,-SANTA NA Pl.r\\11\c &BUt,Dt\[ lcil0 Plan n ing & Building Agency Building safety D ivision 20 Civic Center Plaza P.0. Box 1988 (M-19) Santa Ana, CA92102 (714) 647-5800 www.santa-ana.org DISABLED ACCTSS COMPLIANCT DOCUMENTATION FORM ACC-01 CBC 2019 A. PURPOSE OF THIS DOCUf\i|ENTATION: (check one) X finOing of ,nreasonable hardship for prolects UNDER the valuation threshold. L_.1 Finding of unreasonable hardship for projects OVER the valuation threshold" E Certification of Full Compliance with the 2019 California Building Code . Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and Section 202 is $170,466.0o (as of January 2020) B. PROJECT INFORIVIATION TO BT COMPTETED BY PETITIONER: Permit Numb€rl 101104315 Projecl Descrlption: Repair fire damage at floor framing Floor Number Business Name / Owner: TBO - Tenant space is vacant Business Phone Number Phone Number: Total Construction Cost or Project Valuation$ str,tso 1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold based on the valuation of site and building improvements for the last three-year period. Permit No lssuance Date Valuation of lmprovements Total: $ $2.630 $ $3,74s 4. Describe the impact of the proposed improvements on financial feasibility of the project. Accessible parking space shall be re-asphalt to comply. 5. Describe the nature of the use of the facilily under construction and its availability to persons with disabilities and the nature of accessibility that would be gained or lost: Burldrng wrll be vacant duflng conslruction. Rev 02/0412020 Page 1 ol 2 Projecl Address: 2010 ftrain Sl. Legal Property Owner: Cost of Providing Completo Disabled Accessl$ $s,zas 2. 20ok of fol€l Construction Cost or Project Valuation: 3. The actual amount to be spent to provide disabled access: 6. ldentify the accessibility features and equivalent facilities that gllL be brought into compliance with the latest edition of Title24 asa part of this project and an estimate of thecoslof each item: (Docunentation may be required) Accessible Features to be Made Accessible Cost of lm prove ment a. Entrance n Door E Landing E Stairway/Steps E Ramp $ Exg Complies fl Path of travel from accessible parking to the building entrance and area of remodel $ Exg Comp|€s E Path of travel to sanitary facilities / public phone i drinking fountain $ E Path of travelfrom the public way to the building entrance $ c. Sanitary facilities ( Floor no )$ d. Public phone(s)$ e. Drinkingfountain(s)$ f. Parking $ 3,7as g. Signage & Alarms $ i. Other:$ $T ota l: Accessible Features Not to be lmproved Cost of lm pro ve ment a. Toilel room upgrades $ $2s,000 b $ c s $Total 8. Petitioner must be the legal property owner or his/her legal representative: I certify that the above noted information is true and correct. E Legal Property owner ! ArchitecuEngineer E Contractor E Other Richard ClarkePflnt Name:Phone No. 805459-160s 2775 Pjoneer Ranch Rd. Templelon, CA 93465 Date Feb 10,2021 Re\: O210412020 TOR AG ENCY USE ONLY Date t1q lr,t Page 2 of 2 Approved by: b. Path of Travel: 7. ldentify the accessibility features that Wll-t N0T comply if a request for unreasonable hardshrp rs granted. Provide an estimated cost of compliance for each ilem: (Docunentation nay be required) Address: Signature: